Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8
Files9
Docket No. 26-05-10 Discovery Compilation November 6 2026.pdf
PDF · 134 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation November 6 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation November 6 2026.pdf
ALLCO Set 13_COMBINED.pdf
PDF · 801 KB · 49 pagesText searchable
Download ALLCO Set 13_COMBINED.pdfRead the text of ALLCO Set 13_COMBINED.pdf
ALLCO Set 16_COMBINED.pdf
PDF · 642 KB · 22 pagesText searchable
Download ALLCO Set 16_COMBINED.pdfRead the text of ALLCO Set 16_COMBINED.pdf
ALLCO Set 18_COMBINED.pdf
PDF · 306 KB · 25 pagesText searchable
Download ALLCO Set 18_COMBINED.pdfRead the text of ALLCO Set 18_COMBINED.pdf
CIEC Set 7_COMBINED.pdf
PDF · 230 KB · 7 pagesText searchable
Download CIEC Set 7_COMBINED.pdfRead the text of CIEC Set 7_COMBINED.pdf
DEEP Set 1 (BETP)_COMBINED.pdf
PDF · 1.9 MB · 174 pagesText searchable
Download DEEP Set 1 (BETP)_COMBINED.pdfRead the text of DEEP Set 1 (BETP)_COMBINED.pdf
NECTA Set 6_COMBINED.pdf
PDF · 446 KB · 22 pagesText searchable
Download NECTA Set 6_COMBINED.pdfRead the text of NECTA Set 6_COMBINED.pdf
OCC Set 29_COMBINED.pdf
PDF · 499 KB · 30 pagesText searchable
Download OCC Set 29_COMBINED.pdfRead the text of OCC Set 29_COMBINED.pdf
PURA Set 8_COMBINED.pdf
PDF · 2.5 MB · 230 pagesText searchable
Download PURA Set 8_COMBINED.pdfRead the text of PURA Set 8_COMBINED.pdf
Page 3 of 22
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-16 Date Issued October 19, 2026 ALLCO-207 Page 3 of 3 Further, discovery may not be used to conduct an unrestricted search for information. As the Connecticut Supreme Court has explained, a party “should not be allowed to indulge a hope that a thorough ransacking of any information and material which . . . [CL&P] may possess would turn up evidence helpful to [his] case”. J. Pub. Co. v. Hartford Courant Co., 261 Conn. at 681. Similarly, “[i]nterrogatories should not be used to . . . permit a party to go on a fishing expedition.” Mfr.'s Advert., Inc. v. Pancoast, 4 Conn. Cir. Ct. 668, 670 (1967) (internal quotation marks omitted). Here, Allco’s request seeks information on performance assurance “sacrifices” that has no relevance to PURA’s evaluation of the Company’s application, generally, or its proposed revenue requirement, specifically. Thus, the information requested in this interrogatory is not relevant or material to the Company’s rate application as it does not advance the factual foundation upon which PURA’s decision will rely. Office of Consumer Counsel v. Department of Public Utility Control, 44 Conn. Supp. 21, 26-27 (1994). 1 As the information is irrelevant and immaterial, this discovery must be excluded. See General Statutes § 4-178(1); see also Conn. Agencies Regs. § 161-38(a). In addition, the statutory 350-day timeframe for issuing a final decision on the Company’s application, coupled with and the volume of interrogatories issued, strongly weighs against devoting the parties’ time and resources to discovery that does not advance the resolution of the Company’s application. Requiring the Company to collect, review, and produce information that has not been shown to be material would impose unnecessary administrative burdens and divert resources from the issues PURA must resolve within the statutory timeframe. Accordingly, in the interest of the orderly and efficient conduct of this proceeding, Eversource respectfully requests that the objection be sustained. PURA has also previously ruled that interrogatories must pertain to the evidence and testimony submitted by a witness in the proceeding. See, Ruling on Motion No. 73, Docket No. 23-11-02, Application of Connecticut Natural Gas Corporation and The Southern Connecticut Gas Company to Amend Their Rate Schedules, April 3, 2024, citing, General Statutes § 4-177c(a)(2); Motion Ruling Nos. 15 and 17, Jan. 2, 2009, Docket No. 08-07-15, Petition of the Office of Consumer Counsel for Enforcement of Quality of Service Standards for The Southern New England Telephone Company d/b/a AT&T Connecticut. 1Page 4 of 22
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-16 Date Issued October 19, 2026 ALLCO-208 Page 1 of 3 Date Filed: November 02, 2026 Witness: Counsel Request from: ALLCO Question: (Follow-up to ALLCO-114 — completed projects without a final accounting.) The response restates the Company’s obligation under Section 1.2 of the Guidelines and Section 5.3.2 of the form Interconnection Agreement and answers none of subparts (a) through (d). Answer them: (a) for each calendar year 2017 through 2025, the number of interconnection projects first connected to the electric power system in that year for which no final accounting report had been issued as of September 30, 2026, and the aggregate amounts collected from the interconnecting customers for those projects, stated separately for construction deposits and for percentage overhead or CIAC components; (b) the aggregate amount of those collections the Company still holds and the account(s) in which it is recorded; (c) whether the Company contends that no refunds would be due on those projects if final accountings were performed, and the basis; and (d) each reason final accountings have not been performed, the person by title responsible for deciding whether and when they are performed, and the Company’s plan and schedule for clearing the backlog. If the Company contends that it cannot answer subpart (a) because, as stated in ALLCO-103, final accounting “is not tracked or maintained in PowerClerk,” identify the systems in which project completion dates and final accounting dates are recorded, and state the number of completed projects (from PowerClerk permission-to-operate records) and the number of final accounting reports issued (from the system in which they are prepared) for each year, which together answer the question. Response: CL&P objects to this request. The requested information regarding interconnection deposits and refunds is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. In addition, this overly broad, unduly burdensome, and repetitive request seeks information that is not probative of any material issue presented by the Company’s application in this proceeding, which PURA is conducting as a general distribution rate proceeding pursuant to Conn. Gen. Stat. § 16-19, to amend the Company’s base-rate schedules. This discovery request seeks information on completed interconnection projects for which a final accounting has not been produced without establishing how that information bears on any disputed issue relevant to the Company’s application. Absent such a connection, the requested information is not reasonably calculated to advance the evidentiary record upon which PURA must base its decision.Page 5 of 22
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-16 Date Issued October 19, 2026 ALLCO-208 Page 2 of 3 The purpose of discovery is to provide PURA, the parties, and intervenors with access to relevant, probative information necessary to develop a complete and accurate record -- not to allow repetitive or irrelevant requests that divert time and resources from that objective. By statute, administrative agencies must exclude “irrelevant, immaterial or unduly repetitious evidence.” Conn. Gen. Stat. § 4-178(1); see also Conn. Agencies Regs. § 16-1-38(a). Connecticut judicial precedent explains that evidence is relevant only if it has a tendency to establish the existence of a material fact. United Technologies Corp. v Commission on Human Rights & Opportunities, 72 Conn. App. 212, 229 (2002). Discovery must advance the efficiency of the proceeding and provide the factual foundation upon which an agency decision may rely. Therefore, a party is required to produce discovery documents only if they are “material and necessary to [an] action.” Dotson v. Hartford Roman Catholic Diocesan Corp., No. CV106012742S, 2011 WL 1021745, (Conn. Super. Ct. Feb. 17, 2011) (citing, Berger v. Cuomo, 230 Conn. 1, 7 (1994)); see also Conn. Gen. Stat. § 4-177c(a)(1) (permitting discovery of “relevant and material records, papers and documents[.]”). Additionally, discovery “does not afford an open invitation to delve into [CL&P’s] affairs”. J. Pub. Co. v. Hartford Courant Co., 261 Conn. 673, 681 (2002). Allco “must be able to demonstrate good faith as well as probable cause that the information sought is both material and necessary” to this rate case. Id. Practice Book § 13-2, which defines the scope of discovery, provides in relevant part that a party may only seek discovery of nonprivileged information that is “material to the subject matter involved in the pending action . . . .” “It is axiomatic that [e]vidence is admissible only to prove material facts, that is to say, those facts directly in issue or those probative of matters in issue; evidence offered to prove other facts is immaterial.” Salmon v. Dept. of Public Health & Addiction Services, 259 Conn. 288, 316 (2002) (internal quotation marks omitted; emphasis added.) Further, discovery may not be used to conduct an unrestricted search for information. As the Connecticut Supreme Court has explained, a party “should not be allowed to indulge a hope that a thorough ransacking of any information and material which . . . [CL&P] may possess would turn up evidence helpful to [his] case”. J. Pub. Co. v. Hartford Courant Co., 261 Conn. at 681. Similarly, “[i]nterrogatories should not be used to . . . permit a party to go on a fishing expedition.” Mfr.'s Advert., Inc. v. Pancoast, 4 Conn. Cir. Ct. 668, 670 (1967) (internal quotation marks omitted). Here, Allco’s request seeks information on interconnection project final accountings that has no relevance to PURA’s evaluation of the Company’s application, generally, or its proposed revenue requirement, specifically. Thus, the information requested in this interrogatory is not relevant or material to the Company’s rate application as it does not advance the factual foundation upon which PURA’s decision will rely. Office of Consumer Counsel v. Department of Public UtilityPage 6 of 22
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-16 Date Issued October 19, 2026 ALLCO-208 Page 3 of 3 Control, 44 Conn. Supp. 21, 26-27 (1994). 1 As the information is irrelevant and immaterial, this discovery must be excluded. See General Statutes § 4-178(1); see also Conn. Agencies Regs. § 161-38(a). In addition, the statutory 350-day timeframe for issuing a final decision on the Company’s application, coupled with and the volume of interrogatories issued, strongly weighs against devoting the parties’ time and resources to discovery that does not advance the resolution of the Company’s application. Requiring the Company to collect, review, and produce information that has not been shown to be material would impose unnecessary administrative burdens and divert resources from the issues PURA must resolve within the statutory timeframe. Accordingly, in the interest of the orderly and efficient conduct of this proceeding, Eversource respectfully requests that the objection be sustained. PURA has also previously ruled that interrogatories must pertain to the evidence and testimony submitted by a witness in the proceeding. See, Ruling on Motion No. 73, Docket No. 23-11-02, Application of Connecticut Natural Gas Corporation and The Southern Connecticut Gas Company to Amend Their Rate Schedules, April 3, 2024, citing, General Statutes § 4-177c(a)(2); Motion Ruling Nos. 15 and 17, Jan. 2, 2009, Docket No. 08-07-15, Petition of the Office of Consumer Counsel for Enforcement of Quality of Service Standards for The Southern New England Telephone Company d/b/a AT&T Connecticut. 1Page 7 of 22
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-16 Date Issued October 19, 2026 ALLCO-209 Page 1 of 2 Date Filed: November 05, 2026 Witness: Lavelle A. Freeman, Juan F. Martinez, and Steven C. Osuch Request from: ALLCO Question: (Follow-up to ALLCO-131 — substations at or above the 20 MW DER threshold and rate base treatment of customer-funded upgrades.) Subpart (a) asked the Company to identify each substation at which DER online plus DER in queue equals or exceeds 20 MW; the response refers to the public Hosting Capacity Map and queue reports. Subpart (c) asked whether study fees, deposits, or upgrade payments collected from interconnection customers are credited against the cost of related investments before those investments are added to rate base; the response states that developers bear interconnection costs, which is not an answer. State: (a) in native format, from the Company’s own records rather than by reference to a map, each bulk and distribution substation at which DER online plus DER in queue equaled or exceeded 20 MW as of December 31, 2025 and as of the most recent date available, with DER online (MW), DER in queue (MW), the number and aggregate MW of pending applications, and the number of pending applications over 1 MW; (b) for each such substation, each project in the Application, the Targeted System Performance plan, the SHARE proposal, or the 2026 capital plan (CLP-ADDITIONS-4 Supplemental) that would increase hosting capacity, relieve a thermal or voltage constraint, or replace a transformer at that substation, with its estimated cost and proposed rate treatment; (c) yes or no, whether amounts collected from interconnection customers for upgrades at any such substation are credited against the gross cost of the related plant before it is included in rate base, and if yes, identify the CIAC-funded plant placed in service in 2023, 2024, 2025 and 2026 at each such substation and the CIAC offset recorded for each; and (d) whether any plant whose cost was recovered in whole or part from an interconnection customer is included in the Test Year, Test Year Pro Forma, or Rate Year rate base at gross cost pending “final project billing and reconciliation” (ALLCO-002), and the amount. Response: a. The Company does not keep track of a DER queue with historical snapshots in a time series database, which would be required to answer this subpart. Queues are assessed when projects are studied, in which a project is identified as a pass or fail, or otherwise as snapshots in time and published publicly periodically at: https://www.eversource.com/docs/defaultsource/builders-contractors/ct-der-queue.csv. b. The projects proposed in CLP-TSP-3 are in various stages of development, none of which have full engineering development of solutions. As such the information requested cannot be made available. Grid-needs projects are not guaranteed to DER developers until such time as theyPage 8 of 22
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-16 Date Issued October 19, 2026 ALLCO-209 Page 2 of 2 are placed in service as project timelines and/or scope may be modified based upon the operational needs of the Company and ratepayers. c. As identified in subpart (b), specific solutions for these projects have not yet been determined. Accordingly, the Company cannot evaluate whether any project would incorporate facilities for which CIAC has previously been received. However, any distribution system upgrades funded through CIAC would be expected to be completed prior to the implementation of a subsequent project requiring those facilities. As a result, any future solution identified for the projects listed in subpart (b) would assume that such upgrades are already in service and available to support the system. Therefore, the scope and gross cost of any future solution would not be affected by prior CIAC-funded upgrades, and the Company is not aware of any shared project scope that would give rise to a CIAC credit against the gross plant cost of the projects identified in subpart (b).Page 9 of 22
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-16 Date Issued October 19, 2026 ALLCO-210 Page 1 of 2 Date Filed: November 02, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: ALLCO Question: (Follow-up to ALLCO-123 — the § 16-243p(b) advice.) The response states that the legal advice on which ALLCO-034(d) relies “was given during the process of responding to this request” and that “[n]o separate legal document was prepared.” State: (a) the firm and title of the attorney who gave the advice, the date, and the Company personnel to whom it was given; (b) whether the Company intends to rely on that advice, in whole or in part, to support recovery of confidentialitydesignation and redaction costs, and if so whether it will produce it; (c) in the Company’s own words and without reference to counsel — the question ALLCO-123(d) asked and the response did not address — each reason the Company contends that redaction and confidentialitydesignation work performed for filings and discovery responses in this proceeding is not a “direct or indirect cost[] associated with its … participation in” the proceeding under § 16-243p(b); whether fees paid or payable to Keegan Werlin LLP or TCDI for that work are “attorneys’ fees” or “fees to engage … consultants”; and whether the time of internal counsel and projectmanagement staff devoted to it is “the portion of employee salaries associated with such … participation”; (d) the amount of redaction and confidentiality-designation cost included in the Test Year, Test Year Pro Forma, or Rate Year cost of service or in any deferral, with the schedule and line; and (e) each other category of cost of this proceeding the Company contends is recoverable because it is “incurred to comply with legal obligations,” with the amount and schedule reference (ALLCO-123(e), unanswered). Response: The Company’s response to ALLCO-123 i provided sufficient information to be responsive to Allco’s inquiry. Prior Referenced Response: i ALLCO-123 Question (ALLCO-034(d) — the legal advice on § 16-243p(b).) The Company’s response to ALLCO-034(d) states that it “has been advised by legal counsel that the confidentiality-designation and redaction work does not fall within any of the enumerated classes or categories of costs that are ineligible for recovery through rates under Conn. Gen. Stat. § 16243p(b)” because the work is “incurred to comply with legal obligations governing disclosure of public records and confidential information.” (a) Identify the counsel (firm and individual) who gave that advice, the date(s) on which it was given, and whether it was given orally or in writing. Produce each opinion, memorandum, letter, e-mail, or other document containing or reflecting the advice. (c) If the Company withholds any such document on a claim of privilege, identify for each its date, author, recipients, subject matter, and the privilege claimed, and state whether the CompanyPage 10 of 22
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-16 Date Issued October 19, 2026 ALLCO-210 Page 2 of 2 intends to rely on the advice of counsel, in whole or in part, to support recovery of any cost in this proceeding. (d) State, in the Company’s own words and with reference to the text of § 16-243p(b), each reason the Company contends that confidentiality-designation and redaction work performed for filings and discovery responses in this proceeding is not a “direct or indirect cost[] associated with its … participation in” this rate proceeding; whether fees paid or payable to Keegan Werlin LLP for that work are “attorneys’ fees” within the statute; and whether the time of the Company’s internal legal counsel and project-management staff devoted to that work is “the portion of employee salaries associated with such participation.” (e) Identify every other category of cost of this proceeding that the Company contends is recoverable on the rationale that it is “incurred to comply with legal obligations,” stating for each the amount and the revenue-requirement schedule and line in which it appears. ALLCO-123 Response CL&P objects to this request on the ground that it seeks information protected by the attorney-client and attorney work product privileges. CL&P further objects to this request on the ground that it calls for a legal conclusion. Without waiving said objections, the legal advice in the Company’s response to ALLCO-034i subpart (d) was given during the process of responding to this request. No separate legal document was prepared for the purpose of responding to this subpart.Page 11 of 22
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-16 Date Issued October 19, 2026 ALLCO-211 Page 1 of 3 Date Filed: November 02, 2026 Witness: Warren R. Boutin, Brendan J. O’Brien, Leanne M. Landry, Garrett J. Murray and Jeffrey D. Turano Request from: ALLCO Question: (Follow-up to ALLCO-124 — the Keegan Werlin redaction engagement.) The response answers subpart (a) by reference to ALLCO-027, which concerns the rate case engagement, not the “high-volume redaction and confidentiality-designation services” for which the Company said in ALLCO-034(b), that Keegan Werlin “was only recently engaged.” State: (a) the date of that engagement, whether it is a separate engagement or an expansion of the rate case engagement, the hourly rates or other basis of compensation, any budget, estimate, or notto-exceed amount, and the Company personnel who approved it, and produce the engagement letter, statement of work, or e-mail by which it was made; (b) the hours recorded by Keegan Werlin on redaction and confidentiality-designation work through September 30, 2026 and through the most recent date available, whether or not invoiced; (c) TCDI’s total billings through the most recent date available and the Company’s current estimate of total TCDI cost for the proceeding; (d) for each month since the Application was filed, by title, the hours and loaded cost of internal legal, project-management, and regulatory personnel devoted to redaction and confidentiality-designation work, using time records where they exist and a documented estimate stating its basis where they do not; and (e) the account(s) to which each amount has been charged and whether any amount has been deferred. Response: The Company objects to this request as this question has been asked and answered. The Company has provided responsive answers in ALLCO-034 i, and ALLCO-124 ii, and already committed to supplement its response with additional information, as necessary, once it becomes available. Allco’s request is cumulative and does not advance the development of the evidentiary record. Conn. Gen. Stat. § 4-178(1) (administrative agencies must exclude “irrelevant, immaterial or unduly repetitious evidence). Accordingly, in the interest of the orderly and efficient conduct of this proceeding, Eversource respectfully requests that this objection be sustained. Prior Referenced Responses: i ALLCO-034 Question: The Company’s September 1, 2026 "Redacted Bulk Material" filing describes the preparation of public, redacted versions of Exhibit CLP-STORM-ACCT-2(A) as "a manual, labor-intensive process involving a cross-functional teamPage 12 of 22
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-16 Date Issued October 19, 2026 ALLCO-211 Page 2 of 3 of external vendors and Company personnel." With respect to all redaction and confidentiality-designation work performed in connection with this proceeding (including the storm invoice compilations and all other exhibits and discovery responses): (a) identify each external vendor engaged and each category of Company or ESC personnel involved (by title); (b) state the costs incurred to date and the estimated total cost, separately for vendor fees and for the allocated time of Company/ESC personnel; (c) identify the account(s) to which such costs have been or will be charged, and state whether any portion is included in, or will be sought for recovery through, the Test Year or Rate Year revenue requirement, rate case expense, or any deferral; and (d) if any such recovery is or will be sought, state the Company’s legal basis for recovering such costs from ratepayers notwithstanding Conn. Gen. Stat. § 16-243p(b). i ALLCO-034 Response: (a) The Company has engaged the Technology Concepts and Design Inc. (“TCDI”) Military Spouse Managed Review program and Keegan Werlin LLP to assist with redaction and confidentiality-designation work due to the volume of documentation. Additionally, the Company’s internal legal counsel and project management staff are performing redaction and confidentiality-designation work. (b) The Company does not separately track time for redaction and confidentiality designation work performed by internal resources. Keegan Werlin LLP was only recently engaged to perform high-volume redaction and confidentiality-designation services and, accordingly, has not yet invoiced the Company for those services. The Company will supplement this response with the requested information for Keegan Werlin LLP once it becomes available. TCDI has billed the Company a total of $26,990.40 for redaction work through the end of August 2026. The invoices for the TCDI work are provided as Attachment ALLCO-034, Attachment 1 CONFIDENTIAL. TCDI estimates the costs for additional redaction work in September of $5,000 or less. The Company will supplement this response with additional information, as necessary, once it becomes available. (c) The Company is tracking the costs associated with the redaction and confidentiality-designation work and plans to seek recovery for these costs in this proceeding. (d) The Company has been advised by legal counsel that the confidentiality-designation and redaction work does not fall within any of the enumerated classes or categories of costs that are ineligible for recovery through rates under Conn. Gen. Stat. § 16-243p(b). The Company has been further advised that the costs to perform the confidentialitydesignation and redaction work are incurred to comply with legal obligations governing disclosure of public records and confidential information. ii ALLCO-124 Question: (ALLCO-034(b) — supplementation.) The Company’s response to ALLCO-034(b) states that Keegan Werlin LLP “has not yet invoiced the Company” for redaction and confidentiality-designation services, that the Company “does not separately track” the time of internal resources on that work, and that the response “will be supplemented.” (a) State the date of Keegan Werlin LLP’s engagement for that work, the hourly rates or other basis of compensation, any budget or estimate, the hours recorded through September 30, 2026, and the amount invoiced or accrued through that date; and produce the engagement letter or other document defining the scope of the engagement. (b) State TCDI’s total billings through September 30, 2026, and the Company’s current estimate of total TCDI cost for this proceeding. For each month since the Application was filed, state, by title, the hours and loaded cost of the Company’s and ESC’s internal legal counsel, project-management, regulatory, and other personnel devoted to confidentiality-designation and redaction work, using time records where they exist and, where they do not, a documented estimate stating its basis. (d) Identify the account(s) to which each amount in (a) through (c) has been charged and whether any amount has been deferred as a regulatory asset. (e) State the date by which the Company will serve the supplementation it has promised.
Text of CIEC Set 7_COMBINED.pdf
Extracted from the file · 7 pages · 8,262 characters
Text of DEEP Set 1 (BETP)_COMBINED.pdf
Extracted from the file · 174 pages · 446,641 characters
Text of NECTA Set 6_COMBINED.pdf
Extracted from the file · 22 pages · 43,545 characters
Text of OCC Set 29_COMBINED.pdf
Extracted from the file · 30 pages · 65,312 characters
Text of PURA Set 8_COMBINED.pdf
Extracted from the file · 230 pages · 511,861 characters
As listed on the current system
Corres. 11/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8