  1. Page 1 of 25

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-18 Date Issued October 20, 2026 ALLCO-223 Page 1 of 3 Date Filed: November 03, 2026 Witness: Counsel Request from: ALLCO Question: (Queue position on the Somers/Bilton circuits.) With respect to the distribution circuit(s) and substation serving the Bilton Solar (LREC9-3045), Point Solar (LREC9-3058), and Bilton cluster (LEG-22750, LEG-22751, LEG-22752) projects in Somers, state, in native format, for every interconnection application of 50 kW or more received by the Company for a facility on the same circuit(s) or substation from January 1, 2015 to the present: (a) the PowerClerk or legacy application identifier, applicant (which may be anonymized other than for the Connecticut Green Bank, its affiliates, and projects financed or owned through Green Bank programs, and other than Allco and its affiliates), nameplate capacity, and date-stamp assigned under Guidelines § 2.6; (b) the dates of each study, Contingent Approval, interconnection-agreement issuance, execution by the Company, construction start, and Permission to Operate; (c) the hosting capacity of the circuit and substation as of each such date, and the upgrade cost assigned to each application; (d) each instance in which an application with a later date-stamp than an Allco-affiliate application received a study result, an interconnection agreement, or Permission to Operate before the Allcoaffiliate application, and the reason; (e) whether any Green Bank-affiliated or Green Bankfinanced project on those circuits was processed under a program, agreement, or priority not available to other applicants, identifying it; and (f) the person(s) who made each sequencing decision. Response: Eversource objects to this request. Allco’s overly broad, unduly burdensome, and repetitive request concerning third-party interconnection applications and specific circuit information is not probative of any material or disputed issue relevant to the Company’s application in this proceeding, which PURA is conducting as a general distribution rate proceeding pursuant to Conn. Gen. Stat. § 16-19 to amend the Company’s base-rate schedules. Absent such a connection, the requested information is not reasonably calculated to advance the evidentiary record upon which PURA must base its decision. The purpose of discovery is to provide PURA, the parties, and intervenors with access to relevant, probative information necessary to develop a complete and accurate record -- not to allow repetitive or irrelevant requests that divert time and resources from that objective. By statute, administrative agencies must exclude “irrelevant, immaterial or unduly repetitious evidence.” Conn. Gen. Stat. § 4-178(1); see also Conn. Agencies Regs. § 16-1-38(a). Connecticut judicial
  2. Page 2 of 25

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-18 Date Issued October 20, 2026 ALLCO-223 Page 2 of 3 precedent explains that evidence is relevant only if it has a tendency to establish the existence of a material fact. United Technologies Corp. v Commission on Human Rights & Opportunities, 72 Conn. App. 212, 229 (2002). Discovery must advance the efficiency of the proceeding and provide the factual foundation upon which an agency decision may rely. Therefore, a party is required to produce discovery documents only if they are “material and necessary to [an] action.” Dotson v. Hartford Roman Catholic Diocesan Corp., No. CV106012742S, 2011 WL 1021745, (Conn. Super. Ct. Feb. 17, 2011) (citing, Berger v. Cuomo, 230 Conn. 1, 7 (1994)); see also Conn. Gen. Stat. § 4-177c(a)(1) (permitting discovery of “relevant and material records, papers and documents[.]”). Additionally, discovery “does not afford an open invitation to delve into [CL&P’s] affairs”. J. Pub. Co. v. Hartford Courant Co., 261 Conn. 673, 681 (2002). Allco “must be able to demonstrate good faith as well as probable cause that the information sought is both material and necessary” to this rate case. Id. Practice Book § 13-2, which defines the scope of discovery, provides in relevant part that a party may only seek discovery of nonprivileged information that is “material to the subject matter involved in the pending action . . . .” “It is axiomatic that [e]vidence is admissible only to prove material facts, that is to say, those facts directly in issue or those probative of matters in issue; evidence offered to prove other facts is immaterial.” Salmon v. Dept. of Public Health & Addiction Services, 259 Conn. 288, 316 (2002) (internal quotation marks omitted; emphasis added.) Further, discovery may not be used to conduct an unrestricted search for information. As the Connecticut Supreme Court has explained, a party “should not be allowed to indulge a hope that a thorough ransacking of any information and material which . . . [CL&P] may possess would turn up evidence helpful to [his] case”. J. Pub. Co. v. Hartford Courant Co., 261 Conn. at 681. Similarly, “[i]nterrogatories should not be used to . . . permit a party to go on a fishing expedition.” Mfr.'s Advert., Inc. v. Pancoast, 4 Conn. Cir. Ct. 668, 670 (1967) (internal quotation marks omitted). Here, Allco’s overly broad, unduly burdensome, and repetitive request concerning third-party interconnection applications and specific circuit information is not relevant to PURA’s evaluation of either the Company’s application as a whole or its proposed revenue requirement. Thus, the information requested in this interrogatory is not relevant or material to the Company’s rate application as it does not advance the factual foundation upon which PURA’s decision will rely. Office of Consumer Counsel v. Department of Public Utility Control, 44 Conn. Supp. 21, 26-27 (1994). As the information is irrelevant and immaterial, this discovery must be excluded. See General Statutes § 4-178(1); see also Conn. Agencies Regs. § 16-1-38(a). In addition, the statutory 350-day timeframe for issuing a final decision on the Company’s application, coupled with the volume of interrogatories issued, strongly weighs against devoting the time and resources of the parties and PURA to discovery that does not advance the resolution
  3. Page 3 of 25

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-18 Date Issued October 20, 2026 ALLCO-223 Page 3 of 3 of this proceeding. Requiring the Company to collect, review, and produce information that has not been shown to be material or relevant would impose unnecessary administrative burdens and divert resources from the important issues PURA must evaluate and resolve within the statutory timeframe. Accordingly, in the interest of the orderly and efficient conduct of this proceeding, Eversource respectfully requests that this objection be sustained.
  4. Page 4 of 25

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-18 Date Issued October 20, 2026 ALLCO-224 Page 1 of 3 Date Filed: November 03, 2026 Witness: Counsel Request from: ALLCO Question: (Institutional and pension-fund ownership of Eversource Energy.) The Company has represented to the United States District Court (No. 3:26-cv-01277, ECF 46-3) that the State Board of Administration of Florida Retirement System holds 312,059 Eversource Energy shares, drawn from that fund’s Form 13F-HR. State: (a) for each of the fifty largest holders of Eversource Energy common shares as of the most recent date for which the Company or Eversource Energy has data, the holder, the number of shares, and whether the holder is a public or private pension fund, an index fund, an actively managed fund, an insurance company, or other; (b) the aggregate percentage of Eversource Energy’s shares held by public pension funds, and the source; (c) the actuarial assumed rate of return of each public pension fund among those holders of which the Company or its ROE witness is aware, and the assumed long-term equity return used in Eversource Energy’s own pension plans; (d) whether the Company or its ROE witness considered that the return investors require of Eversource Energy is evidenced by the return assumptions of the pension funds that hold it, and if not, why not; and (e) each service (e.g., Broadridge, DTC, NOBO lists, 13F compilations) through which Eversource Energy identifies its beneficial holders, and the date of the most recent such list. Response: Eversource objects to this request. Allco’s request concerning the lawsuit that it filed against the Company is not probative of any material or disputed issue relevant to the Company’s application in this proceeding, which PURA is conducting as a general distribution rate proceeding pursuant to Conn. Gen. Stat. § 16-19 to amend the Company’s base-rate schedules. Absent such a connection, the requested information is not reasonably calculated to advance the evidentiary record upon which PURA must base its decision. Moreover, Allco’s request is an improper effort to use this rate case proceeding to obtain discovery for purposes of that lawsuit. The purpose of discovery is to provide PURA, the parties, and intervenors with access to relevant, probative information necessary to develop a complete and accurate record -- not to allow repetitive or irrelevant requests that divert time and resources from that objective. By statute, administrative agencies must exclude “irrelevant, immaterial or unduly repetitious evidence.” Conn. Gen. Stat. § 4-178(1); see also Conn. Agencies Regs. § 16-1-38(a). Connecticut judicial precedent explains that evidence is relevant only if it has a tendency to establish the existence of a material fact. United Technologies Corp. v Commission on Human Rights & Opportunities, 72 Conn. App. 212, 229 (2002). Discovery must advance the efficiency of the proceeding and provide
  5. Page 5 of 25

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-18 Date Issued October 20, 2026 ALLCO-224 Page 2 of 3 the factual foundation upon which an agency decision may rely. Therefore, a party is required to produce discovery documents only if they are “material and necessary to [an] action.” Dotson v. Hartford Roman Catholic Diocesan Corp., No. CV106012742S, 2011 WL 1021745, (Conn. Super. Ct. Feb. 17, 2011) (citing, Berger v. Cuomo, 230 Conn. 1, 7 (1994)); see also Conn. Gen. Stat. § 4-177c(a)(1) (permitting discovery of “relevant and material records, papers and documents[.]”). Additionally, discovery “does not afford an open invitation to delve into [CL&P’s] affairs”. J. Pub. Co. v. Hartford Courant Co., 261 Conn. 673, 681 (2002). Allco “must be able to demonstrate good faith as well as probable cause that the information sought is both material and necessary” to this rate case. Id. Practice Book § 13-2, which defines the scope of discovery, provides in relevant part that a party may only seek discovery of nonprivileged information that is “material to the subject matter involved in the pending action . . . .” “It is axiomatic that [e]vidence is admissible only to prove material facts, that is to say, those facts directly in issue or those probative of matters in issue; evidence offered to prove other facts is immaterial.” Salmon v. Dept. of Public Health & Addiction Services, 259 Conn. 288, 316 (2002) (internal quotation marks omitted; emphasis added). Further, discovery may not be used to conduct an unrestricted search for information. As the Connecticut Supreme Court has explained, a party “should not be allowed to indulge a hope that a thorough ransacking of any information and material which . . . [CL&P] may possess would turn up evidence helpful to [his] case”. J. Pub. Co. v. Hartford Courant Co., 261 Conn. at 681. Simiarly, “[i]nterrogatories should not be used to . . . permit a party to go on a fishing expedition.” Mfr.'s Advert., Inc. v. Pancoast, 4 Conn. Cir. Ct. 668, 670 (1967) (internal quotation marks omitted). Here, Allco’s request concerning the lawsuit that it filed against the Company is not relevant to PURA’s evaluation of either the Company’s application as a whole or its proposed revenue requirement. Thus, the information requested in this interrogatory is not relevant or material to the Company’s rate application as it does not advance the factual foundation upon which PURA’s decision will rely. Office of Consumer Counsel v. Department of Public Utility Control, 44 Conn. Supp. 21, 26-27 (1994). As the information is irrelevant and immaterial, this discovery must be excluded. See General Statutes § 4-178(1); see also Conn. Agencies Regs. § 16-1-38(a). In addition, the statutory 350-day timeframe for issuing a final decision on the Company’s application, coupled with the volume of interrogatories issued, strongly weighs against devoting the time and resources of the parties and PURA to discovery that does not advance the resolution of this proceeding. Requiring the Company to collect, review, and produce information that has not been shown to be material or relevant would impose unnecessary administrative burdens and divert resources from the important issues PURA must evaluate and resolve within the statutory
  6. Page 6 of 25

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-18 Date Issued October 20, 2026 ALLCO-224 Page 3 of 3 timeframe. Accordingly, in the interest of the orderly and efficient conduct of this proceeding, Eversource respectfully requests that this objection be sustained.
  7. Page 7 of 25

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-18 Date Issued October 20, 2026 ALLCO-225 Page 1 of 2 Date Filed: November 03, 2026 Witness: Warren R. Boutin, Brendan J. O'Brien and Garrett J. Murray Request from: ALLCO Question: (Overheads recovered in base rates — Docket No. 17-10-46.) State: (a) the amount of administrative and general expense, engineering and supervision, construction overhead, and other indirect cost included in the distribution revenue requirement approved in Docket No. 17-10-46, by FERC account, and the amount of each proposed in this docket; (b) the capitalized overhead and clearing-account rates (including the engineering, supervision, administrative, and construction-overhead loaders identified in ALLCO-102, Attachment 1) in effect in each year 2018 through 2026, and the dollar amount of overhead capitalized to distribution plant in each year; (c) for each year 2018 through 2025, the dollar amount of overhead charged to interconnection customers and other customer-funded work orders through those loaders, and whether that amount was credited against the overhead pool recovered through base rates, capitalized plant, or both — identifying the account and the credit; (d) whether any portion of the overhead charged to interconnection customers consists of costs that are also recovered from all customers through base rates set in 17-10-46 or proposed here, and if the Company contends there is no such double recovery, the reconciliation that shows it; and (e) the percentage overhead rate applied to customerfunded interconnection work in 2018, when 17-10-46 rates took effect, and each change since, with the approval for each change. Response: CL&P objects to this request on the ground that it is improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:36-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. CL&P further objects to this request on the ground that it is not within the scope of the proceeding to review the Company’s application to amend its existing rates schedules because the interrogatory either seeks information specific to Allco projects or seeks information that Allco views as relevant to its specific projects. Without waiving said objections, please refer to the Company’s response to ALLCO-044 i, which is responsive to the question.
  8. Page 8 of 25

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-18 Date Issued October 20, 2026 ALLCO-225 Page 2 of 2 Prior Referenced Response: i ALLCO-044 Question: With respect to each cost category included in the percentage overhead or "CIAC" rates applied to interconnection upgrade, study, and construction costs charged to distributed generation, qualifying facility, and other interconnection customers (including, without limitation, project management, engineering and supervision, administrative and general expense, employee benefits or compensation loaders, insurance, and Eversource Energy Service Company charges): (a) identify each such cost category and its share of the overhead rate in effect in each year 2018 through 2025; (b) state whether the costs in each such category were included, in whole or in part, in the test-year cost of service and revenue requirement approved in the Company’s most recent prior general distribution rate proceeding, Docket No. 17-10-46, and therefore recovered from all ratepayers through base distribution rates during 2018 through the present; (c) if the answer to any part of subpart (b) is affirmative, explain why applying overhead rates that include the same cost categories to amounts charged to interconnection customers does not result in the Company recovering the same costs twice — once from ratepayers generally and again from interconnection customers; (d) quantify, for each year 2018 through 2025, the total dollar amount of overheads collected from interconnection customers in cost categories that were also reflected in base rates; and (e) state whether amounts collected from interconnection customers through overhead rates are recorded as a credit or offset to the corresponding expense or plant accounts recovered in base rates and, if not, where those amounts are recorded, consistent with the Company’s description of its netting treatment of third-party attacher billings in its response to RRU-002. ALLCO-044 Response: CL&P objects to this request on the ground that it is an improper effort by ALLCO to use this rate case proceeding to obtain discovery for purposes of a lawsuit that it filed against the Company on August 10, 2026, in the United States District Court for the District of Connecticut (Civil Action No. 3:26-cv-1277), outside of and in contravention of the rules of procedure that govern discovery in that lawsuit. Without waiving said objection, please note that capital expenditures (direct costs and overheads applied to those amounts) are entirely billed to the interconnection customer and reimbursed through the CIAC process; therefore, these asset additions are not included in rate base. Please refer to ALLCO-064 for additional discussion on the CIAC rate and ALLCO-003ii where the Company goes into more detail on the CIAC Tax Adder.
  9. Page 9 of 25

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-18 Date Issued October 20, 2026 ALLCO-226 Page 1 of 1 Date Filed: November 05, 2026 Witness: Warren R. Boutin, Leanne M. Landry and Jeffrey D. Turano Request from: ALLCO Question: (Exhibit CLP-Additions-4 Supplemental 2 — distributed-generation interconnection projects.) Exhibit CLP-Additions-4 Supplemental 2 (filed October 19, 2026) reports, for projects categorized as “New Customer” distributed-generation interconnections, negative life-to-date direct costs but positive total costs and in-service additions — for example CD01237 (Bristol Solar One Interconnection: direct −$104,968; total $209,423), CD00450 (Lisbon/Preston 20 MW Solar: −$421,868; $443,186), CD00794 (Pawcatuck Solar Center: −$81,796; $530,316), CD01242 (SR– Litchfield Interconnection: −$879,493; $352,781), CD01244 (SR N Stonington Interconnection: −$751,160; −$132,892), and CD01594 (Haddam Qtr Solar: −$191,799; −$6,523). For each project in that exhibit whose description or project type indicates a generator interconnection, state in native format: (a) the gross direct cost, the customer contribution credited, each overhead or indirect loader applied (by name, rate, and dollar amount), and the resulting total cost; (b) the amount placed in rate base and the amount of the customer contribution recorded as CIAC, by account; (c) whether the overhead charged to the interconnection customer on the same work order was credited against the overhead capitalized, and if not, why not; and (d) the final accounting status of the project under Guidelines § 1.2 and the amount of any refund due or paid. Response: a. thru c. Please refer to RSR-058, Attachment 1, which identifies each project associated with distributed generation (DG), including the corresponding line references in Exhibit CLP-ADDITIONS-4 and the Exhibit CLP-ADDITIONS-4 Supplemental filings. The Company notes that information regarding new plant additions on a monthly basis for 2026 is provided as part of the Company’s supplemental filings. Furthermore, note that each referenced project also contains a closing report which summarizes the actual charges for each project. (d) The Company is currently gathering the data and will supplement this response once the data is available.
  10. Page 10 of 25

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-18 Date Issued October 20, 2026 ALLCO-227 Page 1 of 2 Date Filed: November 03, 2026 Witness: Counsel Request from: ALLCO Question: (Follow-up to ALLCO-152 — loss factors.) The response states that for ISO-NE load settlement the Company “does not apply a static value to convert metered retail sales to wholesale loads.” State: (a) the method the Company does apply, step by step, including each loss factor, allocation, or estimation used, and its source; (b) the most recent distribution loss study the Company or Eversource Energy Service Company has prepared or commissioned for the Connecticut system, by title, date, and author, and produce it; (c) the annual 2025 totals of the hourly wholesale loads in ALLCO-063, Attachment 1, for Standard Service, Last Resort Service, and competitive supply, and the annual 2025 retail kWh billed in CIEC-020, Attachment 2 — stated as numbers, not by cross-reference — and the difference; and (d) the Company’s best estimate of the components of that difference (technical losses, unaccounted-for energy, company use, unbilled usage, and other), with the basis for each. Response: Eversource objects to this request. Allco’s request concerning load settlement is not probative of any material or disputed issue relevant to the Company’s application in this proceeding, which PURA is conducting as a general distribution rate proceeding pursuant to Conn. Gen. Stat. § 1619 to amend the Company’s base-rate schedules. Absent such a connection, the requested information is not reasonably calculated to advance the evidentiary record upon which PURA must base its decision. The purpose of discovery is to provide PURA, the parties, and intervenors with access to relevant, probative information necessary to develop a complete and accurate record -- not to allow repetitive or irrelevant requests that divert time and resources from that objective. By statute, administrative agencies must exclude “irrelevant, immaterial or unduly repetitious evidence.” Conn. Gen. Stat. § 4-178(1); see also Conn. Agencies Regs. § 16-1-38(a). Connecticut judicial precedent explains that evidence is relevant only if it has a tendency to establish the existence of a material fact. United Technologies Corp. v Commission on Human Rights & Opportunities, 72 Conn. App. 212, 229 (2002). Discovery must advance the efficiency of the proceeding and provide the factual foundation upon which an agency decision may rely. Therefore, a party is required to produce discovery documents only if they are “material and necessary to [an] action.” Dotson v. Hartford Roman Catholic Diocesan Corp., No. CV106012742S, 2011 WL 1021745, (Conn. Super. Ct. Feb. 17, 2011) (citing, Berger v. Cuomo, 230 Conn. 1, 7 (1994)); see also Conn. Gen. Stat. § 4-177c(a)(1) (permitting discovery of “relevant and material records, papers and documents[.]”).

Text of CIEC Set 7_COMBINED.pdf

Extracted from the file · 7 pages · 8,262 characters

Text of DEEP Set 1 (BETP)_COMBINED.pdf

Extracted from the file · 174 pages · 446,641 characters

Text of NECTA Set 6_COMBINED.pdf

Extracted from the file · 22 pages · 43,545 characters

Text of OCC Set 29_COMBINED.pdf

Extracted from the file · 30 pages · 65,312 characters

Text of PURA Set 8_COMBINED.pdf

Extracted from the file · 230 pages · 511,861 characters

As listed on the current system

Corres. 11/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8

This filing on the current system (opens in a new tab)