Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8
Files9
Docket No. 26-05-10 Discovery Compilation November 6 2026.pdf
PDF · 134 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation November 6 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation November 6 2026.pdf
ALLCO Set 13_COMBINED.pdf
PDF · 801 KB · 49 pagesText searchable
Download ALLCO Set 13_COMBINED.pdfRead the text of ALLCO Set 13_COMBINED.pdf
ALLCO Set 16_COMBINED.pdf
PDF · 642 KB · 22 pagesText searchable
Download ALLCO Set 16_COMBINED.pdfRead the text of ALLCO Set 16_COMBINED.pdf
ALLCO Set 18_COMBINED.pdf
PDF · 306 KB · 25 pagesText searchable
Download ALLCO Set 18_COMBINED.pdfRead the text of ALLCO Set 18_COMBINED.pdf
CIEC Set 7_COMBINED.pdf
PDF · 230 KB · 7 pagesText searchable
Download CIEC Set 7_COMBINED.pdfRead the text of CIEC Set 7_COMBINED.pdf
DEEP Set 1 (BETP)_COMBINED.pdf
PDF · 1.9 MB · 174 pagesText searchable
Download DEEP Set 1 (BETP)_COMBINED.pdfRead the text of DEEP Set 1 (BETP)_COMBINED.pdf
NECTA Set 6_COMBINED.pdf
PDF · 446 KB · 22 pagesText searchable
Download NECTA Set 6_COMBINED.pdfRead the text of NECTA Set 6_COMBINED.pdf
OCC Set 29_COMBINED.pdf
PDF · 499 KB · 30 pagesText searchable
Download OCC Set 29_COMBINED.pdfRead the text of OCC Set 29_COMBINED.pdf
PURA Set 8_COMBINED.pdf
PDF · 2.5 MB · 230 pagesText searchable
Download PURA Set 8_COMBINED.pdfRead the text of PURA Set 8_COMBINED.pdf
Text of ALLCO Set 18_COMBINED.pdf
Extracted from the file · 25 pages · 65,407 characters
Text of CIEC Set 7_COMBINED.pdf
Extracted from the file · 7 pages · 8,262 characters
Page 100 of 174
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-022 Page 16 of 16 above the level forecast and approved in this proceeding, and the rate shock commonly experienced with traditional ratemaking.Page 101 of 174
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-023 Page 1 of 2 Date Filed: October 23, 2026 Witness: David L. Gladey and Jennifer A. Schilling Request from: Department of Energy and Environmental Protection Question: Refer to Exhibit CLP-TSP-1, pp. 33–36 and 67–71; Exhibit CLP-TSP-2, pp. 45–48; and Exhibit CLP-TSP-3, pp. 91–92 and 136–139. Please describe the Company’s current and planned use of artificial intelligence and machine learning technologies in Connecticut. In the Company’s response, please include the following: a. whether the use case is currently in practice, being piloted, or has been proposed for future development; b. the expected benefit to customers; c. the anticipated implementation timeline; d. and any significant data, cybersecurity, workforce, or other foreseeable barriers to implementation. Response: Eversource, consistent with other utilities and industries, can use AI in two main ways; first, use AI as a productivity enhancing and coding and analytics support tool and second, build or buy software tools and applications that have AI embedded. Regarding the first type of AI use, as a workforce assistance tool, at the time of this response, the Company has enabled business users to use Microsoft Copilot, as an overall personal productivity enhancing tool. Microsoft Copilot is not connected to any Company databases or software systems. Moreover, AI can run under the hood of various applications and software with or without the user’s knowledge or ability to choose or not to use it. As a simple example, a search in a web browser still results in an AI-generated response. Many cloud based (SaaS) systems are continuing to introduce AI capabilities on a day to day to basis and the expectation is that AI capabilities will be embedded in progressively more commercial tools. Regarding AI-embedded tools, there is a limited number of internally developed tools that run AI, currently utilized at CL&P. For example, the Control Room Call Analytics Dashboard is used by System Operations Management to efficiently flag training opportunities by analyzing calls between operators and field crews. The Company continues to research and review novel and emerging technologies. We expect future AI products and outputs to increase capabilities while keeping humans in control of decisions and outcomes to promote safe and reliable service. Cyber and physical security of ourPage 102 of 174
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-023 Page 2 of 2 field staff and customers will always be a red line in evaluating the operationalization of any technology, including AI. As is the case for many other companies and industries, the future of AI applications at Eversource is highly volatile and unpredictable at this time.Page 103 of 174
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-024 Page 1 of 1 Date Filed: October 23, 2026 Witness: David L. Gladey and Jennifer A. Schilling Request from: Department of Energy and Environmental Protection Question: Refer to Exhibit CLP-TSP-1, pp. 33–36 and 67–71; Exhibit CLP-TSP-2, pp. 45–48; and Exhibit CLP-TSP-3, pp. 91–92 and 136–139. Did the Company use any artificial intelligence or machine learning in development of the proposed TSP? If not, explain whether and when the Company expects to incorporate those capabilities into its planning process. Response: The Company did not directly use AI tools, like ChatGPT or Claude or similar models, in its development of the TSP. The Company notes that AI can run under the hood of various applications and software with or without the user’s knowledge or ability to choose or not to use it. As a simple example, a search in a web browser still results in an AI-generated response. The Company continues to actively evaluate AI capabilities and use cases.Page 104 of 174
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-025 Page 1 of 4 Date Filed: October 27, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Department of Energy and Environmental Protection Question: Refer to Exhibit CLP-TSP-3. For each proposed substation or distribution-capacity project identified, please briefly identify the principal alternatives considered, including: a. b. c. d. e. f. g. load transfers; equipment uprating; storage demand response; flexible interconnection; or other non-wires alternatives. Please provide the estimated cost, implementation timeline, and principal reason each alternative was rejected or not selected. If no alternatives analysis was performed, explain why. Response: The substation capacity projects identified in the workbooks are in various stages of the projectapproval process. None of the projects have reached a stage that would have received a detailed NWA analysis to date. As these projects proceed through the solution selection and engineering stages, NWA and other alternatives will be vetted. The results will be submitted during the annual grid needs filing as part of the NWS docket. For additional project details, please refer to the Company’s response to OCC-599 i, identifying current project status, estimated budget, and any alternatives identified at this time. The line capacity projects identified currently exceed the planning criteria based on metered data and NWS solutions were analyzed as alternatives to traditional line projects. Demand response and flexible interconnections were not evaluated as alternatives due to the lack of both a DERMS system and AMI. The Company submitted all capital projects to the process monitor as part of Docket No. 25-08-08 and the ongoing Docket No. 26-08-08. Please refer to BETP-025, Attachment 1, identifying alternatives reviewed for distribution line projects. Please note that the PAF reflects only alternatives that were evaluated and determined to be feasible. As an example, load transfer options that were found to be infeasible were not included among the listed alternatives.Page 105 of 174
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-025 Page 2 of 4 Prior Referenced Response: i OCC-599 Question: Refer to Exhibit CLP-TSP-3 at 22–24. a. Provide the data underlying the headroom and constrained-area presentations on pages 22–24. For each substation identified as constrained, provide its normal and emergency rating, five-year historical load and peak load data, available headroom, forecast first year of violation, and proposed project cost. b. For each constrained substation identified, provide the existing analysis of temporary and permanent load transfers. Identify the receiving substation or feeder, available transfer capacity, MW that could be transferred, required enabling work, estimated cost, and reason any transfer was rejected. Please confirm if no transfer analysis was performed. c. Provide a summary of each actual substation capacity violation and stranded-load event experienced from 2016 through the present. Identify the substation, date, maximum loading, applicable rating, duration, contingency, customers at risk, customers interrupted, and whether load transfer prevented or reduced an outage. OCC-599 Response: a. The graphic depicted in CLP-TSP-3, at 22, is derived from headroom data for substations with actual values, time series data, and ratings shown on our public maps using the Eversource CT Grid Connection Navigator. Loads are based on our most recent summer peak year, 2025. Please refer to OCC-599, Attachment 1 CONFIDENTIAL, for project forecast violation year and the 5-year historical peak load data for each respective project. The table contains the LCC rating of each substation which is the planning criteria identified within the DSPG, please refer CLF-SC-023, Attachment 1. The following substations have projects initiated and have obtained at a minimum a conceptual level estimate: Substation West Brookfield 14H Beacon Falls 11N Franklin Drive 1B Southington 4C Berlin 6A_13.8kV Westside 7A Hopewell 22R Estimated Project Cost $16,900,000 $12,632,000 $17,986,000 $9,772,600 $23,199,000 $18,399,000 $17,518,000 All other substations within the attachment have not had a comprehensive evaluation to identify possible solutions and the costs associated with those solutions. The table below depicts a high-level tabletop analysis for possible projected cost of a substation solution. These costs will be refined as these projects progress through the funding process and receive full engineering analysis for solutions and conceptual level estimates.Page 106 of 174
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-025 Page 3 of 4 b. Substations High Level Estimate Project Status Waterside 22M Flax Hill 24A Rocky Hill 12Y $600,000 $500,000 Less than $250,000 Investigating Project Need Investigating Project Need Investigating Project Need – Anticipating Permanent Load Transfer from West Brookfield 14H with settings changes only Triangle 11A Middle River 28M $4,800,000 $500,000 Initial Funding Approved Investigating Project Need Rockville 14W Campville 14R Baldwin 13F Tracy 14M Frybrook 13B Brooklyn 30Y $10,000,000 $52,300,000 $20,250,000 $9,900,000 $20,000,000 Less than $250,000 Initial Funding Approved Partial Funding Initial Funding Submitted Initial Funding Approved Initial Funding Approved Investigating Project Need – Anticipating Permanent Load Transfer from Tracy 14M or Frybrook 13B with settings changes only Prior to initiating a funding project, permanent load transfers are, in many cases, a preferred solution if the conditions at the constrained substation and the adjacent area support this as these are typically substantially lower cost than substation investments and have a much more rapid deployment timeline. Historically these load transfers were not explicitly tracked, and the Company does not possess historical data as it pertains to deferrals by means of permanent load transfer. As of 2024 the Company identified this opportunity to begin having a detailed record of load transfers, partly in response to increasingly constrained regional capacity. The Company is now prepared to track these transfers in the Step Load Tracker as a load transfer on the receiving substation and a negative load transfer to the originally constrained station. This tracker will not only allow the forecasted load transfer to be visible but will also allow for historical reporting of deferred major capital upgrades through completed load transfers. The newly identified projects are in early stages of development and have not yet completed the solution selection process yet. Therefore, these projects would not yet have any tracked load transfers or analyses completed to date. Following initial funding of these projects, all available solutions including permanent load transfers, non-wires solutions, and traditional solutions are identified and evaluated for suitability and for viability. No potential solutions have been rejected at this time from these newly identified projects. Temporary transfers are reserved for substations anticipating overload during a current planned peak event, planned or unplanned outages, or other transient system events. Temporary solutions place the system in an abnormal condition which can impact operations, protections and controls, and automations within the system and are not used as a long-term solution except where necessary to address real-time operational needs that do not have a permanent solution placed into service. c. All substation forecasted violations are mitigated by using pre-contingent load transfers to adjacent substations with remaining capacity. In accordance with planning criteria in the Distribution System Planning Guide (CLFSC-023, Attachment 1), the Company plans and designs its system to avoid overload of major substation assets such as transformers during an N-1 event. During real-time operation, these overload scenarios are avoidedPage 107 of 174
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-025 Page 4 of 4 through the use of monitoring technology and planned mitigation measures. However, the Company’s substation planning group recreates a normalized substation load to aid in the process of forecasting for future years.Page 108 of 174
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-026 Page 1 of 5 Date Filed: October 26, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Department of Energy and Environmental Protection Question: (Integrated Distribution System Plan) Refer to Exhibit CLP-TSP-1, Exhibit CLP-TSP-1, p. 69. Please explain further the Company’s statement that “the Companies have provided their version of the IDSP with reduced scope”. Provide specifics on where the Company’s TSP differs in scope from the Authority’s Version in Docket No. 21-05-15RE03. Response: Based on the question, the Company clarifies the comment referenced in Exhibit CLP-TSP-1, at page 69. The “reduced scope” version of the IDSP referenced here refers to the Company’s response to a proposal issued by PURA on what the IDSP should include, not the TSP submitted in this filing. The Company submitted a proposal for a reduced scope version of the IDSP 1 for PURA to consider in Docket No. 21-05-15RE03, in order to focus on customer affordability and delivering benefits at a lower cost, with the key focus on: 1. A more contained and streamlined stakeholder process; 2. A reduced number of scenarios for the Company to consider and develop as part of planning; and 3. A more limited granularity of system modeling and forecasting. PURA, in its most recent proposed final decision, made certain modifications to the requirements (with the exception of the stakeholder process) that align with the Company’s request ask for two incremental FTEs as part of this filing (please refer to the Company’s response to OCC-835 i). 1 The Company filed this proposal as written exceptions in response to the draft decision for Docket 21-052025. Please see the link to the document: 15RE03 on Aug 28th https://www.dpuc.state.ct.us/dockcurr.nsf/8e6fc37a54110e3e852576190052b64d/6ec4c362aab351ff85258cf400701 215/$FILE/Docket%20No.%2021-05-15RE03%20%20UI%20CLP%20Joint%20Written%20Exceptions%208.28.25.pdfPage 109 of 174
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-026 Page 2 of 5 In the Company’s response to OCC-566 ii, the Company has provided a more detailed mapping of its TSP content (which is not the IDSP) to the IDSP proposed outline. Prior Referenced Responses: i OCC-835 Question: Payroll. Refer to the response to OCC-333 which states that of the 41 new positions requested, 21 vegetation management, 5 power quality positions and 2 distribution planning and forecasting positions are contingent on PURA’s approval in this case. If they are contingent on PURA’s approval, explain how these positions are necessary. OCC-835 Response: For the 21 vegetation management positions, all but one (1) of these are already included in the current vegetation management operations and are necessary for the accomplishment of the vegetation programs. The Company is proposing a shift from contract to internal resources in this case. As noted in the Company’s response to OCC-333: “The Vegetation Management positions allow the Company the opportunity to improve the system’s reliability and improve cost-efficiency by transitioning more work in-house to restructure vegetation management performance for the benefit of our customers. While the twenty-one (21) Vegetation Management positions appear to be incremental, in reality there is only 1 incremental resource. Of the twenty-one (21), eight (8) of the FTEs are the result of 16 employees who currently split their time 50%/50% between O&M and capital work shifting to solely working on the proposed combined O&M program, if approved, results in the equivalent of 8 incremental employees working on the O&M program; twelve (12) resources would be converted from contracted resources to internal resources of which the Company’s proposed vegetation management expenses in Exhibit CLP-REVREQ-2, Work Paper C-3.31 reflect the reduction in outside contractor services; and one (1) resource would be truly incremental.” The five (5) power quality positions allow the Company to better serve our customers with dedicated resources that can troubleshoot, analyze, and identify power quality problems. Power Quality is typically a deviation from sinusoidal voltage or frequency and encompasses a wide variety effects, ranging from voltage sags and swells, surges, transients, low power factor, harmonics and other phenomena that disrupt service or damage customer and utility equipment. The causes of these issues can be failing equipment, lightning, equipment operation or installation as well as customer loads and DER, identifying the causes and mitigation requires specialized skills, field data and analytics. Currently within the Company there is no dedicated group responsible for resolving customer power quality issues This group will take ownership of these complaints and problems and troubleshoot customer power quality issues by taking actual field measurements at both the Company and customer premises. With field measurement and further engineering analysis, the power quality group will be able to identify the source of power quality concerns which could be at the utility side or at the customer side. Based on the group’s assessment the Company will be able to improve response to customer power quality concerns and improve customer service. The two (2) distribution planning and forecasting positions are designated resources for forecasting and modeling in distribution planning to comply with PURA’s requirements outlined in the IDSP for advanced forecasting, 8760 forecasting, and larger number of scenarios, as well as to manage the stakeholder input, verification, and data sharing efforts associated with the IDSP docket. As stated by the Company in 21-05-15 RE03, compliance with an IDSP as
Text of NECTA Set 6_COMBINED.pdf
Extracted from the file · 22 pages · 43,545 characters
Text of OCC Set 29_COMBINED.pdf
Extracted from the file · 30 pages · 65,312 characters
Text of PURA Set 8_COMBINED.pdf
Extracted from the file · 230 pages · 511,861 characters