Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8

Files9

Search terms highlighted
Eversource rate increase is on 89 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
2 pages match
2 pages match

Text of ALLCO Set 18_COMBINED.pdf

Extracted from the file · 25 pages · 65,407 characters

Text of CIEC Set 7_COMBINED.pdf

Extracted from the file · 7 pages · 8,262 characters

48 pages match
  1. Page 119 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-027 Page 7 of 8 Time-Directed Maintenance and Inspections: Eversource has established multiple routine maintenance activities required to be performed for all power transformers within specific time intervals. These activities include monthly visual inspections, annual oil sampling including dissolved gas analysis (DGA), thermographic readings, LTC maintenance, and major maintenance activities. Major maintenance activities include power factor testing, bushing testing, excitation testing, confirmation of proper operation and integrity of pressure relief devices and ensuring all alarms operate properly. Condition-Based Maintenance: These activities are on an as-needed basis when identified upon visual inspection, when performing time-directed maintenance activities, and when output from condition monitoring devices indicate outside normal operating values. Such activities include, but are not limited to, acoustic measurements, core grounding tests, leak repairs, and chassis repair. Substation Technical Engineering leverages data collected by the CASCADE, PTX Analysis, and substation equipment databases to perform asset condition assessments of power transformers. The reports are based on the following six (6) parameters with recommendations for replacement by the Substation Technical Engineering team being based upon whether two (2) of the following (6) parameters are considered high risk: • Oil Analysis Results o DGA o Fluid Quality Analysis o Furan Analysis on Main Tanks • Age • Loading • Maintenance History • Historical Test Data • Physical Inspection Findings The above practices are applicable to all power transformers. Asset age and condition will prompt enhanced inspection, testing, monitoring, and maintenance as noted in the EMP toward the goal of maximizing the usable life of a transformer. Historically the Company has effectively maximized the life of Transformers by extensive maintenance and monitoring practices, evidenced by the age demographics of the fleet which far exceed the typical design life of 40 years. While this practice continues, the risk profile of an aging fleet compounded by longer lead times and more challenging outage constraints has resulted in a need to initiate planned replacements, beyond the historical average of 1-2 transformer replacements per year, to minimize overall impact of a failed transformer and maximize efficiency. A typical transformer replacement can take from 2 to 5 years to plan and execute. From the time of identification of deteriorating health, the transformer will continue to degrade over the course of the project execution time period. While spares are an effective mitigation plan for emergent failures, it is not a “one-size fits all” long-term mitigation plan to address the fleet risk because depending on when the failure or urgent replacements occur, it may happen at a high-risk period of the year which cannot be controlled exposing the system and customers to a much higher risk. Allowing transformers to run to failure also poses a serious safety risk to both the public and utility workers. Additionally a failed transformer could cause damage to adjacent healthy equipment compounding the negative impact. Prior to initiation of a transformer replacement project, the various subject matter experts (SMEs) will confer and review the nameplate data, maintenance records, and PTX scores of the unit. If a transformer is reviewed and a capital project is not to be initiated, the transformer is typically recommended to have further evaluation for maintenance
  2. Page 120 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-027 Page 8 of 8 mitigation of the found issue. This may include repairs or minor refurbishment actions that enable the power transformer to be reenergized and placed back in-service. If the transformer is identified as requiring a capital project an initial funding is established and a project team assembled. The project team includes various SMEs and they are required to review the technical and financial feasibility of transformer replacement, transformer refurbishment, load transfer options, and usage of existing spare transformer inventory for a replacement. After the feasible options are developed, the project team will proceed with a formal review of the multiple feasible options within the procedures of the Eversource Solution Design Committee. Using the nameplate data with age and ratings combined with the PTX scores, the power transformers noted in Exhibit CLP-TSP-1, at 55 have been identified to proceed with the initial capital project evaluation within the Targeted System Plan. As these evaluations are completed, the power transformers will be prioritized and projects initiated as confirmed. The project sequencing and deferral options will be evaluated within this review. The two active and ongoing projects for transformer replacements included within the Targeted System Plan followed the processes noted above, were prioritized within the project portfolio, and are planned to be placed in-service in 2028.
  3. Page 121 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-028 Page 1 of 2 Date Filed: October 26, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Department of Energy and Environmental Protection Question: (Load/DER Forecast) Refer to Exhibit CLP-TSP-1, Exhibit CLP-TSP-1. Please provide all assumptions the Company relied on for its TSP capacity planning, including historical and forecasted substation and circuit peak loads, specific large customer changes, planned circuit changes and estimated growth and retirement of distributed energy resources and energy efficiency. Response: The Company utilizes its bulk-substation peak load forecasts for distribution planning purposes. Please refer to the Company’s response to OCC-591 i for details on assumptions around forecasted loads, customer growth, large customer loads, energy efficiency and more. Prior Referenced Response: i OCC-591 Question: Refer to Exhibit CLP-TSP-1 at 49. a. b. c. d. e. Provide all load forecast models supporting each proposed line and substation capacity project. Provide all assumptions for EV, heat pump, solar, storage, C&I load growth, data centers, step loads, and economic development load. Identify any capacity projects that could be deferred by NWA, DERMS, AMI-enabled load management, or targeted demand response. For each proposed capacity project, quantify the forecast overload in MVA, MW, amperes and the number of violating hours in each year. For every project passing or nearly failing NWA screening, provide the full benefit-cost analysis, all sensitivities, evaluation workpapers and comparison of the NWA with load transfer, staged construction and the traditional solution. Quantify the present value of deferral for one, three, five and ten years. OCC-591 Response: a. Please refer to OCC-591, Attachment 1 CONFIDENTIAL, for a 10-year forecast for each identified substation capacity project. Long-term load forecasts are not generated at the individual feeder level. Line capacity projects are based on actual metered data versus a forecast. Feeder level forecasts become inherently less accurate as stochastic customer behavior of just a few customers can swing forecast results wildly and cause large errors, as compared to large groups where such effects average out. In addition, unlike substation
  4. Page 122 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-028 Page 2 of 2 investments, feeder upgrades can be done on a short turnaround time, allowing the Company to respond to actual loading on the system rather than forecasts. b. The individual substation forecasts are located within each worksheet in OCC-591, Attachment 1 CONFIDENTIAL, and are broken into the individual categories the Company tracks. For details on known, firm distribution connected data centers in the Company’s forecast, this would be factored into the Step Loads category. Please refer to the Company’s response to information request OCC465 for details on how the Company accounts for Step Loads. C & I load growth and economic development load is aggregated into the Trend category unless they are individual requests for interconnection that are considered step loads. Please refer to the Company’s response to CLF-SC-022 request on how the Company accounts for EV, heat pumps, and solar. c. The substation capacity projects identified in the workbooks are in various stages of the project-approval process. None of the projects have reached a stage that would have received a detailed NWA analysis to date. As these projects proceed through the solution selection and engineering stages, NWA and other alternatives will be vetted. The results will be submitted during the annual grid needs filing as part of the NWS docket. The line capacity projects identified currently exceed the planning criteria based on metered data and NWS solutions were analyzed as alternatives to traditional line projects. No existing line capacity projects could be deferred by NWA, DERMS, AMI-enabled load management, or targeted demand response. The Company submitted all capital projects to the process monitor as part of Docket No. 25-08-08 and the ongoing Docket No. 26-08-08. d. Please refer to OCC-591, Attachment 1, for a 10-year forecast for each identified substation capacity project. Each proposed capacity project within the attachment, shows the forecast overload in MVA. The number of violating hours in each year has not yet been analyzed but this would be conducted during the NWS program process. Forecasting is not performed at the distribution line level as these capacity projects can be executed in a short timeframe when compared to substation capacity projects. Please refer to OCC-591, Attachment 2, for the proposed line capacity projects based on actual metered data, and circuit overloads in MVA and Amps. The number of violating hours in each year is not available. e. As part of that PURA approved process, the complete Benefit Cost Analysis (BCA) is available only after projects advance to a competitive solicitation, as the analysis relies on pricing and solution details provided by developers through the solicitation process. Without developer-specific cost information, a comprehensive BCA cannot be completed. As noted in PURA’s Final Decision in Docket No. 26-08-08, no project was ordered to proceed with a competitive solicitation.
  5. Page 123 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-029 Page 1 of 2 Date Filed: October 26, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Department of Energy and Environmental Protection Question: Refer to Exhibit CLP-TSP-1 pp. 29-30. The Company implies a change in the load growth pattern that is changing the investment needs. Please provide examples of this and identify, if possible, what is causing the growth and if the growth is happening in areas with a definable set of characteristics. Response: In the referenced section of CLP-TSP-1 the Company outlines a couple of key items: 1. Over the past decade, the Company has used all available methods to increase the loadserving ability of the distribution system by transferring loads from heavily loaded substations and circuits to neighboring infrastructure. On this point, it is important to note that load transfer between substations does not increase system capacity, but instead, actually diminishes operational flexibility by using transfer capacity intended for emergency conditions to serve load. Load transfer also increases area-wide constraints and risks by moving load to substations outside the natural service area and places the system in a less reliable, off-nominal configuration, compared to the native design. The result of these actions is that, over time, on large portions of the system, the Company is now faced with very little spare capacity and room to maneuver. 2. A compounding effect of Item #1, above, is that load growth, especially driven by larger commercial developments, such as shipping and storage facilities that require significant amounts of land, generally materializes in electrically weaker areas where the infrastructure design is a function of lower-demand rural use, which is now causing these types of substations to be loaded beyond respective thermal capacity limits very quickly. With the area electric system so constrained (as discussed in Item #1), the Company has limited maneuverability to accommodate large new loads and economic growth, which results in the need for substation upgrades to maintain safe, reliable operation of the system and provide the required quality of service for customers. 3. Another effect is that DER growth has developed in a proportionally inverse manner to load density and consequently to infrastructure strength and capacity. Land is the single largest indicator for large-scale solar development potential and land is cheap and abundant
  6. Page 124 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-029 Page 2 of 2 in most areas where electric demand is low. This potentially leads to large amounts of generation injected into areas of the system that were not designed for the ensuing thermal capacity loading on distribution equipment.
  7. Page 125 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-030 Page 1 of 3 Date Filed: October 28, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Department of Energy and Environmental Protection Question: Refer to Exhibit CLP-TSP-1 pp. 29-30. Has the Company raised this change in load growth pattern and the cost implications in a proceeding before the Authority in any of the Equitable Modern Grid Dockets and annual dockets that were the outgrowth of those dockets. Also include in your response, an explanation of: a. the cost implications to non-participating customers as a result of the phenomena described; b. are the costs described here included within the interconnection costs of the DERs that are interconnecting in these areas; c. is whether or not the Company is proposing that the costs described here should be borne by all ratepayers or the interconnecting customers. Response: Please refer to the Company’s response to BETP-029 i for the Company’s response. Yes, the Company has raised these issues in various proceedings before the Authority, such as 22-06-29 RE01. a. The testimony does not describe a specific cost impact to non-participating customers. Rather, it explains how changing patterns of customer load growth and distributed energy resource (“DER”) development are creating new planning challenges for the distribution system. To the extent infrastructure investments are required to maintain safe and reliable service and support customer load growth, those investments are evaluated and implemented in accordance with existing distribution planning practices and cost recovery mechanisms. In contrast, upgrades required solely to accommodate the interconnection of a DER facility are generally the responsibility of the interconnecting customer. As discussed elsewhere in this filing, the proposed SHARE framework is intended to facilitate a more equitable allocation of DER-related interconnection costs among participating beneficiaries and does not shift those costs to non-participating customers. b. DER developers bear the cost of system upgrades required to interconnect a DER facility. Under the current interconnection framework, when a DER project triggers the need for
  8. Page 126 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-030 Page 2 of 3 upgrades to accommodate its interconnection, those upgrade costs are generally assigned to the interconnecting customer. As a result, the first developer whose project causes a system constraint to be identified may be responsible for funding upgrades that subsequently provide benefits to future interconnection customers. Here is a first pass at this: For localized distribution line upgrades, this cost allocation approach may not be prohibitively expensive. However, for larger infrastructure investments, such as substation upgrades required to mitigate hosting-capacity limitations, the costs can become substantial and may present a barrier to interconnection for individual developers. The proposed SHARE framework is intended to address this issue by allowing the Company to facilitate a group study for multiple interested interconnection customers seeking capacity within the same constrained area. Through this process, the costs of interconnection upgrades identified through the group study would be allocated among participating DER developers on a pro-rata basis. Accordingly, the types of costs described in the testimony would continue to be borne by interconnecting customers; however, under the proposed SHARE framework, such costs could be shared among multiple participating beneficiaries rather than being assigned to a single developer under the traditional interconnection process. c. The question appears to be mixing two different aspects of the reference into a single bucket for discussion. First, for DER development, the Company’s SHARE proposal would allocate costs based on a beneficiary pays principle. New load in the region is required to pay, net of any revenue credits, cost for their interconnection. Substations which run out of available load serving capacity, and if triggered by load growth, will be paid for by ratepayers unless they can be part of a SHARE region – in which it then goes back to beneficiary allocation of cost. The Company is not proposing that the costs of DER-driven interconnection upgrades be borne by all ratepayers. Rather, the Company proposes that such costs continue to be borne by the interconnecting customers that benefit from the additional hosting capacity created by those upgrades. The proposed SHARE framework modifies the allocation of such costs among participating DER developers but does not alter the underlying beneficiary-pays principle. Under the current interconnection process, the first developer to trigger a system constraint may be required to fund the full cost of a necessary upgrade. Under the proposed SHARE framework, the Company would facilitate a group study and allocate the costs of identified interconnection upgrades among participating DER developers on a pro-rata basis.
  9. Page 127 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-030 Page 3 of 3 To the extent a project also addresses separate load-serving, reliability, or other system needs, those benefits would continue to be evaluated consistent with existing planning and costallocation practices. The Company’s proposal is intended to ensure that the costs associated with creating additional DER hosting capacity are borne by the customers benefiting from that capacity while allowing project implementation costs to be shared more efficiently among participating stakeholders. Prior Referenced Response: i BETP-029 Question: Refer to Exhibit CLP-TSP-1 pp. 29-30. The Company implies a change in the load growth pattern that is changing the investment needs. Please provide examples of this and identify, if possible, what is causing the growth and if the growth is happening in areas with a definable set of characteristics. BETP-029 Response: In the referenced section of CLP-TSP-1 the Company outlines a couple of key items: 1. Over the past decade, the Company has used all available methods to increase the load-serving ability of the distribution system by transferring loads from heavily loaded substations and circuits to neighboring infrastructure. On this point, it is important to note that load transfer between substations does not increase system capacity, but instead, actually diminishes operational flexibility by using transfer capacity intended for emergency conditions to serve load. Load transfer also increases area-wide constraints and risks by moving load to substations outside the natural service area and places the system in a less reliable, offnominal configuration, compared to the native design. The result of these actions is that, over time, on large portions of the system, the Company is now faced with very little spare capacity and room to maneuver. 2. A compounding effect of Item #1, above, is that load growth, especially driven by larger commercial developments, such as shipping and storage facilities that require significant amounts of land, generally materializes in electrically weaker areas where the infrastructure design is a function of lower-demand rural use, which is now causing these types of substations to be loaded beyond respective thermal capacity limits very quickly. With the area electric system so constrained (as discussed in Item #1), the Company has limited maneuverability to accommodate large new loads and economic growth, which results in the need for substation upgrades to maintain safe, reliable operation of the system and provide the required quality of service for customers. 3. Another effect is that DER growth has developed in a proportionally inverse manner to load density and consequently to infrastructure strength and capacity. Land is the single largest indicator for large-scale solar development potential and land is cheap and abundant in most areas where electric demand is low. This potentially leads to large amounts of generation injected into areas of the system that were not designed for the ensuing thermal capacity loading on distribution equipment.
  10. Page 128 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-031 Page 1 of 2 Date Filed: October 28, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Department of Energy and Environmental Protection Question: Refer to Exhibit CLP-TSP-1 p. 32. Please provide additional information regarding the specific electrical system limitations that the Canadian Company required. Please explain what upgrades were needed and the costs associated with the necessary upgrades? Response: The testimony cited in the question was intended to illustrate the challenges associated with serving very large new load requests in portions of eastern Connecticut and was not intended to imply that the Company had completed a detailed engineering assessment or developed a formal estimate of the upgrades and costs required to serve the project. Rather, the testimony reflected a preliminary assessment that the Company’s existing infrastructure could not support the customer’s requested load within the customer’s required timeframe. The prospective customer was evaluating a manufacturing facility with anticipated electrical demand of a magnitude that would ultimately exceed the capabilities of the existing local distribution system and likely require a dedicated bulk power supply solution. Based on preliminary discussions, the Company determined that sufficient capacity could not be provided within the customer’s required timeframe and that available substation headroom in the area was insufficient to support a practical phased-service approach for initial operations pending development of longer-term infrastructure. Given those constraints, the customer did not pursue the proposed development further, and the project did not progress to a stage at which the Company would perform a detailed engineering analysis or develop a formal estimate of the required upgrades and associated costs. The limitations identified during these preliminary discussions were driven by broader distribution system characteristics in portions of eastern Connecticut, where the electric grid serves a largely rural geography. In many areas, substations are widely spaced, circuit lengths are long, and existing infrastructure was designed to support historically lower levels of customer demand. As a result, available electrical capacity can be limited, particularly in locations experiencing significant commercial and industrial growth. In recent years, the magnitude of individual load requests has increased substantially compared to historic levels. This trend is being driven by factors such as the expansion of manufacturing

Text of NECTA Set 6_COMBINED.pdf

Extracted from the file · 22 pages · 43,545 characters

Text of OCC Set 29_COMBINED.pdf

Extracted from the file · 30 pages · 65,312 characters

Text of PURA Set 8_COMBINED.pdf

Extracted from the file · 230 pages · 511,861 characters

As listed on the current system

Corres. 11/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8

This filing on the current system (opens in a new tab)