Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8

Files9

Search terms highlighted
Eversource rate increase is on 89 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
2 pages match
2 pages match

Text of ALLCO Set 18_COMBINED.pdf

Extracted from the file · 25 pages · 65,407 characters

Text of CIEC Set 7_COMBINED.pdf

Extracted from the file · 7 pages · 8,262 characters

48 pages match
  1. Page 125 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-030 Page 1 of 3 Date Filed: October 28, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Department of Energy and Environmental Protection Question: Refer to Exhibit CLP-TSP-1 pp. 29-30. Has the Company raised this change in load growth pattern and the cost implications in a proceeding before the Authority in any of the Equitable Modern Grid Dockets and annual dockets that were the outgrowth of those dockets. Also include in your response, an explanation of: a. the cost implications to non-participating customers as a result of the phenomena described; b. are the costs described here included within the interconnection costs of the DERs that are interconnecting in these areas; c. is whether or not the Company is proposing that the costs described here should be borne by all ratepayers or the interconnecting customers. Response: Please refer to the Company’s response to BETP-029 i for the Company’s response. Yes, the Company has raised these issues in various proceedings before the Authority, such as 22-06-29 RE01. a. The testimony does not describe a specific cost impact to non-participating customers. Rather, it explains how changing patterns of customer load growth and distributed energy resource (“DER”) development are creating new planning challenges for the distribution system. To the extent infrastructure investments are required to maintain safe and reliable service and support customer load growth, those investments are evaluated and implemented in accordance with existing distribution planning practices and cost recovery mechanisms. In contrast, upgrades required solely to accommodate the interconnection of a DER facility are generally the responsibility of the interconnecting customer. As discussed elsewhere in this filing, the proposed SHARE framework is intended to facilitate a more equitable allocation of DER-related interconnection costs among participating beneficiaries and does not shift those costs to non-participating customers. b. DER developers bear the cost of system upgrades required to interconnect a DER facility. Under the current interconnection framework, when a DER project triggers the need for
  2. Page 126 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-030 Page 2 of 3 upgrades to accommodate its interconnection, those upgrade costs are generally assigned to the interconnecting customer. As a result, the first developer whose project causes a system constraint to be identified may be responsible for funding upgrades that subsequently provide benefits to future interconnection customers. Here is a first pass at this: For localized distribution line upgrades, this cost allocation approach may not be prohibitively expensive. However, for larger infrastructure investments, such as substation upgrades required to mitigate hosting-capacity limitations, the costs can become substantial and may present a barrier to interconnection for individual developers. The proposed SHARE framework is intended to address this issue by allowing the Company to facilitate a group study for multiple interested interconnection customers seeking capacity within the same constrained area. Through this process, the costs of interconnection upgrades identified through the group study would be allocated among participating DER developers on a pro-rata basis. Accordingly, the types of costs described in the testimony would continue to be borne by interconnecting customers; however, under the proposed SHARE framework, such costs could be shared among multiple participating beneficiaries rather than being assigned to a single developer under the traditional interconnection process. c. The question appears to be mixing two different aspects of the reference into a single bucket for discussion. First, for DER development, the Company’s SHARE proposal would allocate costs based on a beneficiary pays principle. New load in the region is required to pay, net of any revenue credits, cost for their interconnection. Substations which run out of available load serving capacity, and if triggered by load growth, will be paid for by ratepayers unless they can be part of a SHARE region – in which it then goes back to beneficiary allocation of cost. The Company is not proposing that the costs of DER-driven interconnection upgrades be borne by all ratepayers. Rather, the Company proposes that such costs continue to be borne by the interconnecting customers that benefit from the additional hosting capacity created by those upgrades. The proposed SHARE framework modifies the allocation of such costs among participating DER developers but does not alter the underlying beneficiary-pays principle. Under the current interconnection process, the first developer to trigger a system constraint may be required to fund the full cost of a necessary upgrade. Under the proposed SHARE framework, the Company would facilitate a group study and allocate the costs of identified interconnection upgrades among participating DER developers on a pro-rata basis.
  3. Page 127 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-030 Page 3 of 3 To the extent a project also addresses separate load-serving, reliability, or other system needs, those benefits would continue to be evaluated consistent with existing planning and costallocation practices. The Company’s proposal is intended to ensure that the costs associated with creating additional DER hosting capacity are borne by the customers benefiting from that capacity while allowing project implementation costs to be shared more efficiently among participating stakeholders. Prior Referenced Response: i BETP-029 Question: Refer to Exhibit CLP-TSP-1 pp. 29-30. The Company implies a change in the load growth pattern that is changing the investment needs. Please provide examples of this and identify, if possible, what is causing the growth and if the growth is happening in areas with a definable set of characteristics. BETP-029 Response: In the referenced section of CLP-TSP-1 the Company outlines a couple of key items: 1. Over the past decade, the Company has used all available methods to increase the load-serving ability of the distribution system by transferring loads from heavily loaded substations and circuits to neighboring infrastructure. On this point, it is important to note that load transfer between substations does not increase system capacity, but instead, actually diminishes operational flexibility by using transfer capacity intended for emergency conditions to serve load. Load transfer also increases area-wide constraints and risks by moving load to substations outside the natural service area and places the system in a less reliable, offnominal configuration, compared to the native design. The result of these actions is that, over time, on large portions of the system, the Company is now faced with very little spare capacity and room to maneuver. 2. A compounding effect of Item #1, above, is that load growth, especially driven by larger commercial developments, such as shipping and storage facilities that require significant amounts of land, generally materializes in electrically weaker areas where the infrastructure design is a function of lower-demand rural use, which is now causing these types of substations to be loaded beyond respective thermal capacity limits very quickly. With the area electric system so constrained (as discussed in Item #1), the Company has limited maneuverability to accommodate large new loads and economic growth, which results in the need for substation upgrades to maintain safe, reliable operation of the system and provide the required quality of service for customers. 3. Another effect is that DER growth has developed in a proportionally inverse manner to load density and consequently to infrastructure strength and capacity. Land is the single largest indicator for large-scale solar development potential and land is cheap and abundant in most areas where electric demand is low. This potentially leads to large amounts of generation injected into areas of the system that were not designed for the ensuing thermal capacity loading on distribution equipment.
  4. Page 128 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-031 Page 1 of 2 Date Filed: October 28, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Department of Energy and Environmental Protection Question: Refer to Exhibit CLP-TSP-1 p. 32. Please provide additional information regarding the specific electrical system limitations that the Canadian Company required. Please explain what upgrades were needed and the costs associated with the necessary upgrades? Response: The testimony cited in the question was intended to illustrate the challenges associated with serving very large new load requests in portions of eastern Connecticut and was not intended to imply that the Company had completed a detailed engineering assessment or developed a formal estimate of the upgrades and costs required to serve the project. Rather, the testimony reflected a preliminary assessment that the Company’s existing infrastructure could not support the customer’s requested load within the customer’s required timeframe. The prospective customer was evaluating a manufacturing facility with anticipated electrical demand of a magnitude that would ultimately exceed the capabilities of the existing local distribution system and likely require a dedicated bulk power supply solution. Based on preliminary discussions, the Company determined that sufficient capacity could not be provided within the customer’s required timeframe and that available substation headroom in the area was insufficient to support a practical phased-service approach for initial operations pending development of longer-term infrastructure. Given those constraints, the customer did not pursue the proposed development further, and the project did not progress to a stage at which the Company would perform a detailed engineering analysis or develop a formal estimate of the required upgrades and associated costs. The limitations identified during these preliminary discussions were driven by broader distribution system characteristics in portions of eastern Connecticut, where the electric grid serves a largely rural geography. In many areas, substations are widely spaced, circuit lengths are long, and existing infrastructure was designed to support historically lower levels of customer demand. As a result, available electrical capacity can be limited, particularly in locations experiencing significant commercial and industrial growth. In recent years, the magnitude of individual load requests has increased substantially compared to historic levels. This trend is being driven by factors such as the expansion of manufacturing
  5. Page 129 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-031 Page 2 of 2 facilities, growth in large-scale warehouse and distribution centers, deployment of electric vehicle charging infrastructure, increased adoption of electric heating technologies such as heat pumps, and greater use of automated and robotic industrial processes. These projects often require significantly larger electrical service capacities than traditional commercial developments. When new load requests exceed the available capacity of the local distribution system, upgrades may be required to maintain system reliability, voltage performance, and compliance with planning and operating criteria. Depending on the location and magnitude of the requested load, necessary upgrades can include distribution feeder reinforcements, conductor replacements, installation of voltage support equipment, substation transformer upgrades, expansion of existing substations, or construction of new distribution infrastructure. The specific upgrades required and the associated costs are highly dependent on the location of the proposed load, the amount of available capacity on the existing system, and the overall magnitude of the requested demand. Consequently, upgrade costs can vary significantly from project to project, ranging from relatively modest distribution modifications to substantial investments in substation and feeder infrastructure where existing system capacity is insufficient to accommodate the requested load. For the specific project under discussion, preliminary assessments indicated that serving the customer’s full long-term load would require significant infrastructure development beyond the capabilities of the existing local distribution system. In addition, available substation capacity in the area was insufficient to support a practical phased-service approach that could accommodate the customer’s interim operational needs while longer-term infrastructure solutions were planned and constructed. As a result, the Company’s assessment was that it could not support the customer’s anticipated load within the customer’s required timeframe. Eversource remains willing to work with project developers to evaluate potential service solutions as projects advance. Should the developer elect to proceed with a high-level engineering study, Eversource will continue to assess infrastructure requirements, available service alternatives, project phasing opportunities, and associated costs needed to reliably accommodate the proposed development.
  6. Page 130 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-032 Page 1 of 1 Date Filed: October 26, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Department of Energy and Environmental Protection Question: Refer to Exhibit CLP-TSP-1, p. 34. The Company's model that includes the past 20 years of upgrades and shows the benefits of every dollar invested in terms of SAIDI and SAIFI. Has the Company identified any trend on reliability improvement and money invested? Specifically, are there diminishing returns on investment at a certain point of reliably? Are there any inflection points? Response: The Company's reliability optimization model evaluates potential reliability projects by estimating their expected reliability benefits, including SAIDI and SAIFI improvements, relative to their cost. This model has identified that, over time, diminishing returns of reliability projects are expected. The model ranks potential investments according to their cost effectiveness. Consistent with reliability planning principles, the projects with the greatest expected reliability benefit per dollar invested are generally identified first. As additional projects are considered, the incremental reliability benefit achieved per dollar invested typically declines. In other words, over time, progressively larger investments are generally required to maintain or improve reliability performance. Not all projects that improve reliability should be identified through the ReBOT tool, whose focus is on zones with multiple feasible mitigations. Potential reliability improvements evolve over time due to factors such as asset aging, changing system conditions, weather impacts, vegetation growth, and the inherently stochastic nature of outage events. Also, as previously identified projects are completed, and updated reliability performance data are integrated into the tool, new opportunities for cost-effective reliability improvements may emerge. Consequently, the Company continually evaluates reliability investment opportunities and assesses their expected benefits and costs as part of its ongoing planning process.
  7. Page 131 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-033 Page 1 of 1 Date Filed: October 26, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Department of Energy and Environmental Protection Question: (Climate Change Vulnerability Study) Refer to Exhibit CLP-TSP-2 p. 88, Exhibit CLP-TSP-4. Did the Company submit Exhibit CLP-TSP-4 as a compliance filing to Order No. 12 on Docket No. 17-12-03RE08, on or before the deadline of October 7, 2022? If not, please explain why. Response: Order No. 12, in Docket No. 17-12-03RE08 specifies that the EDCs shall “submit for Authority review and approval a detailed scope of work, timeline and anticipated budget for completing its Climate Vulnerability Study…” (emphasis added). Eversource Energy and Avangrid jointly submitted a compliance filing in compliance of this Order on October 7, 2022. Please refer to BETP-033, Attachment 1, for a copy of this compliance filing. There is no Order in Docket No. 17-12-03RE08 that directs the EDCs to submit the actual completed Climate Vulnerability Study by a specific deadline, except that, Order No. 13 directs the EDCs to utilize the Climate Vulnerability Study results as part of the Reliability and Resilience Frameworks in the next rate case.
  8. Page 132 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-034 Page 1 of 1 Date Filed: October 26, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Department of Energy and Environmental Protection Question: (Climate Change Vulnerability Study) Refer to Exhibit CLP-TSP-4. In the Final Decision of Docket No. 17-12-03RE08, on p. 79, the Authority instructed the Company to consider the findings of three climate change reports that were specific to Connecticut. Can the Company explain how these three reports were consulted and, if at all, incorporated into the findings of this exhibit? Response: The Company reviewed the three climate change reports and all reports are Connecticut specific. From a methodology and process standpoint, the Company did not find that these three climate change reports are contradictory to its Climate Vulnerability Assessment. However, the Connecticut Physical Climate Science Assessment Report and the CIRCA Sea Level Rise in Connecticut Final Report are older reports, consistent with older Global Climate Models than the ones used in the Company’s Climate Vulnerability Assessment (CVA). Further, because the Company’s ultimate interest is to evaluate the need for a targeted climate adaptation plan, it is important that a CVA include projections for multiple years to prioritize based on the projected changes over time. For example, the CIRCA Sea Level Rise is published for 2050 only. For efficiency and consistency reasons, the Company proceeded with a comprehensive climate study across its tristate territory.
  9. Page 133 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-035 Page 1 of 1 Date Filed: October 26, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Department of Energy and Environmental Protection Question: (Climate Change Vulnerability Study) Refer to Exhibit CLP-TSP-4, p. 13. Please define and explain an “optimal climate adaptation plan,” and describe how this plan can be developed and implemented within the Company’s estimated 18-month schedule from approval? a. Can the Company explain why Phase 3 of the Vulnerability Assessment remains incomplete as of the date of this interrogatory issuance? Response: Although what the “18-month schedule” is referring to and what approval is referred to, the Company’s reference to optimizing the climate adaptation plan refers to proceeding with investments that are effective and efficient in increasing the resilience of the system. As outlined in the analysis of the risk in CLP-TSP-4, the climate conditions assessed as part of the climate vulnerability study are for 2050. This gives the Company sufficient time to deploy potential needed climate adaptation mitigations. The Company notes that recent studies indicate that the pace of climate change may dictate that such analyses are repeated in later years or are performed regularly with some periodicity that is appropriate to capture changes in climate conditions from the previous study. This is of course dependent on the periodicity of the Global Climate Models (GCM) updates.
  10. Page 134 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-036 Page 1 of 1 Date Filed: October 26, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Department of Energy and Environmental Protection Question: (Climate Change Vulnerability Study) Refer to Exhibit CLP-TSP-4. Did the Company review the 2025 Connecticut Grid Resilience Assessment, issued by the University of Connecticut Eversource Center, as part of its preparation of the Climate Vulnerability Study? a. Did the Company participate in the development of the 2025 Connecticut Grid Resilience Assessment Response: Please refer to CLP-TSP-4, at 10. The climate hazard assessment was completed in early 2025. The 2025 Connecticut Grid Resilience Assessment was published in November 2025.

Text of NECTA Set 6_COMBINED.pdf

Extracted from the file · 22 pages · 43,545 characters

Text of OCC Set 29_COMBINED.pdf

Extracted from the file · 30 pages · 65,312 characters

Text of PURA Set 8_COMBINED.pdf

Extracted from the file · 230 pages · 511,861 characters

As listed on the current system

Corres. 11/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8

This filing on the current system (opens in a new tab)