Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8

Files9

Search terms highlighted
Eversource rate increase is on 89 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
2 pages match
2 pages match

Text of ALLCO Set 18_COMBINED.pdf

Extracted from the file · 25 pages · 65,407 characters

Text of CIEC Set 7_COMBINED.pdf

Extracted from the file · 7 pages · 8,262 characters

48 pages match
  1. Page 128 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-031 Page 1 of 2 Date Filed: October 28, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Department of Energy and Environmental Protection Question: Refer to Exhibit CLP-TSP-1 p. 32. Please provide additional information regarding the specific electrical system limitations that the Canadian Company required. Please explain what upgrades were needed and the costs associated with the necessary upgrades? Response: The testimony cited in the question was intended to illustrate the challenges associated with serving very large new load requests in portions of eastern Connecticut and was not intended to imply that the Company had completed a detailed engineering assessment or developed a formal estimate of the upgrades and costs required to serve the project. Rather, the testimony reflected a preliminary assessment that the Company’s existing infrastructure could not support the customer’s requested load within the customer’s required timeframe. The prospective customer was evaluating a manufacturing facility with anticipated electrical demand of a magnitude that would ultimately exceed the capabilities of the existing local distribution system and likely require a dedicated bulk power supply solution. Based on preliminary discussions, the Company determined that sufficient capacity could not be provided within the customer’s required timeframe and that available substation headroom in the area was insufficient to support a practical phased-service approach for initial operations pending development of longer-term infrastructure. Given those constraints, the customer did not pursue the proposed development further, and the project did not progress to a stage at which the Company would perform a detailed engineering analysis or develop a formal estimate of the required upgrades and associated costs. The limitations identified during these preliminary discussions were driven by broader distribution system characteristics in portions of eastern Connecticut, where the electric grid serves a largely rural geography. In many areas, substations are widely spaced, circuit lengths are long, and existing infrastructure was designed to support historically lower levels of customer demand. As a result, available electrical capacity can be limited, particularly in locations experiencing significant commercial and industrial growth. In recent years, the magnitude of individual load requests has increased substantially compared to historic levels. This trend is being driven by factors such as the expansion of manufacturing
  2. Page 129 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-031 Page 2 of 2 facilities, growth in large-scale warehouse and distribution centers, deployment of electric vehicle charging infrastructure, increased adoption of electric heating technologies such as heat pumps, and greater use of automated and robotic industrial processes. These projects often require significantly larger electrical service capacities than traditional commercial developments. When new load requests exceed the available capacity of the local distribution system, upgrades may be required to maintain system reliability, voltage performance, and compliance with planning and operating criteria. Depending on the location and magnitude of the requested load, necessary upgrades can include distribution feeder reinforcements, conductor replacements, installation of voltage support equipment, substation transformer upgrades, expansion of existing substations, or construction of new distribution infrastructure. The specific upgrades required and the associated costs are highly dependent on the location of the proposed load, the amount of available capacity on the existing system, and the overall magnitude of the requested demand. Consequently, upgrade costs can vary significantly from project to project, ranging from relatively modest distribution modifications to substantial investments in substation and feeder infrastructure where existing system capacity is insufficient to accommodate the requested load. For the specific project under discussion, preliminary assessments indicated that serving the customer’s full long-term load would require significant infrastructure development beyond the capabilities of the existing local distribution system. In addition, available substation capacity in the area was insufficient to support a practical phased-service approach that could accommodate the customer’s interim operational needs while longer-term infrastructure solutions were planned and constructed. As a result, the Company’s assessment was that it could not support the customer’s anticipated load within the customer’s required timeframe. Eversource remains willing to work with project developers to evaluate potential service solutions as projects advance. Should the developer elect to proceed with a high-level engineering study, Eversource will continue to assess infrastructure requirements, available service alternatives, project phasing opportunities, and associated costs needed to reliably accommodate the proposed development.
  3. Page 130 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-032 Page 1 of 1 Date Filed: October 26, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Department of Energy and Environmental Protection Question: Refer to Exhibit CLP-TSP-1, p. 34. The Company's model that includes the past 20 years of upgrades and shows the benefits of every dollar invested in terms of SAIDI and SAIFI. Has the Company identified any trend on reliability improvement and money invested? Specifically, are there diminishing returns on investment at a certain point of reliably? Are there any inflection points? Response: The Company's reliability optimization model evaluates potential reliability projects by estimating their expected reliability benefits, including SAIDI and SAIFI improvements, relative to their cost. This model has identified that, over time, diminishing returns of reliability projects are expected. The model ranks potential investments according to their cost effectiveness. Consistent with reliability planning principles, the projects with the greatest expected reliability benefit per dollar invested are generally identified first. As additional projects are considered, the incremental reliability benefit achieved per dollar invested typically declines. In other words, over time, progressively larger investments are generally required to maintain or improve reliability performance. Not all projects that improve reliability should be identified through the ReBOT tool, whose focus is on zones with multiple feasible mitigations. Potential reliability improvements evolve over time due to factors such as asset aging, changing system conditions, weather impacts, vegetation growth, and the inherently stochastic nature of outage events. Also, as previously identified projects are completed, and updated reliability performance data are integrated into the tool, new opportunities for cost-effective reliability improvements may emerge. Consequently, the Company continually evaluates reliability investment opportunities and assesses their expected benefits and costs as part of its ongoing planning process.
  4. Page 131 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-033 Page 1 of 1 Date Filed: October 26, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Department of Energy and Environmental Protection Question: (Climate Change Vulnerability Study) Refer to Exhibit CLP-TSP-2 p. 88, Exhibit CLP-TSP-4. Did the Company submit Exhibit CLP-TSP-4 as a compliance filing to Order No. 12 on Docket No. 17-12-03RE08, on or before the deadline of October 7, 2022? If not, please explain why. Response: Order No. 12, in Docket No. 17-12-03RE08 specifies that the EDCs shall “submit for Authority review and approval a detailed scope of work, timeline and anticipated budget for completing its Climate Vulnerability Study…” (emphasis added). Eversource Energy and Avangrid jointly submitted a compliance filing in compliance of this Order on October 7, 2022. Please refer to BETP-033, Attachment 1, for a copy of this compliance filing. There is no Order in Docket No. 17-12-03RE08 that directs the EDCs to submit the actual completed Climate Vulnerability Study by a specific deadline, except that, Order No. 13 directs the EDCs to utilize the Climate Vulnerability Study results as part of the Reliability and Resilience Frameworks in the next rate case.
  5. Page 132 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-034 Page 1 of 1 Date Filed: October 26, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Department of Energy and Environmental Protection Question: (Climate Change Vulnerability Study) Refer to Exhibit CLP-TSP-4. In the Final Decision of Docket No. 17-12-03RE08, on p. 79, the Authority instructed the Company to consider the findings of three climate change reports that were specific to Connecticut. Can the Company explain how these three reports were consulted and, if at all, incorporated into the findings of this exhibit? Response: The Company reviewed the three climate change reports and all reports are Connecticut specific. From a methodology and process standpoint, the Company did not find that these three climate change reports are contradictory to its Climate Vulnerability Assessment. However, the Connecticut Physical Climate Science Assessment Report and the CIRCA Sea Level Rise in Connecticut Final Report are older reports, consistent with older Global Climate Models than the ones used in the Company’s Climate Vulnerability Assessment (CVA). Further, because the Company’s ultimate interest is to evaluate the need for a targeted climate adaptation plan, it is important that a CVA include projections for multiple years to prioritize based on the projected changes over time. For example, the CIRCA Sea Level Rise is published for 2050 only. For efficiency and consistency reasons, the Company proceeded with a comprehensive climate study across its tristate territory.
  6. Page 133 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-035 Page 1 of 1 Date Filed: October 26, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Department of Energy and Environmental Protection Question: (Climate Change Vulnerability Study) Refer to Exhibit CLP-TSP-4, p. 13. Please define and explain an “optimal climate adaptation plan,” and describe how this plan can be developed and implemented within the Company’s estimated 18-month schedule from approval? a. Can the Company explain why Phase 3 of the Vulnerability Assessment remains incomplete as of the date of this interrogatory issuance? Response: Although what the “18-month schedule” is referring to and what approval is referred to, the Company’s reference to optimizing the climate adaptation plan refers to proceeding with investments that are effective and efficient in increasing the resilience of the system. As outlined in the analysis of the risk in CLP-TSP-4, the climate conditions assessed as part of the climate vulnerability study are for 2050. This gives the Company sufficient time to deploy potential needed climate adaptation mitigations. The Company notes that recent studies indicate that the pace of climate change may dictate that such analyses are repeated in later years or are performed regularly with some periodicity that is appropriate to capture changes in climate conditions from the previous study. This is of course dependent on the periodicity of the Global Climate Models (GCM) updates.
  7. Page 134 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-036 Page 1 of 1 Date Filed: October 26, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Department of Energy and Environmental Protection Question: (Climate Change Vulnerability Study) Refer to Exhibit CLP-TSP-4. Did the Company review the 2025 Connecticut Grid Resilience Assessment, issued by the University of Connecticut Eversource Center, as part of its preparation of the Climate Vulnerability Study? a. Did the Company participate in the development of the 2025 Connecticut Grid Resilience Assessment Response: Please refer to CLP-TSP-4, at 10. The climate hazard assessment was completed in early 2025. The 2025 Connecticut Grid Resilience Assessment was published in November 2025.
  8. Page 135 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-037 Page 1 of 1 Date Filed: October 26, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Department of Energy and Environmental Protection Question: (Climate Change Vulnerability Study) Refer to Exhibit CLP-TSP-4. Did the Company consult UConn Connecticut Institute for Resilience & Climate Adaptation’s (UConn CIRCA) maps to assess potential future coastal flooding. If no, please explain why. Response: For consistency and cost effectiveness of conducting the Climate Vulnerability Study, the Company performed a tri-state study, covering its territory across New Hampshire, Massachusetts and Connecticut and as a result, state-specific studies could not be used as inputs. However, the underlying model used in CIRCA maps is from NOAA, so the model used in CVA is the core of the CIRCA maps.
  9. Page 136 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-038 Page 1 of 1 Date Filed: October 26, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Department of Energy and Environmental Protection Question: (Climate Change Vulnerability Study) Refer to Exhibit CLP-TSP-4 p.45. Please explain the methodologies used and why these approaches were taken in the “Engineering Risk Assessment” section of the Company’s Climate Vulnerability Assessment. Additionally, please identify the sources and resources that behind the methodologies chosen in this study. Response: The Company understands this question to refer to the risk quantification in CLP-TSP-4 that shows risk as the product of threat, vulnerability and consequence. This quantification of risk is considered industry standard, as supported by the references provided on the same page. Please refer to BETP-038, Attachment 1.
  10. Page 137 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-039 Page 1 of 1 Date Filed: October 26, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Department of Energy and Environmental Protection Question: (Climate Change Vulnerability Study) Refer to Exhibit CLP-TSP-4, p.58. Please identify the sources and resources used to support the “Sensitivity Analysis.” a. Please explain the difference between the Risk MAP and Flood Insurance Rate Maps. Response: Please refer to Risk Mapping, Assessment and Planning (Risk MAP) | FEMA.gov. Per FEMA’s webpage, MAP, which stands for Mapping, Assessment and Planning is the process to create maps that visualize flood risk. These maps are called Flood Insurance Rate Maps or FIRMs.

Text of NECTA Set 6_COMBINED.pdf

Extracted from the file · 22 pages · 43,545 characters

Text of OCC Set 29_COMBINED.pdf

Extracted from the file · 30 pages · 65,312 characters

Text of PURA Set 8_COMBINED.pdf

Extracted from the file · 230 pages · 511,861 characters

As listed on the current system

Corres. 11/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8

This filing on the current system (opens in a new tab)