Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8

Files9

Search terms highlighted
Eversource rate increase is on 89 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
2 pages match
2 pages match

Text of ALLCO Set 18_COMBINED.pdf

Extracted from the file · 25 pages · 65,407 characters

Text of CIEC Set 7_COMBINED.pdf

Extracted from the file · 7 pages · 8,262 characters

48 pages match
  1. Page 14 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-001 Page 14 of 16 here. Instead, the Company refers to the line references provided on the last page of this worksheet (Model PDF, page 8) for both Attachments 1 and 2, which detail the calculations performed. For emphasis, note that Line 33 captures the accumulation of depreciation recovered in base rates. By design, the F-Factor intentionally reflects this to properly estimate a reasonably true capital driven revenue requirement. The resulting F-Factor revenue requirement, excluding property tax, which is referenced by the preceding worksheet, is shown on line 53. e. Worksheet “PBR-5 F-Factor Property Tax” This worksheet provides the fiscal year calculations for incremental property tax expense based on capital investments made since 2024 and forecast through 2031. Line 12 references capital investment assumptions discussed elsewhere, while Lines 13-24 perform the calculations of depreciation expense pursuant to Conn. Gen. Stat. §12-63(b)(6), net book value, assessed value pursuant to Conn. Gen. Stat. §12-63(a), and the eventual property tax expense by applying the composite mill rate calculated in Exhibit CLP-REVREQ-2, Schedule WP C-3.37 p17 to 21, Page 20, Line 73. The result is shown on line 24. Lines 28-32 then summarize that result by calendar year, while Lines 38-40 summarize by Rate Year. After adjusting for the extent to which base rates recover the property tax related to these same investments on Line 41, as discussed in previous sections, the final property tax amount reflected in the F-Factor allowance is shown on Line 42. f. Worksheet “PBR-6 Capital Expense Forecast” This worksheet is provided to create the necessary link between the F-Factor revenue allowance calculations and the capital investment forecast discussed in this docket. The capital investment forecast included aligns with the Company’s filed capital investment forecast, as can be seen in Exhibit CLPELP-1, Figure 7. The F-Factor capital investment assumptions reflected in the revenue allowance calculations of “PBR-4 F-Factor” necessarily agree with this worksheet. g. Worksheet “PBR-7 Going-In Capital RR” This worksheet is a collection of select data points as approved in the Company’s “Going-In” rates (or, in this case, as proposed in the Company’s filed cost of service schedules, Exhibit CLP-REVREQ-2-A, B, C, D Schedules, adjusted to reflect the currently authorized return on equity (9.25%) and equity capitalization (53.0%), as stated previously: • Lines 12-16 provide the dollar amounts related to capital-driven costs of services, which are depreciation, property taxes and costs of capital. Amounts shown are currently as proposed in this illustrative model (except where noted), but ultimately will reflect the amounts as approved in this docket. • Lines 21-28 provide a summarized view of the Company’s filed rate base for the Test Year, Rate Year Beginning, Rate Year ending, and Rate Year average balances. These balances serve as the basis (denominators) for establishing the capital-driven costs above as a percentage of approved balances. Those percentages are used on the other “PBR” worksheets, as well as the
  2. Page 15 of 174Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-001 Page 15 of 16 cost of service worksheet to estimate future costs of service based on approved levels (Lines 30-32) h. • Lines 47-81 provide rates for uncollectible expense, gross earnings tax, and the costs of capital as well as necessary calculation of gross-ups to those rates for use in the model’s calculations. • Additional details are shown in column (F) of this worksheet. Worksheet “PBR-8 GDP” This worksheet presents raw Gross Domestic Product-Price Index (GDP-PI) data obtained from the Bureau of Economic Analysis. For illustrative purposes only, this model also includes a projection of GDP-PI obtained from Moody’s September 14, 2026. As noted above, actual calculations of PBR increases, if approved as filed, rely only on historical data available at the time of a given year’s annual PBR filing. i. Worksheet “PBR-9 ECI” This worksheet contains raw Employment Cost Index (ECI) data obtained from the Bureau of Labor Statistics. Note that projections of inflation are used for analytical purposes and to assist with discussion pertaining to future rate increase implications. Calculations of PBR increases, if approved as filed, rely only on historical data available at the time of a given year’s annual PBR filing. 3) Cost of Service The cost of service included for analytical purposes in the Company’s working model consists of three worksheets: “COS-1 Total,” “COS-2 Capital,” and “COS-3 Property Tax.” a. Worksheet “COS-1 Total” This worksheet provides projections of the Company’s actual costs through the end of the PBMRP term as a means of assessing the impact the capital investment forecast and O&M cost pressures have on the overall cost of service as well as the degree to which revenues align with the Company’s cost of service (as reflected on the “Financial Summary” worksheet). Lines 15-37 summarize the results of the cost drivers, including especially O&M (Lines 16-19), depreciation (Line 21), property taxes (Line 22), and costs of capital, including corresponding income taxes (Lines 2427). Gross earnings taxes and uncollectible expense are calculated on Lines 33 and 34 as if the full cost of service (Line 28) is in rates. Non-storm O&M is shown on Lines 38-44, while storm O&M is shown on Lines 45-50, where noncatastrophic costs are identified separately from catastrophic storm / pre-staging funding. Non-storm rate base is shown on Lines 52-59, which reflect the capital investment forecast (exclusive of AMI) filed in this docket.
  3. Page 16 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-001 Page 16 of 16 Lastly, capital-driven costs of service are shown on Lines 61-67. Depreciation, property tax, uncollectible, gross earnings taxes, and costs of capital are based on the Company’s filed cost of service in this docket, specifically Exhibit CLP REVREQ-2-A, B, C, D Schedules, except that the return on equity (9.25%) and equity capitalization (53%) are shown at currently authorized amounts. b. Worksheet “COS-2 Capital” This worksheet functions nearly identically to “PBR-4 F-Factor” except that it relies on actual capital investment projected over the term of the PBMRP. This is essential to understanding actual costs of service, whether or not those costs are supported by revenues. It forms the basis for evaluating the degree to which the F-Factor is sufficient. For additional details pertaining to the mechanics, please see the line references found at the end of this worksheet (or model PDF page 19). c. Worksheet “COS-3 Property Tax” Similarly, this worksheet is included to assist with the calculation of actual costs of service. It operates mechanically identically to “PBR-5 F-Factor Property Tax” except that it relies on actual capital investment projections (Line 12).
  4. Page 17 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-002 Page 1 of 12 Date Filed: October 27, 2026 Witness: Douglas P. Horton Request from: Department of Energy and Environmental Protection Question: (PBMRP) Refer to Exhibit CLP-ELP-1 pp. p. 102. Please clarify the Company’s statement that “Any such investment would instead remain subject to review and consideration in a subsequent base rate proceeding or successor PBMRP Term.” Response: The quoted statement addresses capital additions above the Forecasted Budget cap established for recovery through the F-Factor during the PBMRP term. Under the Company’s proposal, investments during the PBMRP that exceed the plant additions cap would not be eligible for FFactor recovery during the initial PBMRP term and would remain subject to the prudence review and regulatory process typically applicable when rates are next set. As explained in the Company’s responses to OCC-423 i and OCC-426 ii, at a subsequent base-rate proceeding or successor PBMRP term, qualifying plant additions would be considered for inclusion in rate base at their then-applicable net plant, or depreciated, value and would remain subject to prudence review. There is no special or guaranteed recovery for amounts above the FFactor cap. Thus, the financial effect of exceeding the cap is real. The Company bears the carrying costs and unrecovered depreciation associated with those investments unless and until the investments are subsequently reviewed and approved for recovery. Prior Referenced Responses: i OCC-423 Question: Exhibit CLP-ELP-1 Please explain in detail why the Company believes its proposed treatment of capital expenditures under the PBMRP, including the use of forecasted capital expenditures and the F-Factor, is preferable to including capital expenditures within the Revenue Cap Formula framework as proposed in the Docket No. 21-05-15RE01 Proposed Final Decision. In your response, a. b. Please explain why the Company believes O&M expenses are appropriately subject to an externally indexed revenue cap, while capital expenditures require separate recovery through an F-Factor based on a fixed annual capital investment forecast. Please explain how the Company’s proposed treatment of capital expenditures is expected to produce customer cost savings or otherwise improve customer affordability relative to including capital expenditures within a revenue cap formula.
  5. Page 18 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-002 Page 2 of 12 c. Please explain how the proposed F-Factor mitigates or avoids any incentive to favor capital expenditures over O&M solutions, including in circumstances where either a capital or O&M solution could be used to address the same system need. OCC-423 Response: The Company appreciates OCC’s thoughtful and analytical questions on the Company’s proposed performance based multi-year rate plan (“PBMRP”) and looks forward to further discussion on the development of a workable PBR framework for the Company’s customers. To cover the issues raised in the question, the Company’s response is organized as follows: 1. Review of relevant aspects of the Company’s PBMRP. 2. 3. 1. Considerations on the design of capital-driven revenue support. Specific responses to parts (a), (b) and (c), above. Review of the Relevant Aspects of the Company’s PBMRP Ultimately, the Company’s goal in this proceeding is to establish a sustainable, cohesive ratemaking framework that advances electric utility service in the State of Connecticut in an affordable manner for customers, over a long term. This is the Company’s goal because the CL&P system needs investment for reliability, resiliency and modernization. For this investment to be affordable for customers, a coherent ratemaking plan needs to be instituted that will consider the interests of customers over a longer term than just the next rate case. That framework needs to balance: (1) the reliability and performance requirements of the Company’s customers and the broader State of Connecticut; (2) customer rate stability and affordability; (3) incentives for cost efficiency in utility operations; and (4) implementation of a revenue support mechanism sufficient to cover the cost of delivering these objectives to customers. The Company’s PBMRP is designed to address these objectives in a holistic, balanced way. To do this, the Company started with the ratemaking framework under discussion in PURA’s PBR docket (Docket No. 21-0515RE01), while also introducing certain new elements to remediate the flaws that would ultimately hinder PURA’s (draft) PBR model from supporting the necessary stay-out terms. For any multi-year rate plan to be successful, it needs to be grounded in the reality of the utility’s costs, while also incorporating features that innately push the utility to be more efficient. That is not to say every dollar of the utility’s costs will be (or should be) recovered. Rather, the allowed revenues need to be sufficient to afford the utility a reasonable opportunity to cover its cost of service to customers, including a reasonable rate of return on equity (“ROE”) where the utility is operating prudently and efficiently, as required by state law. A framework in which the utility has no reasonable opportunity to earn its ROE, regardless of how hard it strives for efficiency, simply becomes self-defeating because the utility will exercise its statutory rights to a distribution rate proceeding, thereby muting the most powerful efficiency feature of a multi-year rate plan, which is the stay-out term. A framework that underestimates the actual cost to run the system and/or affords the utility no reasonable chance to earn its allowed ROE, year after year, also results in under-investment and a system that not only lacks innovation, but falls further and further behind at a significant – albeit potentially unseen – cost to customers. As a result, a lasting, productive framework is one that is soundly informed by – not detached from – the drivers of the utility’s real cost of service, including its cost of capital. In this context, the two most critical features of the Company’s PBMRP are as follows:
  6. Page 19 of 174Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-002 Page 3 of 12 • A going-in revenue requirement that reasonably reflects the Company’s actual operating expenses and cost of investment in the Rate Year, so that through effective management and prudent decision making, the Company can achieve the true efficiency gains that will be needed to stretch the approved revenue requirement over the stay-out term. Without a reasonable opportunity to maintain financial integrity over a stay-out period, as measured by the authorized ROE, the utility cannot focus on innovation and efficiency gains – and will instead file for the next rate case to make up ground. To accomplish this goal, the overall paradigm must “hang” together, making the base revenue requirement a pivotal element. The many components of a PBR plan, including going-in rates, as well as the subsequent rate adjustments, must work in concert with performance objectives and the capital investment requirements expected of the Company – for the benefit of customers, i.e., the entire framework must work to the benefit of customers, not only in relation to the price they will pay, but also in relation to supporting the level of service that they need and expect. • Revenue support for incremental capital investment to support long-term system goals. The Company operates in a capital-intensive industry and has a substantial need to acquire cash on a systematic basis to operate its business. As annual capital investments regularly exceed net cash from operations (i.e. cash receipts from customers net of operating cash outflows), the Company must look to other capital sources to fund those investments. Those sources are the debt and equity investors supplying the cash to capital markets. This means the Company must compete with all other entities participating in those markets to attract capital. It is simply not possible for the Company to go to those markets and demand cash for free, or at below-market rates relative to the investor’s risk when other entities participating in the same capital markets offer compensation for the use of funds over time. The Company provided extensive analysis and discussion on the cost of capital throughout Docket No. 21-05-15RE01, including specifically as it relates to CT-Bar. PURA’s treatment with respect to going-in revenue requirements as well as any ongoing capital-driven revenue support mechanism, such as CTBar, is paramount to whether the Company, with effective management and sound decision-making, can responsibly cede its right to file for a rate amendment, whereas that is otherwise the only tool the utility has to align its revenues and costs and have a reasonable chance at earning its authorized ROE, which, over time, is necessary in order to attract the capital necessary to meet the standards of service expected of the Company’s customers. The lack of a valid revenue requirement component within the CT-Bar that would allow recovery of the cost of capital associated with incremental capital investment over the term of the PBMRP is a nonstarter from a policy perspective, creating an obstacle that would block a utility from giving up its right to file for rate modifications over the multi-year period in question. This is particularly accurate in the present environment in which significant increases in the level of necessary system investments are expected (and planned). Simply put, the CT-Bar, as previously envisioned in PURA’s draft PBR decision, fully prevented the Company from having any practical chance at staying out of a rate case, and therefore, would never work to create a reasonable PBR framework. The Company’s proposed PBMRP in this docket is designed to track the design of the CT-Bar as closely as possible, given that this was PURA’s developing framework. However, the Company’s PBMRP addresses the two primary faults in PURA’s RE01 framework that would prevent the implementation of a workable PBR framework, which are (1) the deviations from ratemaking fundamentals that grossly understate the “going in” revenue requirement; and (2) modification of the CT-Bar to reflect the revenue requirement applicable to capital investment, which would include recovery of the cost of capital and the cost of removal over the course of the PBMRP term. The Company’s F-Factor also corrects for the mechanical error of deducting depreciation expense from new plant additions, rather than from rate base.
  7. Page 20 of 174Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-002 Page 4 of 12 In particular, the Company’s proposed F-Factor is designed to recover no more than the revenue necessary to support a discrete amount of ongoing system investment, recognizing that the cost of capital is a lawful and factual cost of service that must be incorporated into the revenue requirement calculation for the Company, as it is for any utility. 2. Considerations on the Design of Capital Driven Revenue Support CT-Bar, as defined in PURA’s Proposed Final Decision, issued in Docket No. 21-05-15RE01, on July 14, 2025 (the “RE01-PFD”), had several sensible qualities that the Company supported. However, those “sensible” qualities were overcome by certain critically flawed concepts that would need to be modified or eliminated in order for the Company to consider committing to a stay-out. The positive and negative CT-Bar qualities are outlined briefly here and discussed in greater detail below, including with respect to similarities or differences to the Company’s proposed F-Factor. Summary of constructive features of PURA’s RE01-PFD: 1) Acknowledgement that current revenue support for ongoing investment is essential; 2) No category of capital investment was summarily or preemptively excluded from CT-Bar; 3) CT-Bar takes effect with Rate Year 1; and 4) CT-Bar aligns capital revenue support with the capital investments of the DSP. Summary of unworkable features of PURA’s RE01-PFD: 1) Exclusion of the recognition in the CT-Bar of the cost of capital between rate cases. 2) Exclusion of cost of removal in the CT-Bar. 3) Application of depreciation expense as a reduction to plant additions rather than rate base. Constructive features of PURA’s RE01-PFD: 1) Positive #1: Acknowledgement that current revenue support for ongoing investment is essential to the integrity of the PBR framework. First, that the CT-Bar even existed in PURA’s RE01-PFD is genuine acknowledgement that some form of revenue support for Rate Year investment is essential to support a PBR framework. As discussed at length in that docket, the Company anticipates significant system investment over the next five years to advance the state’s clean energy and reliability goals. Revenue support for ongoing system investment is crucial for any multi-year rate plan, whether in the form of the Company’s proposed PBMRP, step increases, or any other ratemaking framework. CT-Bar’s inclusion in RE01-PFD is a clear indication that incremental revenue support for ongoing system investments is a necessity. 2) Positive #2: No category of capital investment was summarily or preemptively excluded from CT-Bar. Second, the RE01-PFD did not exclude particular categories of capital investment. For example, capital investments in facilities, fleet and information technology are viewed as permissible categories for revenue support in the CT-Bar framework. This is consistent with the Company’s proposed F-Factor in this proceeding. 3) Positive #3: CT-Bar takes effect as of Month 1 of Rate Year 1.
  8. Page 21 of 174Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-002 Page 5 of 12 The Company provided extensive discussion and analysis throughout Docket No. 21-05-15RE01 technical sessions and data responses regarding the “going-in” revenue requirement and the detrimental financial consequences of limiting capital investments to a period of time removed from the Rate Year. Ignoring for a moment the CT-Bar’s deficiencies, having the mechanism take effect Month 1 of Rate Year 1 minimizes or eliminates those detrimental timing consequences, particularly in light of the fact that PURA has in recent years moved away from its prior practice of implementing future-test years in base rate proceedings, instead favoring a strict historical Test Year practice as it relates to plant additions. Revenue decoupling is a factor to consider here because the revenue decoupling mechanism (“RDM”) subsumes all sales growth to the extent that it is occurring, funneling incremental sales revenues back to customers. RDM is supported by valid policy reasons; however, the fact is that there are capital costs associated with adding new customers. Historically, when consistent and steady levels in the range of ~3$ per year of annual growth in sales and revenues was available to a utility to help offset the cost of incremental capital additions between rate cases, the pressing need for incremental revenue support was mitigated. Without the ability to capture that sales growth, and combined with the absence of an ongoing revenue support mechanism such as an F Factor taking effect on Month 1 of Rate Year 1, the Company would not be in a position to commit to a stay-out of any duration. This is because the Company would never be in a position to cover its cost of service (inclusive of its authorized cost of capital) because its rates would be set on a historical level of plant additions, despite the fact that its capital expenditures are higher than historical levels of depreciation, and because revenue decoupling ensures that even if load growth exists (and even if such load growth is enabled by the Company’s increased level of capital expenditures) the Company is unable to retain additional revenues contributed by new customers, or new load. 4) Positive #4: CT-Bar was designed to align capital revenue support with the DSP. Ignoring its deficiencies, the CT-Bar’s connection to the Distribution System Plan (“DSP”) constituted an essential link between ongoing system investments necessary to meet the objectives of the DSP with the revenues necessary to support those investments. Throughout Docket No. 21-05-15RE01, the Company advocated strongly for clearly defined linkages across all three tracks (RE01, RE02 and RE03), including proposing what would be the final technical session touching upon revenue requirements, in which those linkages were discussed. The Company’s F-Factor is similarly aligned with the capital investment forecast provided in this proceeding for the DSP. The Company’s capital investment forecast serves as the basis for a cap on the level of investment for the F-Factor. Unworkable Features of PURA’s RE01-PFD: 1) Negative #1: No recovery of cost of capital in the revenue requirement for capital investment between rate cases. The single-most problematic feature of the CT-Bar was its intentional exclusion of the cost of capital associated with completing capital plant additions to the benefit of customers. Costs of capital are real costs of providing electric distribution service to customers in the State of Connecticut (or anywhere) and are recognized in statute. Although the cost of capital may be a more challenging cost to conceptualize, it is nonetheless as real as vegetation management, insurance, customer service, or any other cost of service. Cash is not free, a fact arising from its scarcity. Fundamentally, capital markets are where people, banks, corporations and other institutions provide their surplus of cash -- which is limited, to those entities that have cash needs -- which are generally unlimited. Consequently, and unsurprisingly, those entities providing the cash for some period of time expect to be compensated for providing it, thus
  9. Page 22 of 174Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-002 Page 6 of 12 establishing real cost to acquire capital. The Company, operating in the capital-intensive industry of regulated utilities, is one of those entities that needs to acquire cash to operate its business. As annual capital investments regularly exceed its net cash from operations (i.e. cash from customers), the Company must look to other sources to fund those investments. Those sources are the debt and equity investors supplying the cash to capital markets. This means the Company must compete with ALL other entities participating in those markets. It is simply not possible for the Company to go to those markets and demand cash for free (or for below-market rates, relative to market expectations of risk and reward) when other entities participating in those capital markets offer adequate compensation for the use of funds over time. Therefore, there is a real and tangible cost to acquiring that capital. Please refer to the Company’s pre-filed cost of capital testimony for in-depth discussion of the cost of capital. The Company provided extensive analysis and discussion on the cost of capital throughout Docket No. 21-05-15RE01, including specifically as it relates to CT-Bar. PURA’s treatment with respect to goingin revenue requirements as well as any ongoing capital revenue support mechanism, such as CT-Bar, is paramount to whether the Company, with effective management and sound decision-making, has the opportunity, but not a guarantee, to cover its cost of service to customers, and to earn its allowed return. The absence of the cost of capital from the CT-Bar, particularly in the present environment where significant increases in the level of necessary system investments are expected, prevents the Company from having any practical opportunity to commit to a stay-out to avoid the next rate case. As discussed in the Company’s response to OCC-435, based on the Company’s current assessment of system investment needs in the near future, the revenue requirement associated exclusively with the cost of capital pertaining to future capital additions (excluding GET and Uncollectible) would amount to an incremental $15.6 million for Rate Year 1; an incremental $32.8 million for Rate Year 2; an incremental $36.4 million for Rate Year 3; and an incremental $39.5 million for Rate Year 4, or $124.1 million in total. This means that -- even if 100% of those future plant additions were only partially supported with CTBar revenues (i.e. revenue covering depreciation expense and property taxes only); and even if the Company’s future cost of service otherwise was 100% supported with rates; and even with perfect operational decision making -- the Company would still need to find $124.1 million of annual savings by Rate Year 4 in order to offset the loss of revenue associated with carrying costs on incremental investment over the term of the PBMRP, which would be necessary to commit to a stay-out term. For perspective, the total O&M expense included in the Company’s cost of service filed in this proceeding is $547.5 million. Thus, to earn its authorized ROE, all else equal, the Company would have to generate cost savings amounting to $124.1 million, or nearly 23%, of its Rate Year O&M level by Year 4, to offset the impact of the accumulating carrying costs on the incremental capital additions completed on the system after base rates are set in this case. This is nearly 34% of operating expense, excluding vegetation management and storm restoration costs, which is a very substantial proportion of the cost of service. For example, the amount of $124M is nearly two-thirds of the Company’s labor and labor-related operating expense, or 60% more than the entire vegetation management program. It simply is not possible for the Company to cut this level of O&M expense without grossly debilitating the Company’s ability to provide service to customers. In fact, it is not plausible to expect that the Company could generate even 10% in annual incremental O&M savings in the face of 2-3% annual inflation and, as a result, the Company could not agree to a stay out under circumstances where there is no recovery of the
  10. Page 23 of 174Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-002 Page 7 of 12 cost of capital on incremental investment over the PBMRP term. Moreover, even if the Company were somehow able to find such remarkable cost savings, the going-in revenue requirement of the subsequent multi-year rate plan would capture those cost savings. Assuming continuation of the same PBR framework and required system investment, the Company would again be in the position of having to find an additional 34% of O&M savings (i.e. more than 60% cumulatively from Rate Year 1) in order to sustain itself over the next PBR term. Clearly, a framework that does not provide revenue supporting the full cost of incremental investment over a four-year period, as well as the next four-year period, is not a plausible or lasting framework. Thus, exclusion of the cost of capital from a capital support mechanism in an environment in which significant increases in capital investments are expected all but ensures the Company has no realistic opportunity to survive the PBR term without a critical need for a rate case to realign costs and rates. Consequently, the overall framework as outlined in the REO1-PFD had no practical chance of sustaining the Company financially for the four-year term, nor would the Company have been able to even agree to a stay-out. To address this indelible flaw, the Company’s proposed PBMRP in this docket is designed to produce the revenue necessary to support ongoing system investment through the F-Factor, which calculates a revenue requirement inclusive of the costs of capital unlike the CT-Bar, while preserving the customer benefits and inherent incentives of a PBR plan. 2) Negative #2: Exclusion of cost of removal from the revenue requirement on capital investment between rate cases. CT-Bar excluded the cost of removal, which is a real cost for all utilities. As a simple example, to install a new utility pole where there is an existing one that needs replacement, the Company must first remove the existing utility pole. That cost is separate and distinct from the cost of the utility pole itself; yet, similarly recovered (as an estimate) over the life a utility pole. The Company’s capital investment forecast in the present docket includes approximately $136 million of cost of removal for January 1, 2026 through June 30, 2028, and approximately $60-70 million per year thereafter. A total of $60-70 million in annual investment equates to pre-tax cost of capital of $6-7 million annual incremental revenue requirement (e.g. $6 million year 1, $12 million year 2, $18 million year 3, etc.). The CT-Bar revenue requirement intentionally excluded this component of the capital investment revenue requirement. The Company’s proposed F-Factor calculation properly restores this component to the rate base computation. 3) Negative #3: Depreciation expense is used as a reduction to plant additions rather than to total rate base, consistent with fundamental ratemaking principles. CT-Bar’s calculation treats depreciation expense as a net against plant additions. Although the Company appreciated that PURA found it important to capture ongoing depreciation expense in the annual revenue requirement calculations, the overall execution of the computation was not correct. The Company’s FFactor corrects for this methodological error. Please refer to the example below outlining the mathematical problem: ($ Millions)

Text of NECTA Set 6_COMBINED.pdf

Extracted from the file · 22 pages · 43,545 characters

Text of OCC Set 29_COMBINED.pdf

Extracted from the file · 30 pages · 65,312 characters

Text of PURA Set 8_COMBINED.pdf

Extracted from the file · 230 pages · 511,861 characters

As listed on the current system

Corres. 11/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8

This filing on the current system (opens in a new tab)