Text of ALLCO Set 18_COMBINED.pdf

Extracted from the file · 25 pages · 65,407 characters

Text of CIEC Set 7_COMBINED.pdf

Extracted from the file · 7 pages · 8,262 characters

48 pages match
  1. Page 52 of 174Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-009 Page 1 of 1 Date Filed: October 27, 2026 Witness: Douglas P. Horton Request from: Department of Energy and Environmental Protection Question: (PBMRP Z- factor) Refer to Exhibit CLP-ELP-1 p. 100. For the purposes of determining the threshold significance of 0.5 percent of CL&P’s total distribution revenue, please explain whether that threshold would be fixed at the Company's allowed base distribution revenue for the Rate Year, the current annual base distribution revenue inclusive of PBMRP Adjustments, or some other amount. Response: The 0.5 percent significance threshold would initially be calculated based on the Company’s allowed total base distribution revenue requirement as established by PURA in this proceeding. Thereafter, the revenue amount used to calculate the threshold would increase by operation of the PBMRP, including the I-X and F-Factor adjustments. Accordingly, the dollar amount of the 0.5 percent significance threshold would not remain fixed throughout the PBMRP term.
  2. Page 53 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-010 Page 1 of 8 Date Filed: November 03, 2026 Witness: Douglas P. Horton Request from: Department of Energy and Environmental Protection Question: (PBMRP Z- factor) Refer to Exhibit CLP-ELP-1 p. 100. Compare and contrast the Company's PBMRP proposal with the performance based ratemaking mechanisms allowed for Eversource's electric operations in other jurisdictions. Response: As described below, the Company’s proposed Z-Factor is generally consistent with the exogenouscost mechanisms applicable to Eversource’s electric operations in Massachusetts and New Hampshire. Although the mechanisms differ in their eligibility criteria and materiality thresholds, each distinguishes ordinary cost variation subject to the incentives and risks of a multi-year plan from material changes outside utility management’s control that may warrant separate regulatory treatment. In this proceeding, the Company has proposed to implement an exogenous cost recovery adjustment for qualifying positive or negative cost changes that are beyond the Company’s control, are not reflected in the I-Factor, and are not otherwise addressed through another PURA-approved cost recovery mechanism. Potential changes include State Initiated Cost Changes, Federally Initiated Cost Changes, Regulatory Cost Reassignments, and Externally Imposed Accounting Rule Changes. The Company proposes an aggregate materiality threshold equal to 0.5 percent of total distribution revenues. Please refer to the Company’s response to BETP-004 i for additional discussion of these categories. 1 In Massachusetts, NSTAR Electric’s exogenous mechanism provides for rate changes for qualifying industry-specific tax, accounting, regulatory, judicial, and legislative changes that are beyond the company’s control and not reflected in the applicable inflation factor. It applies a $4 million individual-event threshold in the first PBR year, adjusted annually by GDP-PI, which equates to approximately 0.37 percent of distribution revenues. 2 Exhibit CLP-ELP-1, p. 100; Company response to BETP-004. PURA Docket No. 21-05-15RE01, Eversource Energy Comments on Revised Straw Proposal (Mar. 26, 2025), pp. 34-41. 1 2
  3. Page 54 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-010 Page 2 of 8 In New Hampshire, the NHPUC approved a $1.5 million applicability threshold for PSNH’s exogenous-cost adjustment. PSNH explained that the threshold was intended to limit the mechanism to changes significant enough to justify a separate proceeding and to protect against events that could “upset the balance of the PBR plan during the term”. 3 The NHPUC allows PSNH to seek recovery of exogenous costs driven by changes in costs driven by state or federal government entities, regulatory cost reassignments, or changes in accounting rules. 4 The Massachusetts and New Hampshire mechanisms demonstrate that the scope and materiality of a Z-Factor may be defined differently without changing its essential purpose. The Company’s proposal identifies comparable categories of externally driven cost changes, but applies a 0.5 percent threshold to the aggregate distribution-revenue impact of qualifying changes. In each case, the mechanism leaves ordinary cost variation within the PBR framework while providing a defined process for addressing material changes that arise outside the utility’s control. Please refer to the Company’s response to BETP-060 ii for additional comparisons and the supporting regulatory authorities. 5 Performance Metrics: Regarding PBR metrics in New Hampshire, while the Company proposed additional metrics as part of DE 24-070, after investigation the Commission determined that reliability of service is a core concern for the Company’s customers and adopted SAIDI and SAIFI metrics as the only metrics to be applied in the alternative regulation. The thresholds are calculated based on a fiveyear rolling average plus one standard deviation. If performance falls outside that threshold for any given year, a $1.5 million (revenue-requirement) penalty shall be assessed, and no offset resulting from exceeding the performance standards shall be used to reduce penalties. The Company’s proposal for SAIDI and SAIFI in this proceeding is similar in that the Company’s proposal calculates these metrics using the IEEE methodology, excluding Major Event Days (MEDs) and planned outages. Regarding the target threshold, while New Hampshire uses a rolling five-year average, the Company recommends setting a fixed target to apply to the full PBR term based on the most recent five years prior to the start of the PBR term. Fixing the target for the full PBR term provides clarity on the standard for performance during the PBR term. Utilizing a rolling five-year average to set targets each year during the term causes performance targets to rise or fall based on the system’s most recent experience rather than focusing on a transparent measure of whether the Company has improved and maintained system reliability as compared to an established set of targets. The proposal for Connecticut also includes gradual penalties, starting at the threshold of “average plus one standard deviation” and full penalty for performance exceeding 3 Docket No. DE-24-070, Public Service Company of New Hampshire response to interrogatory PUC-1-004 issued September 6, 2024. 4 Docket No. DE-24-070, Order No. 28,170, pp. 51, fn. 12. 5 PURA Docket No. 21-05-15RE01, Eversource Energy Comments on Revised Straw Proposal (Mar. 26, 2025), pp. 34-41; Proposed Final Decision.
  4. Page 55 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-010 Page 3 of 8 “average plus two standard deviations” with a penalty range of $1.75 million to $3.5 million each for Blue Sky SAIDI and Blue Sky SAIFI. The Connecticut proposal, like the PSNH metrics, do not include direct offsets resulting from exceeding performance standards for these metrics. Regarding PBR metrics in Massachusetts, the M.D.P.U. approved a PBR plan for NSTAR Electric Company, d/b/a Eversource Energy in Order D.P.U. 22-22. In that Order, the Department approved 18 individual performance metrics. The performance metrics are for reporting purposes and do not include associated penalties or incentives. At the time of approval of the PBR plan, the M.D.P.U. acknowledged that service quality metrics, such as Blue Sky SAIDI and SAIFI, are developed and implemented under a separate regulatory framework than the PBR plan. These metrics have associated penalties under the separate service guidelines. The M.D.P.U therefore approved a broad set of PBR performance metrics that are tied to the goals of the PBR plan without making changes to the service quality guidelines. Note that the M.D.P.U. has recently reopened the Service Quality guidelines that determine the methodology and historical data to calculate targets and deadbands (D.P.U. 24-53). Please refer to BETP-010, Attachment 1, for a full list of the Connecticut proposed PBR metrics, the New Hampshire approved PBR metrics and the Massachusetts approved PBR metrics. Prior Referenced Response: i BETP-004 Question: (PBMRP- Z factor) Refer to Exhibit CLP-ELP-1 p. 99. Define (1) State Initiated Cost Change; (2) Federally Initiated Cost Change; (3) Regulatory Cost Reassignment; and (4) Externally Imposed Accounting Rule Change as it pertains to Exogenous Events in the Company’s proposal. For each category, provide specific examples of potential events the Company expects would and would not qualify for recovery as an Exogenous Event. BETP-004 Response: Below, the Company has provided illustrative examples of the types of events or changes that could qualify for exogenous factor consideration, subject to satisfaction of the applicable Z-Factor criteria: 1. State Initiated Cost Change • A new Connecticut statutory mandate requiring a distribution-system capital investment program or activity that was not contemplated in the revenue requirement used to establish the PBMRP. A new or materially changed PURA or other Connecticut agency requirement imposing material incremental compliance, operational, or infrastructure requirements on electric distribution companies. A change in Connecticut tax law that imposes a new or materially different tax obligation specific to utilities or electric distribution operations. • • 2. Federally Initiated Cost Change
  5. Page 56 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-010 Page 4 of 8 • • • 3. Regulatory Cost Reassignment • • 4. A change in jurisdictional cost responsibility between federal and state regulation that causes a category of costs to become, or cease to be, the responsibility of distribution customers. A regulatory determination that moves responsibility for a material cost into or out of distribution rates Externally Imposed Accounting Rule Change • • • ii A new or materially revised federal reliability or cybersecurity requirement that requires incremental distribution-system investment or operating expenditures. A new federal environmental requirement requiring remediation, equipment modifications, monitoring, or other incremental expenditures associated with distribution assets or operations. A new or materially revised federal safety or physical-security standard requiring changes to distribution facilities, equipment, systems, or operating practices. A new or amended FASB accounting standard that requires a material change in the recognition or measurement of distribution-related costs. A mandatory regulatory-accounting change that requires costs previously capitalized to be expensed, or costs previously expensed to be capitalized. A mandatory accounting change that creates, eliminates, or materially changes the accounting treatment of a regulatory asset or regulatory liability. BETP-060 Question: (PBR- Z factor) Refer to Exhibit CLP-PBR-1p. 74. Provide a summary of Z Factor designs tested and implemented in other jurisdictions, including the decision where such designs were approved, the qualifying criteria for associated expenses and the associated tariffs BETP-060 Response: The following table summarizes the Z-Factor provisions approved in a sampling of jurisdictions that have deployed an I-X based PBR framework. Approval of these mechanisms does not necessarily constitute approval of specific cost adjustments that are generally evaluated on a case-by-case basis. Jurisdiction Regulatory decision / Approved Z-Factor Criteria scope and qualifying eligibility events for Z-Factor Materiality threshold Reference
  6. Page 57 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-010 Page 5 of 8 New Approved a relatively Cost changes must fall within $1.5 million revenue- New Hampshire Hampshire – narrow Z-Factor the Commission's defined requirement impact Public Utilities Public Service covering specific cost categories and satisfy the Commission Order Company of changes resulting from applicable threshold. The No. 28,170 (July New state or federal Commission adopted its 25, 2025), Docket Hampshire government actions, earlier definition for the DE 24-070, pp. 2 regulatory cost exogenous-event provision. and 54. reassignments, and changes in accounting rules. These adjustments may be forward-looking when known and measurable. Alberta – Approved a general Z-Factor for All five criteria must be met: (1) outside Jurisdiction Regulatory decision / Approved Z-Factor Criteria scope and qualifying eligibility events for Dollar equivalent of an after-tax 40- Z-Factor Materiality threshold AUC Decision 27388-D01-2023 Reference Electric and significant positive or management's control; (2) basis-point change in (October 4, 2023), Gas negative financial material impact; (3) no ROE, calculated using Appendix 5, pp. Distribution impacts from exogenous significant influence on the the utility's equity 119–120. Utilities events. inflation factor; (4) prudently supporting 2023 May apply to capital or incurred costs; and (5) going-in rates; O&M. No exclusive list unforeseen event. The impact escalated annually by of qualifying events is must also lack another I-X prescribed. reasonable recovery mechanism within the PBR framework.
  7. Page 58 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-010 Page 6 of 8 Massachusetts – Eversource (NSTAR Electric) Approved exogenous Cost change must be beyond $4 million per MDPU, NSTAR costs from: (1) tax-law company control, arise from individual event in the Electric Company changes uniquely qualifying first PBR year, d/b/a Eversource affecting the industry; legal/accounting/regulatory adjusted annually by Energy, D.P.U. 22(2) industry-specific action, uniquely affect electric GDP-PI 22, Final Order, accounting changes; and distribution rather than the Generally (November 30, (3) regulatory, judicial, general economy, and not be noncumulative, with 2022), pp. 71–76. or legislative changes reflected in GDP-PI. limited exceptions for uniquely affecting the Supporting evidence is related property-tax industry. required, and eligibility is events determined case by case. Massachusetts Approved the standard Beyond management control; $110,000 per event MDPU, Fitchburg – MA categories of arises from qualifying changes with annual GDP-PI Gas and Electric Fitchburg Gas industry-specific tax, in requirements or directives; adjustments Light Company d/b/a and Electric accounting, regulatory, unique to the distribution Unitil, Light Company judicial, and legislative industry; material; and not D.P.U. 23(Unitil Electric) changes. reflected in the inflation index 80/D.P.U. 23-81, or otherwise in PBR formula. Final Order (June 28, 2024), 51–54 Jurisdiction Regulatory decision / Approved Z-Factor Criteria scope and qualifying eligibility events for Z-Factor Materiality threshold Reference
  8. Page 59 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-010 Page 7 of 8 Massachusetts Approved the standard Qualifying costs must be $3.6 million per MDPU, – Massachusetts beyond control, arise from individual event Massachusetts Massachusetts categories. Also industry-specific initially, adjusted Electric Company Electric expressly approved legal/accounting/regulatory annually by GDP-PI and Nantucket Company and potential Z-Factor changes, not be reflected in the Special storm Electric Company, Nantucket recovery for certain applicable inflation provision: individual each d/b/a National Electric major storm-related adjustment, and meet the storm O&M expenses Grid, Company O&M expenses, subject significance threshold. For above $30 million, D.P.U. 23-150, (National Grid to additional conditions major storms, additional where the storm fund Final Order Electric) and prudence review. storm-fund eligibility balance plus costs (September 30, requirements apply. exceeding 2024), pp. 94–96. $30M, exceeds $75M. Ontario Electricity Distributors – Approved a general Z- Three principal tests: (i) Under the OEB's 3rd Ontario Energy Factor mechanism for causation, (ii) materiality, and Generation IRM, the Board, Supplemental extraordinary, (iii) prudence. Costs must be standard Z-factor Report on 3rd unforeseen events incremental to those reflected materiality thresholds outside management's in rates; management must are C$50,000 for control. Examples show the event could not utilities with Generation Incentive for include severe storms reasonably have been planned distribution revenue Regulation and other exceptional or budgeted for. Current requirements up to Ontario’s Electricity Distributors, Docket events. The framework guidance also requires the C$10M; 0.5% of does not restrict claims distributor's achieved ROE not distribution revenue EB-2007-0673, solely to legal or to exceed its deemed ROE by requirement for (September regulatory changes. more than 300 basis points. utilities above C$10M 17, 2008), through C$200M; Appendix B, VIIC$1M for utilities VIII above C$200M. The threshold applies on a per-event basis.
  9. Page 60 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-010 Page 8 of 8 Jurisdiction Regulatory decision / Approved Z-Factor Criteria scope and qualifying eligibility events for Z-Factor Materiality threshold Reference However, utilities operating under OEBapproved Custom IR plans may be subject to different, utilityspecific materiality thresholds. Hawaii Hawaiian Electric Companies – Approved a broad Z- Six criteria: (1) outside control $4 million per event Hawaii Public Factor mechanism for of a prudent utility; for HECO; $1 million Utilities exceptional events (2) directly related to the per event for HELCO Commission, beyond reasonable exogenous event; (3) impact and MECO Decision and Order utility management outside the original rate base; No. 37507 control. Potential (4) prudently incurred; (5) not (December 22, examples discussed in otherwise recovered through 2020), Docket the proceeding include rates, insurance, government 2018-0088, pp. tax-law changes, natural aid, or third parties; and (6) 57–60 and 80. disasters, and above materiality threshold. pandemics, but the Each request is evaluated Commission individually. deliberately did not establish an exclusive or automatically approved list. Changes to ROE or credit ratings do not qualify.
  10. Page 61 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-011 Page 1 of 2 Date Filed: October 27, 2026 Witness: Donald J. Scacco Jr., Digaunto Chatterjee and Douglas P. Horton Request from: Department of Energy and Environmental Protection Question: (Utility Owned Generation) Refer to Exhibit CLP-ELP-1 p. 21-24. Please explain the Company’s position on its legal authority to own the generation it is proposing in its CLP-ELP-1 testimony? Response: The Company’s response to CIEC-001 i explained that “the Company is not advancing any specific proposal in this proceeding to promote, allow, or enable utility ownership of generation.” Regarding BETP’s request for information on the Company’s position on its legal authority to own generation, the Company’s legal counsel advised that General Statute Section 16-244e(a) identifies the circumstances under which an electric distribution company can own generation, stating: “An electric distribution company shall not own or operate generation assets, except as provided in this section and sections 16-43d, 16-243m, 16-243u, 16a-3b and 16a-3c, provided nothing in this section or in section 16-244w shall be interpreted to prohibit or limit the ability of an electric distribution company from building, owning or operating an energy storage system.” Prior Referenced Response: i CIEC-001 Question: (Executive Leadership Panel) With reference to page 21 of the Executive Leadership Panel’s Direct Testimony, state whether the Company is advancing any proposal in this proceeding that would promote, allow, or otherwise enable utility ownership of generation. If the Company is advancing any such proposal in this proceeding, provide a reference to the testimony where the proposal(s) may be found. CIEC-001 Response: No, the Company is not advancing any specific proposal in this proceeding to promote, allow, or enable utility ownership of generation. The Company’s point is that it is time to consider all alternatives to solving the energy affordability conundrum in Connecticut (and the broader New England region). This should start with development of a comprehensive independent integrated resource planning assessment that projects the state of resource adequacy under a range of scenarios – ten years out. This is the type of study completed with robust stakeholder participation and input – including EDCs, LDCs, the legislature, and advocates for all customer segments (residential, commercial, and industrial) – that is essential to formulate an informed view of the comprehensive solution set necessary to meet the future resource adequacy needs within Connecticut. The Company is open to consideration of what would

Text of NECTA Set 6_COMBINED.pdf

Extracted from the file · 22 pages · 43,545 characters

Text of OCC Set 29_COMBINED.pdf

Extracted from the file · 30 pages · 65,312 characters

Text of PURA Set 8_COMBINED.pdf

Extracted from the file · 230 pages · 511,861 characters

As listed on the current system

Corres. 11/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8

This filing on the current system (opens in a new tab)