Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8

Files9

Search terms highlighted
Eversource rate increase is on 89 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
2 pages match
2 pages match

Text of ALLCO Set 18_COMBINED.pdf

Extracted from the file · 25 pages · 65,407 characters

Text of CIEC Set 7_COMBINED.pdf

Extracted from the file · 7 pages · 8,262 characters

48 pages match
  1. Page 57 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-010 Page 5 of 8 New Approved a relatively Cost changes must fall within $1.5 million revenue- New Hampshire Hampshire – narrow Z-Factor the Commission's defined requirement impact Public Utilities Public Service covering specific cost categories and satisfy the Commission Order Company of changes resulting from applicable threshold. The No. 28,170 (July New state or federal Commission adopted its 25, 2025), Docket Hampshire government actions, earlier definition for the DE 24-070, pp. 2 regulatory cost exogenous-event provision. and 54. reassignments, and changes in accounting rules. These adjustments may be forward-looking when known and measurable. Alberta – Approved a general Z-Factor for All five criteria must be met: (1) outside Jurisdiction Regulatory decision / Approved Z-Factor Criteria scope and qualifying eligibility events for Dollar equivalent of an after-tax 40- Z-Factor Materiality threshold AUC Decision 27388-D01-2023 Reference Electric and significant positive or management's control; (2) basis-point change in (October 4, 2023), Gas negative financial material impact; (3) no ROE, calculated using Appendix 5, pp. Distribution impacts from exogenous significant influence on the the utility's equity 119–120. Utilities events. inflation factor; (4) prudently supporting 2023 May apply to capital or incurred costs; and (5) going-in rates; O&M. No exclusive list unforeseen event. The impact escalated annually by of qualifying events is must also lack another I-X prescribed. reasonable recovery mechanism within the PBR framework.
  2. Page 58 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-010 Page 6 of 8 Massachusetts – Eversource (NSTAR Electric) Approved exogenous Cost change must be beyond $4 million per MDPU, NSTAR costs from: (1) tax-law company control, arise from individual event in the Electric Company changes uniquely qualifying first PBR year, d/b/a Eversource affecting the industry; legal/accounting/regulatory adjusted annually by Energy, D.P.U. 22(2) industry-specific action, uniquely affect electric GDP-PI 22, Final Order, accounting changes; and distribution rather than the Generally (November 30, (3) regulatory, judicial, general economy, and not be noncumulative, with 2022), pp. 71–76. or legislative changes reflected in GDP-PI. limited exceptions for uniquely affecting the Supporting evidence is related property-tax industry. required, and eligibility is events determined case by case. Massachusetts Approved the standard Beyond management control; $110,000 per event MDPU, Fitchburg – MA categories of arises from qualifying changes with annual GDP-PI Gas and Electric Fitchburg Gas industry-specific tax, in requirements or directives; adjustments Light Company d/b/a and Electric accounting, regulatory, unique to the distribution Unitil, Light Company judicial, and legislative industry; material; and not D.P.U. 23(Unitil Electric) changes. reflected in the inflation index 80/D.P.U. 23-81, or otherwise in PBR formula. Final Order (June 28, 2024), 51–54 Jurisdiction Regulatory decision / Approved Z-Factor Criteria scope and qualifying eligibility events for Z-Factor Materiality threshold Reference
  3. Page 59 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-010 Page 7 of 8 Massachusetts Approved the standard Qualifying costs must be $3.6 million per MDPU, – Massachusetts beyond control, arise from individual event Massachusetts Massachusetts categories. Also industry-specific initially, adjusted Electric Company Electric expressly approved legal/accounting/regulatory annually by GDP-PI and Nantucket Company and potential Z-Factor changes, not be reflected in the Special storm Electric Company, Nantucket recovery for certain applicable inflation provision: individual each d/b/a National Electric major storm-related adjustment, and meet the storm O&M expenses Grid, Company O&M expenses, subject significance threshold. For above $30 million, D.P.U. 23-150, (National Grid to additional conditions major storms, additional where the storm fund Final Order Electric) and prudence review. storm-fund eligibility balance plus costs (September 30, requirements apply. exceeding 2024), pp. 94–96. $30M, exceeds $75M. Ontario Electricity Distributors – Approved a general Z- Three principal tests: (i) Under the OEB's 3rd Ontario Energy Factor mechanism for causation, (ii) materiality, and Generation IRM, the Board, Supplemental extraordinary, (iii) prudence. Costs must be standard Z-factor Report on 3rd unforeseen events incremental to those reflected materiality thresholds outside management's in rates; management must are C$50,000 for control. Examples show the event could not utilities with Generation Incentive for include severe storms reasonably have been planned distribution revenue Regulation and other exceptional or budgeted for. Current requirements up to Ontario’s Electricity Distributors, Docket events. The framework guidance also requires the C$10M; 0.5% of does not restrict claims distributor's achieved ROE not distribution revenue EB-2007-0673, solely to legal or to exceed its deemed ROE by requirement for (September regulatory changes. more than 300 basis points. utilities above C$10M 17, 2008), through C$200M; Appendix B, VIIC$1M for utilities VIII above C$200M. The threshold applies on a per-event basis.
  4. Page 60 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-010 Page 8 of 8 Jurisdiction Regulatory decision / Approved Z-Factor Criteria scope and qualifying eligibility events for Z-Factor Materiality threshold Reference However, utilities operating under OEBapproved Custom IR plans may be subject to different, utilityspecific materiality thresholds. Hawaii Hawaiian Electric Companies – Approved a broad Z- Six criteria: (1) outside control $4 million per event Hawaii Public Factor mechanism for of a prudent utility; for HECO; $1 million Utilities exceptional events (2) directly related to the per event for HELCO Commission, beyond reasonable exogenous event; (3) impact and MECO Decision and Order utility management outside the original rate base; No. 37507 control. Potential (4) prudently incurred; (5) not (December 22, examples discussed in otherwise recovered through 2020), Docket the proceeding include rates, insurance, government 2018-0088, pp. tax-law changes, natural aid, or third parties; and (6) 57–60 and 80. disasters, and above materiality threshold. pandemics, but the Each request is evaluated Commission individually. deliberately did not establish an exclusive or automatically approved list. Changes to ROE or credit ratings do not qualify.
  5. Page 61 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-011 Page 1 of 2 Date Filed: October 27, 2026 Witness: Donald J. Scacco Jr., Digaunto Chatterjee and Douglas P. Horton Request from: Department of Energy and Environmental Protection Question: (Utility Owned Generation) Refer to Exhibit CLP-ELP-1 p. 21-24. Please explain the Company’s position on its legal authority to own the generation it is proposing in its CLP-ELP-1 testimony? Response: The Company’s response to CIEC-001 i explained that “the Company is not advancing any specific proposal in this proceeding to promote, allow, or enable utility ownership of generation.” Regarding BETP’s request for information on the Company’s position on its legal authority to own generation, the Company’s legal counsel advised that General Statute Section 16-244e(a) identifies the circumstances under which an electric distribution company can own generation, stating: “An electric distribution company shall not own or operate generation assets, except as provided in this section and sections 16-43d, 16-243m, 16-243u, 16a-3b and 16a-3c, provided nothing in this section or in section 16-244w shall be interpreted to prohibit or limit the ability of an electric distribution company from building, owning or operating an energy storage system.” Prior Referenced Response: i CIEC-001 Question: (Executive Leadership Panel) With reference to page 21 of the Executive Leadership Panel’s Direct Testimony, state whether the Company is advancing any proposal in this proceeding that would promote, allow, or otherwise enable utility ownership of generation. If the Company is advancing any such proposal in this proceeding, provide a reference to the testimony where the proposal(s) may be found. CIEC-001 Response: No, the Company is not advancing any specific proposal in this proceeding to promote, allow, or enable utility ownership of generation. The Company’s point is that it is time to consider all alternatives to solving the energy affordability conundrum in Connecticut (and the broader New England region). This should start with development of a comprehensive independent integrated resource planning assessment that projects the state of resource adequacy under a range of scenarios – ten years out. This is the type of study completed with robust stakeholder participation and input – including EDCs, LDCs, the legislature, and advocates for all customer segments (residential, commercial, and industrial) – that is essential to formulate an informed view of the comprehensive solution set necessary to meet the future resource adequacy needs within Connecticut. The Company is open to consideration of what would
  6. Page 62 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-011 Page 2 of 2 essentially be customer-owned generation through the utility operating model, if it would be the most cost-effective solution to meet reliability needs of Connecticut customers.
  7. Page 63 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-012 Page 1 of 1 Date Filed: October 23, 2026 Witness: Warren R. Boutin and Andrew C. Belden Request from: Department of Energy and Environmental Protection Question: (DERs) Has the Company conducted a retrospective analysis on the costs avoided by DERs against the costs incurred for integrating and supporting DERs? If so, please provide the results. Response: The Company has not conducted a retrospective analysis comparing costs avoided vs cost incurred. It must be noted that costs for system investments are incurred by the respective DER project and do not directly impact ratepayers.
  8. Page 64 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-013 Page 1 of 3 Date Filed: October 27, 2026 Witness: Leanne M. Landry and Jeffrey D. Turano Request from: Department of Energy and Environmental Protection Question: (Historic Capital Investment) Please provide by total dollars per year the amount spent on annual capital investments for each year from 2005 –2025 for: (1) distribution and (2) transmission. Are capital investments primarily constrained by capital availability or system needs? Response: Please refer to CIEC-008 i for capital distribution expenditures by year from 2018 through 2025, as annually filed in compliance with Docket No. 17-10-46. The Company notes that historical capital investment data is provided beginning in 2018, as this represents the relevant historical period for purposes of the current rate case. CL&P’s transmission investment is out of scope for this distribution rate proceeding, however, for informational purposes to assist in DEEP’s inquiry, please refer to the below excerpt from the Year End 2025 Earnings Report where the Company presented actual 2025 transmission capital spending and forecasted spending for the years 2026-2030. This publicly available chart summarizes the transmission capital expenditures for each Eversource Energy electric operating company. Please refer to OCC-924 ii which addresses budget flexibility with capital investments.
  9. Page 65 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-013 Page 2 of 3 Prior Referenced Responses: i CIEC-008 Question: (Capital Additions Panel) For each of the past 10 calendar years, specify: a. the capital expenditure budget broken down by investment in the transmission, sub-transmission, primary, and secondary systems; and b. the amount of actual capital expenditures, broken down by investment in the transmission, sub-transmission, primary, and secondary systems. CIEC-008 Response: For purposes of the capital expenditure budget in this distribution rate proceeding, the Company does not track investment by the categories of “transmission, sub-transmission, primary, and secondary systems.” ii a. Please refer to CIEC-008, Attachment 1, for a summary of actual and forecast distribution capital expenditures for the years 2018-2025 as filed in compliance with Docket No. 17-10-46 each year. b. Please refer to subpart a. Please also refer to Exhibit CLP-ADDITIONS-4 which summarizes the cumulative capital spending to date for each project put in service from 2017-2025 greater than $100K and Exhibit CLPADDITIONS 6 which includes the associated capital project documentation. Also for reference, although not capital spending, Exhibit CLP-ADDITIONS-2 and 3 provide a summary of plant additions (both distribution and transmission) by year and is reconciled to the Company’s FERC Form 1. OCC-924 Question: (Capital Projects) Referring to Exhibit CLP-Additions-1, page 12. Please define the term “flexibility in the budget”; explain what determines whether a project has budget flexibility or not; and identify the components (i.e. project cost categories) of a project budget which are flexible and which are inflexible. OCC-924 Response: The term “flexibility in the budget” is a reference to the overall capital budget, not the budget for a specific project. The term refers to the ability to defer, accelerate, or reprioritize planned capital spending within a given budget period in response to changing system conditions, emerging operational needs, or unforeseen project requirements. Budget flexibility is an important component of managing a large capital portfolio and enables the Company to efficiently allocate capital to projects that provide the greatest near-term benefit to customers and system operations. Whether a specific project has flexibility in relation to the overall budget depends primarily on the urgency of the underlying need, regulatory or compliance requirements, customer commitments, safety considerations, and the potential system impacts associated with delaying the work. Projects that address immediate safety concerns, mandated compliance requirements, emergent reliability issues, customer-driven obligations, or equipment failures generally have limited or no budget flexibility because delays could result in unacceptable operational, safety, or customer impacts. In contrast, projects addressing aging infrastructure that remain in serviceable condition may have greater flexibility because the assets can continue to operate safely and reliably for a period beyond the originally planned replacement date.
  10. Page 66 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-013 Page 3 of 3 For aging infrastructure replacement projects, budget flexibility typically exists when asset condition, engineering assessments, operational history and system performance indicate that the asset can remain in service without creating an immediate reliability, safety, or compliance concern. In these situations, The Company may defer a planned replacement project by one or more years with limited near-term impact on customer reliability while continuing to monitor the asset through its normal maintenance and inspection programs. Budget categories that are generally considered more flexible include planned construction expenditures associated with asset replacement programs, such as labor, materials, equipment, and contractor costs for projects that have not yet commenced construction or where construction can be paused without creating risk to the distribution system and can be rescheduled based on emergent priorities. The ability to defer certain aging infrastructure replacement projects provides an important mechanism for managing capital expenditures within the overall portfolio. When unforeseen conditions arise, such as unexpected equipment failures, storm-related damage, deteriorated assets identified through inspections, or other emergent reliability needs, funding associated with projects that can be safely deferred may be reallocated to address those higher-priority needs. This approach allows the Company to respond promptly to emergent system conditions while continuing to maintain safe and reliable service. Deferred replacement projects remain within the long-term capital plan and are reevaluated in subsequent planning cycles to ensure that asset condition and system risk remain acceptable before replacement is further postponed. Accordingly, budget flexibility does not reflect the elimination of planned infrastructure investments, but rather the Company’s ability to optimize the timing of certain replacement projects whose deferral is not expected to have an immediate impact on system reliability, while ensuring sufficient funding is available to address unforeseen conditions that require immediate corrective action.

Text of NECTA Set 6_COMBINED.pdf

Extracted from the file · 22 pages · 43,545 characters

Text of OCC Set 29_COMBINED.pdf

Extracted from the file · 30 pages · 65,312 characters

Text of PURA Set 8_COMBINED.pdf

Extracted from the file · 230 pages · 511,861 characters

As listed on the current system

Corres. 11/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8

This filing on the current system (opens in a new tab)