Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8
Files9
Docket No. 26-05-10 Discovery Compilation November 6 2026.pdf
PDF · 134 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation November 6 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation November 6 2026.pdf
ALLCO Set 13_COMBINED.pdf
PDF · 801 KB · 49 pagesText searchable
Download ALLCO Set 13_COMBINED.pdfRead the text of ALLCO Set 13_COMBINED.pdf
ALLCO Set 16_COMBINED.pdf
PDF · 642 KB · 22 pagesText searchable
Download ALLCO Set 16_COMBINED.pdfRead the text of ALLCO Set 16_COMBINED.pdf
ALLCO Set 18_COMBINED.pdf
PDF · 306 KB · 25 pagesText searchable
Download ALLCO Set 18_COMBINED.pdfRead the text of ALLCO Set 18_COMBINED.pdf
CIEC Set 7_COMBINED.pdf
PDF · 230 KB · 7 pagesText searchable
Download CIEC Set 7_COMBINED.pdfRead the text of CIEC Set 7_COMBINED.pdf
DEEP Set 1 (BETP)_COMBINED.pdf
PDF · 1.9 MB · 174 pagesText searchable
Download DEEP Set 1 (BETP)_COMBINED.pdfRead the text of DEEP Set 1 (BETP)_COMBINED.pdf
NECTA Set 6_COMBINED.pdf
PDF · 446 KB · 22 pagesText searchable
Download NECTA Set 6_COMBINED.pdfRead the text of NECTA Set 6_COMBINED.pdf
OCC Set 29_COMBINED.pdf
PDF · 499 KB · 30 pagesText searchable
Download OCC Set 29_COMBINED.pdfRead the text of OCC Set 29_COMBINED.pdf
PURA Set 8_COMBINED.pdf
PDF · 2.5 MB · 230 pagesText searchable
Download PURA Set 8_COMBINED.pdfRead the text of PURA Set 8_COMBINED.pdf
Text of ALLCO Set 18_COMBINED.pdf
Extracted from the file · 25 pages · 65,407 characters
Text of CIEC Set 7_COMBINED.pdf
Extracted from the file · 7 pages · 8,262 characters
Page 62 of 174
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-011 Page 2 of 2 essentially be customer-owned generation through the utility operating model, if it would be the most cost-effective solution to meet reliability needs of Connecticut customers.Page 63 of 174
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-012 Page 1 of 1 Date Filed: October 23, 2026 Witness: Warren R. Boutin and Andrew C. Belden Request from: Department of Energy and Environmental Protection Question: (DERs) Has the Company conducted a retrospective analysis on the costs avoided by DERs against the costs incurred for integrating and supporting DERs? If so, please provide the results. Response: The Company has not conducted a retrospective analysis comparing costs avoided vs cost incurred. It must be noted that costs for system investments are incurred by the respective DER project and do not directly impact ratepayers.Page 64 of 174
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-013 Page 1 of 3 Date Filed: October 27, 2026 Witness: Leanne M. Landry and Jeffrey D. Turano Request from: Department of Energy and Environmental Protection Question: (Historic Capital Investment) Please provide by total dollars per year the amount spent on annual capital investments for each year from 2005 –2025 for: (1) distribution and (2) transmission. Are capital investments primarily constrained by capital availability or system needs? Response: Please refer to CIEC-008 i for capital distribution expenditures by year from 2018 through 2025, as annually filed in compliance with Docket No. 17-10-46. The Company notes that historical capital investment data is provided beginning in 2018, as this represents the relevant historical period for purposes of the current rate case. CL&P’s transmission investment is out of scope for this distribution rate proceeding, however, for informational purposes to assist in DEEP’s inquiry, please refer to the below excerpt from the Year End 2025 Earnings Report where the Company presented actual 2025 transmission capital spending and forecasted spending for the years 2026-2030. This publicly available chart summarizes the transmission capital expenditures for each Eversource Energy electric operating company. Please refer to OCC-924 ii which addresses budget flexibility with capital investments.Page 65 of 174
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-013 Page 2 of 3 Prior Referenced Responses: i CIEC-008 Question: (Capital Additions Panel) For each of the past 10 calendar years, specify: a. the capital expenditure budget broken down by investment in the transmission, sub-transmission, primary, and secondary systems; and b. the amount of actual capital expenditures, broken down by investment in the transmission, sub-transmission, primary, and secondary systems. CIEC-008 Response: For purposes of the capital expenditure budget in this distribution rate proceeding, the Company does not track investment by the categories of “transmission, sub-transmission, primary, and secondary systems.” ii a. Please refer to CIEC-008, Attachment 1, for a summary of actual and forecast distribution capital expenditures for the years 2018-2025 as filed in compliance with Docket No. 17-10-46 each year. b. Please refer to subpart a. Please also refer to Exhibit CLP-ADDITIONS-4 which summarizes the cumulative capital spending to date for each project put in service from 2017-2025 greater than $100K and Exhibit CLPADDITIONS 6 which includes the associated capital project documentation. Also for reference, although not capital spending, Exhibit CLP-ADDITIONS-2 and 3 provide a summary of plant additions (both distribution and transmission) by year and is reconciled to the Company’s FERC Form 1. OCC-924 Question: (Capital Projects) Referring to Exhibit CLP-Additions-1, page 12. Please define the term “flexibility in the budget”; explain what determines whether a project has budget flexibility or not; and identify the components (i.e. project cost categories) of a project budget which are flexible and which are inflexible. OCC-924 Response: The term “flexibility in the budget” is a reference to the overall capital budget, not the budget for a specific project. The term refers to the ability to defer, accelerate, or reprioritize planned capital spending within a given budget period in response to changing system conditions, emerging operational needs, or unforeseen project requirements. Budget flexibility is an important component of managing a large capital portfolio and enables the Company to efficiently allocate capital to projects that provide the greatest near-term benefit to customers and system operations. Whether a specific project has flexibility in relation to the overall budget depends primarily on the urgency of the underlying need, regulatory or compliance requirements, customer commitments, safety considerations, and the potential system impacts associated with delaying the work. Projects that address immediate safety concerns, mandated compliance requirements, emergent reliability issues, customer-driven obligations, or equipment failures generally have limited or no budget flexibility because delays could result in unacceptable operational, safety, or customer impacts. In contrast, projects addressing aging infrastructure that remain in serviceable condition may have greater flexibility because the assets can continue to operate safely and reliably for a period beyond the originally planned replacement date.Page 66 of 174
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-013 Page 3 of 3 For aging infrastructure replacement projects, budget flexibility typically exists when asset condition, engineering assessments, operational history and system performance indicate that the asset can remain in service without creating an immediate reliability, safety, or compliance concern. In these situations, The Company may defer a planned replacement project by one or more years with limited near-term impact on customer reliability while continuing to monitor the asset through its normal maintenance and inspection programs. Budget categories that are generally considered more flexible include planned construction expenditures associated with asset replacement programs, such as labor, materials, equipment, and contractor costs for projects that have not yet commenced construction or where construction can be paused without creating risk to the distribution system and can be rescheduled based on emergent priorities. The ability to defer certain aging infrastructure replacement projects provides an important mechanism for managing capital expenditures within the overall portfolio. When unforeseen conditions arise, such as unexpected equipment failures, storm-related damage, deteriorated assets identified through inspections, or other emergent reliability needs, funding associated with projects that can be safely deferred may be reallocated to address those higher-priority needs. This approach allows the Company to respond promptly to emergent system conditions while continuing to maintain safe and reliable service. Deferred replacement projects remain within the long-term capital plan and are reevaluated in subsequent planning cycles to ensure that asset condition and system risk remain acceptable before replacement is further postponed. Accordingly, budget flexibility does not reflect the elimination of planned infrastructure investments, but rather the Company’s ability to optimize the timing of certain replacement projects whose deferral is not expected to have an immediate impact on system reliability, while ensuring sufficient funding is available to address unforeseen conditions that require immediate corrective action.Page 67 of 174
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-014 Page 1 of 1 Date Filed: October 27, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray and Steven C. Osuch Request from: Department of Energy and Environmental Protection Question: (SHARE) Refer to Exhibit CLP-TSP-3 p. 47-48. Are any of these costs related to the Shared Hosting for Advancement of Renewable Energy (SHARE) proposal? If yes, please provide a breakdown in each category listed of SHARE-related costs and non-SHARE-related costs. Response: Exhibit CLP-TSP-3, pages 47-48, do not pertain to the Shared Hosting for Advancement of Renewable Energy (SHARE) proposals. Rather, these pages identify grid needs that are intended to be addressed through the Targeted System Performance plan. Therefore, the costs presented on p. 47-48 are not categorized as SHARE-related costs. The SHARE proposals are included within the Advancing the Grid planning category discussed in Exhibit CLP-TSP-3, page 131. While page 131 presents SHARE within the overall Advancing the Grid forecast, it does not separately provide the investment-category breakdown requested here. Therefore, to provide a response in a format comparable to the investment-category presentation shown on pages 47-48, the Company has provided the updated Advancing the Grid investment chart below, together with the associated category-level cost breakdown. The chart separately identifies SHARE-related investments from other Advancing the Grid investments.Page 68 of 174
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-015 Page 1 of 1 Date Filed: October 27, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Department of Energy and Environmental Protection Question: Refer to Exhibit CLP-TSP-3 p. 102. Please provide project details about the 39.1 MW of DER in the queue that is assumed to come online within the next three years, including but not limited to: a. b. c. d. technology type; size; date entered the interconnection queue; and any relevant ratepayer-funded incentive program the project may be participating in (e.g. Nonresidential Renewable Energy Solutions, Shared Clean Energy Facilities, Energy Storage Solutions, etc.) Response: Exhibit CLP-TSP-3, page 102, references the historical DER queue that existed at the time the study supporting the proposed non-wires alternative solution at the Campville 14R Bulk Substation was performed. The Company does not maintain historical snapshots of the interconnection queue; however, BETP-015, Attachment 1 CONFIDENTIAL, provides a list of projects that were online as of 2022, as well as projects currently in the queue, which should be generally representative of the queue at that time. This information would not include projects that were subsequently withdrawn and may have been reflected in the queue when the study was originally conducted. BETP-015, Attachment 1 CONFIDENTIAL, provides information responsive to subparts (a) through (d). With respect to subpart (d), however, the Company does not maintain a single dataset with common identifiers that can be readily queried across customer-funded incentive programs, interconnection applications and substation planning records. Accordingly, the information provided is substantially complete and reasonably representative; however, the data may contain omissions or inaccuracies resulting from limitations in the underlying source systems and the absence of direct linkages between these data sets.Page 69 of 174
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-016 Page 1 of 1 Date Filed: October 27, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Department of Energy and Environmental Protection Question: Refer to Exhibit CLP-TSP-3 p. 143. Please describe how the two substations from the list of eight substations identified in Docket No. 22-06-29RE01 were chosen over the others, and describe how the one additional substation was chosen over others identified in Docket No. 22-06-29RE01 for the Shared Hosting for Advancement of Renewable Energy (SHARE) proposal. Response: Project selection was based on limited or constrained hosting capacity within the proposed project area, the amount of distributed energy resource (DER) capacity (MW) in the interconnection queue and identified adjacent grid needs within the area. The DER capacity considered as part of this evaluation was based on the active interconnection queue at the time of project screening. Since the interconnection queue is dynamic and continually changes as projects are submitted, withdrawn, modified, or placed online, the Company focused on substations with active interconnection requests that could directly benefit from hosting-capacity improvements. While historical withdrawal activity may indicate prior interest in DER development at a particular substation, withdrawn projects no longer have active applications and therefore would not be candidates to initially benefit from the SHARE program. Addressing DER hosting-capacity needs concurrently with identified grid needs in the area allows investment plans to be co-optimized, resulting in reduced overall cost and higher utilization. If the area system needs were addressed independently or myopically, additional future investments may be required to accommodate incremental demand growth (from load or DER), resulting in duplicative costs, including, but not limited to, mobilization, outage coordination, engineering, and construction activities. By combining these investments into a single project, the Company can address both system and DER needs more cost-effectively while ensuring that costs are appropriately allocated to beneficiaries based on capacity use.Page 70 of 174
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-017 Page 1 of 2 Date Filed: October 26, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Department of Energy and Environmental Protection Question: Refer to Exhibit CLP-TSP-3 p. 145. For each of the eight proposed and potential substations to participate in the Shared Hosting for Advancement of Renewable Energy (SHARE) proposal, please provide project details about the DER in queue, including but not limited to: a. technology type; b. size; c. date entered the interconnection queue; d. and any relevant ratepayer-funded incentive program the project may be participating in (e.g. Nonresidential Renewable Energy Solutions, Shared Clean Energy Facilities, Energy Storage Solutions, etc.) Response: The Company provides BETP-017, Attachment 1 CONFIDENTIAL, in response to this request. The attachment provides information on active interconnection requests associated with the proposed and potential SHARE substations identified on pages 145 through 149, of Exhibit CLPTSP-3, and provides the requested project information, including technology type, size, queue date, and participation in certain customer-funded incentive programs. The queue information reflected in BETP-017, Attachment 1 CONFIDENTIAL, represents a current snapshot of active interconnection applications and therefore may differ from the queue values referenced on pages 145 through 149, of Exhibit CLP-TSP-3, which were based on earlier evaluations of these opportunities. Changes in queue quantities can result from a variety of factors, including new applications, completed interconnections with developer funded improvements, project modifications, incidental grid needs resulting in increased hosting capacity, and withdrawn applications. As a result, current queue levels may differ from those considered during the original screening analyses. In particular, highly constrained substations may experience project withdrawals when substantial interconnection upgrades are required before projects can proceed. Under the current interconnection framework, the first developer to trigger such a constraint may be responsible for funding an upgrade that subsequently benefits additional interconnection customers. As a result, projects may remain in the queue for extended periods while developers evaluate alternatives orPage 71 of 174
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-017 Page 2 of 2 await system improvements that may reduce assigned interconnection costs and, in some cases, projects may ultimately be withdrawn. Consequently, the active queue at a given point in time may not fully reflect the historical level of developer interest at a location. These conditions are among the challenges that the proposed SHARE framework is intended to address through a more effective allocation of upgrade costs among participating beneficiaries. The Company also notes that certain SHARE opportunities reflected on pages 145 through 149, of Exhibit CLP-TSP-3, have been refined from the original concepts evaluated in Docket No. 2206-29RE01. In certain cases, the Company expanded the scope from individual substations to broader group study regions in an effort to improve cost allocation and maximize benefits for stakeholders. To provide additional context regarding the current proposals, BETP-017, Attachment 1, includes summary information and supporting queue data for substations incorporated into the proposed Campville and Tracy SHARE group-study regions. Participation in customer-funded incentive programs was compiled using information obtained from multiple Company and program-administrator data sources. Although the information provided is substantially complete and reasonably representative, the Company does not maintain a single dataset with common identifiers that can be readily queried across interconnection applications, incentive program records and planning databases. Accordingly, the attachment may reflect omissions or inaccuracies resulting from limitations in the underlying source systems, differences in data quality and the absence of direct linkages between these datasets.
Text of NECTA Set 6_COMBINED.pdf
Extracted from the file · 22 pages · 43,545 characters
Text of OCC Set 29_COMBINED.pdf
Extracted from the file · 30 pages · 65,312 characters
Text of PURA Set 8_COMBINED.pdf
Extracted from the file · 230 pages · 511,861 characters
As listed on the current system
Corres. 11/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8