Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8

Files9

Search terms highlighted
Eversource rate increase is on 89 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
2 pages match
2 pages match

Text of ALLCO Set 18_COMBINED.pdf

Extracted from the file · 25 pages · 65,407 characters

Text of CIEC Set 7_COMBINED.pdf

Extracted from the file · 7 pages · 8,262 characters

48 pages match
  1. Page 97 of 174Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-022 Page 13 of 16 proposal aligns cost recovery with prudent investment and incentivizes efficient execution of the capital program, all while minimizing customer over-collection. Based on the above framework, an exhibit that demonstrates a revenue requirement consisting of: (1) a reconciliation of actual plant additions placed in service during the previous calendar year against the approved forecast (also referred to as the F-factor allowance) for that calendar year, and (2) the F-factor allowance for the new Rate Year beginning July 1st, would be filed on or about March 1st of each year consistent with the timing of all other RAM component reconciliations. Concurrent with that timing, all plant additions documentation for the previous calendar year included in the above reconciliation will also be filed on or about March 1st as part of the same filing. Further, under the Company’s proposed timeline, the revenue requirement resulting from the reconciliation of the prior year’s F-factor allowance and the new Rate Year’s F-factor allowance will go into effect on July 1, following the March 1st filing. As part of the RAM process, PURA performed prudence reviews of capital documentation filed for the ESI, including discovery, between March 1st and September 1st, the date on which additional RAM rate changes were made. Even though PBMRP rates would go into effect on July 1st, the Company proposes that this timeline continues to be used for capital prudence reviews under the PBMRP. To the extent PURA’s prudence review warrants any adjustment to the revenue requirement that went into effect on July 1, the Company will calculate the excess revenue collected from customers over the period of July 1 through August 31 and include this amount, plus carrying costs for those 2 months, in the RDM’s allowed revenue target for the July 1 through June 30th Rate Year. b. Please refer to subpart (d) of this question. c. Please refer to subpart (d) of this question. d. Please refer to the example shown in EOE-156, Attachment 1, pages 4 through 12, showing how the annual capital recovery process, including reconciliation, would function, including detailed calculations in the form to be used in the annual adjustment filings. Please note that pages 4, through 12, show an illustrative example for all four Rate Years contemplated for the duration of the PBMRP; however, the annual filing would only be for a single year of the PBMRP. As part of this example, please refer to the differences between realized annual plant addition costs and the associated rate base, and the return, taxes, and depreciation on rate base that are included in the going-in revenues found in EOE-156, Attachment 1, worksheet “PBR-7 Going-In Capital RR”, Lines 13-16. Additionally, the detailed calculations shown in EOE-156, Attachment 1, pages 4 through 12, demonstrate that the annual PBR reconciliations will be an assessment of the Company’s total accumulated depreciation included in base distribution rates (i.e., customers will be receiving credit for the increase in the Company’s accumulated depreciation for all capital included in base distribution rates), as opposed to the Company’s entire rate base (the Company considers its entire rate base to include other rate base items such as deferred assets and liabilities, etc.). e. The revenue requirement for capital recovery will include appropriate recovery of net plant in service, accumulated deferred income taxes (“ADIT”) and accumulated depreciation for the cumulative additional plant additions and will include a pre-tax return on investment (i.e. return on rate base including income taxes), return of investment (i.e. depreciation), property taxes, gross earnings tax and uncollectible expense. iii OCC-858 Question:
  2. Page 98 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-022 Page 14 of 16 Refer to Exhibit CLP-ELP-1, figure 7. Please explain whether the amounts shown in Figure 7 are capital expenditures versus plant additions. Please explain any differences in the nature, or timing of the amounts shown in Figure 7 and the amounts of plant addition that would be used in comparing [i.e., determining “lessor of”] annual plant addition costs in the annual reconciliation filings. a. Please identify, in disaggregated table form, all of the component costs included in each category of the amounts shown in Figure 7. OCC-858 Response: Plant additions and capital expenditures represent two different ways of viewing the same underlying investment. Capital expenditures are generally organized and managed around specific business objectives, programs, projects, or asset installation efforts, such as substation expansions, feeder rebuilds, pole replacement programs, or other distribution system investments. Capital expenditures are incurred over the course of project execution and may span multiple months or years depending on project scope, complexity, and construction schedules. Plant additions, by contrast, are recognized when utility assets are placed in service and meet the applicable accounting criteria for recording as utility plant. Accordingly, a plant addition is generally recorded at a specific point in time, whereas the associated capital expenditures may have been incurred over an extended period. The Company develops its forecast of plant additions using its capital investment plans, project schedules, anticipated in-service dates when possible, and historical experience. However, actual in-service dates may differ from forecasted in-service dates (where available) due to changes in project scope, construction sequencing, permitting, material availability, operational considerations, weather, or other factors. Consequently, the timing of annual plant additions may differ from the timing of annual capital expenditures. While such timing differences may occur in any given year, over a multi-year period it is reasonable to expect that plant additions, together with associated cost of removal, will generally track with capital expenditures. The amounts shown in Figure 7 are forecasted capital expenditures associated with the Company’s planned investment programs. As stated in its response to OCC-423i and other interrogatories, the Company’s annual F-Factor reconciliation would consider specifically the plant additions actually placed in-service through the calendar year-end prior to a given annual filing. For subpart (a) of this request, please refer to OCC-858, Attachment 1. iv EOE-371 Question: (F-FACTOR; TARGETED SYSTEM PERFORMANCE PLAN) Refer to Response to EOE-156, Att.1-Att.2. The Company’s F-Factor Excel spreadsheet (PBR-4 F-Factor tab) details monthly Plant Additions, Retirements, and Cost of Removal and cites “Exhibit CLP-ELP-1, Figure 7, annual figure divided by 12 less COR” and “Per Company Financial Forecast”. Additionally, the PBR-6 Capital Expense Forecast tab details similar annual information by category. Please provide the underlying information used to derive the cited Figure 7 and the Financial Forecast. As part of the response, provide a detailed listing of all planned capital additions, the anticipated in-service date, the total amount per addition, the category, and any additional details available to assist in understanding the nature and timing of the planned capital additions. This request also attempts to understand the level of information available for parties to assess if the planned capital additions within the TSP are adequately substantiated for both necessity and anticipated cost. EOE-371 Response:
  3. Page 99 of 174Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-022 Page 15 of 16 Please refer to the Company’s response to interrogatory OCC-858i, which describes the capital expenditure forecast as well as plant placed into service. Additionally, OCC-858, Attachment 1, provides additional details of the investments comprising the amounts shown in Figure 7. For additional discussion of the Company’s TSP and proposed F-Factor, please refer to the Company’s responses to interrogatories OCC-857ii, EOE-372iii, and EOE-374iv. As explained therein, the capital forecast presented in this proceeding serves as the foundation of the Company’s proposed F-Factor framework. As the Company explained in response to EOE-374: “[…] the Company is proposing a hard cap on core capital investment eligible for the F-Factor based on the capital forecast presented in this proceeding. By doing so, the Company can provide upfront, during this proceeding, indicative revenue increases necessary to support those investments while committing to cap resulting revenue increases during the PBMRP even if actual capital investment exceeds the forecast. Additionally, the downward-only reconciliation of the Company’s proposed F-Factor protects customers from theoretically-excessive investment, including even investments unforeseen today.” The information underlying Figure 7 of Exhibit CLP-ELP-1 and the F-Factor calculations reflects the Company’s current assessment of the investments necessary to maintain and improve the system over the PBMRP term, based on the operating conditions, planning assumptions, and system objectives known today. Accordingly, the forecast serves two critical purposes in this proceeding: it establishes the maximum level of capital investment eligible for recovery through the F-Factor (excluding AMI and other legislatively mandated capital programs not contemplated today) and provides the basis for the illustrative revenues necessary to support those investments. Consistent with the structure of the proposed PBMRP, the Company’s proposal does not require a determination, in this proceeding, of the prudence of individual capital projects that may ultimately be undertaken during the plan term. Rather, the focus at this stage is appropriately placed on the Company’s TSP, including the system needs, operating conditions, and policy objectives currently facing the Company, and the revenues necessary to support the investments intended to address those needs and achieve the objectives of the PBMRP, based on the information available today. The proposed annual reconciliation and prudence review is the mechanism through which the necessity, reasonableness, execution, and support for specific investments can be evaluated based on actual facts rather than forecasts. By the time of prudence review, stakeholders will have access to the completed investment, project-specific documentation, actual costs, rationale, and the circumstances that existed when the investment decision was made. Accordingly, the annual review process places parties in a substantially better position to evaluate prudence than would be possible in this proceeding, which necessarily relies on forward-looking forecasts and planning assumptions and precedes the investments themselves. This distinction is important because it aligns the review with the information available at each stage of the process. This proceeding necessarily relies on forecasts and planning assumptions to establish prospective investment levels and associated revenue requirements, while the annual reconciliation permits review of actual investment decisions based on a complete factual record available at that time. This structure also provides important customer protections. Customer rates ultimately reflect only prudent investments, not merely the projected investments and associated revenue requirements presented today. Recovery remains subject to review through the annual reconciliation process, and only investments found prudent are eligible for recovery through the F-Factor. At the same time, the Company’s proposed hard cap ensures that recoverable capital investment cannot exceed the forecasted level of investment presented and approved in this proceeding. Taken together, these features protect customers from recovery of imprudent investments, recovery of capital investment
  4. Page 100 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-022 Page 16 of 16 above the level forecast and approved in this proceeding, and the rate shock commonly experienced with traditional ratemaking.
  5. Page 101 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-023 Page 1 of 2 Date Filed: October 23, 2026 Witness: David L. Gladey and Jennifer A. Schilling Request from: Department of Energy and Environmental Protection Question: Refer to Exhibit CLP-TSP-1, pp. 33–36 and 67–71; Exhibit CLP-TSP-2, pp. 45–48; and Exhibit CLP-TSP-3, pp. 91–92 and 136–139. Please describe the Company’s current and planned use of artificial intelligence and machine learning technologies in Connecticut. In the Company’s response, please include the following: a. whether the use case is currently in practice, being piloted, or has been proposed for future development; b. the expected benefit to customers; c. the anticipated implementation timeline; d. and any significant data, cybersecurity, workforce, or other foreseeable barriers to implementation. Response: Eversource, consistent with other utilities and industries, can use AI in two main ways; first, use AI as a productivity enhancing and coding and analytics support tool and second, build or buy software tools and applications that have AI embedded. Regarding the first type of AI use, as a workforce assistance tool, at the time of this response, the Company has enabled business users to use Microsoft Copilot, as an overall personal productivity enhancing tool. Microsoft Copilot is not connected to any Company databases or software systems. Moreover, AI can run under the hood of various applications and software with or without the user’s knowledge or ability to choose or not to use it. As a simple example, a search in a web browser still results in an AI-generated response. Many cloud based (SaaS) systems are continuing to introduce AI capabilities on a day to day to basis and the expectation is that AI capabilities will be embedded in progressively more commercial tools. Regarding AI-embedded tools, there is a limited number of internally developed tools that run AI, currently utilized at CL&P. For example, the Control Room Call Analytics Dashboard is used by System Operations Management to efficiently flag training opportunities by analyzing calls between operators and field crews. The Company continues to research and review novel and emerging technologies. We expect future AI products and outputs to increase capabilities while keeping humans in control of decisions and outcomes to promote safe and reliable service. Cyber and physical security of our
  6. Page 102 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-023 Page 2 of 2 field staff and customers will always be a red line in evaluating the operationalization of any technology, including AI. As is the case for many other companies and industries, the future of AI applications at Eversource is highly volatile and unpredictable at this time.
  7. Page 103 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-024 Page 1 of 1 Date Filed: October 23, 2026 Witness: David L. Gladey and Jennifer A. Schilling Request from: Department of Energy and Environmental Protection Question: Refer to Exhibit CLP-TSP-1, pp. 33–36 and 67–71; Exhibit CLP-TSP-2, pp. 45–48; and Exhibit CLP-TSP-3, pp. 91–92 and 136–139. Did the Company use any artificial intelligence or machine learning in development of the proposed TSP? If not, explain whether and when the Company expects to incorporate those capabilities into its planning process. Response: The Company did not directly use AI tools, like ChatGPT or Claude or similar models, in its development of the TSP. The Company notes that AI can run under the hood of various applications and software with or without the user’s knowledge or ability to choose or not to use it. As a simple example, a search in a web browser still results in an AI-generated response. The Company continues to actively evaluate AI capabilities and use cases.
  8. Page 104 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-025 Page 1 of 4 Date Filed: October 27, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Department of Energy and Environmental Protection Question: Refer to Exhibit CLP-TSP-3. For each proposed substation or distribution-capacity project identified, please briefly identify the principal alternatives considered, including: a. b. c. d. e. f. g. load transfers; equipment uprating; storage demand response; flexible interconnection; or other non-wires alternatives. Please provide the estimated cost, implementation timeline, and principal reason each alternative was rejected or not selected. If no alternatives analysis was performed, explain why. Response: The substation capacity projects identified in the workbooks are in various stages of the projectapproval process. None of the projects have reached a stage that would have received a detailed NWA analysis to date. As these projects proceed through the solution selection and engineering stages, NWA and other alternatives will be vetted. The results will be submitted during the annual grid needs filing as part of the NWS docket. For additional project details, please refer to the Company’s response to OCC-599 i, identifying current project status, estimated budget, and any alternatives identified at this time. The line capacity projects identified currently exceed the planning criteria based on metered data and NWS solutions were analyzed as alternatives to traditional line projects. Demand response and flexible interconnections were not evaluated as alternatives due to the lack of both a DERMS system and AMI. The Company submitted all capital projects to the process monitor as part of Docket No. 25-08-08 and the ongoing Docket No. 26-08-08. Please refer to BETP-025, Attachment 1, identifying alternatives reviewed for distribution line projects. Please note that the PAF reflects only alternatives that were evaluated and determined to be feasible. As an example, load transfer options that were found to be infeasible were not included among the listed alternatives.
  9. Page 105 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-025 Page 2 of 4 Prior Referenced Response: i OCC-599 Question: Refer to Exhibit CLP-TSP-3 at 22–24. a. Provide the data underlying the headroom and constrained-area presentations on pages 22–24. For each substation identified as constrained, provide its normal and emergency rating, five-year historical load and peak load data, available headroom, forecast first year of violation, and proposed project cost. b. For each constrained substation identified, provide the existing analysis of temporary and permanent load transfers. Identify the receiving substation or feeder, available transfer capacity, MW that could be transferred, required enabling work, estimated cost, and reason any transfer was rejected. Please confirm if no transfer analysis was performed. c. Provide a summary of each actual substation capacity violation and stranded-load event experienced from 2016 through the present. Identify the substation, date, maximum loading, applicable rating, duration, contingency, customers at risk, customers interrupted, and whether load transfer prevented or reduced an outage. OCC-599 Response: a. The graphic depicted in CLP-TSP-3, at 22, is derived from headroom data for substations with actual values, time series data, and ratings shown on our public maps using the Eversource CT Grid Connection Navigator. Loads are based on our most recent summer peak year, 2025. Please refer to OCC-599, Attachment 1 CONFIDENTIAL, for project forecast violation year and the 5-year historical peak load data for each respective project. The table contains the LCC rating of each substation which is the planning criteria identified within the DSPG, please refer CLF-SC-023, Attachment 1. The following substations have projects initiated and have obtained at a minimum a conceptual level estimate: Substation West Brookfield 14H Beacon Falls 11N Franklin Drive 1B Southington 4C Berlin 6A_13.8kV Westside 7A Hopewell 22R Estimated Project Cost $16,900,000 $12,632,000 $17,986,000 $9,772,600 $23,199,000 $18,399,000 $17,518,000 All other substations within the attachment have not had a comprehensive evaluation to identify possible solutions and the costs associated with those solutions. The table below depicts a high-level tabletop analysis for possible projected cost of a substation solution. These costs will be refined as these projects progress through the funding process and receive full engineering analysis for solutions and conceptual level estimates.
  10. Page 106 of 174

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-025 Page 3 of 4 b. Substations High Level Estimate Project Status Waterside 22M Flax Hill 24A Rocky Hill 12Y $600,000 $500,000 Less than $250,000 Investigating Project Need Investigating Project Need Investigating Project Need – Anticipating Permanent Load Transfer from West Brookfield 14H with settings changes only Triangle 11A Middle River 28M $4,800,000 $500,000 Initial Funding Approved Investigating Project Need Rockville 14W Campville 14R Baldwin 13F Tracy 14M Frybrook 13B Brooklyn 30Y $10,000,000 $52,300,000 $20,250,000 $9,900,000 $20,000,000 Less than $250,000 Initial Funding Approved Partial Funding Initial Funding Submitted Initial Funding Approved Initial Funding Approved Investigating Project Need – Anticipating Permanent Load Transfer from Tracy 14M or Frybrook 13B with settings changes only Prior to initiating a funding project, permanent load transfers are, in many cases, a preferred solution if the conditions at the constrained substation and the adjacent area support this as these are typically substantially lower cost than substation investments and have a much more rapid deployment timeline. Historically these load transfers were not explicitly tracked, and the Company does not possess historical data as it pertains to deferrals by means of permanent load transfer. As of 2024 the Company identified this opportunity to begin having a detailed record of load transfers, partly in response to increasingly constrained regional capacity. The Company is now prepared to track these transfers in the Step Load Tracker as a load transfer on the receiving substation and a negative load transfer to the originally constrained station. This tracker will not only allow the forecasted load transfer to be visible but will also allow for historical reporting of deferred major capital upgrades through completed load transfers. The newly identified projects are in early stages of development and have not yet completed the solution selection process yet. Therefore, these projects would not yet have any tracked load transfers or analyses completed to date. Following initial funding of these projects, all available solutions including permanent load transfers, non-wires solutions, and traditional solutions are identified and evaluated for suitability and for viability. No potential solutions have been rejected at this time from these newly identified projects. Temporary transfers are reserved for substations anticipating overload during a current planned peak event, planned or unplanned outages, or other transient system events. Temporary solutions place the system in an abnormal condition which can impact operations, protections and controls, and automations within the system and are not used as a long-term solution except where necessary to address real-time operational needs that do not have a permanent solution placed into service. c. All substation forecasted violations are mitigated by using pre-contingent load transfers to adjacent substations with remaining capacity. In accordance with planning criteria in the Distribution System Planning Guide (CLFSC-023, Attachment 1), the Company plans and designs its system to avoid overload of major substation assets such as transformers during an N-1 event. During real-time operation, these overload scenarios are avoided

Text of NECTA Set 6_COMBINED.pdf

Extracted from the file · 22 pages · 43,545 characters

Text of OCC Set 29_COMBINED.pdf

Extracted from the file · 30 pages · 65,312 characters

Text of PURA Set 8_COMBINED.pdf

Extracted from the file · 230 pages · 511,861 characters

As listed on the current system

Corres. 11/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8

This filing on the current system (opens in a new tab)