Eversource rate increase is on 89 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
2 pages match
2 pages match

Text of ALLCO Set 18_COMBINED.pdf

Extracted from the file · 25 pages · 65,407 characters

Text of CIEC Set 7_COMBINED.pdf

Extracted from the file · 7 pages · 8,262 characters

Text of DEEP Set 1 (BETP)_COMBINED.pdf

Extracted from the file · 174 pages · 446,641 characters

Words on different pages
  1. Page 2 of 22

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-06 Date Issued October 14, 2026 NECTA-128 Page 2 of 2 Additionally, the two pole counts are from different time periods. The pole counts from the Company’s CPR are as of December 31, 2025 while the GIS pole counts are from an extract that was performed in February 2026. The Company would like to note that the CPR for Account 364 has historically been used as the source of the count of poles used to calculate the annual third party pole attachment rates. The Company previously provided a similar explanation to NECTA in response to NECTA-059 in the Company’s last rate case Docket No. 17-10-46.
  2. Page 3 of 22

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-06 Date Issued October 14, 2026 NECTA-129 Page 1 of 2 Date Filed: October 28, 2026 Witness: Leanne M. Landry, Marisa B. Paruta, and Jeffrey D. Turano Request from: New England Connectivity and Telecommunications Association Question: Refer to NECTA-059 Attachment 1 lines 23–29 ($63,608,379 of completed construction not classified in Account 106010, with a reported quantity of 77,320), NECTA-062 (non-unitized poles cannot be identified from the provided classification), and NECTA-058 (work-order movement from Account 107 to 106 and subsequently 101). a. Explain precisely what the reported 77,320 “Non-unitized” quantity represents, its units of measure and the source from which it was derived; identify whether it includes any physical pole count. b. Identify the number and ownership of poles associated with the $1,065,950 December 2025 adjusting journal entry described in NECTA-059 Attachment 1. A complete response will state whether their quantity is recognized in the formula denominator and reconcile any mismatch. Response: a. The reported 77,320 ‘non-unitized’ quantity disclosed in NECTA-059, Attachment 1, represents a system generated quantity count of activity recorded to FERC Account 106 (Completed Construction Not Classified). The accounting system automatically assigns a quantity of one to each transaction recognized, regardless of dollar amount, nature of the transaction or number of physical assets associated with the activity. These system-generated quantities have no relationship to the actual number of retirement units ultimately established when the work order is closed and the final costs of the assets in FERC Account 106 are moved to FERC Account 101010 (Utility Plant in Service) and unitized/posted to the Continuing Property Records (CPR). Retirement unit quantities are determined through the unitization process once the applicable work order activities are complete and the assets are classified and posted to CPR. Therefore, the reported 77,320 ‘non-unitized’ quantity disclosed in NECTA059, Attachment 1, does not represent or include any physical pole count, nor does it predict any future retirement unit quantities. b. The December 2025 journal entry of $1,065,950 related to the amount agreed to by the joint owners in the Frontier Settlement and was allocated amongst existing jointly owned pole assets in the Company’s CPR. This journal was to account for Frontier incurred costs, invoiced, and
  3. Page 4 of 22

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-06 Date Issued October 14, 2026 NECTA-129 Page 2 of 2 billed, and ultimately settled, for capital costs incurred on existing jointly owned poles and CTruss assets; therefore, no quantity adjustments were made.
  4. Page 5 of 22

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-06 Date Issued October 14, 2026 NECTA-130 Page 1 of 2 Date Filed: October 28, 2026 Witness: Edward A. Davis, Marisa B. Paruta and Kimberly R. Parsons Request from: New England Connectivity and Telecommunications Association Question: Refer to Exhibit CLP-RATES-2, Workpaper 2.14, pp. 3 and 7 (gross/net investment and equivalent poles), NECTA-059, Attachment 1, p. 1 (Accounts 101010 and 106010, and December 2025 journal entry), and NECTA-062, p. 1 (only unitized 101010 pole retirement units are counted). a. Provide a reconciliation that places the total and equivalent-pole denominators and gross/net Account 364 investment on a common population. b. Identify any changes to accumulated depreciation, accumulated deferred income taxes, or other rate-model inputs needed if the pole count or underlying investment population is modified under subpart a. Response: a. The Company is providing a revised response as NECTA-059-RV01 i, to include additional quantities associated with assets that have a zero-dollar balance but retain a reportable quantity. The original extraction excluded records with zero-dollar balances. Because quantities are not provided in the Plant FERC reporting data, the exclusion was not identified during the initial reconciliation process. During a subsequent review using different query parameters, the Company identified the additional quantity records and updated the response accordingly. The revision impacts quantities only and does not affect the previously reported dollar amounts. Please refer to NECTA-059-RV01, Attachment 1 ,for the updated quantity balances, which tie to CLP-RATES-2, Workpaper 2.14, pp. 3. No reconciliation or update to CLP-RATES-2, Workpaper 2.14, pp. 7, is necessary. b. Refer the response to subpart a. Prior Referenced Response: i NECTA-059-RV01 Question: (FERC Accounts) Provide a description of any Subaccounts for FERC Account 364 maintained by the Company, and identify and produce all plant and accounting records pertaining to FERC account 364 pole plant investment that break out the specific classes of pole investment by the items listed in the FERC Account 364 instructions, including but not
  5. Page 6 of 22

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-06 Date Issued October 14, 2026 NECTA-130 Page 2 of 2 limited to any documents that identify the amount of investment in poles, crossarms, or other appurtenances affixed to the bare wood pole, or by subaccount maintained by the Company. NECTA-059-RV01 Response: Please refer to NECTA-059-RV01, Attachment 1, for the updated quantities associated with fully reimbursed assets that have a zero-dollar balance but retain a reportable quantity. The original extraction excluded records with zerodollar balances. Because quantities are not provided in the Plant FERC reporting data, the exclusion was not identified during the initial reconciliation process. During a subsequent review using different query parameters, the Company identified the additional quantity records and updated the response accordingly. The revision impacts quantities and does not affect the previously reported dollar amounts for these retirement units. In addition, the Company reflected the removal of those retirement units (INSULATOR PIN/POST, INSULATION, STRING, TRANSFORMER, OVERHEAD <500 KVA, and XFMR, INST OVERHEAD < 500 KVA) that were reclassified in its September 2026 accounting close, as described in the Company’s response to NECTA-118i, subpart a.
  6. Page 7 of 22

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-06 Date Issued October 14, 2026 NECTA-131 Page 1 of 4 Date Filed: October 28, 2026 Witness: Leanne M. Landry, Marisa B. Paruta, and Jeffrey D. Turano Request from: New England Connectivity and Telecommunications Association Question: Refer to NECTA-059, page 1, and NECTA-059, Attachment 1, lines 10–24; NECTA-064 and NECTA-065. To the extent not already provided in response to NECTA-118, provide the following: a. For every retirement-unit entry in NECTA-059, Attachment 1—including INSULATOR, PIN/POST; INSULATOR, STRING; the four “POLE Fully Owned/Jointly Owned” categories; POLE PLATFORM; POLE TOP FRAMING; TRANSFORMER, OVERHEAD < 500 KVA; XFMR, INST OVERHEAD < 500 KVA; and Non-unitized— provide the Company definition, unit of measurement, retirement-unit code, criteria for recording an addition or retirement, and typical equipment/materials, labor, and overhead costs included. b. Produce any retirement-unit dictionary, continuing-property-record manual, plantaccounting instructions, accounting guides, technical publications or other Company documents that define or govern retirement units. c. If a listed retirement-unit description has a different meaning from standard engineering terminology, explain that difference and identify the Eversource document that controls its meaning. Response: a. As discussed in the response to NECTA-118 i, the Company has since reclassified the INSULATOR, PIN/POST; INSULATOR, STRING; TRANSFORMER, OVERHEAD < 500 KVA; XFMR, INST OVERHEAD < 500 KVA retirement units to their appropriate Utility Accounts. As described in NECTA-130, the Company is providing a revised response to NECTA-059-RV01, Attachment 1 (NECTA-059-RV01 ii), which will provide updated retirement units. For every retirement unit entry in NECTA-059-RV01, Attachment 1, Account 364310, please find below the Company definition:
  7. Page 8 of 22

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-06 Date Issued October 14, 2026 NECTA-131 Page 2 of 4 Please refer to NECTA-131, Attachment 1, for a listing of the compatible units (CUs) that comprise the “POLE Fully Owned/Jointly Owned” categories. A listing of CUs that comprise the POLE PLATFORM and POLE TOP FRAMING Retirement Units can be found in NECTA-118, Attachment 1. Unitized assets are recorded in the Continuing Property Records (CPR) at a ‘fully loaded’ cost, including all applicable labor, materials, minor items, and overheads according to the individual work orders’ installation/removal/expense FERC Account mapping allocation, which would calculate the final cost / book value for each unit of measure that is ultimately recognized in the FERC Account 101010 Utility Account. b. Please refer to NECTA-131, Attachment 2, for the Company’s distribution retirement unit manual, NECTA-131, Attachment 3 for the Company’s distribution plant account manual and EOE-060, Attachment 3, APS08 - Capital Versus Expense Criteria, for the Company’s capital vs. expense policy (APS#8). Combined, these documents define and govern the Company’s retirement units. c. There are no listed retirement-unit descriptions that have a different meaning from standard engineering terminology. Prior Referenced Responses: i NECTA-118 Question: Refer to NECTA-059, Attachment 1. For each of the following retirement-unit categories reported under Utility Account 364310—“INSULATOR, PIN/POST,” “INSULATOR, STRING,” “POLE PLATFORM,” “POLE TOP FRAMING,” “TRANSFORMER, OVERHEAD < 500 KVA,” and “XFMR, INST OVERHEAD < 500 KVA”— please provide the following as of December 31, 2025: a. Identify and describe each compatible-unit code whose costs are included in the category. For each code, provide its description, physical components, function, quantity, and gross book cost, and reconcile the
  8. Page 9 of 22

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-06 Date Issued October 14, 2026 NECTA-131 Page 3 of 4 b. compatible-unit costs to the category’s book cost in NECTA-059, Attachment 1. Explain any costs that cannot be identified by compatible-unit code. Identify the accumulated depreciation and accumulated deferred income taxes attributable to each category and calculate its net book cost. If these balances are not maintained by retirement-unit category, explain why. NECTA-118 Response: a. During the preparation of the response to NECTA-059i, the Company recognized that the retirement unit categories of” INSULATOR, PIN/POST,” “INSULATOR, STRING,” “TRANSFORMER, OVERHEAD < 500 KVA,” and “XFMR, INST OVERHEAD < 500 KVA” were incorrectly assigned to Utility Account 364310. As such, the Company performed an asset transfer to move those assets which totaled $59,702 to their correct utility accounts. At this time, the only retirement units reported under Utility Account 364310 are as follows: Account 364310 - Poles and Appurtenance Retirement Units at 9/30/26 Non-unitized POLE FO <= 35FT POLE FO > 35FT POLE JO <= 35FT POLE JO > 35FT POLE PLATFORM POLE TOP FRAMING The remaining retirement units are correctly classified per the FERC USofA, 18 CFR Part 101, Electric Plant Instructions for account 364. Please refer to NECTA-118, Attachment 1, for a list of all compatible units which comprise the pole platform and pole top framing retirement units in Account 364310. The gross book cost included in NECTA-059, Attachment 1, includes labor, material, loaders, AFUDC, etc. and therefore cannot be reconciled to the compatible units. b. ii Please refer to NECTA-118, Attachment 2, for the accumulated depreciation, net book value and accumulated deferred income taxes related to Pole Platforms and Pole Top Framing as of December 31, 2025. NECTA-059-RV01 Question: (FERC Accounts) Provide a description of any Subaccounts for FERC Account 364 maintained by the Company, and identify and produce all plant and accounting records pertaining to FERC account 364 pole plant investment that break out the specific classes of pole investment by the items listed in the FERC Account 364 instructions, including but not limited to any documents that identify the amount of investment in poles, crossarms, or other appurtenances affixed to the bare wood pole, or by subaccount maintained by the Company. NECTA-059-RV01 Response: Please refer to NECTA-059-RV01, Attachment 1, for the updated quantities associated with fully reimbursed assets that have a zero-dollar balance but retain a reportable quantity. The original extraction excluded records with zerodollar balances. Because quantities are not provided in the Plant FERC reporting data, the exclusion was not identified
  9. Page 10 of 22

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-06 Date Issued October 14, 2026 NECTA-131 Page 4 of 4 during the initial reconciliation process. During a subsequent review using different query parameters, the Company identified the additional quantity records and updated the response accordingly. The revision impacts quantities and does not affect the previously reported dollar amounts for these retirement units. In addition, the Company reflected the removal of those retirement units (INSULATOR PIN/POST, INSULATION, STRING, TRANSFORMER, OVERHEAD <500 KVA, and XFMR, INST OVERHEAD < 500 KVA) that were reclassified in its September 2026 accounting close, as described in the Company’s response to NECTA-118ii, subpart a.
  10. Page 11 of 22

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-06 Date Issued October 14, 2026 NECTA-132 Page 1 of 4 Date Filed: November 05, 2026 Witness: David L. Gladey, Leanne M. Landry, Marisa B. Paruta and Jeffrey D. Turano Request from: New England Connectivity and Telecommunications Association Question: Refer to NECTA-059 Attachment 1, page 1, line 18 (790,582 POLE TOP FRAMING units; $258,449,437), and NECTA-064, page 1. To the extent not already provided in response to NECTA118, provide the following: a. Define “POLE TOP FRAMING” as used in Eversource’s retirement-unit records. Identify separately whether it includes crossarms and braces, extension arms, conductor-support brackets, insulator pins/supports, guys or anchors, pole-top pins, bolts, mounting hardware, conductor-support structures without crossarms, labor, removal, and other costs; for every included component, state whether it supports the common pole structure, electric facilities, or both. b. Produce the Company’s pole-top-framing construction standards, standard drawings and assemblies, design guides, engineering manuals, technical bulletins, approved manufacturer specifications, and existing construction or as-built photographs illustrating the configurations recorded in this retirement unit. c. Explain the retirement-unit quantity of 790,582. State precisely what one “POLE TOP FRAMING” unit counts. d. Provide a component-level cost breakout of the $258,449,437 balance, or, if not maintained, the compatible-unit/material-cost and work-order records from which an estimate can be reconstructed. At a minimum, separately identify crossarms and braces, electric-specific brackets/extensions/insulator supports, common structural supports, and all other or unclassified costs. e. Provide at least one representative 2023–2025 installed or replaced pole-top-framing assembly for each major standard configuration, with drawing, bill of material, installation work order, and capitalized cost detail identifying material, labor, and overhead. Response: a. Please refer to the Company’s response in NECTA-131 i, subpart a, where the Company provided the definition for “POLE TOP FRAMING.” Please also refer to the Company’s response in NECTA-118, Attachment 1, where the Company provided a list of all compatible units (CUs) that have been identified individually for “POLE TOP FRAMING,” which comprise the retirement units in FERC Account 364310. As stated in

Text of OCC Set 29_COMBINED.pdf

Extracted from the file · 30 pages · 65,312 characters

Text of PURA Set 8_COMBINED.pdf

Extracted from the file · 230 pages · 511,861 characters

As listed on the current system

Corres. 11/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8