Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8

Files9

Search terms highlighted
Eversource rate increase is on 89 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
2 pages match
2 pages match

Text of ALLCO Set 18_COMBINED.pdf

Extracted from the file · 25 pages · 65,407 characters

Text of CIEC Set 7_COMBINED.pdf

Extracted from the file · 7 pages · 8,262 characters

Text of DEEP Set 1 (BETP)_COMBINED.pdf

Extracted from the file · 174 pages · 446,641 characters

Text of NECTA Set 6_COMBINED.pdf

Extracted from the file · 22 pages · 43,545 characters

2 pages match
  1. Page 15 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-29 Date Issued October 19, 2026 OCC-974 Page 3 of 3 system is the potential impact to reliability that may occur by not assessing encroachment and fall in risks to the electric system.
  2. Page 16 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-29 Date Issued October 19, 2026 OCC-975 Page 1 of 1 Date Filed: October 28, 2026 Witness: David L. Gladey and Steven Lamontagne Request from: Office of Consumer Counsel Question: (UNDERGROUNDING) Has the Company investigated the costs of undergrounding power lines? If yes, please provide the most recent estimates obtained and indicate when these estimates were obtained. Response: Underground lines (UG) are far more expensive than installing overhead lines (OH) because of the many aspects involved in their constructions. Trenching to install conduits, vaults and a duct bank is not an easy process; it consists of the entire “upheaval” and rebuild of the area including the road, sidewalks, parking areas, and driveways. In addition, trees may need to be removed. Many other underground utilities including sewer, water, communication, and gas lines may need to be relocated to install the conduit and vaults. Real estate easements may be required to be able to place equipment on or under customers property, for all the facilities. Along with the construction of the new facilities, the existing lines and equipment must also be removed. Lastly, undergrounding of overhead lines involves a cost to the customer since home and business service entrance equipment must also be converted. The Company’s construction standard is open wire OH construction. The Company’s most recent study for new construction was completed in year 2022 resulting in the following: - The average cost to underground single phase laterals is $1.5M / mile. - The average cost to underground three phase laterals is $3.2M / mile. - The average cost to underground three phase backbone is $8.24M / mile. - The cost estimate to replace an overhead line with an underground line ranges from $1 million in a rural, single phase, lateral area to $14 million in a densely populated downtown backbone area with an average of $3.8 million per mile.
  3. Page 17 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-29 Date Issued October 19, 2026 OCC-976 Page 1 of 2 Date Filed: November 02, 2026 Witness: Mark P. Baldwin, Christopher E. Colorio, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (Storm MN25K – Meals) The following pertains to the response provided as part of OCC-879. a. How did the Company identify the clerical error in the meal reimbursement calculations for lines 110 and 1352? b. Considering the response to subpart (a), explain how the Company is comfortable that there are no other clerical errors related to the remaining meal expenses in the ‘Labor by Empl. Title’ tab for storm MN25K? If there are clerical errors within the remaining expenses, identify and report them. Response: a. The Company identified the errors through a review of the hours worked and a verification of meal allowances earned based on those hours. The applicable contract language is located in EOE-259 Attachment 3, page 50, Section 15, which outlines the meal allowance provisions for union employees working extended hours. The errors identified in response to OCC-879 i were related to the classification of MealDay/Minor versus Meal-Evening/Major meal allowances. Following its review, the Company determined that the employees were entitled to receive meal compensation. However, the incorrect meal type and corresponding amount were entered based on the time at which the meal was earned. As a result, the issue was not whether a meal allowance was warranted (it was), but rather whether the allowance was coded and paid under the correct meal category. b. To resolve any further questions in relation to meal expenses, the Company will conduct an additional review and supplement this response with the findings. Prior Referenced Response: i OCC-879 Question:
  4. Page 18 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-29 Date Issued October 19, 2026 OCC-976 Page 2 of 2 (Storm MN25K Meals) Refer to Exhibit ACCT-2 (CLP-13) (MN25K) CONFIDENTIAL, Labor by Empl. Title tab. Provide documentation to support the following Meals. As part of the response, provide relevant calculations, citations, invoices, or other supporting documents. a. b. c. d. e. Row 110, Chief/Top Line Mechanic, $150 Row 497, Response Specialist – Line, $60 Row 1352, Reliability Shift Electrician, $40 Row 1898, Line Mechanic, $190 Row 3858, Garage Mechanic, $20 OCC-879 Response: Referring to Exhibit ACCT-2 (CLP-13) (MN25K), Labor by Empl. Title Tab. • Please refer to OCC-879, Attachment 1 CONFIDENTIAL, regarding summary and location of supporting calculations of meals reimbursed. • Please refer to OCC-879, Attachment 2 CONFIDENTIAL, regarding meal reimbursement calculations. Please refer to the Company’s response to EOE-259i for a supporting justification on meal reimbursements to union employees. Additionally, please refer to EOE-259, Attachment 3, page 50, Section 15, regarding meal allowance provisions applicable to union employees working extended hours. Upon further review in drafting this response, the Company identified that there was a clerical error in the dollar amount charged for line 110 in the amount of $10 and line 1352 in the amount of $10. The Company will supplement line 110 to reflect the total amount of $140 and line 1352 to reflect the total amount of $30.
  5. Page 19 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-29 Date Issued October 19, 2026 OCC-977 Page 1 of 1 Date Filed: November 02, 2026 Witness: Mark P. Baldwin, Christopher E. Colorio, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (Storms - P-Cards) The following pertains to the response provided as part of OCC-880. a. Given the purchase on line 198 was considered to be inappropriately charged to MN25K, consider the purchase on line 251, Wood-N-Tap, Meals, $71. Explain if this purchase should be considered a storm related purchase or not given this purchase has a different cost center (2BB). b. Considering the response to subpart (a), do each of the 14 storm events have a specific cost center code assigned to them and if so, can you identify the cost center codes for each storm? Response: a. Referring to ACCT-2(CLP-13)(MN25K), P-Card tab, line 251, the Wood-N-Tap Transaction was appropriately charged to the storm. Please refer to OCC-977 Attachment 1, for the receipt supporting this charge. The work order, not the cost center, determines if the charges are considered a storm purchase. Accordingly, the cost center code assigned to the transaction identified on Line 198 was not considered in the Company's evaluation of the charge. The Company's determination to exclude the charge was based on a review of the underlying documentation and the nature of the expense, rather than the cost center code to which the transaction was assigned. b. No, each of the 14 storms does not have a specific cost center code. The only unique accounting for each event is the field work order. The Wood-N-Tap P-Card transaction was charged to the field work order MN25K011, which categorizes the charge as related to the February 14, 2024, storm event.
  6. Page 20 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-29 Date Issued October 19, 2026 OCC-978 Page 1 of 4 Date Filed: November 05, 2026 Witness: Mark P. Baldwin, Christopher E. Colorio, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (Storm MN25K – Employee Expense Reimbursement) The following pertains to the responses provided as part of OCC-881 and respective costs. a. What factors were considered in determining the costs on line 74, 140, and 424 of the ‘Empl. Expense&Other’ tab of Exhibit ACCT-2 (CLP-13) (MN25K) CONFIDENTIAL to not be associated with the storm event? b. Considering the response to subpart (a) above and the response in OCC-881 regarding supervisor review through the Workforce system, how is the Company comfortable that the remaining costs within this tab of the exhibit are truly related to storm MN25K given 60% of the costs selected as part of OCC-881 were considered costs not associated with the event? c. Provide documentation to support the remaining employee expenses within the ‘Empl. Expense&Other’ tab of the exhibit. As part of the response, provide a description of the purchase, relevant invoices, and other supporting documentation demonstrating the necessity and applicability to the MN25K event. If a particular cost is not associated with the event, identify the cost and provide a reason. Response: a. The determination of whether costs were attributable to the storm event was based on a review of the receipts and items purchased. That review confirmed that the costs were properly attributable to the storm and were necessitated to carry out work functions and clean-up work on the system after all customers were restored. However, to limit the items subject to debate in this docket, the Company elected to remove the costs for purposes of answering OCC-881. b. Yes. The Company is “comfortable that the remaining costs within this tab are truly related to storm MN25K.” Based on the Company’s review of cost items for OCC-881, i the Company expanded its review beyond the OCC-881 sample and evaluated 100% of the transactions included within the population. The review considered information provided on the receipt, the nature of the goods or services purchased and the relationship of the expenditure to storm response and restoration activities associated with storm MN25K. As a result of this thorough review, the Company was able to validate that all of the costs charged to storm MN25K were “truly related to storm MN25K.” However, the Company has similarly decided to remove a total of $3,180 of the costs correctly charged to storm MN25K to limit the items subject to
  7. Page 21 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-29 Date Issued October 19, 2026 OCC-978 Page 2 of 4 debate in this docket, which includes the $1,710 of costs referenced in OCC-881. This amount of $3,180 is the only population requiring adjustment. c. Please refer to OCC-978, Attachment 1 CONFIDENTIAL, for a summary of purchases and a description of the transactions included in the review. Please also refer to OCC-978, Attachment 2 CONFIDENTIAL, for copies of all receipts directly associated with the storm event and OCC-978, Attachment 3 CONFIDENTIAL, for the related Workforce expenses. With respect to receipt requirements, please refer to the Company's response to OCC-881, which outlines the Company's policy regarding purchases under $25. Consistent with that policy, receipts are not required for transactions below the established threshold. The Company relied on the available supporting documentation, transaction descriptions, and additional review procedures performed as part of its comprehensive evaluation of the stormrelated cost population to validate these expenses. Although properly attributable to the storm event and incurred for work associated with the storm event, the Company has elected to remove the following costs totaling $1,470 from this event: • The Company will supplement Exhibit ACCT-2 (CLP-13) (MN25K), to remove line 155 in the amount of $821. • The Company will supplement Exhibit ACCT-2 (CLP-13) (MN25K), to remove line 208 in the amount of $8. • The Company will supplement Exhibit ACCT-2 (CLP-13) (MN25K), to remove line 219 in the amount of $9. • The Company will supplement Exhibit ACCT-2 (CLP-13) (MN25K), to remove line 241 in the amount of $80. • The Company will supplement Exhibit ACCT-2 (CLP-13) (MN25K), to reflect line 254 in the amount of $174. • The Company will supplement Exhibit ACCT-2 (CLP-13) (MN25K), to remove line 295 in the amount of $22. • The Company will supplement Exhibit ACCT-2 (CLP-13) (MN25K), to remove line 332 in the amount of $44. • The Company will supplement Exhibit ACCT-2 (CLP-13) (MN25K), to reflect line 352 in the amount of $25.
  8. Page 22 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-29 Date Issued October 19, 2026 OCC-978 Page 3 of 4 • The Company will supplement Exhibit ACCT-2 (CLP-13) (MN25K), to remove line 378 in the amount of $21. • The Company will supplement Exhibit ACCT-2 (CLP-13) (MN25K), to remove line 421 in the amount of $25. • The Company will supplement Exhibit ACCT-2 (CLP-13) (MN25K), to remove line 427 in the amount of $287. Prior Referenced Response i OCC-881 Question: (Storm MN25K – Employee Expense Reimbursement) Refer to Exhibit ACCT-2 (CLP-13) (MN25K) CONFIDENTIAL, ‘Empl. Expense&Other’ tab. Provide documentation to support the following employee expenses. As part of the response, provide a description of the purchase, relevant invoices, and other supporting documents demonstrating the necessity and applicability to the MN25K event. a. Row 59, Meals – Employee Reimbursement, $140 b. Row 74, Employee Reimbursement, $638 c. Row 140, Meals – Employee Reimbursement, $200 d. Row 426, Travel, $273 e. Row 424, Meals – Employee Reimbursement, $872 OCC-881 Response: Referring to Exhibit ACCT-2 (CLP-13) (MN25K), Empl. Expense & Other. Please refer to OCC-881 Attachment 1, for a summary of purchases and descriptions of transactions. In addition, please refer to OCC-881 Attachment 2, for all receipts directly associated with this event. Please note that line 29 includes one miscellaneous expense in the amount of $24. Pursuant to the Company's Employee Expense Policy, receipts are not required for individual expenses below $25.00. This threshold reflects the Company's determination that the administrative burden associated with collecting, reviewing, and retaining receipts for nominal-value transactions exceeds the corresponding control benefit. To mitigate the risk of circumvention through multiple small-dollar submissions, all de minimis expenses must be submitted through the Workforce system rather than Workday. The Workforce system provides centralized tracking, requires supervisory review and approval contemporaneous with the expense submission, and facilitates monitoring for unusual or potentially duplicative expense patterns. The expenses identified above were submitted in accordance with the applicable provisions of the Employee Expense Policy and were reviewed and approved by the employees' supervisors through the Workforce system. As part of that approval process, the supervisors confirmed that the expenses were incurred in connection with storm restoration activities. Accordingly, these expenses represent properly incurred storm-related costs and are eligible for recovery
  9. Page 23 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-29 Date Issued October 19, 2026 OCC-978 Page 4 of 4 Upon further review in drafting this response, the Company determined that the cost for the following lines are not associated with the event: • The Company will supplement Exhibit ACCT-2 (CLP-13) (MN25K), to remove line 74 in the amount of $638. • The Company will supplement Exhibit ACCT-2 (CLP-13) (MN25K), to remove line 140 in the amount of $200. • The Company will supplement Exhibit ACCT-2 (CLP-13) (MN25K), to reflect line 424 in the amount of $872.
  10. Page 24 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-29 Date Issued October 19, 2026 OCC-979 Page 1 of 1 Date Filed: November 02, 2026 Witness: John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (STORM EVENT DOCUMENTATION) On August 14, 2026, the Company responded to Interrogatory EOE-30 stating that it “will supplement the remaining spreadsheets for the remaining 13 storm events included in the request.” Please provide any available supplements created to date and provide an update on the progress of whatever supplements remain (including a projected finish date). Response: Please refer to the Company’s response to EOE-30-SP01 i, for the requested information. Prior Referenced Response i EOE-30-SP01 Question: (STORM EVENT DOCUMENTATION) For each catastrophic storm event included in the Company’s storm request, provide an unlocked Excel spreadsheet detailing the total number of billable hours for each external line crew. Specifically include the breakdown of hours split between work, standby, and mobilization/demobilization. Additionally, identify the total dollar amount billed for each category, summarize the total number of hours per category, and cite the supporting documentation. EOE-030-SP01 Supplemental Response: Please reference EOE-030-SP01 Attachment 1, for a summary of hours and costs associated with external line crew support for spreadsheets for the 14 storm events included in the request. Original Response: The Company does not track or account for the billable hours in the manner requested in this interrogatory. In order to respond to this request, the Company must perform a manual exercise to identify each billable hour by work or standby time for each individual invoice by storm. The Company is currently working through this exercise for each storm. Please reference EOE-030, Attachment 1, for a summary of hours and costs associated with external line crew support for MS24A011. The Company will supplement the remaining spreadsheets for the remaining 13 storm events included in the request.

Text of PURA Set 8_COMBINED.pdf

Extracted from the file · 230 pages · 511,861 characters

As listed on the current system

Corres. 11/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8

This filing on the current system (opens in a new tab)