Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8
Files9
Docket No. 26-05-10 Discovery Compilation November 6 2026.pdf
PDF · 134 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation November 6 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation November 6 2026.pdf
ALLCO Set 13_COMBINED.pdf
PDF · 801 KB · 49 pagesText searchable
Download ALLCO Set 13_COMBINED.pdfRead the text of ALLCO Set 13_COMBINED.pdf
ALLCO Set 16_COMBINED.pdf
PDF · 642 KB · 22 pagesText searchable
Download ALLCO Set 16_COMBINED.pdfRead the text of ALLCO Set 16_COMBINED.pdf
ALLCO Set 18_COMBINED.pdf
PDF · 306 KB · 25 pagesText searchable
Download ALLCO Set 18_COMBINED.pdfRead the text of ALLCO Set 18_COMBINED.pdf
CIEC Set 7_COMBINED.pdf
PDF · 230 KB · 7 pagesText searchable
Download CIEC Set 7_COMBINED.pdfRead the text of CIEC Set 7_COMBINED.pdf
DEEP Set 1 (BETP)_COMBINED.pdf
PDF · 1.9 MB · 174 pagesText searchable
Download DEEP Set 1 (BETP)_COMBINED.pdfRead the text of DEEP Set 1 (BETP)_COMBINED.pdf
NECTA Set 6_COMBINED.pdf
PDF · 446 KB · 22 pagesText searchable
Download NECTA Set 6_COMBINED.pdfRead the text of NECTA Set 6_COMBINED.pdf
OCC Set 29_COMBINED.pdf
PDF · 499 KB · 30 pagesText searchable
Download OCC Set 29_COMBINED.pdfRead the text of OCC Set 29_COMBINED.pdf
PURA Set 8_COMBINED.pdf
PDF · 2.5 MB · 230 pagesText searchable
Download PURA Set 8_COMBINED.pdfRead the text of PURA Set 8_COMBINED.pdf
Text of ALLCO Set 18_COMBINED.pdf
Extracted from the file · 25 pages · 65,407 characters
Text of CIEC Set 7_COMBINED.pdf
Extracted from the file · 7 pages · 8,262 characters
Text of DEEP Set 1 (BETP)_COMBINED.pdf
Extracted from the file · 174 pages · 446,641 characters
Text of NECTA Set 6_COMBINED.pdf
Extracted from the file · 22 pages · 43,545 characters
Text of OCC Set 29_COMBINED.pdf
Extracted from the file · 30 pages · 65,312 characters
Page 143 of 230
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 RRU-079 Page 2 of 3 years other than the test year, the data does not have the level of precision that is necessary for a specific item-by-item comparison between the settled resolution of the rate case in Docket No. 1710-46 and the figures presented in Exhibit CLP-REVREQ-3 in this case. b. (i) The payroll tax and benefit rate of 26.26% in OCC-326 i reflects the payroll tax, benefits and insurance components for the General Service Company Overhead Rate effective July 2026, whereas the overhead rates in OCC-202 Attachment 2, refers to the weighting of the Payroll Benefit Rates for CL&P, two separate and distinct overhead rates. Please refer to RRU-055 Attachment 1, for each overhead rate component and calculation effective January 2023 through July 2026. Additionally, please refer to RRU-055 Attachment 2, for the weighted overhead calculation. (ii) Neither rate is used in Schedule C-3.38 and please refer to RRU-055 Attachment 1, for the overhead rate components and calculations. c. The Social Security wage base in the Rate Year reflects the wage base effective in the Test Year, 2025. The wage base was not amended for the Rate Year. The additional Medicare Tax subject to wages above $200,000 as of the Test Year were carried through to the Rate Year. d. The Company did not adjust the Rate Year State Unemployment tax because the 1.5% is applied to the first $15,000 of earnings and it’s assumed that the Test Year is already applied to each employee on the full capped amount of $15,000, and the State Unemployment was not adjusted for the incremental FTEs in the cost of service. Prior Referenced Response: i OCC-326 Question: Payroll (open positions). For each open position: a. b. c. d. e. f. Total annual compensation, benefits and payroll taxes associated for the unfilled position Length of time that the position has been open. Planned hiring dates for each position, Hiring dates for any of these positions that have been filled. Copy of the advertisement for employment. For each open position, state whether it is a CL&P employee/FTE or shared service employee/FTE. OCC-326 Response: Please refer to OCC-326, Attachment 1. As of December 31, 2025, there were 333 open, unfilled positions between CL&P and Eversource Energy Service Company (“ESC”):Page 144 of 230
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 RRU-079 Page 3 of 3 (A) Description Open/unfilled positions (B) CL&P (C) EESCO 30 (D)=(B)+(C) Total 303 333 There are no open positions in either CL&P or ESC with a target hiring date in the Rate Year. Currently, of the open and unfilled positions at December 31, 2025, there remain 14 un-filled positions in ESC and one position in CL&P. The total annual compensation for un-filled positions in ESC (OCC-326, Attachment 1, Column K) consists of the market rate for the position and a 26.41% loader comprised of Payroll Tax + Benefits (26.26%) and Insurance (0.15%). Union positions are indicated by an asterisk (*); compensation rates are per contract. In response to (f), the path to the Eversource Career Site for each position is shown in OCC-326, Attachment 1, Column L.Page 145 of 230
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 RRU-080 Page 1 of 3 Date Filed: October 16, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray and Timothy J. Griffin Request from: Public Utilities Regulatory Authority Question: (DEFERRED INCOME TAXES) Application, Sch. C-3.41 and Sch. WP C-3.41. Regarding the deferred income tax expense: a. (i) Explain the Test Year deferred income tax expense of $21,178,000 against the five-year average of $64,398,000; and (ii) identify each temporary difference driving the reduction and state whether the Test Year is representative. b. Provide the derivation of the pro forma adjustment of $13,829,000 and of the Rate Year adjustment of negative $17,412,000, by temporary difference. c. Explain: (i) the sign combination on the line item entitled Tax Depreciation on pages 1, 2, and 3 of Schedule WP C-3.41; (ii) the zero Connecticut amount on the line entitled Ld Powertax Adj - Accrual Estimate on pages 1, 2, and 3 of Schedule WP C-3.41; and (ii) the four line items on pages 1 and 2 of Schedule WP C-3.41 that show a $0 amount in the Test Year and Test Year pro forma and carry temporary differences of $3,268,000, negative $1,581,000, $775,000 and $225,000 in the Rate Year on page 3 of Schedule WP C-3.41. d. (i) Provide the amortization schedule for the federal rate change amortization; (ii) reconcile Schedule C-3.41 to the accumulated deferred income tax balance of $1,263,352,000 in Schedule B-1.0; and (iii) provide the proration schedule and identify the averaging convention used. Response: a. Deferred income tax expense is dependent upon temporary differences, which are differences between how revenues and expenses are recognized for book purposes versus tax purposes. These temporary differences fluctuate year over year which causes the deferred income tax expense to fluctuate year over year. Any single period could be significantly different from another. Over the five-year period referenced, the main temporary differences driving the reduction is the result of activity within the tax depreciation, storm reserves and pension deferral categories. Of these items, storm-related temporary differences were a particularly significant driver of the variance. As shown in Exhibit CLP-REVREQ-2, WP C-3.26, Lines 28-32, catastrophic storm restoration costs were approximately $220.3 million in 2021 compared to $78.2 million in 2025. Applying the composite statutory income tax rate of 27.52% results in deferred tax impacts of approximately $60.6 million and $21.5 million, respectively, a reduction of approximately $39.1 million.Page 146 of 230
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 RRU-080 Page 2 of 3 In addition, the Company’s rate filing does not assume a timing difference between the recovery and incurrence of catastrophic storm costs during the rate year. Specifically, the Company proposes $60 million of catastrophic storm funding in rates (Schedule C-3.0, Line 43 of the same exhibit) and assumes those costs are incurred during the Rate Year. Therefore, with no timing difference related to these costs and the corresponding recovery, there is no related deferred tax expense reflected in the Rate Year. That is, where deferred income tax expense related to catastrophic storm costs was $60.6 million in 2021, the Rate Year has none. Yes, the $21,178,000 is representative of the Test Year, as it is based on actual activity within the period. b. Please refer to RRU-080, Attachment 1, which provides the temporary differences and its respective deferred tax expense derivation by proforma adjustment and by Rate Year adjustment. c. i.) The sign combination related to line item description “Tax Depreciation” has to be looked at synonymously with two other line items descriptions “Section 263a Costs” and “Repairs.” These three line items make up total “Tax Depreciation” which in totality has state deferred taxes as a positive amount. ii) The line item LD Powertax Adj – Accrual Estimates has zero for Connecticut state deferred taxes, because it is related to several tax basis adjustments that are treated as flow through for state purposes and as a result there is no state deferred taxes associated with it. Basis adjustments that are treated as flow-thru for state are 263a, CIAC, and Capitalized Interest. iii.)WP C-3.41 page 1 of 3 shows the Test Year current activity. The four lines had zero activity reflected in the Test Year and in the proforma Test Year. However, for Rate Year there was an increase in activity as shown in Schedule B-6.2, which was incorporated into the WP C-3.41 page 3 of 3. The temporary differences $3,268,000 (Deferred COVID-19 Costs and COVID-19 related Bad Debt), <$1,581,000> (Fee for Free Deferred (Over)/Under Recovery Dkt 17-10-46), $775,000 (Deferred Rate Case Expenses) and $225,000 (CT Management Audit) are new temporary differences included in this filing. The amounts represent the Rate Year activity as calculated using balances from Schedule B-6.2. d. Please refer to RRU- 080, Attachment 2, which provides an amortization schedule for the Federal Rate change amortization. This schedule includes the actual balances as of December 31, 2018 to be amortized and reflects actual amortization through year 2025.Page 147 of 230
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 RRU-080 Page 3 of 3 Estimated annual tax amounts are included thereafter. All amounts will be updated as the amortization process continues through completion under the Average Rates Assumption Method (ARAM). The $1,263,353 is an average between the beginning and ending Rate Year 1 balances for the Accumulated Provision for Deferred Income Taxes. The actual difference between Rate Year 1 beginning balance and the ending balance is $24,342. Please refer to RRU080 Attachment 3, which details the reconciliation of amounts to Schedule C-3.41Page 148 of 230
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 RRU-081 Page 1 of 2 Date Filed: October 13, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Public Utilities Regulatory Authority Question: (PRO FORMA ADJUSTMENTS) Application, Sch. C-3.0; Interrog. Resp. OCC-312. Regarding the pro forma adjustments reflected in the schedules sponsored by the Revenue Requirements Panel: a. (i) Provide an exhibit that lists each pro forma adjustment in the Application, as filed and as subsequently revised; and (ii) for each adjustment, state the schedule and line item in which it appears, the dollar amount, the effective date, and the basis for treating it as a known and measurable adjustment. b. (i) Provide an exhibit that lists each non-recurring, extraordinary or out-of-period item over $10,000 that is recorded in the Test Year and (ii) for each item, state the amount, a description, the schedule and line, and whether it was removed or normalized. c. (i) Identify each item in the schedules and work papers sponsored by the Revenue Requirements Panel or the Compensation and Benefits Panel that the Company has determined since July 14, 2026, requires correction; and (ii) for each item, state the schedule or work paper and line in which it appears, the amount as filed, and the corrected amount. Response: a. Please refer to Schedule C-3.0 of Exhibit CLP-REVREQ-2-(Schedules A, B, C, D) for an Exhibit that lists out the pro forma adjustments by schedule. Further, please refer to Exhibit CLP-REVREQ-1, page 67 for a detailed narrative of the pro forma adjustments made to each of the schedules. b. During the preparation of the Company’s application to amend its rate schedules, the Company conducted a rigorous review of its Test Year expenses, eliminating all nonrecurring costs that do not reflect the representative level of expenses necessary to operate and maintain the distribution system and to provide safe and reliable electric service to our customers. The amounts included in the Rate Year provide an accurate representation of the level of expenses necessary to continue providing safe and reliable electric service to our customers from the date of new effective rates in this case. Since the Company does not include non-recurring, extraordinary or out-of-period items within the Test Year proforma or Rate Year, there is no relevant supporting documentation to provide.Page 149 of 230
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 RRU-081 Page 2 of 2 c. The Company will include a summary with a detailed listing of the adjustments incorporated in the revenue requirement in its next cost of service update.Page 150 of 230
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 RRU-082 Page 1 of 1 Date Filed: October 13, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Public Utilities Regulatory Authority Question: (HISTORICAL COST DATA) Application, Ex. CLP-REVREQ-3; Interrog. Resp. OCC-374 and Interrog. Resp. OCC-375. Regarding the five-year historical cost presentation in Ex. CLPREVREQ-3: a. (i) Identify each of the schedules and each of the calendar years from 2021 through 2024 in Exhibit CLP-REVREQ-3 for which the Company contends the amounts reported are not a precise representation of the Company’s actual cost; and (ii) for each, quantify the classification variance and state the actual cost data the Company can produce for those years on a basis consistent with the Test Year. b. Explain why the Company provided Exhibit CLP-REVREQ-3 in support of the Application while describing the amounts provided in the exhibit as not precise representations of the Company’s actual cost. Response: a. The Historical C-3.0 is provided only for informational purposes. During the preparation of the Company’s cost of service, the Company performs a detailed review of the Test Year data. This detailed review is not performed for historical years where that data does not impact the Company’s Test Year nor its cost of service. As a result, the data and amounts given in Exhibit CLP-REVREQ-3 are not precise. b. The Company provided Exhibit CLP-REVREQ-3 consistent with the schedules submitted for Yankee Gas Services Company pursuant to the Settlement Agreement in Docket No. 18-05-10, which says, “Beginning with the Company’s next rate case, the Company will file with its SFRs five years of historical expense data in the form of Schedule C-3.0,” (See Motion 43, Joint Motion to Approve Settlement Agreement, Docket No. 18-05-10, Application of Yankee Gas Services Company d/b/a Eversource Energy to Amend its Rate Schedules, p. 12).Page 151 of 230
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 RRU-083 Page 1 of 2 Date Filed: October 13, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Public Utilities Regulatory Authority Question: (COMPLIANCE FILINGS) Decision, Apr. 18, 2018, Docket No. 17-10-46, Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules (17-10-46 Decision), Orders Nos. 5, 6, 7 and 8. Regarding the filings required by Orders Nos. 5, 6, 7 and 8 of the 17-10-46 Decision: a. Provide each annual filing filed by the Company in compliance with Orders Nos. 5, 6, 7, and 8 of the 17-10-46 Decision from January 31, 2019, through January 31, 2026. b. For each of the three rate years addressed by Order No. 8 of the 17-10-46 Decision, state the number of incremental positions hired against the authorized levels, the compensation recovered per position against the authorized amounts, and the reduction taken to outside contractor expense. Response: a. Please refer to RRU-083, Attachment 1, for annual compliance filings for Orders Nos. 5, 6, and 7, and RRU-083, Attachment 2 for the annual compliance filings for Order No. 8 from January 31, 2019, through January 31, 2026, in Docket No. 17-10-46. b. Please refer to Table 1, for the number of incremental positions as compared to the levels in existence at the time of the Company’s last rate case, compensation per position as compared to amounts included in the cost of service, and the reduction taken to outside contractor expense for each of the three rate years addressed by Order No. 8 of the 17-1046 Decision. Please note that the authorized amount of incremental hires was the lesser of the actual net hires or a fixed amount of 33 hires for Rate Year One and Two, and 34 hires for Rate Year Three. The compensation per position and the reduction to outside contractor expense were the amounts authorized per the settlement agreement.Page 152 of 230
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 RRU-083 Page 2 of 2 Table 1 Category Incremental Hires Authorized Incremental Hires Rate Year 1 57 33 Rate Year 2 85 66 Rate Year 3 123 100 Compensation Recovered/FTE (000’s) Authorized Compensation/FTE (000’s) Reduction to Outside Contractor (000’s) $84 $84 $(168) $83 $83 $(660) $84 $84 $(1,530)
As listed on the current system
Corres. 11/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8