Eversource rate increase is on 89 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
2 pages match
2 pages match

Text of ALLCO Set 18_COMBINED.pdf

Extracted from the file · 25 pages · 65,407 characters

Text of CIEC Set 7_COMBINED.pdf

Extracted from the file · 7 pages · 8,262 characters

Text of DEEP Set 1 (BETP)_COMBINED.pdf

Extracted from the file · 174 pages · 446,641 characters

Text of NECTA Set 6_COMBINED.pdf

Extracted from the file · 22 pages · 43,545 characters

Text of OCC Set 29_COMBINED.pdf

Extracted from the file · 30 pages · 65,312 characters

35 pages match
  1. Page 180 of 230

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 RSR-019 Page 1 of 1 Date Filed: October 08, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Public Utilities Regulatory Authority Question: (VEGETATION MANAGEMENT) Exhibit CLP-VMP-1, p. 37. Provide documentation on how the Company reached the conclusion on vegetation growth and trimming efficiency based on 1-2 years’ time for contact. Response: Please refer to Exhibit CLP-VMP-1, at page 36, line 8, through page 37, line 7. This section of the testimony discusses the changes in the proposed Scheduled Maintenance Trim (“SMT”) budget and cost efficiencies that could be achieved by transitioning Scheduled Maintenance Trimming (“SMT”) to full circuit trimming rather than targeted condition-based trimming, which is based on the comparison of cycle trimming costs and condition-based trimming costs derived from the analysis of terrestrial LiDAR collection. Please also refer to Exhibit CLP-VMP-2, on page 34, for the demonstration of cycle-based, condition-based, and selective condition-based trimming mileage and costs for years one through eight, and on page 15, for a description of condition-based and cycle approaches that the Company utilized. Condition-based and selective condition-based trimming scenarios use risk levels 5 (highest risk) to 0 (lowest risk). Risk levels 5 through 1 are stratified within portions of the established Utility Protection Zone and correspond to the Company’s Standard Maintenance Trimming specification. In this context, it is more operationally and financially efficient to trim all risk levels under a full circuit trimming program in Year 1, rather than trimming lower risk levels (e.g. risk levels 2 and 1) at a higher cost in Year 2 through Year 3.
  2. Page 181 of 230

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 RSR-020 Page 1 of 1 Date Filed: October 08, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Public Utilities Regulatory Authority Question: (VEGETATION MANAGEMENT) Exhibit CLP-VMP-1, p. 38. Does the Company have a selected vendor for the annual LiDAR data? Response: The Company has not selected a vendor to collect, process, and analyze the annual LiDAR data. Vendor selection will be conducted through a competitive request for proposals (“RFP”) process to identify vendors that will partner with the Company to provide quality services at a competitive cost. The RFP and vendor selection process will commence and be completed in early 2027 in order to perform LiDAR scans during the “leaf on” period (April through October) for prioritization of the 2028 work plan.
  3. Page 182 of 230

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 RSR-021 Page 1 of 1 Date Filed: October 09, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Public Utilities Regulatory Authority Question: (VEGETATION MANAGEMENT) Exhibit CLP-VMP-1, p. 38. Provide the service agreement for the LiDAR services. If an agreement is not in effect, provide an overview of the LiDAR services the Company is planning to contract for. Response: The Company has not selected a vendor to collect, process, and analyze the annual LiDAR data and does not have an active service agreement in effect. Vendor selection will be conducted through a competitive request for proposals (“RFP”) process to identify vendors that will partner with the Company to provide quality services at a competitive cost. The RFP and vendor selection process will commence and be completed in early 2027 in order to perform LiDAR scans during the “leaf on” period (April through October) for prioritization of the 2028 work plan. In reference to Exhibit CLP-VMP-1, on page 38, at line 6, the contracts for the successful LiDAR pilot can be provided. Please refer to RSR-021, Attachment 1 CONFIDENTIAL, and RSR-021, Attachment 2 CONFIDENTIAL, for the 2025 LiDAR pilot contracts.
  4. Page 183 of 230

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 RSR-022 Page 1 of 1 Date Filed: October 09, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Public Utilities Regulatory Authority Question: (VEGETATION MANAGEMENT) Exhibit CLP-VMP-1, p. 40. Provide a comparison of how the new vegetation management contracts would differ from those currently in place. Response: Referring to Exhibit CLP-VMP-1, page 40, lines 12-17, the Company has historically utilized multi-year vegetation management contracts to provide the vendors and their workers predictable available work over a four-year contract term, which assists the vendor in retaining crews and provides a basis for tree vendors to submit competitive pricing bids in response to Eversource’s solicitation. In this context, the updated 2027-2030 Vegetation Management Plant (“VMP”) contract will continue to utilize a four-year contract term modeled after the success of the 20232026 vegetation management contract and supported by the Connecticut LiDAR data, which indicated that the best strategy is to treat all vegetation encroachment along the entire circuit length during the same year on a cyclical basis for optimal efficiency and lower overall unit costs per mile. One primary difference is that the Company has strategically separated the Waterbury Area Work Center (“AWC”) from the Cheshire AWC to facilitate competition and promote operational efficiencies in the 2027-2030 VMP contract.
  5. Page 184 of 230

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 RSR-023 Page 1 of 1 Date Filed: October 09, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Public Utilities Regulatory Authority Question: (VEGETATION MANAGEMENT) Exhibit CLP-VMP-1, p. 40. Does the Company currently have any multi-year vegetation management contracts that were in place for the last trimming cycle? If so provide. Response: In reference to Exhibit CLP-VMP-1, on page 40, the Company indicates that there are longer-term concerns with the workforce in the Utility Vegetation Management field due to the lack of seasoned and skilled tree crews. Multi-year full-service contracts provide the vendors and their workers with predictable available work over the four-year contract term and that certainty assists the vendors in retaining crews and providing competitive pricing. The Company has multi-year vegetation management contracts in places for the last trimming cycle (2023-2026). Please refer to OCC-044, Attachment 2: Contract Number Citation Lewis Tree Services CW2302093 Lucas Tree Experts CW2302214 OCC-044, Attachment 2, Page 355 OCC-044, Attachment 2, Page 3215 OCC-044, Attachment 2, Page 3367 Vendor Asplundh Tree Expert Co. CW2302015
  6. Page 185 of 230

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 RSR-024 Page 1 of 1 Date Filed: October 09, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Public Utilities Regulatory Authority Question: (VEGETATION MANAGEMENT) Exhibit CLP-VMP-1, p. 42. Provide the standards the Company has for vegetation management. Response: In reference to Exhibit CLP-VMP-1, page 42, monitoring the performance of VMP contractors to ensure compliance with the Company’s specifications and operational efficiency is outlined in the executed contracts (i.e. Section II Special Conditions and Amendments and Section III Specification for Local Distribution Line Clearance Tree Work and Brush Control). Please refer to OCC-044, Attachment 2, on pages 388-398, for an example of Section II Special Conditions and Amendments, and pages 403-416, for an example of Section III Specification for Local Distribution Line Clearance Tree Work and Brush Control. Please refer to RSR-024, Attachment 1, for the Electric Maintenance Program (“EMP”) standards for Vegetation Management.
  7. Page 186 of 230

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 RSR-025 Page 1 of 1 Date Filed: October 09, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Public Utilities Regulatory Authority Question: (VEGETATION MANAGEMENT) Exhibit CLP-VMP-1, p. 42. Provide a breakdown or summary of contractors that have failed to meet the 4-week threshold. Response: In reference to Exhibit CLP-VMP-1, on page 42, at lines 19-20, depending on the year, weather, restoration activity, and scheduled workloads, including support of construction activities, all maintenance contractors, at some point, have failed to meet the four-week threshold for completing discrepancies identified through Vegetation Management staff audits, including Asplundh Tree Experts Co., Lewis Tree Service Inc., and Lucas Tree Experts.
  8. Page 187 of 230

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 RSR-026 Page 1 of 1 Date Filed: October 09, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Public Utilities Regulatory Authority Question: (VEGETATION MANAGEMENT) Exhibit CLP-VMP-1, p. 42. For each year since 2018, provide the following regarding the completion of “rework” by vegetation management contractors: a. the number of instances of rework; b. the total mileage of rework; and c. the percentage of rework mileage to the total actual mileage done. Response: a. There were 65,291 scheduled maintenance discrepancies from 2018 through 2025. b. There were 2,176 miles of scheduled maintenance rework from 2018 through 2025. c. The percentage of rework mileage to total actual mileage was 7% from 2018 through 2025.
  9. Page 188 of 230

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 RSR-027 Page 1 of 2 Date Filed: October 09, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Public Utilities Regulatory Authority Question: (VEGETATION MANAGEMENT) Exhibit CLP-VMP-1, p. 47. Has the Company attempted to estimate how the new trimming program would improve SAIDI scores? Explain. Response: The System Average Interruption Duration Index (“SAIDI”) reflects both the number of customers interrupted and the duration of those interruptions. The impact of a vegetation-related outage varies based on the location and nature of the event, the extent of equipment damage, the availability of information identifying the outage and its location, and the field conditions and work required to safely restore service. Weather, access limitations, and the number of concurrent outages also affect restoration duration. The proposed Vegetation Management Plan (“VMP”) is intended to reduce vegetation-related outages; however, these event-specific factors limit the Company’s ability to translate the proposed program into quantified improvements in SAIDI. The Company’s Reliability Tree Work (“RTW”) program is designed to allow the Company to address the locations on scheduled circuits where overhang and Enhanced Tree Trimming (“ETT”) clearances were not previously achieved on the portion of those circuits that serve the most customers and are highly susceptible to tree-related outages, particularly in relation to circuit backbones that were addressed through the ETT program over 20 years ago. RTW will encompass trimming of overhanging branches, as overhanging branches that break and fall on the power lines account for approximately 24% of the tree-related outages on the system. By targeting the zones with overhang that serve the highest number of customers through the RTW program, risk will be mitigated. The program will also strive to remove all overhang and trees in close proximity, although the Company remains constrained by tree owner consent and tree warden limitations. Please refer to Exhibit CLP-VMP-1 on page 30-31, summarized on page 19 of Exhibit CLP-VMP2, where the Company proposes the RTW program. The RTW program will be key in preventing vegetation outages from outside zone overhanging limb fall-in and inside zone tree fall-in on high priority line segments with the goal of achieving clearance of 10 ft of vegetation from ground to sky where permission allows.
  10. Page 189 of 230

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 RSR-027 Page 2 of 2 Please refer to pages 49-51 of Exhibit CLP-VMP-1 which is also summarized on page 11 of Exhibit CLP-VMP-2. The Company selected 21 circuit zones with high System Average Interruption Duration Index (SAIDI) for targeted vegetation management in 2023. The table and summary table on page 50 of Exhibit CLP-VMP-1 below shows pre- and post-treatment customer reliability (CMI and CI) for circuit zones that received targeted vegetation management. This targeted vegetation management included seeking to remove within 10 feet of the outermost conductor and all overhanging vegetation. On average, the segments where targeted vegetation management was performed experienced a 94% reliability improvement demonstrating a benefit for these circuits associated with removal of overhang, trees that are too close to the distribution system, and removal of high-risk trees. The University of Connecticut 2022 Study, A Statistical Framework for Evaluating the Effectiveness of Vegetation Management in Reducing Power Outages Caused during Storms in Distribution Networks (please refer to Exhibit CLP-VMP-4), demonstrated that, “enhanced vegetation management is particularly helpful in reducing trouble spots for lower severity storms, with reductions between 45.8% and 63.8%, and substantially reduces trouble spots during the most severe events when vegetation management is particularly comprehensive, demonstrating a 37.3% reduction when compared with circuits with little to no enhanced tree trimming.” The reliability improvements were observed in individual storm events as well as in annual totals. The University of Connecticut 2022 study further elaborates that, “when compared with previous studies in the effectiveness of vegetation management activities, this analysis provides a better understanding of how more rigorous vegetation management standards (applying ETT) help reduce outages at an individual event level, for both the more frequent events and those less frequent, stronger storms, which may also occur more frequently in the future due to climate change.” Please refer to Exhibit CLP-TSP-3 where the company estimates approximately 3% reliability improvement resulting from the proposed VMP, and to Exhibit CLP-TSP-4, where the Company illustrates the impact of enhanced vegetation management and an estimated 35% SAIDI improvement on zones that currently have bare wire conductor and have had on average more than one (1) interruption per year in the examined period (2020-2023).

As listed on the current system

Corres. 11/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8

This filing on the current system (opens in a new tab)