Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8
Files9
Docket No. 26-05-10 Discovery Compilation November 6 2026.pdf
PDF · 134 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation November 6 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation November 6 2026.pdf
ALLCO Set 13_COMBINED.pdf
PDF · 801 KB · 49 pagesText searchable
Download ALLCO Set 13_COMBINED.pdfRead the text of ALLCO Set 13_COMBINED.pdf
ALLCO Set 16_COMBINED.pdf
PDF · 642 KB · 22 pagesText searchable
Download ALLCO Set 16_COMBINED.pdfRead the text of ALLCO Set 16_COMBINED.pdf
ALLCO Set 18_COMBINED.pdf
PDF · 306 KB · 25 pagesText searchable
Download ALLCO Set 18_COMBINED.pdfRead the text of ALLCO Set 18_COMBINED.pdf
CIEC Set 7_COMBINED.pdf
PDF · 230 KB · 7 pagesText searchable
Download CIEC Set 7_COMBINED.pdfRead the text of CIEC Set 7_COMBINED.pdf
DEEP Set 1 (BETP)_COMBINED.pdf
PDF · 1.9 MB · 174 pagesText searchable
Download DEEP Set 1 (BETP)_COMBINED.pdfRead the text of DEEP Set 1 (BETP)_COMBINED.pdf
NECTA Set 6_COMBINED.pdf
PDF · 446 KB · 22 pagesText searchable
Download NECTA Set 6_COMBINED.pdfRead the text of NECTA Set 6_COMBINED.pdf
OCC Set 29_COMBINED.pdf
PDF · 499 KB · 30 pagesText searchable
Download OCC Set 29_COMBINED.pdfRead the text of OCC Set 29_COMBINED.pdf
PURA Set 8_COMBINED.pdf
PDF · 2.5 MB · 230 pagesText searchable
Download PURA Set 8_COMBINED.pdfRead the text of PURA Set 8_COMBINED.pdf
Text of ALLCO Set 18_COMBINED.pdf
Extracted from the file · 25 pages · 65,407 characters
Text of CIEC Set 7_COMBINED.pdf
Extracted from the file · 7 pages · 8,262 characters
Text of DEEP Set 1 (BETP)_COMBINED.pdf
Extracted from the file · 174 pages · 446,641 characters
Text of NECTA Set 6_COMBINED.pdf
Extracted from the file · 22 pages · 43,545 characters
Text of OCC Set 29_COMBINED.pdf
Extracted from the file · 30 pages · 65,312 characters
Page 207 of 230
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 UPA-052 Page 2 of 3 Utilities series.[1] Footnote 10 on page 28 expressly states that “[t]he comparable series for the period prior to March 2006 is electric, gas, and sanitary services.”[2] In addition, the BLS Technical Note on page 2 explains that the Historical Listing contains industry series that BLS determined to be continuous between the former classification system used through December 2005 and the current classification system used beginning in March 2006.[3] Thus, BLS itself identifies Electric, gas, and sanitary services as the pre-2006 comparable series for Utilities, rather than LEI independently assuming that the two unrelated series could be combined. The two published series also track closely during their 2001–2005 overlap. LEI therefore treated the overlap as a transition period and gave the two series equal weight by taking their simple average for those years. For example, the respective index values are 82.4 versus 82.1 in 2001, 86.3 versus 85.8 in 2002, 90.1 versus 89.2 in 2003, and 94.9 versus 94.3 in 2004. By 2005, both series report exactly 99.2. Accordingly, there is no level discontinuity introduced by switching from the predecessor series to the Utilities series at the end of the overlap period: the two series converge to the same index value immediately before the transition. The close correspondence throughout the overlap also confirms that the two series exhibit substantially the same underlying movement. The approach LEI employed to merge the two series has precedent. For example, the Federal Reserve Bank of St. Louis notes in its discussion of index-number splicing that overlapping annual index series may be linked either in a single year or “over an average of years in the overlap”.[4] Similarly, the Australian Bureau of Statistics uses a “mean splice” for its CPI methodology specifically because using all periods common to the two series avoids making the result depend on the choice of a single splice period and has proved more robust empirically.[5] Although these approaches are not identical to LEI’s simple arithmetic average, they provide a recognized statistical basis for using the overlapping observations collectively to produce a smooth transition between closely comparable index series, rather than arbitrarily selecting a single crossover point during the overlap. b. As explained in response to subpart (a), no single BLS ECI series covering the relevant utility industry is available for the entire 1988–2024 period. The predecessor Electric, gas, and sanitary services series is needed for the earlier years, while the Utilities series is available only for the later years. Accordingly, a continuous labor-price series for the full period necessarily requires the two BLS series to be linked. LEI therefore cannot perform the requested sensitivity using an alternative, independently observed ECI series that is applicable to the EDC industry covering the full study period because such a series is not available.Page 208 of 230
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 UPA-052 Page 3 of 3 BLS. Employment Cost Index Historical Listing – Volume V. P. 23. BLS. Employment Cost Index Historical Listing – Volume V. P. 28. [3] BLS. Employment Cost Index Historical Listing – Volume V. P. 2. [4] Federal Reserve Bank of St. Louis. Revisions to User Costs for the Federal Reserve Bank of St. Louis Monetary Services Indexes. (2005). P. 5. [5] Australian Bureau of Statistics. Consumer Price Index: Concepts, Sources and Methods, 2017. [1] [2]Page 209 of 230
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 UPA-053 Page 1 of 2 Date Filed: October 09, 2026 Witness: Julia Frayer Request from: Public Utilities Regulatory Authority Question: (OM&A PFP AND X-FACTOR) Exhibit CLP-PBR-2; Exhibit CLP-PBR-3; Interrog. Resps. OCC-534 and OCC-538. LEI uses a 20-year period (i.e., 2005-2024) for the Total Factor Productivity (TFP)/PFP analysis and a 10-year period (i.e., 2015-2024) for the econometric benchmarking analysis. LEI states that the longer TFP/PFP period reduces the influence of yearto-year variability, unusual observations, and one-time events and better reflects long-run productivity trends. a. Explain why these considerations support a 20-year period for the TFP/PFP analysis but not for the econometric benchmarking analysis. b. Conversely, explain why the considerations supporting the 2015-2024 period for the econometric benchmarking analysis do not support using a similar period for the TFP/PFP analysis. c. Explain the basis for selecting 2015 as the starting year for the econometric benchmarking analysis. Response: a. The appropriate study period depends on the purpose and methodology of the analysis. The TFP/PFP analysis is intended to estimate a long-run industry productivity trend, based on changes in industry inputs and outputs over a sufficiently long period of time. For that purpose, a longer period provides more annual growth observations and reduces the influence of individual years affected by changes in consumption, lumpy capital expenditures, labor-cost fluctuations, or other one-time events. LEI therefore selected the 2005–2024 period as a sufficiently long period to measure the underlying industry productivity trend, while remaining relevant to current industry conditions. The econometric benchmarking analysis serves a different purpose. It estimates the relationship between utility costs and contemporaneous cost drivers in order to assess CL&P’s current cost performance relative to the industry. For that analysis, LEI selected a more recent ten-year period to estimate the relationship between costs and drivers and provided annual results for the own-cost benchmarking – this timeframe, in the context of the panel regression with 88 EDCs, provides sufficient observations for statistically robust estimation while maintaining the relevance of the estimated cost relationships to current operating conditions and future PBR rate setting.Page 210 of 230
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 UPA-053 Page 2 of 2 b. Conversely, the considerations supporting the 2015–2024 period for econometric benchmarking do not support limiting the TFP/PFP analysis to the same ten-year period. The benchmarking analysis is intended to capture relatively recent operating and cost relationships at a specific point in time. In contrast, the objective of the TFP/PFP analysis is to measure productivity trends over time. Shortening that analysis to ten years would reduce the number of annual growth observations and increase the influence of the particular economic and operating conditions occurring within that shorter period, including unusual or transitory events. This would be less consistent with the objective of estimating a representative long-run industry productivity trend. The TFP study therefore balances the need to reduce the influence of individual-year volatility against the need to retain relevance to current industry conditions. c. LEI selected 2015 as the starting year because 2015–2024 represents the most recent tenyear period ending with the latest complete year of data used in the study. That period provides a balanced panel in which each of the 88 EDCs is observed in each year, while providing sufficient observations to estimate and test the relevant business drivers and capturing a range of recent operating conditions relevant to the benchmarking analysis.Page 211 of 230
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 UPA-054 Page 1 of 3 Date Filed: October 09, 2026 Witness: Julia Frayer Request from: Public Utilities Regulatory Authority Question: (OM&A PFP AND X-FACTOR) Exhibit CLP-PBR-2, p. 25. LEI interpolated isolated missing observations when data were unavailable for a single year but available for the immediately preceding year and following years. a. Identify each interpolated observation, including the utility, year, and variable, and provide the value before and after interpolation and the method used to calculate the interpolated value. b. Recalculate the OM&A PFP growth rate and resulting X-factor excluding interpolated observations and compare the results with LEI’s proposed –0.03 X-factor. c. Identify whether any observations used in Exhibit CLP-PBR-3 were interpolated, imputed, estimated, or otherwise constructed to address missing data. If so, identify each such observation and the method used. Response: a. Please refer to Table 1 below. LEI used interpolation where one or more annual observations were missing but reported observations were available for the same EDC both before and after the missing period. For each such gap, LEI used the nearest available observations preceding and following the gap and linearly interpolated the intervening years, thereby smoothing the change between the two observed endpoints across the missing period. Where multiple consecutive years were missing, the change between the two available endpoint observations was distributed across the intervening years rather than treating each missing year independently. This treatment maintains continuity in the historical series and avoids treating the absence of a reported observation as an actual change in the utility’s underlying plant or other input. The table below identifies each interpolated observation, including the utility, variable, year, original value, and interpolated value.Page 212 of 230
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 UPA-054 Page 2 of 3 Table 1 b. The interpolated observations identified in subpart (a) relate to historical plant-in-service balances and retirements used in constructing the capital input series. These observations are not inputs to the calculation of OM&A PFP. Accordingly, excluding the interpolated capital observations does not change the industry OM&A PFP growth rate or the resulting X Factor; both remain approximately -0.03%. The interpolated observations may affect the construction of the capital input series and, therefore, capital PFP and total TFP, but those measures are not used to establish the Company’s proposed X Factor. c. Exhibit CLP-PBR-3 uses several data series developed for LEI’s Industry TFP Study. The unit-cost benchmarking analysis uses the same OM&A costs, capital costs, and customer counts as the TFP Study, and the econometric benchmarking analysis similarly uses the capital and OM&A cost measures developed using the TFP methodology. Accordingly, the historical plant-in-service and retirement observations identified in response to subpart (a) were used in constructing the capital cost series that is also used in Exhibit CLP-PBR-3. These were not separate interpolations performed for the benchmarking analysis; rather, the benchmarking analysis uses the resulting capital cost series developed from the same underlying historical data. See the response to subpart (a) for the utility, year, variable, and interpolation method.Page 213 of 230
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 UPA-054 Page 3 of 3 With respect to variables developed separately for the econometric benchmarking analysis, LEI used one data substitution to address unavailable data. For Potomac Electric Power Company’s District of Columbia operations, LEI used Maryland’s BLS Quarterly Census of Employment and Wages (“QCEW”) utility-industry average annual pay as a proxy for the District of Columbia labor-price variable for each year from 2015 through 2024 because the corresponding District of Columbia series was unavailable. The Maryland value for each year was used and transformed into natural logarithmic form consistent with the model specification. This treatment is a proxy substitution, not an interpolation.Page 214 of 230
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 UPA-055 Page 1 of 1 Date Filed: October 30, 2026 Witness: Julia Frayer Request from: Public Utilities Regulatory Authority Question: (OM&A PFP AND X-FACTOR) Exhibit CLP-PBR-2A CONFIDENTIAL. The values reported for the OM&A price index and Real OM&A are hard-coded or embedded in the workbook rather than calculated through formulas that permit reproducible results. a. Refile Exhibit CLP-PBR-2A CONFIDENTIAL, as an unlocked Excel workbook with all equations, calculations, links, and underlying assumptions/workpapers unhidden, unprotected, and in a reproducible format. b. Define the term in Cell Z8, and discuss how LEI developed the OM&A and Real OM&A cost components. Include citations to the underlying source data. c. Discuss how the OM&A price index for each utility and year was constructed, including how the normalized ECI, normalized Gross Domestic Product for Final Sales to Domestic Purchasers (GDP-FSDP), and labor cost share are incorporated into the calculation(s). d. Explain how the labor cost share is calculated, including the underlying data source(s), FERC 1 accounts or other inputs used, and adjustments made, and whether the labor cost share is utility-specific and/or varies by year. e. Identify any other derived inputs, intermediate calculations, indices, or results used in the TFP, PFP, or X-factor calculations in Exhibit CLP-PBR-2A CONFIDENTIAL, that are reported as hard-coded/ embedded values or otherwise cannot be reproduced from the formulas contained in the workbook. For each, provide the underlying data, equation or methodology, calculations, and other items necessary to reproduce the reported value, with formulas intact. Response: a. Please refer to UPA-055 Attachment 1, CONFIDENTIAL. b. Please refer to Section 3.2. of the CLP-PBR 2. c. Please refer to Section 3.2 of the CLP-PBR 2. d. Please refer to Section 3.2. of the CLP-PBR-2. e. Please refer to UPA-055 Attachment 1, CONFIDENTIAL.Page 215 of 230
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 UPA-056 Page 1 of 2 Date Filed: October 09, 2026 Witness: Julia Frayer Request from: Public Utilities Regulatory Authority Question: (OM&A PFP AND S-FACTOR) Exhibit CLP-PBR-3 and Interrog. Resps. OCC-444. LEI’s econometric benchmarking model uses pooled Ordinary Least Squares (OLS) with a linear time trend and heteroskedasticity-robust standard errors. a. Because the dataset contains repeated annual observations for the same utilities, re-estimate the models using fixed effects in place of the linear time trend and standard errors clustered at the utility level. Use the estimated utility fixed effects to construct an industry-level benchmark and compare the Company’s cost performance to that benchmark. Explain how the industry-level benchmark is constructed from the utility-specific effects and provide the Company’s resulting efficiency gap. b. Provide the resulting coefficient estimates, standard errors, model fit statistics, and Company benchmarking results, and compare them with the results from LEI’s originally submitted specifications. Response: a. This is a time-consuming request that could not reasonably be completed during the discovery process. More importantly, it is LEI’s expert opinion that such analysis is not likely to yield reliable results. LEI considered a utility fixed-effects specification during preliminary development of the econometric models. However, given the size of the benchmarking sample (88 EDCs), such a model specification would have required introduction of 87 utility-specific indicator variables in addition to the business drivers. This would materially reduce the degrees of freedom available to estimate the relationships between costs and the selected explanatory variables, resulting in less reliable statistical estimates in the context of benchmarking. In order to support a fixed-effects specification with a larger number of utility-specific effects, LEI would need to extend the study period substantially further back in time, thereby introducing older data into the benchmarking sample. LEI does not consider this preferable because an econometric benchmarking study should reflect the current efficiency of an individual firm relative to other firms in the industry. LEI’s selected 10year study period therefore strikes a balance between using sufficiently recent data to provide a current measure of relative cost performance and using a sufficiently long period so that the results are not unduly influenced by events or conditions affecting only a singlePage 216 of 230
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 UPA-056 Page 2 of 2 year. As a result, LEI did not proceed with a utility fixed effects specification and instead selected specifications that provided more reliable and interpretable estimates of relative cost performance across EDCs. b. LEI could not reliably deploy a fixed-effects approach described in subpart (a) to construct an alternative cost-level benchmark.
As listed on the current system
Corres. 11/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8