Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8

Files9

Search terms highlighted
Eversource rate increase is on 89 pages across 5 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
2 pages match
2 pages match

Text of ALLCO Set 18_COMBINED.pdf

Extracted from the file · 25 pages · 65,407 characters

Text of CIEC Set 7_COMBINED.pdf

Extracted from the file · 7 pages · 8,262 characters

Text of DEEP Set 1 (BETP)_COMBINED.pdf

Extracted from the file · 174 pages · 446,641 characters

Text of NECTA Set 6_COMBINED.pdf

Extracted from the file · 22 pages · 43,545 characters

Text of OCC Set 29_COMBINED.pdf

Extracted from the file · 30 pages · 65,312 characters

35 pages match
  1. Page 210 of 230

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 UPA-053 Page 2 of 2 b. Conversely, the considerations supporting the 2015–2024 period for econometric benchmarking do not support limiting the TFP/PFP analysis to the same ten-year period. The benchmarking analysis is intended to capture relatively recent operating and cost relationships at a specific point in time. In contrast, the objective of the TFP/PFP analysis is to measure productivity trends over time. Shortening that analysis to ten years would reduce the number of annual growth observations and increase the influence of the particular economic and operating conditions occurring within that shorter period, including unusual or transitory events. This would be less consistent with the objective of estimating a representative long-run industry productivity trend. The TFP study therefore balances the need to reduce the influence of individual-year volatility against the need to retain relevance to current industry conditions. c. LEI selected 2015 as the starting year because 2015–2024 represents the most recent tenyear period ending with the latest complete year of data used in the study. That period provides a balanced panel in which each of the 88 EDCs is observed in each year, while providing sufficient observations to estimate and test the relevant business drivers and capturing a range of recent operating conditions relevant to the benchmarking analysis.
  2. Page 211 of 230

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 UPA-054 Page 1 of 3 Date Filed: October 09, 2026 Witness: Julia Frayer Request from: Public Utilities Regulatory Authority Question: (OM&A PFP AND X-FACTOR) Exhibit CLP-PBR-2, p. 25. LEI interpolated isolated missing observations when data were unavailable for a single year but available for the immediately preceding year and following years. a. Identify each interpolated observation, including the utility, year, and variable, and provide the value before and after interpolation and the method used to calculate the interpolated value. b. Recalculate the OM&A PFP growth rate and resulting X-factor excluding interpolated observations and compare the results with LEI’s proposed –0.03 X-factor. c. Identify whether any observations used in Exhibit CLP-PBR-3 were interpolated, imputed, estimated, or otherwise constructed to address missing data. If so, identify each such observation and the method used. Response: a. Please refer to Table 1 below. LEI used interpolation where one or more annual observations were missing but reported observations were available for the same EDC both before and after the missing period. For each such gap, LEI used the nearest available observations preceding and following the gap and linearly interpolated the intervening years, thereby smoothing the change between the two observed endpoints across the missing period. Where multiple consecutive years were missing, the change between the two available endpoint observations was distributed across the intervening years rather than treating each missing year independently. This treatment maintains continuity in the historical series and avoids treating the absence of a reported observation as an actual change in the utility’s underlying plant or other input. The table below identifies each interpolated observation, including the utility, variable, year, original value, and interpolated value.
  3. Page 212 of 230

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 UPA-054 Page 2 of 3 Table 1 b. The interpolated observations identified in subpart (a) relate to historical plant-in-service balances and retirements used in constructing the capital input series. These observations are not inputs to the calculation of OM&A PFP. Accordingly, excluding the interpolated capital observations does not change the industry OM&A PFP growth rate or the resulting X Factor; both remain approximately -0.03%. The interpolated observations may affect the construction of the capital input series and, therefore, capital PFP and total TFP, but those measures are not used to establish the Company’s proposed X Factor. c. Exhibit CLP-PBR-3 uses several data series developed for LEI’s Industry TFP Study. The unit-cost benchmarking analysis uses the same OM&A costs, capital costs, and customer counts as the TFP Study, and the econometric benchmarking analysis similarly uses the capital and OM&A cost measures developed using the TFP methodology. Accordingly, the historical plant-in-service and retirement observations identified in response to subpart (a) were used in constructing the capital cost series that is also used in Exhibit CLP-PBR-3. These were not separate interpolations performed for the benchmarking analysis; rather, the benchmarking analysis uses the resulting capital cost series developed from the same underlying historical data. See the response to subpart (a) for the utility, year, variable, and interpolation method.
  4. Page 213 of 230

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 UPA-054 Page 3 of 3 With respect to variables developed separately for the econometric benchmarking analysis, LEI used one data substitution to address unavailable data. For Potomac Electric Power Company’s District of Columbia operations, LEI used Maryland’s BLS Quarterly Census of Employment and Wages (“QCEW”) utility-industry average annual pay as a proxy for the District of Columbia labor-price variable for each year from 2015 through 2024 because the corresponding District of Columbia series was unavailable. The Maryland value for each year was used and transformed into natural logarithmic form consistent with the model specification. This treatment is a proxy substitution, not an interpolation.
  5. Page 214 of 230

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 UPA-055 Page 1 of 1 Date Filed: October 30, 2026 Witness: Julia Frayer Request from: Public Utilities Regulatory Authority Question: (OM&A PFP AND X-FACTOR) Exhibit CLP-PBR-2A CONFIDENTIAL. The values reported for the OM&A price index and Real OM&A are hard-coded or embedded in the workbook rather than calculated through formulas that permit reproducible results. a. Refile Exhibit CLP-PBR-2A CONFIDENTIAL, as an unlocked Excel workbook with all equations, calculations, links, and underlying assumptions/workpapers unhidden, unprotected, and in a reproducible format. b. Define the term in Cell Z8, and discuss how LEI developed the OM&A and Real OM&A cost components. Include citations to the underlying source data. c. Discuss how the OM&A price index for each utility and year was constructed, including how the normalized ECI, normalized Gross Domestic Product for Final Sales to Domestic Purchasers (GDP-FSDP), and labor cost share are incorporated into the calculation(s). d. Explain how the labor cost share is calculated, including the underlying data source(s), FERC 1 accounts or other inputs used, and adjustments made, and whether the labor cost share is utility-specific and/or varies by year. e. Identify any other derived inputs, intermediate calculations, indices, or results used in the TFP, PFP, or X-factor calculations in Exhibit CLP-PBR-2A CONFIDENTIAL, that are reported as hard-coded/ embedded values or otherwise cannot be reproduced from the formulas contained in the workbook. For each, provide the underlying data, equation or methodology, calculations, and other items necessary to reproduce the reported value, with formulas intact. Response: a. Please refer to UPA-055 Attachment 1, CONFIDENTIAL. b. Please refer to Section 3.2. of the CLP-PBR 2. c. Please refer to Section 3.2 of the CLP-PBR 2. d. Please refer to Section 3.2. of the CLP-PBR-2. e. Please refer to UPA-055 Attachment 1, CONFIDENTIAL.
  6. Page 215 of 230

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 UPA-056 Page 1 of 2 Date Filed: October 09, 2026 Witness: Julia Frayer Request from: Public Utilities Regulatory Authority Question: (OM&A PFP AND S-FACTOR) Exhibit CLP-PBR-3 and Interrog. Resps. OCC-444. LEI’s econometric benchmarking model uses pooled Ordinary Least Squares (OLS) with a linear time trend and heteroskedasticity-robust standard errors. a. Because the dataset contains repeated annual observations for the same utilities, re-estimate the models using fixed effects in place of the linear time trend and standard errors clustered at the utility level. Use the estimated utility fixed effects to construct an industry-level benchmark and compare the Company’s cost performance to that benchmark. Explain how the industry-level benchmark is constructed from the utility-specific effects and provide the Company’s resulting efficiency gap. b. Provide the resulting coefficient estimates, standard errors, model fit statistics, and Company benchmarking results, and compare them with the results from LEI’s originally submitted specifications. Response: a. This is a time-consuming request that could not reasonably be completed during the discovery process. More importantly, it is LEI’s expert opinion that such analysis is not likely to yield reliable results. LEI considered a utility fixed-effects specification during preliminary development of the econometric models. However, given the size of the benchmarking sample (88 EDCs), such a model specification would have required introduction of 87 utility-specific indicator variables in addition to the business drivers. This would materially reduce the degrees of freedom available to estimate the relationships between costs and the selected explanatory variables, resulting in less reliable statistical estimates in the context of benchmarking. In order to support a fixed-effects specification with a larger number of utility-specific effects, LEI would need to extend the study period substantially further back in time, thereby introducing older data into the benchmarking sample. LEI does not consider this preferable because an econometric benchmarking study should reflect the current efficiency of an individual firm relative to other firms in the industry. LEI’s selected 10year study period therefore strikes a balance between using sufficiently recent data to provide a current measure of relative cost performance and using a sufficiently long period so that the results are not unduly influenced by events or conditions affecting only a single
  7. Page 216 of 230

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 UPA-056 Page 2 of 2 year. As a result, LEI did not proceed with a utility fixed effects specification and instead selected specifications that provided more reliable and interpretable estimates of relative cost performance across EDCs. b. LEI could not reliably deploy a fixed-effects approach described in subpart (a) to construct an alternative cost-level benchmark.
  8. Page 217 of 230

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 UPA-057 Page 1 of 3 Date Filed: October 09, 2026 Witness: Julia Frayer Request from: Public Utilities Regulatory Authority Question: (OM&A PFP AND S-FACTOR) Exhibit CLP-PBR-3. LEI’s econometric benchmarking model uses customer count as the principal measure of utility output. a. Identify any alternative or additional output or scale measures LEI considered, including delivered energy and peak demand, or a combination of all three (i.e., delivered energy, peak demand, and customer count), and provide the results of any such specifications that were estimated. b. If LEI did not evaluate alternative output or scale measures, re-estimate the preferred OM&A benchmarking model using reasonable alternative or additional measure of utility output or scale and provide the resulting Company benchmarking results. Response: a. In developing the econometric benchmarking models, LEI considered and tested several alternative measures of utility scale, including customer count, delivered energy sales, and specifications that included both customer count and delivered energy sales. The data was readily available for these variables across time and all EDCs and reliable. As described in LEI’s response to OCC-444 i, LEI selected customer count as the preferred specification based on statistical performance, economic reasonableness, and parsimony. The OM&A cost model includes the natural logarithm of customer count, which has a coefficient of approximately 0.870 and is statistically significant. This result is consistent with the economic relationship that utilities serving more customers generally incur greater operating, maintenance, and administrative costs. Results for preliminary tests using delivered energy sales, either in place of or in addition to customer count, were not retained, as stated in response to OCC-444. Accordingly, LEI does not have additional regressions results to provide at this time. LEI did not estimate a specification using peak demand because such data is not available to LEI’s knowledge, for all 88 utilities over time in FERC Form 1 or EIA data sets. b. Not applicable. As discussed in response to subpart (a), LEI evaluated alternative scale measures, including delivered energy sales and specifications incorporating both customer
  9. Page 218 of 230

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 UPA-057 Page 2 of 3 count and delivered energy sales. Accordingly, the condition in subpart (b)—“if LEI did not evaluate alternative output or scale measures”—does not apply. i OCC-444 Question: Exhibit CLP-PBR-1 PBR Testimony Please provide the complete econometric specification and diagnostic testing underlying each preferred benchmarking model, including: a. b. c. d. e. Whether the model is pooled OLS, fixed-effects, random-effects, or another panel-data specification; The basis for the selected panel-data specification and the results of any specification tests performed; How the models account for utility-specific unobserved heterogeneity; How standard errors account for repeated observations for the same utility over time, including whether standard errors are clustered at the utility level; Results of tests for serial correlation, heteroskedasticity, multicollinearity, influential observations, and model specification error; and All alternative model specifications tested and the resulting the Company benchmarking results under each specification. OCC-444 Response: a. The statistical cost models developed for the econometric benchmarking analysis use a pooled ordinary least squares (“OLS”) specification, as shown in Exhibit CLP-PBR-3B. b. LEI selected a pooled OLS specification because of its cross-sectional properties. Panel treatment allows for development of explanatory relationships on cost functions based on both variation across utilities and time. LEI used a sample of 88 utilities over a 10-year period resulting in a balanced panel dataset with 880 total observations. Econometric analysis benefits from having a sufficiently large number of observations, as this improves the precision and reliability of the statistical estimates. c. LEI’s benchmarking model controls for various observable utility-specific cost drivers through selected, economically intuitive, independent variables that represent business drivers/operating characteristics. Subsequently, any remaining differences in cost performance that are not explained by those observable characteristics, i.e. “utility-specific unobserved heterogeneity,” are reflected in the model’s residual values. For benchmarking purposes, this residual is used as the measure of relative cost performance, representing the extent to which a utility’s actual costs differ from the costs predicted by the model given the utility’s own circumstances related to its scale, input prices and network characteristics, and the impact that those business drivers are expected to have on cost (based on fitted values developed from analysis across the industry). d. In developing the econometric equation with fitted values for each cost function, LEI used heteroskedasticityrobust standard errors (vce (robust)), rather than standard errors clustered by utility. e. The table below summarizes the various tests that LEI performed on the regressions for the three cost models. LEI did not separately test for influential observations, which assess whether individual observations disproportionately affect the regression estimates, or for model specification error, which assesses whether the assumed model form may be mis-specified.
  10. Page 219 of 230

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-08 Date Issued September 25, 2026 UPA-057 Page 3 of 3 OM&A model Total Cost model Capital Cost model Serial correlation Wooldridge F = 2.671; p = Wooldridge F = 3.523; p = Wooldridge F = 319.424; p = 0.1058 0.0639 0.0000 Heteroskedasticity Breusch-Pagan χ² = 7.47; p = 0.0063 Multicollinearity Mean Variance Inflation Mean VIF = 156.98; Factor (“VIF”) = 1.61; Ln_Customers_sq max 540.14; Ln_Customers = 2.22 = 539.91 Mean VIF = 156.98; = Ln_Customers_sq = 540.14; Ln_Customers = 539.91 Model Selection Criteria AIC = 477.00; BIC = AIC = -179.14; BIC = 500.90 -140.90 AIC = 170.44; BIC = 208.68 f. χ² = 0.01; p = 0.9054 χ² = 37.55; p = 0.0000 During the initial phases of constructing an econometric model, LEI considered and tested a range of alternative explanatory variables for each const function, which were selected based on economic intuition and their potential relevance to utility cost performance. Various combinations of these variables were also assessed as part of the specification process. LEI generally found that other variables initially considered were not statistically significant for the chosen time period and sample of utilities and were therefore not retained in the final model specifications. LEI did not retain workpapers for these initial tests as these other candidate variables were ultimately not reflected in the final model specification.

As listed on the current system

Corres. 11/06/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation ALLCO Set 13, 16, 18, CIEC Set 7, DEEP Set 1, NECTA Set 6, OCC Set 29, PURA 8

This filing on the current system (opens in a new tab)