Discovery Compilation (ALLCO Set 19, CIEC Set 8, PURA Set 12).
Files4
Docket No. 26-05-10 Discovery Compilation November 10 2026.pdf
PDF · 133 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation November 10 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation November 10 2026.pdf
ALLCO Set 19_COMBINED.pdf
PDF · 424 KB · 27 pagesText searchable
Download ALLCO Set 19_COMBINED.pdfRead the text of ALLCO Set 19_COMBINED.pdf
CIEC Set 8_COMBINED.pdf
PDF · 327 KB · 14 pagesText searchable
Download CIEC Set 8_COMBINED.pdfRead the text of CIEC Set 8_COMBINED.pdf
PURA Set 12_COMBINED.pdf
PDF · 530 KB · 25 pagesText searchable
Download PURA Set 12_COMBINED.pdfRead the text of PURA Set 12_COMBINED.pdf
Page 1 of 25
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-12 Date Issued October 13, 2026 RRU-087 Page 1 of 2 Date Filed: October 27, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray and Denise Cosentino Request from: Public Utilities Regulatory Authority Question: (AC-INSURANCE EXPENSE) Application, Sch, WPC- 3.19. Explain what the following insurance coverages are, what each policy covers, and why each is needed for the provision of utility services. a. b. c. d. e. f. Accrual for Uncollectible Claims; Public Liability Expense; General Liability; All Risk Property/Boiler & Machine; Privacy Protection; and Fiduciary. Response: a. The accrual for uncollectible claims is a reserve against damage to the Company’s infrastructure such as poles and underground lines by third parties. The third parties are billed for the costs to repair and this accrual accounts for the uncollectible portion of the amount billed. The Company estimates the likelihood of recovery through the third party’s insurance, settlement, legal action, or other means, and books a reserve adjustment against the receivable. By pursuing the third party who caused the damage for the associated costs to repair, the costs are transferred away from customers. b. The Company maintains a reserve for general liability claims within the self-insurance retention that the Company becomes legally obligated to pay. The accrual expense associated with this reserve provides a smoothing effect on the cost to customers related to such claims. An actuary reviews the balance in the Company reserve each year for adequacy and the expense is the steady addition of funds to cover claims. c. General Liability insurance covers third party claims the company becomes legally obligated to pay. Maintaining this insurance transfers the risk of paying claims over the self-insurance retention away from customers. For example, in 2016, the Company settled a wrongful death case for $5 million and insurance paid for all costs over $1 million. The $1 million came from the public-liability reserve.Page 2 of 25
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-12 Date Issued October 13, 2026 RRU-087 Page 2 of 2 d. All Risk Property/Boiler & Machine covers physical losses to insurable property owned, used, or leased by the Company from covered perils. Property insurance transfers the risk of repairing/replacing damaged insurable infrastructure away from customers. e. Privacy Protection covers breaches of networks and operational technology including investigation, remediation and credit monitoring. Maintaining this insurance transfers the risk of costs associated with a cyber breach that exceeds self-insurance retention away from customers. f. Fiduciary Liability covers breach of responsibilities, obligations or duties by a fiduciary of any named benefit program sponsored by the Company such as the pension and 401k. Fiduciary insurance protects the benefit plans that are an important piece to retaining workers who provide utility services.Page 3 of 25
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-12 Date Issued October 13, 2026 RRU-088 Page 1 of 1 Date Filed: October 27, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Public Utilities Regulatory Authority Question: (AC-BANK AND DEBT SERVICE CHARGES) Interrog. Resp. RRU-10, Att. 4, p.1. a. Explain why the Rating Agency Surveillance fee increased by 13.85% in 2024 compared to 2023. b. Explain why the Rating Agency Surveillance fee increased by 12.37% in 2025 compared to 2024. Response: Rating agency surveillance fees are fees charged by S&P, Moody’s and Fitch for their ongoing rating and monitoring of CL&P. Surveillance fees help rating agencies continuously assess the creditworthiness of a company, which can change over time due to various factors. This includes ongoing review of the Company’s regulatory environment, financial performance, operations, and evaluating new developments that could impact the Company’s credit quality. In exchange for paying these surveillance fees, S&P, Moody’s and Fitch provide credit ratings on CL&P. Absent paying these fees, S&P, Moody’s and Fitch would not provide credit ratings. CL&P’s credit ratings play a critical role in the Company’s ability to attract least cost debt capital. Not paying these fees, and in turn, not maintaining credit ratings, would be extremely detrimental to CL&P’s customers. Rating agency surveillance fees are allocated to Eversource Energy and its subsidiaries rated by S&P, Moody’s and/or Fitch on a pro rata basis based on the amount of debt outstanding at each entity. The increase in fees identified in parts (a) and (b) are driven by: (1) an increase in the absolute level of fees charged; and (2) an increase in the allocation to CL&P based on CL&P having a larger proportionate share of outstanding debt.Page 4 of 25
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-12 Date Issued October 13, 2026 RRU-089 Page 1 of 1 Date Filed: October 27, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Public Utilities Regulatory Authority Question: (AC-BANK FEES AND DEBT SERVICE CHARGES) Interrog. Resp. RRU-10 Att. 3, p. 1. Explain why the Bank Service charges for Work Order TFEE0011 increased by 26% in the Test Year compared to 2024. Response: The Bank Service charges increase in 2025 for Work Order TFEE0011 is attributable to year-overyear increase in each fee structure and a new service offering in 2025 by JPMorgan Chase. Please refer to RRU-089, Attachment 1, for the year-over-year analysis for each fee structure and new service offerings in the test year.Page 5 of 25
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-12 Date Issued October 13, 2026 RRU-090 Page 1 of 1 Date Filed: October 27, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Public Utilities Regulatory Authority Question: (AC-CUSTOMER DEPOSITS) Application, Sch. B-9. Confirm if the balance of Customer Deposits will remain same for the Test Year and the Rate Year. Provide a detailed explanation and any supporting workpapers demonstrating how the Rate Year balance was derived. Response: The Company’s proposal is that the balance of Customer Deposits stated within Exhibit CLPREVREQ-2, of $10,881,000 will remain the same for the Test Year and the Rate Year. Therefore, the Rate Year balance is a direct derivation of the Test Year amount as of December 31, 2025. The Company could not reasonably estimate the amount of non-residential security deposits collected through the Rate Year and relied on the Test Year balance as a reasonable level of customer deposits to reflect in the rate base and in the cost of service.Page 6 of 25
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-12 Date Issued October 13, 2026 RSR-046 Page 1 of 3 Date Filed: October 27, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Public Utilities Regulatory Authority Question: (ENVIRONMENTAL REMEDIATION) Application, Ex. CLP-REVREQ-2, Schedule WP C3.36, p. 2; Application, Ex. CLP-REVREQ-2 Schedule WP C-3.13. Describe whether any costs related to complex environmental remediation sites have ever been included in the Company’s O&M expense item for environmental remediation shown in schedule C-3.13. Response: Please refer to the Company’s response to RSR-037 i for the justification for deferring complex environmental site costs; the Company’s response to OCC-854 ii for discussion of the environmental O&M expense requested in this proceeding; and OCC-061 iii for the regulatory proceedings authorizing recovery of environmental remediation costs. Prior Referenced Responses i RSR-037 Question: (ENVIRONMENTAL REMEDIATION) Application, Ex. CLP-ENV-1, pp. 34–35. Regarding Site #103 Parsons Lane Durham Mineral Oil Dielectric Fluid Release: a. Provide a copy of the settlement agreement; b. Provide the total portion of project costs recovered through the settlement agreement and the portion of costs requested for recovery in this proceeding; c. Explain why these costs are recovered through the deferred accounting mechanism rather than as a routine environmental remediation cost; and d. Describe why the utility pole failed and provide the age of the pole at the time of failure. RSR-037 Response: a. Please refer to RSR-037, Attachment 1 CONFIDENTIAL, for a copy of the settlement agreement. b. Please refer to RSR-037, Attachment 2 CONFIDENTIAL, for the requested information. c. As noted in the testimony in Exhibit CLP-ENV-1 of Marc J. Richards, Gary A. Iadarola, and Clare B. Connolly, the sequence, timing, and magnitude of response activities can vary from site to site depending upon the size of the site, the degree of contamination, nearby sensitive receptors, land ownership, the degree of oversight and control exercised by regulators, and many other site-specific factors. These dynamic circumstances, on-site conditions and state and municipal requirements or expectations speed projects up or slow projects down, impacting not only timing but cost. All of these variables make it extremely difficult toPage 7 of 25
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-12 Date Issued October 13, 2026 RSR-046 Page 2 of 3 accurately forecast the level of expense to be incurred in a year and cause significant fluctuations year-overyear in the level of expense incurred. Therefore, these costs do not fit well with traditional base rate recovery which is designed to establish base distribution rates based on expected future levels of annual costs. The variability in these environmental remediation costs drives the need for the continuation of deferral treatment. This request is not a blank check, but rather a treatment that requires the Company to meet the burden of a prudence review on its environmental remediation costs in the next rate case. d. ii The pole was installed in 1962. The reason for failure is unknown. OCC-854 Question: (Environmental Remediation) Per a footnote in Settlement Agreement Attachment 3, in Docket Number 17-10–46, the Company was allowed $2.289 million for environmental O&M expenses in Rate Year 1, $2.381 million in Rate Year 2, and $2.467 million in Rate Year 3. a. Were the O&M expenses incurred in the prior rate plan’s Rate Years of a similar nature to the $1.93 million requested in the current rate application? Explain. b. Were there any environmental remediation costs being deferred prior to the time of the last rate case? c. If yes, indicate the amounts deferred annually. d. Were there any deferred environmental remediation costs being amortized or recovered prior to the time of the last rate case? e. Were there any deferred environmental remediation costs being amortized/recovered and as a result of the approved settlement agreement in Docket No. 17-10-46? f. If yes, indicate the amounts amortized or recovered annually. OCC-854 Response: a. Yes. As shown on WP C-3.13 of the Company’s July 14, 2026, filing in this docket, the categories of cost that make up the $1.93 million requested in the current rate application include: (1) Clean Up & Disposal of Waste Material; (2) Manholes & Vaults; (3) Licensing & Permitting; and (4) Environmental Outside Services. There was also a fifth category, Reserve Site Remediation, but a pro forma adjustment removed the costs associated with this category that were related to reserve adjustment accruals associated with new environmental sites. The environmental O&M expenses included in Docket No. 17-10-46 were presented in the Company’s November 22, 2017, filing WP C-3.8, page 1 of 3, in categories identified as: (1) Overhead Environmental Cleanup; (2) Underground; (3) Environmental – Other; (4) Maintenance of Property Units; (5) Substation; and (6) Maintenance of Str. Lighting Equipment. Despite the differences in categories in each of the filings, the dollars that make up the costs in each filings’ Environmental schedule were identified using the same cost elements from the Company’s Powerplan cost repository, with two exceptions. First, there was one additional cost element for Compliance Assistance-Fees-Plans included in Environmental in the 2017 filing that was included in the Field Operations (Overhead Lines) and Residual schedules in the current filing (the Test Year amount in the 2017 filing was $28,382 and the Test Year amounts in the current filing were $5,795 in the Field Operations (Overhead Lines) schedule and $11,924 in the Residual schedule, for a total of $17,719). Second, the cost element for Reserve Site Remediation in the 2017 filing in the amount of $79,082 was not removed from the Environmental schedule using a pro forma adjustment the way it was removed in the current rate application.Page 8 of 25
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-12 Date Issued October 13, 2026 RSR-046 Page 3 of 3 b-d. No. As explained in the November 22, 2017, testimony of Company witnesses Catherine Finneran and Timothy Griffin in Docket No. 17-10-46, there was no current recovery from customers for environmental investigation and remediation costs at the time of the last rate case. Between 1998 and 2003, with small amounts received through 2013, the Company had pursued and achieved recoveries of $15.170 million for environmental investigation and remediation costs from several of the Company’s historical insurance carriers and a third party. Because the Company had not recovered expenses for environmental investigation and remediation costs in electric rates, in essence it had used these recoveries to pay for the Company’s investigation and remediation of its environmental liabilities, including manufactured gas plants (MGPs) and other Company sites. By the end of September of 2017 (just prior to the filing of the Company’s rate case in November 2017), the Company spent $8.4 million with an additional $4.9 million recorded to the environmental liability that was charged to shareholders via a “below the line” account. Therefore, the Company was $1.9 million away from spending or charging to shareholders an amount equal to the proceeds received. e.-f. No, as demonstrated in the March 29, 2018, Settlement Amendment Update to Settlement Agreement Attachment 5, Other Amortization Expense, there were no deferred environmental remediation costs being amortized/recovered as a result of the approved settlement agreement in Docket No. 17-10-46. iii OCC-061 Question: (Environmental Remediation) Identify all other proceedings by Company name and docket number in which the Company requested recovery of environmental remediation costs other than through operating expenses (e.g., regulatory asset, tracker, etc.). OCC-061 Response: As an example, the Company’s legal counsel has informed the Company of the following proceeding and outcomes: Importantly, Section 8 of the 2018 Rate Settlement approved by PURA in Docket No. 17-10-46, Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend Rate Schedules, states “Environmental remediation costs shall be recovered as follows: (i) The Company shall be allowed to recover its environmental remediation costs in accordance with the proposal described in the Application; and (ii) the Company is authorized to track and defer environmental costs for future review and recovery in each subsequent rate case.Page 9 of 25
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-12 Date Issued October 13, 2026 RSR-047 Page 1 of 2 Date Filed: November 03, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Public Utilities Regulatory Authority Question: (EXPENSES) Exhibit CLP-REVREQ-2, Schedule WP C-3.16. Explain whether the Company anticipates any cost savings from the Targeted System Performance (TSP) plan, and whether these savings are reflected in the Rate Year. Provide details on how those cost savings, if any, will be realized and in what projected dollar amounts. Response: The Company anticipates that Targeted System Performance ("TSP") plan investments will deliver significant reliability, resiliency, and operational benefits by improving system performance, expanding capacity to support future growth, addressing aging infrastructure, and reducing the frequency and duration of customer outages. While certain investments may provide near-term operational efficiencies, the majority of the benefits associated with the TSP plan are expected to be realized over multiple years as projects are completed, system improvements are fully integrated into the electric grid, and the impact of the investments are manifested over time. For substation-related investments, project schedules often involve extensive engineering, permitting, and long lead-time material procurement. As a result, many of the anticipated reliability and capacity benefits will not be fully realized during the Rate Year. These investments are primarily intended to support long-term system performance, reliability, and economic development needs rather than generate immediate operating expense reductions. However, planning for the orderly, economic expansion of the system potentially reduces costs that might be incurred responding to unplanned outages or emergency events due to lack of capacity. Similarly, the primary objective of the Company's resiliency investments is to harden vulnerable portions of the system to improve performance and reduce the impacts of severe weather events. Although the Company does not anticipate material, quantifiable operating expense reductions in the Rate Year associated with these investments, its analysis indicates that the proposed resiliency plan is expected to reduce customers interrupted and customer minutes of interruption during an average of approximately 40 storm-related outage events annually. This reduction in outage exposure is estimated to lower storm response and restoration costs by approximately $450,000 per year. In addition, the Company estimates annual customer reliability benefits, measured using Value of Lost Load ("VOLL"), of approximately $37 million. These benefits represent avoidedPage 10 of 25
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-12 Date Issued October 13, 2026 RSR-047 Page 2 of 2 customer interruption impacts and improved service reliability due to resiliency plan investments, rather than direct reductions in Company operating expenses. For distribution system investments, including feeder and infrastructure replacement projects, the Company expects long-term operational benefits through improved asset condition, reduced equipment failures, and enhanced operational flexibility. As aging infrastructure is proactively replaced and system conditions improve, the Company anticipates a reduction in emergent events, unplanned corrective maintenance activities, and associated operating costs. However, the timing and magnitude of these benefits depend on several factors, including asset condition, weather impacts, and actual system performance. The full value of these investments is expected to be realized over multiple years as the cumulative effects of increased proactive infrastructure replacement and system improvements are achieved.
As listed on the current system
Corres. 11/10/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (ALLCO Set 19, CIEC Set 8, PURA Set 12).