Utility Dockets and Filings

Discovery Compilation (ALLCO Set 19, CIEC Set 8, PURA Set 12).

Files4

Search terms highlighted
Eversource rate increase is on 2 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
1 page match
1 page match
  1. Page 6 of 25

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-12 Date Issued October 13, 2026 RSR-046 Page 1 of 3 Date Filed: October 27, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Public Utilities Regulatory Authority Question: (ENVIRONMENTAL REMEDIATION) Application, Ex. CLP-REVREQ-2, Schedule WP C3.36, p. 2; Application, Ex. CLP-REVREQ-2 Schedule WP C-3.13. Describe whether any costs related to complex environmental remediation sites have ever been included in the Company’s O&M expense item for environmental remediation shown in schedule C-3.13. Response: Please refer to the Company’s response to RSR-037 i for the justification for deferring complex environmental site costs; the Company’s response to OCC-854 ii for discussion of the environmental O&M expense requested in this proceeding; and OCC-061 iii for the regulatory proceedings authorizing recovery of environmental remediation costs. Prior Referenced Responses i RSR-037 Question: (ENVIRONMENTAL REMEDIATION) Application, Ex. CLP-ENV-1, pp. 34–35. Regarding Site #103 Parsons Lane Durham Mineral Oil Dielectric Fluid Release: a. Provide a copy of the settlement agreement; b. Provide the total portion of project costs recovered through the settlement agreement and the portion of costs requested for recovery in this proceeding; c. Explain why these costs are recovered through the deferred accounting mechanism rather than as a routine environmental remediation cost; and d. Describe why the utility pole failed and provide the age of the pole at the time of failure. RSR-037 Response: a. Please refer to RSR-037, Attachment 1 CONFIDENTIAL, for a copy of the settlement agreement. b. Please refer to RSR-037, Attachment 2 CONFIDENTIAL, for the requested information. c. As noted in the testimony in Exhibit CLP-ENV-1 of Marc J. Richards, Gary A. Iadarola, and Clare B. Connolly, the sequence, timing, and magnitude of response activities can vary from site to site depending upon the size of the site, the degree of contamination, nearby sensitive receptors, land ownership, the degree of oversight and control exercised by regulators, and many other site-specific factors. These dynamic circumstances, on-site conditions and state and municipal requirements or expectations speed projects up or slow projects down, impacting not only timing but cost. All of these variables make it extremely difficult to
  2. Page 7 of 25

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-12 Date Issued October 13, 2026 RSR-046 Page 2 of 3 accurately forecast the level of expense to be incurred in a year and cause significant fluctuations year-overyear in the level of expense incurred. Therefore, these costs do not fit well with traditional base rate recovery which is designed to establish base distribution rates based on expected future levels of annual costs. The variability in these environmental remediation costs drives the need for the continuation of deferral treatment. This request is not a blank check, but rather a treatment that requires the Company to meet the burden of a prudence review on its environmental remediation costs in the next rate case. d. ii The pole was installed in 1962. The reason for failure is unknown. OCC-854 Question: (Environmental Remediation) Per a footnote in Settlement Agreement Attachment 3, in Docket Number 17-10–46, the Company was allowed $2.289 million for environmental O&M expenses in Rate Year 1, $2.381 million in Rate Year 2, and $2.467 million in Rate Year 3. a. Were the O&M expenses incurred in the prior rate plan’s Rate Years of a similar nature to the $1.93 million requested in the current rate application? Explain. b. Were there any environmental remediation costs being deferred prior to the time of the last rate case? c. If yes, indicate the amounts deferred annually. d. Were there any deferred environmental remediation costs being amortized or recovered prior to the time of the last rate case? e. Were there any deferred environmental remediation costs being amortized/recovered and as a result of the approved settlement agreement in Docket No. 17-10-46? f. If yes, indicate the amounts amortized or recovered annually. OCC-854 Response: a. Yes. As shown on WP C-3.13 of the Company’s July 14, 2026, filing in this docket, the categories of cost that make up the $1.93 million requested in the current rate application include: (1) Clean Up & Disposal of Waste Material; (2) Manholes & Vaults; (3) Licensing & Permitting; and (4) Environmental Outside Services. There was also a fifth category, Reserve Site Remediation, but a pro forma adjustment removed the costs associated with this category that were related to reserve adjustment accruals associated with new environmental sites. The environmental O&M expenses included in Docket No. 17-10-46 were presented in the Company’s November 22, 2017, filing WP C-3.8, page 1 of 3, in categories identified as: (1) Overhead Environmental Cleanup; (2) Underground; (3) Environmental – Other; (4) Maintenance of Property Units; (5) Substation; and (6) Maintenance of Str. Lighting Equipment. Despite the differences in categories in each of the filings, the dollars that make up the costs in each filings’ Environmental schedule were identified using the same cost elements from the Company’s Powerplan cost repository, with two exceptions. First, there was one additional cost element for Compliance Assistance-Fees-Plans included in Environmental in the 2017 filing that was included in the Field Operations (Overhead Lines) and Residual schedules in the current filing (the Test Year amount in the 2017 filing was $28,382 and the Test Year amounts in the current filing were $5,795 in the Field Operations (Overhead Lines) schedule and $11,924 in the Residual schedule, for a total of $17,719). Second, the cost element for Reserve Site Remediation in the 2017 filing in the amount of $79,082 was not removed from the Environmental schedule using a pro forma adjustment the way it was removed in the current rate application.
  3. Page 8 of 25

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-12 Date Issued October 13, 2026 RSR-046 Page 3 of 3 b-d. No. As explained in the November 22, 2017, testimony of Company witnesses Catherine Finneran and Timothy Griffin in Docket No. 17-10-46, there was no current recovery from customers for environmental investigation and remediation costs at the time of the last rate case. Between 1998 and 2003, with small amounts received through 2013, the Company had pursued and achieved recoveries of $15.170 million for environmental investigation and remediation costs from several of the Company’s historical insurance carriers and a third party. Because the Company had not recovered expenses for environmental investigation and remediation costs in electric rates, in essence it had used these recoveries to pay for the Company’s investigation and remediation of its environmental liabilities, including manufactured gas plants (MGPs) and other Company sites. By the end of September of 2017 (just prior to the filing of the Company’s rate case in November 2017), the Company spent $8.4 million with an additional $4.9 million recorded to the environmental liability that was charged to shareholders via a “below the line” account. Therefore, the Company was $1.9 million away from spending or charging to shareholders an amount equal to the proceeds received. e.-f. No, as demonstrated in the March 29, 2018, Settlement Amendment Update to Settlement Agreement Attachment 5, Other Amortization Expense, there were no deferred environmental remediation costs being amortized/recovered as a result of the approved settlement agreement in Docket No. 17-10-46. iii OCC-061 Question: (Environmental Remediation) Identify all other proceedings by Company name and docket number in which the Company requested recovery of environmental remediation costs other than through operating expenses (e.g., regulatory asset, tracker, etc.). OCC-061 Response: As an example, the Company’s legal counsel has informed the Company of the following proceeding and outcomes: Importantly, Section 8 of the 2018 Rate Settlement approved by PURA in Docket No. 17-10-46, Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend Rate Schedules, states “Environmental remediation costs shall be recovered as follows: (i) The Company shall be allowed to recover its environmental remediation costs in accordance with the proposal described in the Application; and (ii) the Company is authorized to track and defer environmental costs for future review and recovery in each subsequent rate case.
  4. Page 9 of 25

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-12 Date Issued October 13, 2026 RSR-047 Page 1 of 2 Date Filed: November 03, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Public Utilities Regulatory Authority Question: (EXPENSES) Exhibit CLP-REVREQ-2, Schedule WP C-3.16. Explain whether the Company anticipates any cost savings from the Targeted System Performance (TSP) plan, and whether these savings are reflected in the Rate Year. Provide details on how those cost savings, if any, will be realized and in what projected dollar amounts. Response: The Company anticipates that Targeted System Performance ("TSP") plan investments will deliver significant reliability, resiliency, and operational benefits by improving system performance, expanding capacity to support future growth, addressing aging infrastructure, and reducing the frequency and duration of customer outages. While certain investments may provide near-term operational efficiencies, the majority of the benefits associated with the TSP plan are expected to be realized over multiple years as projects are completed, system improvements are fully integrated into the electric grid, and the impact of the investments are manifested over time. For substation-related investments, project schedules often involve extensive engineering, permitting, and long lead-time material procurement. As a result, many of the anticipated reliability and capacity benefits will not be fully realized during the Rate Year. These investments are primarily intended to support long-term system performance, reliability, and economic development needs rather than generate immediate operating expense reductions. However, planning for the orderly, economic expansion of the system potentially reduces costs that might be incurred responding to unplanned outages or emergency events due to lack of capacity. Similarly, the primary objective of the Company's resiliency investments is to harden vulnerable portions of the system to improve performance and reduce the impacts of severe weather events. Although the Company does not anticipate material, quantifiable operating expense reductions in the Rate Year associated with these investments, its analysis indicates that the proposed resiliency plan is expected to reduce customers interrupted and customer minutes of interruption during an average of approximately 40 storm-related outage events annually. This reduction in outage exposure is estimated to lower storm response and restoration costs by approximately $450,000 per year. In addition, the Company estimates annual customer reliability benefits, measured using Value of Lost Load ("VOLL"), of approximately $37 million. These benefits represent avoided
  5. Page 10 of 25

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-12 Date Issued October 13, 2026 RSR-047 Page 2 of 2 customer interruption impacts and improved service reliability due to resiliency plan investments, rather than direct reductions in Company operating expenses. For distribution system investments, including feeder and infrastructure replacement projects, the Company expects long-term operational benefits through improved asset condition, reduced equipment failures, and enhanced operational flexibility. As aging infrastructure is proactively replaced and system conditions improve, the Company anticipates a reduction in emergent events, unplanned corrective maintenance activities, and associated operating costs. However, the timing and magnitude of these benefits depend on several factors, including asset condition, weather impacts, and actual system performance. The full value of these investments is expected to be realized over multiple years as the cumulative effects of increased proactive infrastructure replacement and system improvements are achieved.
  6. Page 11 of 25

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-12 Date Issued October 13, 2026 RSR-048 Page 1 of 2 Date Filed: November 03, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Public Utilities Regulatory Authority Question: (EXPENSES) Exhibit CLP-REVREQ-2, Schedule WP C-3.17. Explain whether the Company anticipates any cost savings from the TSP plan, and whether these savings are reflected in the Rate Year. Provide details on how those cost savings, if any, will be realized and in what projected dollar amounts. Response: Please refer to the Company’s response to RSR-047 i. Prior Referenced Response: i RSR-047 Question: (EXPENSES) Exhibit CLP-REVREQ-2, Schedule WP C-3.16. Explain whether the Company anticipates any cost savings from the Targeted System Performance (TSP) plan, and whether these savings are reflected in the Rate Year. Provide details on how those cost savings, if any, will be realized and in what projected dollar amounts. RSR-047 Response: The Company anticipates that Targeted System Performance ("TSP") plan investments will deliver significant reliability, resiliency, and operational benefits by improving system performance, expanding capacity to support future growth, addressing aging infrastructure, and reducing the frequency and duration of customer outages. While certain investments may provide near-term operational efficiencies, the majority of the benefits associated with the TSP plan are expected to be realized over multiple years as projects are completed, system improvements are fully integrated into the electric grid, and the impact of the investments are manifested over time. For substation-related investments, project schedules often involve extensive engineering, permitting, and long leadtime material procurement. As a result, many of the anticipated reliability and capacity benefits will not be fully realized during the Rate Year. These investments are primarily intended to support long-term system performance, reliability, and economic development needs rather than generate immediate operating expense reductions. However, planning for the orderly, economic expansion of the system potentially reduces costs that might be incurred responding to unplanned outages or emergency events due to lack of capacity. Similarly, the primary objective of the Company's resiliency investments is to harden vulnerable portions of the system to improve performance and reduce the impacts of severe weather events. Although the Company does not anticipate material, quantifiable operating expense reductions in the Rate Year associated with these investments, its analysis indicates that the proposed resiliency plan is expected to reduce the customers interrupted and customer minutes of
  7. Page 12 of 25

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-12 Date Issued October 13, 2026 RSR-048 Page 2 of 2 interruption during an average of approximately 40 storm-related outage events annually. This reduction in outage exposure is estimated to lower storm response and restoration costs by approximately $450,000 per year. In addition, the Company estimates annual customer reliability benefits, measured using Value of Lost Load ("VOLL"), of approximately $37 million. These benefits represent avoided customer interruption impacts and improved service reliability due to resiliency plan investments, rather than direct reductions in Company operating expenses. For distribution system investments, including feeder and infrastructure replacement projects, the Company expects long-term operational benefits through improved asset condition, reduced equipment failures, and enhanced operational flexibility. As aging infrastructure is proactively replaced and system conditions improve, the Company anticipates a reduction in emergent events, unplanned corrective maintenance activities, and associated operating costs. However, the timing and magnitude of these benefits depend on several factors, including asset condition, weather impacts, and actual system performance. The full value of these investments is expected to be realized over multiple years as the cumulative effects of increased proactive infrastructure replacement and system improvements are achieved.
  8. Page 13 of 25

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-12 Date Issued October 13, 2026 RSR-049 Page 1 of 2 Date Filed: November 05, 2026 Witness: Craig Dikeman and Matthew J. Correia Request from: Public Utilities Regulatory Authority Question: (EXPENSES) Exhibit CLP-REVREQ-2, Schedule WP C-3.17. Regarding the Test Year Field Operations – Underground Lines O&M expense: a. Provide contract agreements between contractors and CL&P for underground line maintenance operations that were in place during the test year. b. Provide contract agreements between vendors and CL&P for underground line maintenance operations that are currently in place or that will be in place in the rate year. c. State whether competitive bidding was utilized for selecting the contractors. d. If competitive bidding was utilized, provide a copy of the Company’s competitive solicitation, all bids received, and any internal bid review and selection documentation. e. If competitive bidding was not utilized, explain why the Company did not utilize competitive bidding for purposes of making contracting decisions. Response: a. Please refer to RSR-049, Attachment 1, for a listing of contracts between CL&P and contractors for underground line maintenance operations that were in place during the Test Year. Due to the magnitude of this request, the Company has provided the subset of contracts associated with the highest level of Test Year expense. This contract subset represents approximately 90% of the test-year expense. If PURA needs additional contracts, the Company will provide additional contracts upon request. b. Please refer to RSR-049, Attachment 1 for a listing of contracts between CL&P and contractors for underground line maintenance operations. The column labeled “End Date” contains the end date of each agreement and indicates whether the agreement is currently in place or is expected to remain in place during the Rate Year. c. Please refer to the “Contract Category” column in RSR-049, Attachment 1, which indicates whether competitive bidding was utilized in selecting each contractor. d. Please refer to RSR-049, Attachment 1. The columns “RSR-049 Attachment” and “RSR-049 Page Number” identify the location of the applicable competitive solicitation and accompanying bid evaluation. Please refer to RSR-049, Attachment 2 CONFIDENTIAL, for
  9. Page 14 of 25

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-12 Date Issued October 13, 2026 RSR-049 Page 2 of 2 the competitive solicitations and bid evaluations associated with the contracts listed in Attachment 1. Certain competitive solicitations generated a significant volume of supplier proposals and supporting bid documentation. To provide a reasonable documentation submission, RSR-049 Attachment 2 does not include all supplier proposals and supporting bid documentation associated with those solicitations. The Company will provide the supplier proposals and other supporting bid documentation associated with the solicitations identified in RSR-049 Attachment 1, upon request. e. All contracts included in RSR-049 Attachment 1, which collectively represent approximately 90% of the Test Year expense, were awarded through a competitive bidding process. Accordingly, no Sole Source Justifications are applicable to the contracts included in this production.
  10. Page 15 of 25

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-12 Date Issued October 13, 2026 RSR-050 Page 1 of 2 Date Filed: November 09, 2026 Witness: Craig Dikeman and Matthew J. Correia Request from: Public Utilities Regulatory Authority Question: (EXPENSES) Exhibit CLP-REVREQ-2, Schedule WP C-3.16. Regarding the “Field Operations – Overhead Lines” Test Year expenses: a. Provide contract agreements between contractors and CL&P for overhead line maintenance operations. b. Provide contract agreements between vendors and CL&P for overhead line maintenance operations that are currently in place or that will be in place in the Rate Year. c. State whether competitive bidding was utilized for selecting the contractors. d. If competitive bidding was utilized, provide a copy of the Company’s competitive solicitation, all bids received, and any internal bid review and selection documentation. e. If competitive bidding was not utilized, explain why the Company did not utilize competitive bidding for purposes of making contracting decisions. Response: a. Please refer to RSR-050, Attachment 1, for a listing of contracts between CL&P and contractors for overhead line maintenance operations that were in place during the Test Year. Due to the size of the request, the Company has provided the subset of contracts associated with the highest level of Test Year expense. This contract subset represents approximately 90% of the Test Year expense, if additional contracts are needed the company will provide them upon request. b. Please refer to RSR-050, Attachment 1, for a listing of contracts between CL&P and contractors for overhead line maintenance operations. The column labeled “End Date” contains the end date of each agreement and indicates whether the agreement is currently in place or is expected to remain in place during the Rate Year. c. Please refer to the “Contract Category” column in RSR-050, Attachment 1, which indicates whether competitive bidding was utilized in selecting each contractor. d. Please refer to RSR-050, Attachment 1. The Columns “RSR-050, Attachment”, “RSR-050, Page Number”, “RSR-049, Attachment”, “RSR-049, Page Number” identify the location of the applicable competitive solicitation and accompanying bid evaluation or Sole Source Justification documentation. Please refer to RSR-050, Attachment 2 CONFIDENTIAL,

As listed on the current system

Corres. 11/10/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (ALLCO Set 19, CIEC Set 8, PURA Set 12).

This filing on the current system (opens in a new tab)