  1. Page 17 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-383 Page 1 of 4 Date Filed: October 27, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (STORM VEGETATION REMOVAL) Provide copies of all policies, procedures, guidance, statutes, or regulations, that details the Company’s obligations for the removal of vegetation caused by a storm event. As part of the response, identify if the Company is permitted to perform vegetation removal and then bill the costs to the property owner or municipality. Response: The removal of damaged vegetation caused by a storm event is an industry-wide practice utilized to return the electric distribution system to the pre-storm reliable state and minimize the possibility of subsequent storm-related outages from damaged trees and limbs. Please refer to EOE-383, Attachment 1, at page 56, where PURA addresses post-storm activities in Docket No. 11-09-09, stating, “The Liberty Report found that CL&P has a good plan for conducting post-storm activities and performed well in all respects. The Authority determines that none of its findings or conclusions with regard to post storm activities issues are contradicted by the record in this proceeding. Thus, the Authority adopts the findings, conclusions and recommendations of the Liberty Report with regard to post storm activities.” Please refer to EOE-383, Attachment 2, at page 179. The Liberty Report emphasizes “that there are three primary post-event activities, ramp-down, clean-up, and post-event critiques.” The Liberty Report further elaborates that “clean-up is performing patrols, tree trimming, and line repairs as required to restore facilities to a reliable state. Specifically in reference to the storm response activities within Docket No. 11-09-09, the Liberty Report states, “CL&P performed a thorough post-storm analysis for Irene and the October storm. This included contracting the assessment of approximately 17,000 miles of its overhead electric distribution system. This assessment involved a visual inspection from ground level of wires and poles, and the identification of vegetation management issues such as hazard trees. About 30 survey teams performed this work. Work continued to correct all items on a priority basis.”
  2. Page 18 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-383 Page 2 of 4 Please refer to EOE-010, Attachment 7, at page 52, where the Company outlines the damage assessment process and, more specifically, the Post-Event Survey (emphasis added): This assessment is performed after-restoration but prior to releasing resources and is intended to identify any remaining work to restore the system to its normal configuration. It also includes the identification and documentation of any remaining Electric System debris or other hazards that require attention and services where temporary repairs were made to restore power. Please refer to Exhibit CLP-STORM-1, at page 58, lines 7-17: “Toward the end of the restoration process, the Company used tree-clearance vendors to conduct “sweeps” of circuits to remove trees and limbs posing an imminent hazard. This effort reduced the number of service interruption recurrences during the final stage of the restoration process, thereby reducing the frequency with which both tree and line resources needed to revisit circuits to remove hazard trees and limbs that had subsequently become entangled in the Company’s facilities and to re-restore power. This proactive approach (as opposed to a reactive approach of waiting for power outages to recur) helped reduce overall storm costs by reducing the number of return visits line crews had to make to areas that already had their power restored.” Regarding whether “the Company is permitted to perform vegetation removal and then bill the costs to the property owner or municipality,” please refer to EOE-383, Attachment 3, at page 24. In Docket 12-01-10, the Company stated that “[PA 14-151] did not specifically address tree owner responsibility and liability for trees that cause damage to the Company’s facilities.” The Company further contended that, “public and private tree owners should be responsible for maintaining their trees within the rights of way and should be held responsible for resulting claims should their successful objection to line clearance work result in tree failure and damage.” The State Vegetation Management Taskforce (“SVMTF”), “concurred with the Company regarding trees on private property that have potential to fail and impact public safety and the SVMTF recommended that those trees be maintained by the owners of those trees.” PURA recognized that, “damage from trees located on private property adjacent to utility infrastructure remains problematic since these trees are not under the control of the utilities except for the branches that overhang the [public Rights-of-Way].” PURA’s position was that “participation by private property owners would lead to improved reliability, safer roads, less cleanup costs and faster restoration.” This issue was not resolved in Docket 12-01-10, rather PURA recommended that the SVMTF address the issue should it be reconvened; however, the Company is prohibited from recovering damages from an objecting property owner when vegetation causes an outage or damages the electric distribution system, per CT G.S. § 16-234 subsection (c)(1), which states (emphasis added):
  3. Page 19 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-383 Page 3 of 4 “In conducting vegetation management, no utility shall prune or remove any tree or shrub within the utility protection zone, or on or overhanging any public road, public highway or public ground, without delivering notice of the proposed vegetation management to the abutting property owner or private property owner. Such notice shall include the option for the abutting property owner or private property owner to consent, in writing, to such proposed pruning or removal, object to such proposed pruning or removal or modify such proposed pruning or removal. The notice shall include instructions regarding how the recipient may object in accordance with subdivision (3) of this subsection. Such notice shall also include a statement that if a person objects to the proposed pruning or removal, and such tree falls on any utility infrastructure, such person shall not be billed by the utility for any resulting damage. If requested by an owner of private property, the utility, municipality or the Commissioner of Transportation, as appropriate, shall provide such owner with information regarding whether a tree or shrub to be pruned or removed is in the public right-of-way or whether such tree or shrub is on such owner’s private property.” Referencing common law, please refer to EOE-383, Attachment 4, at page 1, where the Connecticut General Assembly Office of Legislative Research (“OLR”) summarizes The Law of Torts 390 (5th ed., 1984) (emphasis added): “According to Prosser and Keeton, under the traditional common law rule a landowner owes no duty to those outside of his premises to remedy conditions of purely natural origin on his land, even if the conditions are highly dangerous or inconvenient to his neighbors. This rule is reflected in the Restatement (Second) of Torts, Sections 363 and 840.” Expanding on the Restatement of Torts, Section 363, please refer to EOE-383, Attachment 5, at pages 4-5, where the Connecticut General Assembly OLR summarizes 2016-2017 Connecticut Superior Court case law (emphasis added): 2016 Case “The defendant cited to the Restatement (Second) of Torts, § 363 (1965), which provides that, other than in certain situations involving public highways, “neither a possessor of land, nor a vendor, lessor, or other transferor, is liable for physical harm caused to others outside of the land by a natural condition of the land.” The Restatement specifies that the “natural condition of the land” includes the natural growth of trees.” “The court ruled in favor of the defendant, rejecting the plaintiffs’ arguments that the Restatement is outdated. It referenced other Connecticut cases which cited to the Restatement in other contexts. The court noted that the tree on the defendant’s property clearly fit within the Restatement’s definition of “natural condition of land”.”
  4. Page 20 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-383 Page 4 of 4 2017 Case “The defendant moved for summary judgment on the ground that it owed no duty of care to the insured because the tree was a naturally occurring feature of the land. The defendant cited to the Restatement (Second) of Torts, § 363.” “The court granted the defendant’s motion for summary judgment. The court cited favorably to the [2017 Case] (described above). It concluded that there was nothing in the pleadings to suggest that the tree was “anything more than a natural condition upon the defendant’s land” and thus, the Restatement applied.” The Connecticut General Assembly OLR also summarizes subsequent legislation voted out by the Judiciary Committee in 2015-2017 (H.B. No. 5602; H.B. No. 5258; H.B. No. 5655) in EOE-383, Attachment 5, on pages 5-6, that may have imposed liability based on notification to a property owner requiring a licensed Arborist’s documented inspection. Referring specifically to H.B. No. 5602, the provisions did not apply to trees on land owned by political subdivisions of the state (e.g., municipalities). From the Company’s understanding, all successive bills and other similar legislative attempts to impose liability on a property owner for a hazard tree failure resulting from a natural condition have failed. While H.B. No. 5602, H.B. No. 5258, and H.B. No. 5655 may have imposed liability with notification to a property owner, requiring a licensed Arborist’s documented inspection, had they not been voted out, the Company would still not have been able to bill a notified property owner post-objection if a tree causes damage to the electric distribution facilities per CT G.S. § 16-234 subsection (c)(1).
  5. Page 21 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-384 Page 1 of 2 Date Filed: October 27, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (STORM-EXTERNAL VENDORS) Refer to Response to EOE-176. The Company identified that “[t]he contract currently allows for two hours pre/post mob/de-mob to complete activities related to travel, which include but are not limited to safety briefings, meals, and hotel room assignments.” The Company further provided an excerpt from the “current” Exhibit C Pricing Schedule which referenced an applicable Rate. Respond to the following: a. Identify the specific dates for which the “current Exhibit C Pricing Schedule” was included within the various external vendor contracts. To the extent that the schedule was updated for vendors for storm events included in the current docket, provide a listing of the applicable vendors and identify the corresponding effective dates. b. Identify if the pricing schedules have also been modified to define specific rates that are applicable to the “Travel Pre/Post” activity. c. Explain why de-mobilization would require an additional two hours of billable treatment for “safety training/site or storm specific trainings or briefings and hotel assignments”. d. Provide a complete copy of the “current Exhibit C Pricing Schedule” template. Response: a. Please refer to EOE-384, Attachment 1, for a listing of all current storm contractors and the corresponding effective dates for the Exhibit C Pricing Schedule. In certain instances, a contractor may have entered into a newer agreement while an existing purchase order continued to be governed by an earlier agreement or Pricing Schedule. In those instances, the terms applicable to a particular charge were determined by the agreement and Pricing Schedule supporting the purchase order under which the services were authorized and performed. Accordingly, the date of a contractor’s newer agreement may not, by itself, determine the terms applicable to every charge incurred after that date. b. The current Exhibit C - Pricing Schedule defines the Travel Pre/Post (Mob/De-Mob) provision in EOE-384 Attachment 2, page 4. This rate classification is specific to the “Travel Pre/Post” activity as defined. A copy of the current Exhibit C – Pricing Schedule is provided as EOE384, Attachment 2.
  6. Page 22 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-384 Page 2 of 2 The two-hour pre/post mobilization and demobilization travel provision was introduced in the current Exhibit C Pricing Schedule, implemented May 31, 2025. This provision did not previously exist within Exhibit A of the prior Line Crew Emergency Response agreement. The current Exhibit C Pricing Schedule expressly defines the allowance for activities associated with mobilization and demobilization, including, but not limited to, safety briefings, meals, and hotel room assignments. Refer to EOE-384, Attachment 2, page 4, for the applicable contractual provisions. c. The two-hour pre/post mobilization and demobilization provision is intended to accommodate the operational, administrative, safety-related, and logistical activities associated with the arrival and release of external contractor resources during storm restoration events. As outlined on page 4 of Exhibit C, demobilization involves more than the physical return travel of contractor resources. The process includes formal release authorization by the Company, debriefing by the Company’s field representative, unloading of materials, and coordination of the contractor’s departure or reassignment to another utility. The two-hour provision recognizes that activities associated with concluding a storm assignment may continue following the contractor’s official release from restoration work and prior to departure. Certain activities, such as initial safety briefings and hotel room assignments, are typically associated with mobilization. However, the examples identified in Exhibit C were not intended to be tied to either mobilization or demobilization, nor to represent an exhaustive list of activities applicable to either of those phases. The provision establishes a defined contractual period for these transitional activities, separate from the travel time associated with returning contractor resources to their point of origin. d. A complete copy of the current Exhibit C - Pricing Schedule template is provided as EOE-384, Attachment 2.
  7. Page 23 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-385 Page 1 of 2 Date Filed: October 27, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TRAFFIC) Refer to Response to EOE-253. Clarify the Company’s response to subsections ‘d’ and ‘e’. Specifically, subsection ‘d’ inquired “why services were billed for five hours when the documentation details services for the hours of 0800-1000, or a total of two hours.” The Company’s response cited Confidential Exhibit ACCT-2 CLP-1A-20, p. 40 for justification of an additional hour that would be charged, not three hours. Additionally, subsection ‘e’ referenced that the services were cancelled. Respond to the following: a. Explain how the Company derived four hours when the timesheet and invoice both detailed the hours of 0800-1000, or a total of two hours. b. Explain if any of the originally scheduled services were performed or if all services were cancelled for January 9, 2024. If all services were cancelled, explain why the Company would be billed for travel when travel did not occur. If certain services were performed prior to cancellation, explain why all costs were charged to the MS24A event. c. Explain why the Company was unable to cancel the traffic control request within the 24-hour period that would have prevented a cancellation charge. Response: a. The Company derived the four-hour charge from the Ellington Resident State Trooper’s “Procedure/Agreement for Hiring Ellington Town Police Officers for Traffic Control at Highway Construction Sites/Special Events,” referenced in Confidential Exhibit ACCT-2 CLP-1A-20, at page 40. Specifically, the document provides for a minimum call-out of four hours per event and states that “hours should be paid in increments of four hours regardless of the actual hours worked.” Accordingly, the Company incurred and paid the charges based on the required four-hour minimum. Travel time is separate from, and not included within, the four-hour minimum charge. b. All services were canceled on January 9, 2024, due to the anticipated storm event later that evening. It is common practice for police traffic control personnel to report directly to the job site rather than remain at their agency location. Accordingly, travel is incurred for each event for which services are requested. While the Company makes every effort to cancel such services within the required notice period to avoid incurring charges, that was not possible under these circumstances. As the Company was rapidly reallocating resources
  8. Page 24 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-385 Page 2 of 2 in preparation for the incoming storm event, the traffic control services were canceled after the applicable cancellation deadline, resulting in the associated charges being incurred. c. To avoid cancellation charges, the Company would have been required to cancel the services by 7:00 a.m. on January 8, 2024, in accordance with the applicable 24-hour cancellation requirement. At that time, plans for the anticipated storm event had not yet been finalized, and the Company could not reasonably determine whether the services would still be necessary. Accordingly, the services were not canceled until January 9, 2024. As the Company’s priority shifted to preparations for the anticipated storm event, planned work scheduled for that day was deferred, resulting in the cancellation of the traffic control services after the applicable notice period and the associated charges being incurred.
  9. Page 25 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-386 Page 1 of 1 Date Filed: October 27, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-FOOD/LODGING) Refer to Response to EOE-219. The Company’s response identified that it “did not require rooms and meals” for January 22, 2024 (i.e., for the HTExit 88 Hotel TRS LLC vendor, aka Marriott Mystic) and that a “cancellation notification was sent via email on Wednesday, January 10, 2024, at 2:19pm.” Respond to the following: a. Provide a copy of the contract with the Marriott Mystic. b. Identify the minimum amount of notice that would have prevented a cancellation charge and cite the applicable provisions within the contract. As part of the response, please identify if there are different notice requirements for meals versus lodging. c. Identify the breakdown in costs for rooms (i.e., the evening of January 11, 2024) and meals (i.e., breakfast, lunch, and dinner for both January 11, 2024, and January 12, 2024). d. Identify any efforts that the Company performed to donate the unused meals to charitable organizations. If no efforts were performed, explain why. Response: a. Please refer to EOE-386, Attachment 1 CONFIDENTIAL, for a copy of the Statement of Work and Purchase Order with Marriott Mystic. b. The notice required that would have prevented a cancellation charge would have been anytime prior to 6pm on the same day. Section 2 Late Arrivals and Cancellations, within the Statement of Work in EOE-386, Attachment 1, includes this provision. In EOE-386, Attachment 1, within the Statement of Work, there is no notice requirement for meals. The Meals provision is located in Section 3 Meals, in EOE-386, Attachment 1. c. Please refer to Exhibit ACCT-2 CLP-1A-10, p. 158 for hotel and meal breakdowns. In addition, p.159-162 provides the breakdown of each meal. d. The Company makes every effort to encourage hotels and caterers to donate unused food; however, the Company did not take possession of or exercise control over such food. Because the Company was neither in possession nor control of the food at the relevant time, any decision regarding the donation, retention, or disposal of unused food was solely within the discretion of the hotel or catering provided.
  10. Page 26 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-387 Page 1 of 2 Date Filed: October 27, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-FOOD) Refer to Response to EOE-235. Respond to the following: a. Identify the total cost of meals that were paid and not used. b. Provide a copy of the January 8, 2024, email confirming that meals “could not be cancelled.” c. Identify any efforts that the Company performed to donate the unused meals to charitable organizations. If no efforts were made, explain why. Response: Referring to response to EOE-235 i. a. The Company incurred costs totaling $31,432.08 for 960 unused meals for January 10, 2024, January 11, 2024, and January 12, 2024. b. Please refer to EOE-387, Attachment 1, regarding the email from LaKota Oaks confirming that meals “could not be cancelled” due to being a special catering order. The Company makes every effort to encourage hotels and caterers to donate unused food; however, the Company did not take possession of or exercise control over such food. Because the Company was neither in possession nor control of the food at the relevant time, any decision regarding the donation, retention, or disposal of unused food was solely within the discretion of the hotel or catering provided. Prior Referenced Response: i EOE-235 Question: (MS24A-VENDOR-FOOD) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-16, p. 213. The Company reported an incremental charge of $31,432 for the Madison Lakota Oaks FB LLC vendor. The charges included 160 meals (e.g., “To Go Breakfast” and “sandwich To Go Lunch”) for January 12, 2024. Identify if all of the referenced meals were utilized in support of the MS24A event, and if so, by which vendor(s). If not all used, explain why they could not be canceled.