Discovery Compilation (PURA Set 13, EOE Set 8)
Files3
Docket No. 26-05-10 Discovery Compilation November 16 2026.pdf
PDF · 133 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation November 16 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation November 16 2026.pdf
EOE Set 8_COMBINED.pdf
PDF · 1012 KB · 105 pagesText searchable
Download EOE Set 8_COMBINED.pdfRead the text of EOE Set 8_COMBINED.pdf
PURA Set 13_COMBINED.pdf
PDF · 1.5 MB · 144 pagesText searchable
Download PURA Set 13_COMBINED.pdfRead the text of PURA Set 13_COMBINED.pdf
Page 19 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-383 Page 3 of 4 “In conducting vegetation management, no utility shall prune or remove any tree or shrub within the utility protection zone, or on or overhanging any public road, public highway or public ground, without delivering notice of the proposed vegetation management to the abutting property owner or private property owner. Such notice shall include the option for the abutting property owner or private property owner to consent, in writing, to such proposed pruning or removal, object to such proposed pruning or removal or modify such proposed pruning or removal. The notice shall include instructions regarding how the recipient may object in accordance with subdivision (3) of this subsection. Such notice shall also include a statement that if a person objects to the proposed pruning or removal, and such tree falls on any utility infrastructure, such person shall not be billed by the utility for any resulting damage. If requested by an owner of private property, the utility, municipality or the Commissioner of Transportation, as appropriate, shall provide such owner with information regarding whether a tree or shrub to be pruned or removed is in the public right-of-way or whether such tree or shrub is on such owner’s private property.” Referencing common law, please refer to EOE-383, Attachment 4, at page 1, where the Connecticut General Assembly Office of Legislative Research (“OLR”) summarizes The Law of Torts 390 (5th ed., 1984) (emphasis added): “According to Prosser and Keeton, under the traditional common law rule a landowner owes no duty to those outside of his premises to remedy conditions of purely natural origin on his land, even if the conditions are highly dangerous or inconvenient to his neighbors. This rule is reflected in the Restatement (Second) of Torts, Sections 363 and 840.” Expanding on the Restatement of Torts, Section 363, please refer to EOE-383, Attachment 5, at pages 4-5, where the Connecticut General Assembly OLR summarizes 2016-2017 Connecticut Superior Court case law (emphasis added): 2016 Case “The defendant cited to the Restatement (Second) of Torts, § 363 (1965), which provides that, other than in certain situations involving public highways, “neither a possessor of land, nor a vendor, lessor, or other transferor, is liable for physical harm caused to others outside of the land by a natural condition of the land.” The Restatement specifies that the “natural condition of the land” includes the natural growth of trees.” “The court ruled in favor of the defendant, rejecting the plaintiffs’ arguments that the Restatement is outdated. It referenced other Connecticut cases which cited to the Restatement in other contexts. The court noted that the tree on the defendant’s property clearly fit within the Restatement’s definition of “natural condition of land”.”Page 20 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-383 Page 4 of 4 2017 Case “The defendant moved for summary judgment on the ground that it owed no duty of care to the insured because the tree was a naturally occurring feature of the land. The defendant cited to the Restatement (Second) of Torts, § 363.” “The court granted the defendant’s motion for summary judgment. The court cited favorably to the [2017 Case] (described above). It concluded that there was nothing in the pleadings to suggest that the tree was “anything more than a natural condition upon the defendant’s land” and thus, the Restatement applied.” The Connecticut General Assembly OLR also summarizes subsequent legislation voted out by the Judiciary Committee in 2015-2017 (H.B. No. 5602; H.B. No. 5258; H.B. No. 5655) in EOE-383, Attachment 5, on pages 5-6, that may have imposed liability based on notification to a property owner requiring a licensed Arborist’s documented inspection. Referring specifically to H.B. No. 5602, the provisions did not apply to trees on land owned by political subdivisions of the state (e.g., municipalities). From the Company’s understanding, all successive bills and other similar legislative attempts to impose liability on a property owner for a hazard tree failure resulting from a natural condition have failed. While H.B. No. 5602, H.B. No. 5258, and H.B. No. 5655 may have imposed liability with notification to a property owner, requiring a licensed Arborist’s documented inspection, had they not been voted out, the Company would still not have been able to bill a notified property owner post-objection if a tree causes damage to the electric distribution facilities per CT G.S. § 16-234 subsection (c)(1).Page 21 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-384 Page 1 of 2 Date Filed: October 27, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (STORM-EXTERNAL VENDORS) Refer to Response to EOE-176. The Company identified that “[t]he contract currently allows for two hours pre/post mob/de-mob to complete activities related to travel, which include but are not limited to safety briefings, meals, and hotel room assignments.” The Company further provided an excerpt from the “current” Exhibit C Pricing Schedule which referenced an applicable Rate. Respond to the following: a. Identify the specific dates for which the “current Exhibit C Pricing Schedule” was included within the various external vendor contracts. To the extent that the schedule was updated for vendors for storm events included in the current docket, provide a listing of the applicable vendors and identify the corresponding effective dates. b. Identify if the pricing schedules have also been modified to define specific rates that are applicable to the “Travel Pre/Post” activity. c. Explain why de-mobilization would require an additional two hours of billable treatment for “safety training/site or storm specific trainings or briefings and hotel assignments”. d. Provide a complete copy of the “current Exhibit C Pricing Schedule” template. Response: a. Please refer to EOE-384, Attachment 1, for a listing of all current storm contractors and the corresponding effective dates for the Exhibit C Pricing Schedule. In certain instances, a contractor may have entered into a newer agreement while an existing purchase order continued to be governed by an earlier agreement or Pricing Schedule. In those instances, the terms applicable to a particular charge were determined by the agreement and Pricing Schedule supporting the purchase order under which the services were authorized and performed. Accordingly, the date of a contractor’s newer agreement may not, by itself, determine the terms applicable to every charge incurred after that date. b. The current Exhibit C - Pricing Schedule defines the Travel Pre/Post (Mob/De-Mob) provision in EOE-384 Attachment 2, page 4. This rate classification is specific to the “Travel Pre/Post” activity as defined. A copy of the current Exhibit C – Pricing Schedule is provided as EOE384, Attachment 2.Page 22 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-384 Page 2 of 2 The two-hour pre/post mobilization and demobilization travel provision was introduced in the current Exhibit C Pricing Schedule, implemented May 31, 2025. This provision did not previously exist within Exhibit A of the prior Line Crew Emergency Response agreement. The current Exhibit C Pricing Schedule expressly defines the allowance for activities associated with mobilization and demobilization, including, but not limited to, safety briefings, meals, and hotel room assignments. Refer to EOE-384, Attachment 2, page 4, for the applicable contractual provisions. c. The two-hour pre/post mobilization and demobilization provision is intended to accommodate the operational, administrative, safety-related, and logistical activities associated with the arrival and release of external contractor resources during storm restoration events. As outlined on page 4 of Exhibit C, demobilization involves more than the physical return travel of contractor resources. The process includes formal release authorization by the Company, debriefing by the Company’s field representative, unloading of materials, and coordination of the contractor’s departure or reassignment to another utility. The two-hour provision recognizes that activities associated with concluding a storm assignment may continue following the contractor’s official release from restoration work and prior to departure. Certain activities, such as initial safety briefings and hotel room assignments, are typically associated with mobilization. However, the examples identified in Exhibit C were not intended to be tied to either mobilization or demobilization, nor to represent an exhaustive list of activities applicable to either of those phases. The provision establishes a defined contractual period for these transitional activities, separate from the travel time associated with returning contractor resources to their point of origin. d. A complete copy of the current Exhibit C - Pricing Schedule template is provided as EOE-384, Attachment 2.Page 23 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-385 Page 1 of 2 Date Filed: October 27, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TRAFFIC) Refer to Response to EOE-253. Clarify the Company’s response to subsections ‘d’ and ‘e’. Specifically, subsection ‘d’ inquired “why services were billed for five hours when the documentation details services for the hours of 0800-1000, or a total of two hours.” The Company’s response cited Confidential Exhibit ACCT-2 CLP-1A-20, p. 40 for justification of an additional hour that would be charged, not three hours. Additionally, subsection ‘e’ referenced that the services were cancelled. Respond to the following: a. Explain how the Company derived four hours when the timesheet and invoice both detailed the hours of 0800-1000, or a total of two hours. b. Explain if any of the originally scheduled services were performed or if all services were cancelled for January 9, 2024. If all services were cancelled, explain why the Company would be billed for travel when travel did not occur. If certain services were performed prior to cancellation, explain why all costs were charged to the MS24A event. c. Explain why the Company was unable to cancel the traffic control request within the 24-hour period that would have prevented a cancellation charge. Response: a. The Company derived the four-hour charge from the Ellington Resident State Trooper’s “Procedure/Agreement for Hiring Ellington Town Police Officers for Traffic Control at Highway Construction Sites/Special Events,” referenced in Confidential Exhibit ACCT-2 CLP-1A-20, at page 40. Specifically, the document provides for a minimum call-out of four hours per event and states that “hours should be paid in increments of four hours regardless of the actual hours worked.” Accordingly, the Company incurred and paid the charges based on the required four-hour minimum. Travel time is separate from, and not included within, the four-hour minimum charge. b. All services were canceled on January 9, 2024, due to the anticipated storm event later that evening. It is common practice for police traffic control personnel to report directly to the job site rather than remain at their agency location. Accordingly, travel is incurred for each event for which services are requested. While the Company makes every effort to cancel such services within the required notice period to avoid incurring charges, that was not possible under these circumstances. As the Company was rapidly reallocating resourcesPage 24 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-385 Page 2 of 2 in preparation for the incoming storm event, the traffic control services were canceled after the applicable cancellation deadline, resulting in the associated charges being incurred. c. To avoid cancellation charges, the Company would have been required to cancel the services by 7:00 a.m. on January 8, 2024, in accordance with the applicable 24-hour cancellation requirement. At that time, plans for the anticipated storm event had not yet been finalized, and the Company could not reasonably determine whether the services would still be necessary. Accordingly, the services were not canceled until January 9, 2024. As the Company’s priority shifted to preparations for the anticipated storm event, planned work scheduled for that day was deferred, resulting in the cancellation of the traffic control services after the applicable notice period and the associated charges being incurred.Page 25 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-386 Page 1 of 1 Date Filed: October 27, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-FOOD/LODGING) Refer to Response to EOE-219. The Company’s response identified that it “did not require rooms and meals” for January 22, 2024 (i.e., for the HTExit 88 Hotel TRS LLC vendor, aka Marriott Mystic) and that a “cancellation notification was sent via email on Wednesday, January 10, 2024, at 2:19pm.” Respond to the following: a. Provide a copy of the contract with the Marriott Mystic. b. Identify the minimum amount of notice that would have prevented a cancellation charge and cite the applicable provisions within the contract. As part of the response, please identify if there are different notice requirements for meals versus lodging. c. Identify the breakdown in costs for rooms (i.e., the evening of January 11, 2024) and meals (i.e., breakfast, lunch, and dinner for both January 11, 2024, and January 12, 2024). d. Identify any efforts that the Company performed to donate the unused meals to charitable organizations. If no efforts were performed, explain why. Response: a. Please refer to EOE-386, Attachment 1 CONFIDENTIAL, for a copy of the Statement of Work and Purchase Order with Marriott Mystic. b. The notice required that would have prevented a cancellation charge would have been anytime prior to 6pm on the same day. Section 2 Late Arrivals and Cancellations, within the Statement of Work in EOE-386, Attachment 1, includes this provision. In EOE-386, Attachment 1, within the Statement of Work, there is no notice requirement for meals. The Meals provision is located in Section 3 Meals, in EOE-386, Attachment 1. c. Please refer to Exhibit ACCT-2 CLP-1A-10, p. 158 for hotel and meal breakdowns. In addition, p.159-162 provides the breakdown of each meal. d. The Company makes every effort to encourage hotels and caterers to donate unused food; however, the Company did not take possession of or exercise control over such food. Because the Company was neither in possession nor control of the food at the relevant time, any decision regarding the donation, retention, or disposal of unused food was solely within the discretion of the hotel or catering provided.Page 26 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-387 Page 1 of 2 Date Filed: October 27, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-FOOD) Refer to Response to EOE-235. Respond to the following: a. Identify the total cost of meals that were paid and not used. b. Provide a copy of the January 8, 2024, email confirming that meals “could not be cancelled.” c. Identify any efforts that the Company performed to donate the unused meals to charitable organizations. If no efforts were made, explain why. Response: Referring to response to EOE-235 i. a. The Company incurred costs totaling $31,432.08 for 960 unused meals for January 10, 2024, January 11, 2024, and January 12, 2024. b. Please refer to EOE-387, Attachment 1, regarding the email from LaKota Oaks confirming that meals “could not be cancelled” due to being a special catering order. The Company makes every effort to encourage hotels and caterers to donate unused food; however, the Company did not take possession of or exercise control over such food. Because the Company was neither in possession nor control of the food at the relevant time, any decision regarding the donation, retention, or disposal of unused food was solely within the discretion of the hotel or catering provided. Prior Referenced Response: i EOE-235 Question: (MS24A-VENDOR-FOOD) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-16, p. 213. The Company reported an incremental charge of $31,432 for the Madison Lakota Oaks FB LLC vendor. The charges included 160 meals (e.g., “To Go Breakfast” and “sandwich To Go Lunch”) for January 12, 2024. Identify if all of the referenced meals were utilized in support of the MS24A event, and if so, by which vendor(s). If not all used, explain why they could not be canceled.Page 27 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-387 Page 2 of 2 EOE-235 Response: Referring to Exhibit ACCT-2 CLP-1A-16 (MS24A), Madison Lakota Oaks, for charges of $31,432, which included dinner for Wednesday, January 10, 2024, ‘to go’ breakfast, lunch and buffet dinner for Thursday, January 11, 2024, and ‘to go’ breakfast and lunch for Friday, January 12, 2024. Under the Company’s ERP for a severe weather event, resource and logistical acquisitions such as hotel rooms and food, must be undertaken ahead of time based on the expected severity and complexity of an event. Expected complexity and the associated resource and logistical requirements are analyzed based on considerations of numerous factors including, but not limited to, forecasted weather conditions; certainty of the weather forecast, size of the anticipated incident and expected impacts to personal safety and property, outage prediction modeling, anticipated extent of potential or known damage, and historical experience with other events. The Company cannot wait until a predicted weather event actually reaches its service territory to formulate its response plan and secure needed resources, as PURA has established pursuant to Conn Gen. St. §§16-32e, 16-32h and PURA’s performance standards, as well as the structure and implementation of the ERP. If the Company were to wait until a storm’s actual impact to secure mutual aid and contractor crews, hotels, food services and other logistics necessities, critical resources may not be available when needed, or, even if available, would be significantly more expensive than if procured earlier. The Company makes every effort to cancel rooms that are unused if known within the timeframe for allowed cancellation according to the hotel policy. However, based on the shifting restoration needs or priorities, crews are often relocated within regions of the service territory to work on restoration well after the cancellation period has expired and may have to be re-assigned to other hotel rooms that are closer to their physical work location (the Company focuses on locating crews as close as possible to their assigned restoration jobs to minimize the need for travel, thus freeing them up for actual restoration work). The Company must meet its contractual obligations with each hotel to pay for rooms reserved post the cancellation time frame. It is also important to note that, in times of service outages, there are other demands on hotel space from displaced residents that are experiencing service outages. As a result, the Company needs to be able to have adequate facilities to house the crews that are required to be on-site at the outset of an event, and the Company does that through contractual and logistical commitments made ahead of the event. In preparation for the storm event, the Company had booked rooms at the Madison Lakota Oaks for Wednesday, January 10, 2024 and Thursday, January 11, 2024 nights and ordered all meals as noted previously. On January 8, 2024, the Madison Lakota Oaks confirmed that food had been ordered to accommodate all meals and could not be cancelled. Due to changes in food and lodging needs for the storm event, the Company had to cancel the rooms. The cancellation notification was sent via email on Wednesday, January 10, 2024, at 11:37am. The Company did not incur any charges for the cancelled rooms, but did incur the cost of the ordered food.Page 28 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-388 Page 1 of 2 Date Filed: October 27, 2026 Witness: John P. Dipaola-Tromba, Sean D. Redding, Jenna M. Turner, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Response to EOE-231. The interrogatory requested for the Company to “[i]dentify if the extra chainsaws were pre-authorized by the Eversource arborist and identify the total incremental amounts. If pre-authorization occurred, please provide documentation, along with explanations for why the extra equipment was necessary.” Respond to the following: a. Identify if pre-authorization occurred and, if so, provide supporting documentation of the preauthorization. b. Identify the incremental amounts charged. Response: a. Please refer to the Company’s response to EOE-231 i (emphasis added): It is an established practice for contractor tree crews to bill for larger chainsaws during storm restoration activities. The use of larger-bar chainsaws when removing large-diameter trees improves operational efficiency and enhances worker safety by allowing the work to be performed quicker and with less risk to the operator. The chainsaws billed on the referenced invoices are larger than the standard chainsaws provided on each bucket truck, consistent with the applicable contract provisions. Because tree crews cannot determine the size and removal requirements of a tree until they arrive at the work location, requiring a separate trip to obtain a larger chainsaw could delay restoration efforts and result in additional travel costs. Pre-authorization for utilizing a larger chainsaw during storm-response activities is not required as it is an established practice. Requiring pre-authorization would hinder storm restoration activities as the tree crew would not know that a larger chainsaw was needed until they arrived at the outage location and evaluated the situation. If a larger chainsaw was required, the tree crew would need to leave the outage event, drive to a centralized location where chainsaws would be stored, select and inspect the chainsaw, and drive back to the outage event before the tree crew was able to start their job briefing and perform the associated tree work. Pre-authorization to utilize larger chainsaws would not be operationally efficient or beneficial to our customers.
As listed on the current system
Corres. 11/16/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (PURA Set 13, EOE Set 8)