Discovery Compilation (PURA Set 13, EOE Set 8)

Files3

Search terms highlighted
Eversource rate increase is on 38 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
  1. Page 37 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-390 Page 4 of 9 Reconciling Contractual Terms to the Statement in EOE-188 These interrelated contractual terms make it clear that, once Eversource has directed a crew to “report to a show up location in anticipation of performing Emergency Response Work,” standard Working rates apply, including for travel to and from that location. Accordingly, contractually, when contractor crews are directed to be on shift and ready to receive work, they are automatically on “Work Time” rates, regardless of when they receive their first event assignment, as the Company explained in response to EOE-188. Reconciling to EOE-173, Attachment 1, at 27. Second, the question asks the Company to “reconcile” its response to EOE-188 to the ERSGContractor Obligations-Instructions provided at EOE-173, Attachment.1, p. 27, which state “3. Per the contract: b. All crews on standby until they receive the first ticket.” EOE-173, Attachment 1, is a copy of the hiring package that the Company formerly distributed to hired contractors during an ERP event. 1 These instructions have been in use for many years, evolving over time as new content was added. Although the specific terminology differs from the MSA and Exhibit B, in place over the time period 2021 to 2025 for Contractors of Choice (such as the contractor referenced in EOE-188), the practice is exactly as stated in response to EOE-188. Meaning that the terminology “all crews on standby until they receive the first ticket,” is referencing that crews will be on standby until receiving the first direction or communication of an Emergency Work Release from Eversource to report to Work to be deployed to specific events (see, Article 1 of the MSA, referencing “oral communication” and Exhibit B, Section 3.3, referencing commencement of work at show-up site). In industry practice, the receipt of the “first ticket” or the “first direction” from Eversource is understood as the same thing – in either case, the crew is departing from their Rest Time “to report to a show up location in anticipation of performing Emergency Response Work,” as stated in Exhibit B, Section 4.4(d)(ii) of the COC Pricing Schedule. Standardized Contract Terms in Place During 2025 This industry practice was more precisely memorialized in the new standardized ERP contract that the Company implemented in May 2025. This pricing schedule is designated at “Exhibit C,” utilizing the following provisions: As of July 1, 2026, the Company no longer uses this type of hiring package as the Company is implemented “Storm Manager,” which is a more automated system. As a result, it is no longer necessary for the Company to distribute its hiring package. 1
  2. Page 38 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-390 Page 5 of 9 “Emergency Preparedness” or “EP” is the organization within Owner responsible for management, communication and coordination efforts needed for system restoration during emergencies. “Emergency Response Work” refers to Scope of Work (“SOW”) attached as Exhibit D to the Cover Agreement. “Emergency Response Labor Rates” are the agreed rates payable from the commencement of applicable Emergency Response Work through the termination of such Emergency Response Work, excluding rest and standby rate times during Emergency Response Work. Rates are all inclusive of wages, insurance, taxes, overhead, profit and shall be in effect for the term of this Agreement. Labor rates are detailed within the attached Schedule A. "Emergency Response Work Release" (also known as “Ticket”) means each release for Emergency Response Work pursuant to an oral communication (i.e., by telephone or in person) or written (i.e., by email or other documentation, in whatever form) issued and/or approved by Owner for Emergency Response Work, in each case under the Purchase Order, and in the form and on such terms determined by Owner in good faith. Contractor’s commencement of Emergency Response Work awarded to it by Owner pursuant to each Release shall constitute Contractor’s acceptance of all of the provisions of the applicable Release. “On Call - Standby Rates” (Home/Hotel) are paid at Standby Rate per hour for personnel; and 50% of Equipment Rates. Standby Rates are set forth in the attached Schedule A. Contractor shall be directed in the ERSG hiring email when standby hours are in effect. Standby Rates are only in effect when approved by ERSG. “Working Time” are the hours worked in an ERP event where any Crews within the state of operation are being issued active Emergency Response Work Releases or transitioning to additional Emergency Response Work Releases and have not received Demobilization instructions and/or an ERSG Demobilization email. Prior Referenced Responses i EOE-188 Question: (MS24A-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-1, Confidential Exhibit ACCT-2 CLP-1A-1, pp. 29-56. The Company reported an incremental charge of $177,073 for the Asplundh Construction Corp. Respond to the following: a. Confirm that the difference between the reported recovery amount and the invoice amount is attributed to the “car vs. pole” activity referenced on p. 46. If not confirmed, explain the difference. b. Referring to p. 42, explain why each of the individuals billed for 10 hours at a DT rate (i.e., compared to pp. 31-32) when the first work assignment was not started until 10:29 (i.e., approx. 4.5 hours after the employees’ start time). Please explain why the vendor employees did not record activity as standby and bill at the lower
  3. Page 39 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-390 Page 6 of 9 c. TH rate prior to the first assignment. As part of the response, please identify the total incremental charge for the referenced employees billing at DT rates for the 4.5 hours in lieu of the TH rates. Referring to pp. 35-36, explain why the vendor billed for equipment during standby. As part of the response, identify the total incremental charge for the equipment billed during standby and separately identify the incremental equipment charge for the hours referenced in subsection b. EOE-188 Response: Please refer to Exhibit ACCT-2 CLP-1(MS24A), Outside Line Contractors, at Line 37, Asplundh Construction Corp, in the amount of $177,073. a. The Company confirms that the difference between the reported recovery amount and the total invoice amount is attributable to the car-versus-pole activity referenced on page 46. Specifically, the variance of $6,405.66 represents costs associated with the “car vs pole” incident, which was separately identified and not included in the reported recovery amount. b. The crews are in “working” status once they are on shift – from the beginning to the end of the shift. The Company does not compensate crews based on the specific restoration event to which they are assigned, nor are crews expected to be actively engaged in an “event” every minute of their shift. Time must be allocated at the start and end of each day, as well as between restoration “events,” to complete all necessary steps to ensure safe working conditions in the field. For the Resource Management Teams identifying the jobs and deploying crews and the EFRC, the critical focus is to follow procedures, keep the crews safe, and keep them moving efficiently throughout the working shift. In this context, there is no bright line that separates one event from another and neatly segmenting the day from an “event” perspective – all activities whether in preparation of, or “on the pole,” are proper work activities that are undertaken during the work shift and will not be specified on the timesheet. Additionally, crews are dispatched as damage is assessed. Contractually when contractor crews are directed to be on shift and ready to receive work, they are automatically on “Work Time” rates, regardless of when they receive their first assignment. As a result, the crews are appropriately billed “Work Time” for the referenced hours. The total incremental charge for the referenced employees resulting from billing 4.5 hours at DT rates in lieu of TH rates is $997.65 c. ii Asplundh is a COC contractor. Per the provisions in their contract equipment -- while on standby -- is permitted to be charged at 50%. The total incremental charge for the equipment billed during standby for pages 35-36 is $3,938.22. The total incremental charge for the equipment billed for the hours referenced in subsection (b) is $398.25. EOE-389 Question: (LINE CREW EMERGENCY RESPONSE AGREEMENTS) Refer to Response to EOE-174. The Company’s response clarified that the “Master Service Agreements do not include the provision stated in the question of ‘standby rates apply to labor resources only.’ This standby language is included in the Line Crew Emergency Response agreements.” Respond to the following: a. b. Explain the difference between the Master Service Agreements and the Line Crew Emergency Response agreements. Provide a copy of every template Line Crew Emergency Response agreement utilized by the Company since 2018, indicating the period of time each template was utilized. Identify all “template” changes made to the Line Crew Emergency Response agreement since 2018, along with the respective dates of the changes.
  4. Page 40 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-390 Page 7 of 9 c. Provide a listing of all vendors subject to the Line Crew Emergency Response agreements and, if applicable, including the specific version of the template that they are subject to. As part of the response, cite the documents in the record. EOE-389 Response: a. Master Service Agreements (“MSAs”) were established with the Company’s Contractors of Choice, or “COCs,” primarily to support planned, non-emergency construction and maintenance activities, commonly referred to as “blue-sky” work. These agreements also contain specific provisions governing the deployment and compensation of those same contractor resources when supporting storm restoration activities. In contrast, the Line Crew Emergency Response agreements are intended for contractors providing line crew resources specifically for emergency restoration. These agreements contain dedicated pricing provisions addressing mobilization, demobilization, standby, working time, and equipment compensation. Although both of these agreements address storm restoration work, the applicable compensation provisions differ based on the agreement under which the contractor is engaged. As clarified in EOE-174ii, the language stating that “standby rates apply to labor resources only” was specific to the earlier Line Crew Emergency Response Pricing Schedule and was not included in the COC MSAs. b. As discussed in response to EOE-390, the contract provisions applicable to storm work at any given time were/are as follows: • Exhibit A Pricing Schedule - 12/7/2021 - 5/31/2025 (ERP-only Contractor Agreements) • Exhibit B Pricing Schedule - 6/1/2021 - 12/31/2025 (COC MSA – Covering blue sky and ERP). Note: Once the new standardized storm contract became effective in May 2025, this contract form was utilized only for blue-sky work). • Exhibit C Pricing Schedule - 5/31/2025 -Present (New ERP-specific standardized contract form). The Company is providing the applicable Pricing Schedule templates associated with the Line Crew Emergency Response agreements as EOE-389, Attachment 1. Please also refer to EOE-384, Attachment 2 CONFIDENTIAL. • EOE-389, Attachment 1 CONFIDENTIAL, is a template that contains the prior Pricing Schedule, identified as Exhibit A, Version 12.7.21, which was utilized prior to the implementation of the revised agreement in approximately May 2025. • EOE-384, Attachment 2 CONFIDENTIAL, contains the revised Pricing Schedule, identified as Exhibit C, implemented generally beginning May 31, 2025. Please refer to EOE-384, Attachment 1, for precise dates for each contractor. The revised Pricing Schedule provided in EOE-384, Attachment 2 CONFIDENTIAL, incorporates several clarifications and modifications to the compensation and administration of emergency response resources, including the following: Standby Compensation: The earlier Pricing Schedule specified that standby rates applied to labor resources only and established a labor-based standby retainer. The revised Pricing Schedule provides for hourly standby
  5. Page 41 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-390 Page 8 of 9 compensation for labor resources and equipment compensation at 50% of the applicable equipment rates during authorized standby periods. Working Time: The revised Pricing Schedule establishes a more detailed definition of Working Time, including the applicable period of emergency restoration activities and the distinction between working, standby and travel classifications. Mobilization and Demobilization: The revised Pricing Schedule establishes additional provisions governing the calculation and documentation of travel time, including the use of estimated travel durations, contractor deployment locations, and applicable border-crossing allowances. Pre/post Mobilization and Demobilization: The revised Pricing Schedule expressly defines two-hour periods associated with activities such as safety briefings, meals and hotel assignments. Resource Classifications and Support Equipment: The revised Pricing Schedule establishes additional definitions and billing parameters for qualified overhead crews, digger derricks, general foremen, safety professionals, and mechanics. Administrative Controls: The revised Pricing Schedule incorporates additional requirements for ERSG hiring communications, authorization of standby periods, work releases, and resource documentation. Lodging and Reimbursable Expenses: The revised Pricing Schedule specifies double-occupancy lodging requirements unless otherwise authorized in writing by the Company. All of the revisions are designed to provide additional specificity regarding the application of compensation classifications, resource eligibility and administrative requirements during emergency restoration events. c. Refer to EOE-384, Attachment 1, for a listing of current Emergency Response Agreements in which Exhibit C applies. Please refer to EOE-389, Attachment 2, for a listing of Line Crew Emergency Response agreements and the effective date of the pricing schedule that preceded the current contracts which are effective May 31, 2025 to present. Certain contractors appear more than once in the attachment because invoices included in this rate case are associated with multiple versions of their respective Pricing Schedules. Each version is applicable to the corresponding contractual period during which the invoiced services were performed. Accordingly, the duplicate entries are intentional and reflect the applicable contractual provisions for the respective time periods. In certain instances, a contractor may have entered into a newer agreement while an existing purchase order continued to be governed by an earlier agreement or Pricing Schedule. In those instances, the terms applicable to a particular charge were determined by the agreement and Pricing Schedule supporting the purchase order under which the services were authorized and performed. Accordingly, the date of a contractor’s newer agreement may not, by itself, determine the terms applicable to every charge incurred after that date. Historically, the Company’s COCs operated under MSAs containing storm-specific provisions, while external emergency response contractors operated under separate Line Crew Emergency Response agreements. The revised agreement, implemented generally beginning May 31, 2025, establishes a consistent contractual framework for both COCs and external overhead line contractors, eliminating the distinction between the two agreement types for emergency restoration work and providing greater clarity and consistency in the applicable terms and compensation provisions.
  6. Page 42 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-390 Page 9 of 9 The prior and revised Emergency Response Pricing Schedule, Exhibit A, is provided as EOE-389, Attachment 1. The revised Pricing Schedule, Exhibit C, is provided in EOE-384, Attachment 2 CONFIDENTIAL, respectively. The applicable agreement version for each contractor is determined by its respective agreement effective date.
  7. Page 43 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-391 Page 1 of 1 Date Filed: October 27, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MUTUAL AID) Refer to Responses to EOE-038 and EOE-186. In reference to EOE-038, Att.3, respond to the following: a. Provide a breakdown of the Labor Benefits & Non-Productive Time costs (i.e., $492,233.44) split between Straight Time and Over-Time. b. Discuss the specific activities or expenses that comprise the $331,638.85 Contractor Charges referenced. c. Discuss the specific activities or expenses that comprise the $135,287.58 Mutual Aid – Administrative Fee referenced. Response: a. Please refer to the table below for a breakdown of Labor Benefits & Non-Productive Time costs between straight-time and overtime. NonPayroll Total Productive Benefits Straight Time $ 47,360 $ 84,419 $ 131,779 Overtime 131,175 229,279 360,454 Total $ 178,535 $ 313,698 $ 492,233 b. There are six invoices from KTI Utility Construction & Maintenance LLC that make up the $331,638.85. The invoices are for crews that traveled with Eversource to Virginia to aid in restoration. Please refer to attachments EOE-391, Attachment 1 CONFIDENTIAL, through EOE-391, Attachment 6 CONFIDENTIAL, for copies of the invoices. c. The administrative fee is charged on all mutual aid invoices to cover the costs of support that are not directly charged. Usually, it is a flat rate but in this case since four Eversource companies provided mutual aid support, a weighted average was developed for each company based on the labor hours charged to the support mutual aid WO’s. The $135,287.58 is the result of the weighted average rate multiplied by the total charges for assistance rendered by CL&P to Appalachian Energy.
  8. Page 44 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-392 Page 1 of 3 Date Filed: October 28, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (STORM INTERNAL CONTROLS) Refer to Response to EOE-184, and Exhibit CLP-STORM1, pp. 94-103. Identify and discuss the Company’s internal controls performed in support of the Rate Case submission for storm related expenses. Specifically, discuss how the Company accumulated the costs and verified the accuracy of supporting documentation. This inquiry differs from the Company’s PFT included within Ex. CLP-STORM-1, in that it is looking to understand the controls applicable to the Company’s storm data aggregation (i.e., a different set of controls). Response: For purposes of this response, the Company understands “storm data aggregation (i.e., a different set of controls)” to refer to the internal controls surrounding how the Company extracts, compiles, and organizes the storm data necessary to prepare its storm filing. The Company has a number of detective and preventative controls in place to ensure that the storm costs included in its filing, and ultimately sought for recovery, are complete and accurate: Initial Process Level Controls CL&P’s invoice review process consists of three steps. First, emergency preparedness personnel compile records of outside crews—including mobilization and demobilization dates, hours worked, and daily crew timesheets—which are reviewed and approved by the CL&P representative overseeing the work. Second, when a vendor invoice is received, personnel reconcile charges against these records and timesheets, verify hours and contracted rates, recalculate charges, and review reimbursable expenses for validity and appropriateness. This thorough review identifies billing discrepancies, unapproved or non-reimbursable expenses, overcharges, and clerical errors. Invoices without discrepancies are approved through the Company’s Accounts Payable system. Finally, if discrepancies are found, CL&P personnel contact the vendor to resolve them. Resolved invoices are resubmitted for approval and payment, while unresolved disputes result in a “short-pay”—CL&P approves and pays only the undisputed portion of the invoice. All other storm costs categories including direct labor, materials & supplies, P-cards, other employee expenses, etc. have their own set of process level controls to ensure all costs are appropriately identified, categorized, supported and approved. For example,
  9. Page 45 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-392 Page 2 of 3 Initial Process Level Controls each week employees must submit and their supervisor / manager must review and approve their timesheet to verify the work performed and any labor charged to a storm work order. Additionally, any P-Card charge or employee expense would require supporting documentation and receipts which would be reviewed and approved by the employee’s supervisor or manager prior to that transactions being recorded directly to the storm work order. As outlined above, each cost category included for recovery has its own set of internal controls applied to ensure each cost is properly charged and supported. Capitalization occurs several months after the event, once costs have stabilized. Capital units of property are identified by analyzing the storm work orders, and internal labor, contractor installation, and supervision costs are estimated for each unit. Applicable food and lodging costs are also allocated to the capital units. The total cost of each unit is then removed from the storm work order and transferred to a capital work order. This process involves multiple employees in finance / accounting and incorporates a review process to ensure all capitalization adjustments are appropriate. The Company performs a monthly analysis of storm costs by work order. The Company runs PowerPlan queries for the month-end close, and an analysis is completed on all costs to calculate the total incremental costs. This monthly review is depicted on page 1, of EOE-392, Attachment 1, which visually represents the steps in the Company’s storm cost analysis process. As shown in that flowchart, PowerPlan queries are run for the month-end close, and an analysis is completed on all costs to calculate the total incremental costs. The product of that analysis is the “Working Review Files” and all the steps in that process are depicted on page 2, of EOE-392, Attachment 1. Filing Preparation Controls The Company prepares filing exhibits for each storm, as shown on page 5, of EOE-392, Attachment 1. During this process, the Company conducts further validation to ensure a valid invoice exists, verifies that supporting timesheets are available, reconciles invoice amounts with those reflected in the exhibits, and confirms the dates match the applicable storm event. The Company retrieves the supporting invoices from Maximo, organizes them for filing, and reconciles them to the corresponding exhibits. The Company investigates any discrepancies identified during this review and resolves them through adjustments, as necessary. After validation and reconciliation, the Company prepares draft filing exhibits summarizing storm-related costs and detailing major cost categories, including labor, materials, and outside services. The Company’s internal instructions for preparing these exhibits are provided in EOE-392, Attachment 2. Finally, the Company conducts a final review of the filing exhibits and supporting documentation to confirm their accuracy and completeness before submission.
  10. Page 46 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-392 Page 3 of 3 The Company has not changed the underlying control process discussed herein or in Docket No. 25-12-13, because the storms addressed in this filing were filed before the Final Decision in that proceeding. However, the Company has considered the lessons learned and issues identified in Docket No. 25-12-13, and will continue to refine and enhance its invoice and storm review processes to support the completeness and accuracy of the storm information it provides.
38 pages match