Discovery Compilation (PURA Set 13, EOE Set 8)
Files3
Docket No. 26-05-10 Discovery Compilation November 16 2026.pdf
PDF · 133 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation November 16 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation November 16 2026.pdf
EOE Set 8_COMBINED.pdf
PDF · 1012 KB · 105 pagesText searchable
Download EOE Set 8_COMBINED.pdfRead the text of EOE Set 8_COMBINED.pdf
PURA Set 13_COMBINED.pdf
PDF · 1.5 MB · 144 pagesText searchable
Download PURA Set 13_COMBINED.pdfRead the text of PURA Set 13_COMBINED.pdf
Page 42 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-390 Page 9 of 9 The prior and revised Emergency Response Pricing Schedule, Exhibit A, is provided as EOE-389, Attachment 1. The revised Pricing Schedule, Exhibit C, is provided in EOE-384, Attachment 2 CONFIDENTIAL, respectively. The applicable agreement version for each contractor is determined by its respective agreement effective date.Page 43 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-391 Page 1 of 1 Date Filed: October 27, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MUTUAL AID) Refer to Responses to EOE-038 and EOE-186. In reference to EOE-038, Att.3, respond to the following: a. Provide a breakdown of the Labor Benefits & Non-Productive Time costs (i.e., $492,233.44) split between Straight Time and Over-Time. b. Discuss the specific activities or expenses that comprise the $331,638.85 Contractor Charges referenced. c. Discuss the specific activities or expenses that comprise the $135,287.58 Mutual Aid – Administrative Fee referenced. Response: a. Please refer to the table below for a breakdown of Labor Benefits & Non-Productive Time costs between straight-time and overtime. NonPayroll Total Productive Benefits Straight Time $ 47,360 $ 84,419 $ 131,779 Overtime 131,175 229,279 360,454 Total $ 178,535 $ 313,698 $ 492,233 b. There are six invoices from KTI Utility Construction & Maintenance LLC that make up the $331,638.85. The invoices are for crews that traveled with Eversource to Virginia to aid in restoration. Please refer to attachments EOE-391, Attachment 1 CONFIDENTIAL, through EOE-391, Attachment 6 CONFIDENTIAL, for copies of the invoices. c. The administrative fee is charged on all mutual aid invoices to cover the costs of support that are not directly charged. Usually, it is a flat rate but in this case since four Eversource companies provided mutual aid support, a weighted average was developed for each company based on the labor hours charged to the support mutual aid WO’s. The $135,287.58 is the result of the weighted average rate multiplied by the total charges for assistance rendered by CL&P to Appalachian Energy.Page 44 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-392 Page 1 of 3 Date Filed: October 28, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (STORM INTERNAL CONTROLS) Refer to Response to EOE-184, and Exhibit CLP-STORM1, pp. 94-103. Identify and discuss the Company’s internal controls performed in support of the Rate Case submission for storm related expenses. Specifically, discuss how the Company accumulated the costs and verified the accuracy of supporting documentation. This inquiry differs from the Company’s PFT included within Ex. CLP-STORM-1, in that it is looking to understand the controls applicable to the Company’s storm data aggregation (i.e., a different set of controls). Response: For purposes of this response, the Company understands “storm data aggregation (i.e., a different set of controls)” to refer to the internal controls surrounding how the Company extracts, compiles, and organizes the storm data necessary to prepare its storm filing. The Company has a number of detective and preventative controls in place to ensure that the storm costs included in its filing, and ultimately sought for recovery, are complete and accurate: Initial Process Level Controls CL&P’s invoice review process consists of three steps. First, emergency preparedness personnel compile records of outside crews—including mobilization and demobilization dates, hours worked, and daily crew timesheets—which are reviewed and approved by the CL&P representative overseeing the work. Second, when a vendor invoice is received, personnel reconcile charges against these records and timesheets, verify hours and contracted rates, recalculate charges, and review reimbursable expenses for validity and appropriateness. This thorough review identifies billing discrepancies, unapproved or non-reimbursable expenses, overcharges, and clerical errors. Invoices without discrepancies are approved through the Company’s Accounts Payable system. Finally, if discrepancies are found, CL&P personnel contact the vendor to resolve them. Resolved invoices are resubmitted for approval and payment, while unresolved disputes result in a “short-pay”—CL&P approves and pays only the undisputed portion of the invoice. All other storm costs categories including direct labor, materials & supplies, P-cards, other employee expenses, etc. have their own set of process level controls to ensure all costs are appropriately identified, categorized, supported and approved. For example,Page 45 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-392 Page 2 of 3 Initial Process Level Controls each week employees must submit and their supervisor / manager must review and approve their timesheet to verify the work performed and any labor charged to a storm work order. Additionally, any P-Card charge or employee expense would require supporting documentation and receipts which would be reviewed and approved by the employee’s supervisor or manager prior to that transactions being recorded directly to the storm work order. As outlined above, each cost category included for recovery has its own set of internal controls applied to ensure each cost is properly charged and supported. Capitalization occurs several months after the event, once costs have stabilized. Capital units of property are identified by analyzing the storm work orders, and internal labor, contractor installation, and supervision costs are estimated for each unit. Applicable food and lodging costs are also allocated to the capital units. The total cost of each unit is then removed from the storm work order and transferred to a capital work order. This process involves multiple employees in finance / accounting and incorporates a review process to ensure all capitalization adjustments are appropriate. The Company performs a monthly analysis of storm costs by work order. The Company runs PowerPlan queries for the month-end close, and an analysis is completed on all costs to calculate the total incremental costs. This monthly review is depicted on page 1, of EOE-392, Attachment 1, which visually represents the steps in the Company’s storm cost analysis process. As shown in that flowchart, PowerPlan queries are run for the month-end close, and an analysis is completed on all costs to calculate the total incremental costs. The product of that analysis is the “Working Review Files” and all the steps in that process are depicted on page 2, of EOE-392, Attachment 1. Filing Preparation Controls The Company prepares filing exhibits for each storm, as shown on page 5, of EOE-392, Attachment 1. During this process, the Company conducts further validation to ensure a valid invoice exists, verifies that supporting timesheets are available, reconciles invoice amounts with those reflected in the exhibits, and confirms the dates match the applicable storm event. The Company retrieves the supporting invoices from Maximo, organizes them for filing, and reconciles them to the corresponding exhibits. The Company investigates any discrepancies identified during this review and resolves them through adjustments, as necessary. After validation and reconciliation, the Company prepares draft filing exhibits summarizing storm-related costs and detailing major cost categories, including labor, materials, and outside services. The Company’s internal instructions for preparing these exhibits are provided in EOE-392, Attachment 2. Finally, the Company conducts a final review of the filing exhibits and supporting documentation to confirm their accuracy and completeness before submission.Page 46 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-392 Page 3 of 3 The Company has not changed the underlying control process discussed herein or in Docket No. 25-12-13, because the storms addressed in this filing were filed before the Final Decision in that proceeding. However, the Company has considered the lessons learned and issues identified in Docket No. 25-12-13, and will continue to refine and enhance its invoice and storm review processes to support the completeness and accuracy of the storm information it provides.Page 47 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-393 Page 1 of 1 Date Filed: October 27, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (STORM FLEET) Refer to Responses to EOE-177 and EOE-178. Provide an unlocked Excel spreadsheet calculating the breakdown of the Storm Fleet costs split between Connecticut, Massachusetts, and New Hampshire. As part of the request, provide calculations using actual information wherever possible (e.g., depreciation expense on actual vehicles per state) and discuss any assumptions necessary for costs that cannot be attributed to a given location. Response: Please refer to EOE-393, Attachment 1, for an unlocked Excel spreadsheet calculating the breakdown of Storm Fleet costs split between Connecticut, Massachusetts, and New Hampshire for 2024-Jun 2026. The annual storm fleet clearing costs are the most accurate and up-to-date information available at the time of reporting.Page 48 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-394 Page 1 of 2 Date Filed: October 27, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (STORM FLEET) Refer to Response to EOE-177, Att.1. Respond to the following: a. Explain why the number of storm fleet vehicles has decreased for each state and explain if the Company is expected to sustain the decreases. b. Referring to the MN26C011 event (i.e., Excel row 103), identify the ES Electric vendor. If this entity is indicative of the Company, explain why it was necessary for the Company to utilize the Storm Fleet and explain how this usage aligns to the Company’s response to EOE-031. Response: a. Storm Fleet vehicle reductions reflect ongoing fleet optimization and updated storm-response planning, not a reduction in emergency-response capability. Fleet inventories were right-sized based on utilization reviews, readiness assessments, deployment modeling, and increased reliance on contractor support and regional resource sharing. The Company expects these reductions to be sustainable based on current operational requirements and storm-response needs. All critical storm-response equipment remains available, and the Company continues to maintain access to contractor, mutual assistance, and cross-state resources when necessary. Storm fleet levels are continually evaluated and may increase or decrease based on operational requirements, utilization trends, contractor availability, and lessons learned from storm events. Accordingly, fleet inventories are not fixed and are adjusted as necessary to maintain appropriate storm-response capability. b. Referring to the MN26C011 event, the “ES Electric” vendor on Excel row 103 in EOE-177, Attachment 1, is labeled incorrectly. The Company confirmed the vehicles were used by Eversource-Transmission and aligns with the Company’s response to EOE-031 i, which states that Eversource-Transmission are the only Company employees to utilize the vehicles. Prior Referenced Response: i EOE-031 Question: (STORM FLEET) Provide details regarding the Company’s use of the Storm Fleet including information on the annual costs (2024 through present), the number of available units (i.e., vehicles) per location (i.e., state), the number of hours used per storm event, the total cost allocated to each storm event, and any other relevant details that would assist inPage 49 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-394 Page 2 of 2 minimizing following interrogatories. To the extent that the Storm Fleet has been used by the Company’s affiliates, provide details. EOE-031 Response: Please refer to EOE-031, Attachment 1, for the requested details on the Storm Fleet for all storms that occurred from 2024 through June 2026. The only time Company employees use the Storm Fleet vehicles is when Transmission employees are supporting Distribution restoration. Otherwise, the Storm Fleet vehicles are used only by external vendors.Page 50 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-395 Page 1 of 2 Date Filed: November 05, 2026 Witness: John G. Griffin, Leanne M. Landry, Danielle J. Munson and Marisa B. Paruta Request from: Office of Education, Outreach, and Enforcement Question: (STORM FLEET-DEPRECIATION/RATE OF RETURN) Refer to Response to EOE-178, Att.1. Provide an unlocked Excel spreadsheet demonstrating the calculations supporting the Service Company Depreciation and Rate of Return amounts reported within the Storm Fleet Clearing by CE-2025 tab. As part of the response, identify all inputs and assumptions and provide citations, where possible. Additionally, identify any changes to the Company’s calculation approaches for 2024 or 2025. Response: During the Company’s evaluation of the underlying data needed to prepare a response to this discovery, it was determined that certain Eversource Service Company (ESC) depreciation expense costs included in EOE-178, Attachment 1 i, for the years 2024 and 2025 were inadvertently applied to the incorrect calendar year and the ESC Rate of Return was based on information that had been further updated but not reflected in the calculation. This necessitated Eversource’s calculation of the pool of ESC Fleet Vehicle costs, by year, which allocates these costs to the Eversource enterprise electric utility major storm work orders that occurred within each year of 2024 and 2025, to be revised and re-allocated based on calendar year utilization. Therefore, the Company is providing a revised attachment in EOE-178RV01, Attachment 1, to update the costs charged to the CL&P catastrophic storm work orders in 2024 and 2025 for both ESC Rate of Return and ESC depreciation expense. In addition, the information provided in this response conforms to the revised calculation and will reconcile to EOE-178RV01, Attachment 1. Please refer to EOE-395, Attachment 1, and EOE-395, Attachment 2, for the calculations supporting the ESC Rate of Return for 2024 and 2025, respectively, as adjusted in the Storm Fleet Clearing response to EOE-178RV01, Attachment 1. The ESC Rate of Return was adjusted to reflect the updated ESC Fleet Vehicle depreciation rates effective January 1, 2024. ESC implemented an enhancement in the ESC Fleet Vehicle depreciation rate calculation, using the last state-regulatory commission approved Eversource corporate-wide electric utility base distributionPage 51 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-395 Page 2 of 2 rate case fleet vehicle depreciation rates for similar class vehicles. These most recent approved depreciation rates are used to develop an ESC Fleet Vehicle composite depreciation rate and updated accordingly. Therefore, the ESC Rate of Return for 2024 and 2025 were revised to reflect an updated net plant asset value (book cost less accumulated depreciation, as adjusted for new depreciable lives) for the ESC Fleet Vehicles, and appropriately include all vehicles utilized for Eversource enterprise-wide storm restoration efforts. As a result of these revisions, the ESC Rate of Return for 2024 and 2025, as adjusted, are higher by $103,132 and $77,688, respectively. Please refer to EOE-395, Attachment 3, for the calculations supporting the ESC Depreciation expense for 2024 and 2025, as adjusted in the Storm Fleet Clearing response to EOE-178RV01, Attachment 1. As a result of the revised depreciable lives to align with the depreciation rates most recently approved in base distribution rate cases, as well as removal of costs that were inadvertently included in the 2025 calendar year, the net change to the ESC Depreciation expense for 2024 and 2025, as adjusted, are lower by $2,527,098 and $298,466, respectively. Prior Referenced Response: i EOE-178 Question: (STORM FLEET) Refer to Response to EOE-031, including Att. 1. Provide an unlocked Excel spreadsheet detailing the each storm fleet cost for 2024 through present. As part of the response, please provide both a summary of the storm costs by category and a detailed listing of storm fleet costs that can be used to sample individual expenses. EOE refers the Company to Docket No. 25-12-13, Interrog. Resps. EOE-666, Att.2 and EOE-722, Att.1 for the costs by category (EOE-666, Att.2) as an example of the detailed listing of individual expenses (EOE-722, Att.1). Separately, provide the individual number of “hours used” by state (i.e., CT, MA, NH). EOE-178 Response: Please refer to EOE-178, Attachment 1, for the details of the storm fleet costs for 2024 through June 2026. Included is the invoice listing of “other outside services” expenses similar to what was provided in EOE-666 from Docket No. 25-12-13. Please refer to EOE-177, Attachment 1, for the individual number of “hours used” by state.
As listed on the current system
Corres. 11/16/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (PURA Set 13, EOE Set 8)