Discovery Compilation (PURA Set 13, EOE Set 8)

Files3

Search terms highlighted
Eversource rate increase is on 38 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
  1. Page 47 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-393 Page 1 of 1 Date Filed: October 27, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (STORM FLEET) Refer to Responses to EOE-177 and EOE-178. Provide an unlocked Excel spreadsheet calculating the breakdown of the Storm Fleet costs split between Connecticut, Massachusetts, and New Hampshire. As part of the request, provide calculations using actual information wherever possible (e.g., depreciation expense on actual vehicles per state) and discuss any assumptions necessary for costs that cannot be attributed to a given location. Response: Please refer to EOE-393, Attachment 1, for an unlocked Excel spreadsheet calculating the breakdown of Storm Fleet costs split between Connecticut, Massachusetts, and New Hampshire for 2024-Jun 2026. The annual storm fleet clearing costs are the most accurate and up-to-date information available at the time of reporting.
  2. Page 48 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-394 Page 1 of 2 Date Filed: October 27, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (STORM FLEET) Refer to Response to EOE-177, Att.1. Respond to the following: a. Explain why the number of storm fleet vehicles has decreased for each state and explain if the Company is expected to sustain the decreases. b. Referring to the MN26C011 event (i.e., Excel row 103), identify the ES Electric vendor. If this entity is indicative of the Company, explain why it was necessary for the Company to utilize the Storm Fleet and explain how this usage aligns to the Company’s response to EOE-031. Response: a. Storm Fleet vehicle reductions reflect ongoing fleet optimization and updated storm-response planning, not a reduction in emergency-response capability. Fleet inventories were right-sized based on utilization reviews, readiness assessments, deployment modeling, and increased reliance on contractor support and regional resource sharing. The Company expects these reductions to be sustainable based on current operational requirements and storm-response needs. All critical storm-response equipment remains available, and the Company continues to maintain access to contractor, mutual assistance, and cross-state resources when necessary. Storm fleet levels are continually evaluated and may increase or decrease based on operational requirements, utilization trends, contractor availability, and lessons learned from storm events. Accordingly, fleet inventories are not fixed and are adjusted as necessary to maintain appropriate storm-response capability. b. Referring to the MN26C011 event, the “ES Electric” vendor on Excel row 103 in EOE-177, Attachment 1, is labeled incorrectly. The Company confirmed the vehicles were used by Eversource-Transmission and aligns with the Company’s response to EOE-031 i, which states that Eversource-Transmission are the only Company employees to utilize the vehicles. Prior Referenced Response: i EOE-031 Question: (STORM FLEET) Provide details regarding the Company’s use of the Storm Fleet including information on the annual costs (2024 through present), the number of available units (i.e., vehicles) per location (i.e., state), the number of hours used per storm event, the total cost allocated to each storm event, and any other relevant details that would assist in
  3. Page 49 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-394 Page 2 of 2 minimizing following interrogatories. To the extent that the Storm Fleet has been used by the Company’s affiliates, provide details. EOE-031 Response: Please refer to EOE-031, Attachment 1, for the requested details on the Storm Fleet for all storms that occurred from 2024 through June 2026. The only time Company employees use the Storm Fleet vehicles is when Transmission employees are supporting Distribution restoration. Otherwise, the Storm Fleet vehicles are used only by external vendors.
  4. Page 50 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-395 Page 1 of 2 Date Filed: November 05, 2026 Witness: John G. Griffin, Leanne M. Landry, Danielle J. Munson and Marisa B. Paruta Request from: Office of Education, Outreach, and Enforcement Question: (STORM FLEET-DEPRECIATION/RATE OF RETURN) Refer to Response to EOE-178, Att.1. Provide an unlocked Excel spreadsheet demonstrating the calculations supporting the Service Company Depreciation and Rate of Return amounts reported within the Storm Fleet Clearing by CE-2025 tab. As part of the response, identify all inputs and assumptions and provide citations, where possible. Additionally, identify any changes to the Company’s calculation approaches for 2024 or 2025. Response: During the Company’s evaluation of the underlying data needed to prepare a response to this discovery, it was determined that certain Eversource Service Company (ESC) depreciation expense costs included in EOE-178, Attachment 1 i, for the years 2024 and 2025 were inadvertently applied to the incorrect calendar year and the ESC Rate of Return was based on information that had been further updated but not reflected in the calculation. This necessitated Eversource’s calculation of the pool of ESC Fleet Vehicle costs, by year, which allocates these costs to the Eversource enterprise electric utility major storm work orders that occurred within each year of 2024 and 2025, to be revised and re-allocated based on calendar year utilization. Therefore, the Company is providing a revised attachment in EOE-178RV01, Attachment 1, to update the costs charged to the CL&P catastrophic storm work orders in 2024 and 2025 for both ESC Rate of Return and ESC depreciation expense. In addition, the information provided in this response conforms to the revised calculation and will reconcile to EOE-178RV01, Attachment 1. Please refer to EOE-395, Attachment 1, and EOE-395, Attachment 2, for the calculations supporting the ESC Rate of Return for 2024 and 2025, respectively, as adjusted in the Storm Fleet Clearing response to EOE-178RV01, Attachment 1. The ESC Rate of Return was adjusted to reflect the updated ESC Fleet Vehicle depreciation rates effective January 1, 2024. ESC implemented an enhancement in the ESC Fleet Vehicle depreciation rate calculation, using the last state-regulatory commission approved Eversource corporate-wide electric utility base distribution
  5. Page 51 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-395 Page 2 of 2 rate case fleet vehicle depreciation rates for similar class vehicles. These most recent approved depreciation rates are used to develop an ESC Fleet Vehicle composite depreciation rate and updated accordingly. Therefore, the ESC Rate of Return for 2024 and 2025 were revised to reflect an updated net plant asset value (book cost less accumulated depreciation, as adjusted for new depreciable lives) for the ESC Fleet Vehicles, and appropriately include all vehicles utilized for Eversource enterprise-wide storm restoration efforts. As a result of these revisions, the ESC Rate of Return for 2024 and 2025, as adjusted, are higher by $103,132 and $77,688, respectively. Please refer to EOE-395, Attachment 3, for the calculations supporting the ESC Depreciation expense for 2024 and 2025, as adjusted in the Storm Fleet Clearing response to EOE-178RV01, Attachment 1. As a result of the revised depreciable lives to align with the depreciation rates most recently approved in base distribution rate cases, as well as removal of costs that were inadvertently included in the 2025 calendar year, the net change to the ESC Depreciation expense for 2024 and 2025, as adjusted, are lower by $2,527,098 and $298,466, respectively. Prior Referenced Response: i EOE-178 Question: (STORM FLEET) Refer to Response to EOE-031, including Att. 1. Provide an unlocked Excel spreadsheet detailing the each storm fleet cost for 2024 through present. As part of the response, please provide both a summary of the storm costs by category and a detailed listing of storm fleet costs that can be used to sample individual expenses. EOE refers the Company to Docket No. 25-12-13, Interrog. Resps. EOE-666, Att.2 and EOE-722, Att.1 for the costs by category (EOE-666, Att.2) as an example of the detailed listing of individual expenses (EOE-722, Att.1). Separately, provide the individual number of “hours used” by state (i.e., CT, MA, NH). EOE-178 Response: Please refer to EOE-178, Attachment 1, for the details of the storm fleet costs for 2024 through June 2026. Included is the invoice listing of “other outside services” expenses similar to what was provided in EOE-666 from Docket No. 25-12-13. Please refer to EOE-177, Attachment 1, for the individual number of “hours used” by state.
  6. Page 52 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-396 Page 1 of 2 Date Filed: October 30, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: STORM FLEET-EXPENSES) Refer to Response to EOE-178, Att.1. Provide documentation supporting the following sampled expenses reported within the Vendor Inv#-2025 tab. As part of the response, provide explanations detailing the nature of the expenses and invoices or other relevant documentation. a. b. c. d. e. f. g. h. Row 213; Altec Industries Inc; $18,710.56 Row 358; Altec Industries Inc; $12,572.83 Row 714; LDV Inc; $76,463.33 Row 725; Maximos Construction; $11,910.53 Row 942; Mirabelli Automotive LLC; $17,347.95 Row 951; Stuart C Irby Co; $33,041.38 Row 965; (blank); $232,106.98 Row 991; Global Rental Company Inc; $4,781.25 Response: Referring to Response EOE-178, Attachment 1, please see below for attachment references and an explanation of expenses for the selected rows within the Vendor Inv#-2025 tab. Request Row 213; Altec Industries Inc; $18,710.56 Att. Reference EOE-396 Att. 1 Row 358; Altec Industries Inc; $12,572.83 N/A Row 714; LDV Inc; $76,463.33 EOE-396 Att. 2 Details of charges During a maintenance inspection there was an issue with the hydraulics in this unit, the fluid had to be flushed, and the lower and upper boom lift cylinder had to be replaced. Due to the replacement, a load structural test also had to be conducted. The details are listed on the invoice. This is a recurring monthly charge for storage for the storm vehicles. This was approved without an invoice; we did catch this during our internal review process and developed a process to ensure that all charges have an invoice attachment. This was for work to upgrade our MRC command vehicles.
  7. Page 53 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-396 Page 2 of 2 Row 725; Maximos Construction; $11,910.53 Row 942; Mirabelli Automotive LLC; $17,347.95 EOE-396 Att. 3 This was to plow and clear the Shrewsbury storm lot details on invoice. EOE-396 Att. 4 Row 951; Stuart C Irby Co; $33,041.38 EOE-396 Att. 5 Row 965; (blank); $232,106.98 Row 991; Global Rental Company Inc; $4,781.25 EOE-396 Att. 6 EOE-396 Att. 7 This was for monthly charges for internet, restrooms and power for storm lot. It also is for labor for employees to operate trucks for die electric testing and driving the trucks to keep them from forming issues from sitting for long periods. The details are on the invoice. This is for rubber goods testing of the rubber goods in the trucks, to ensure they are compliant and safe for operation. These are journal entries and UVL transactions to account for charges in the proper account. This is for a rental invoice for a specialty "cutter truck" which allows the user to clear power lines off of trees or vehicles safely without having to dispatch a line crew. This was designed to speed up clearing roads and allow Eversource to restore power faster.
  8. Page 54 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-397 Page 1 of 3 Date Filed: October 29, 2026 Witness: Craig Dikeman and Matthew J. Correia Request from: Office of Education, Outreach, and Enforcement Question: (WIRE GUARDS/COMP BID) Refer to Response to EOE-182. The Company was requested to provide competitive bid assessments that were relevant for the years 2024-2025. In response, the Company provided a one-page summary of results that appears to be applicable to Connecticut, Massachusetts, and New Hampshire. Please supplement the response with specific details on each vendor’s location(s) and the corresponding bid cost structure. Additionally, explain how each of the scores were derived and how the scores account for incremental costs that would result from travel from their respective locations to Connecticut. If an assessment of the incremental costs associated with travel did not occur, explain why. Response: The Company supplements its response to EOE-182 by providing the detailed competitive bid evaluation associated with the 2024–2026 Wire Down Guard solicitation as EOE-397, Attachment 2 CONFIDENTIAL. This attachment identifies the participating vendors, proposed resource commitments, service territory, competitive rankings. The Company provides additional information related to the bid evaluation process in EOE-397, Attachment 1 CONFIDENTIAL. The commercial and technical evaluation results were combined using their respective weightings to establish the overall competitive scores reflected in EOE-182, Attachment 1. The supplemental evaluation provides additional visibility into the vendor information considered during the solicitation. Unlike traditional line contractors, Wire Down Guard resources are not generally pre-staged in anticipation of storm events, nor are they routinely performing ongoing non-emergency work within the Company’s service territory. Although vendors identify a corporate headquarters or principal office location during the solicitation process, the personnel ultimately deployed for emergency response activities are frequently located throughout multiple states and regions. The Company obtains resource availability information directly from vendors at the time resources are requested and assigned. As a result, the location of a vendor's headquarters is not a reliable indicator of where specific personnel will originate when responding to an event.
  9. Page 55 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-397 Page 2 of 3 During major storm events, vendors may deploy personnel from locations other than their headquarters, including resources temporarily positioned in the region to support emergency restoration efforts. Accordingly, the Company's evaluation does not assume that resources will originate from a vendor's principal office location. In addition, several participating vendors operate on a regional or multi-state basis and maintain personnel across multiple geographic areas rather than staffing exclusively from a single headquarters location. The Company's utilization of regional providers allows it to leverage aggregated purchasing power and broader resource commitments across Connecticut, Massachusetts, and New Hampshire, which can enhance resource availability and support the procurement of more competitive rates. As a result, evaluating vendors based solely on the location of a corporate headquarters would not accurately reflect either the resources available for deployment or the overall value proposition offered by regional service providers. Wire Down Guard resources generally are not compensated for travel time. In limited circumstances, travel time may be reimbursed when specifically authorized by the Company's Resource Acquisition organization and provided for within the applicable contractual and purchase order requirements. Resource deployment decisions are based primarily on resource availability, response capability, safety considerations, and the ability to support the affected service territory. Geographic proximity may be considered where known and relevant; however, resource assignments are not made solely based upon the location of a contractor's corporate office. For these reasons, a separate quantitative assessment of incremental travel costs based on each vendor’s home office location was not performed as part of the competitive evaluation. Such an assessment would require assumptions regarding the originating locations, availability, and deployment of individual resources during future storm events, which cannot be reliably established during the solicitation process. However, geographic considerations were incorporated into the technical evaluation through the assessment of each vendor’s proposed resource commitments and the Eversource service territories they were able and willing to support. This allowed the Company to consider the vendors’ anticipated ability to provide resources within the required geographic areas without assigning speculative travel costs based solely on corporate office locations. While cost remains an important consideration, Wire Down Guard services are provided during emergency response situations where public safety and response readiness are critical. Accordingly, the Company evaluates both pricing and operational capabilities, including resource availability and geographic coverage, to ensure qualified personnel can be deployed in a timely manner to protect the public and support restoration activities. For the reasons described above,
  10. Page 56 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-397 Page 3 of 3 the Company did not perform a separate quantitative assessment of travel costs based solely on vendor headquarters locations.
38 pages match