Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery Compilation (PURA Set 13, EOE Set 8)

Files3

Search terms highlighted
Eversource rate increase is on 38 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
  1. Page 51 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-395 Page 2 of 2 rate case fleet vehicle depreciation rates for similar class vehicles. These most recent approved depreciation rates are used to develop an ESC Fleet Vehicle composite depreciation rate and updated accordingly. Therefore, the ESC Rate of Return for 2024 and 2025 were revised to reflect an updated net plant asset value (book cost less accumulated depreciation, as adjusted for new depreciable lives) for the ESC Fleet Vehicles, and appropriately include all vehicles utilized for Eversource enterprise-wide storm restoration efforts. As a result of these revisions, the ESC Rate of Return for 2024 and 2025, as adjusted, are higher by $103,132 and $77,688, respectively. Please refer to EOE-395, Attachment 3, for the calculations supporting the ESC Depreciation expense for 2024 and 2025, as adjusted in the Storm Fleet Clearing response to EOE-178RV01, Attachment 1. As a result of the revised depreciable lives to align with the depreciation rates most recently approved in base distribution rate cases, as well as removal of costs that were inadvertently included in the 2025 calendar year, the net change to the ESC Depreciation expense for 2024 and 2025, as adjusted, are lower by $2,527,098 and $298,466, respectively. Prior Referenced Response: i EOE-178 Question: (STORM FLEET) Refer to Response to EOE-031, including Att. 1. Provide an unlocked Excel spreadsheet detailing the each storm fleet cost for 2024 through present. As part of the response, please provide both a summary of the storm costs by category and a detailed listing of storm fleet costs that can be used to sample individual expenses. EOE refers the Company to Docket No. 25-12-13, Interrog. Resps. EOE-666, Att.2 and EOE-722, Att.1 for the costs by category (EOE-666, Att.2) as an example of the detailed listing of individual expenses (EOE-722, Att.1). Separately, provide the individual number of “hours used” by state (i.e., CT, MA, NH). EOE-178 Response: Please refer to EOE-178, Attachment 1, for the details of the storm fleet costs for 2024 through June 2026. Included is the invoice listing of “other outside services” expenses similar to what was provided in EOE-666 from Docket No. 25-12-13. Please refer to EOE-177, Attachment 1, for the individual number of “hours used” by state.
  2. Page 52 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-396 Page 1 of 2 Date Filed: October 30, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: STORM FLEET-EXPENSES) Refer to Response to EOE-178, Att.1. Provide documentation supporting the following sampled expenses reported within the Vendor Inv#-2025 tab. As part of the response, provide explanations detailing the nature of the expenses and invoices or other relevant documentation. a. b. c. d. e. f. g. h. Row 213; Altec Industries Inc; $18,710.56 Row 358; Altec Industries Inc; $12,572.83 Row 714; LDV Inc; $76,463.33 Row 725; Maximos Construction; $11,910.53 Row 942; Mirabelli Automotive LLC; $17,347.95 Row 951; Stuart C Irby Co; $33,041.38 Row 965; (blank); $232,106.98 Row 991; Global Rental Company Inc; $4,781.25 Response: Referring to Response EOE-178, Attachment 1, please see below for attachment references and an explanation of expenses for the selected rows within the Vendor Inv#-2025 tab. Request Row 213; Altec Industries Inc; $18,710.56 Att. Reference EOE-396 Att. 1 Row 358; Altec Industries Inc; $12,572.83 N/A Row 714; LDV Inc; $76,463.33 EOE-396 Att. 2 Details of charges During a maintenance inspection there was an issue with the hydraulics in this unit, the fluid had to be flushed, and the lower and upper boom lift cylinder had to be replaced. Due to the replacement, a load structural test also had to be conducted. The details are listed on the invoice. This is a recurring monthly charge for storage for the storm vehicles. This was approved without an invoice; we did catch this during our internal review process and developed a process to ensure that all charges have an invoice attachment. This was for work to upgrade our MRC command vehicles.
  3. Page 53 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-396 Page 2 of 2 Row 725; Maximos Construction; $11,910.53 Row 942; Mirabelli Automotive LLC; $17,347.95 EOE-396 Att. 3 This was to plow and clear the Shrewsbury storm lot details on invoice. EOE-396 Att. 4 Row 951; Stuart C Irby Co; $33,041.38 EOE-396 Att. 5 Row 965; (blank); $232,106.98 Row 991; Global Rental Company Inc; $4,781.25 EOE-396 Att. 6 EOE-396 Att. 7 This was for monthly charges for internet, restrooms and power for storm lot. It also is for labor for employees to operate trucks for die electric testing and driving the trucks to keep them from forming issues from sitting for long periods. The details are on the invoice. This is for rubber goods testing of the rubber goods in the trucks, to ensure they are compliant and safe for operation. These are journal entries and UVL transactions to account for charges in the proper account. This is for a rental invoice for a specialty "cutter truck" which allows the user to clear power lines off of trees or vehicles safely without having to dispatch a line crew. This was designed to speed up clearing roads and allow Eversource to restore power faster.
  4. Page 54 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-397 Page 1 of 3 Date Filed: October 29, 2026 Witness: Craig Dikeman and Matthew J. Correia Request from: Office of Education, Outreach, and Enforcement Question: (WIRE GUARDS/COMP BID) Refer to Response to EOE-182. The Company was requested to provide competitive bid assessments that were relevant for the years 2024-2025. In response, the Company provided a one-page summary of results that appears to be applicable to Connecticut, Massachusetts, and New Hampshire. Please supplement the response with specific details on each vendor’s location(s) and the corresponding bid cost structure. Additionally, explain how each of the scores were derived and how the scores account for incremental costs that would result from travel from their respective locations to Connecticut. If an assessment of the incremental costs associated with travel did not occur, explain why. Response: The Company supplements its response to EOE-182 by providing the detailed competitive bid evaluation associated with the 2024–2026 Wire Down Guard solicitation as EOE-397, Attachment 2 CONFIDENTIAL. This attachment identifies the participating vendors, proposed resource commitments, service territory, competitive rankings. The Company provides additional information related to the bid evaluation process in EOE-397, Attachment 1 CONFIDENTIAL. The commercial and technical evaluation results were combined using their respective weightings to establish the overall competitive scores reflected in EOE-182, Attachment 1. The supplemental evaluation provides additional visibility into the vendor information considered during the solicitation. Unlike traditional line contractors, Wire Down Guard resources are not generally pre-staged in anticipation of storm events, nor are they routinely performing ongoing non-emergency work within the Company’s service territory. Although vendors identify a corporate headquarters or principal office location during the solicitation process, the personnel ultimately deployed for emergency response activities are frequently located throughout multiple states and regions. The Company obtains resource availability information directly from vendors at the time resources are requested and assigned. As a result, the location of a vendor's headquarters is not a reliable indicator of where specific personnel will originate when responding to an event.
  5. Page 55 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-397 Page 2 of 3 During major storm events, vendors may deploy personnel from locations other than their headquarters, including resources temporarily positioned in the region to support emergency restoration efforts. Accordingly, the Company's evaluation does not assume that resources will originate from a vendor's principal office location. In addition, several participating vendors operate on a regional or multi-state basis and maintain personnel across multiple geographic areas rather than staffing exclusively from a single headquarters location. The Company's utilization of regional providers allows it to leverage aggregated purchasing power and broader resource commitments across Connecticut, Massachusetts, and New Hampshire, which can enhance resource availability and support the procurement of more competitive rates. As a result, evaluating vendors based solely on the location of a corporate headquarters would not accurately reflect either the resources available for deployment or the overall value proposition offered by regional service providers. Wire Down Guard resources generally are not compensated for travel time. In limited circumstances, travel time may be reimbursed when specifically authorized by the Company's Resource Acquisition organization and provided for within the applicable contractual and purchase order requirements. Resource deployment decisions are based primarily on resource availability, response capability, safety considerations, and the ability to support the affected service territory. Geographic proximity may be considered where known and relevant; however, resource assignments are not made solely based upon the location of a contractor's corporate office. For these reasons, a separate quantitative assessment of incremental travel costs based on each vendor’s home office location was not performed as part of the competitive evaluation. Such an assessment would require assumptions regarding the originating locations, availability, and deployment of individual resources during future storm events, which cannot be reliably established during the solicitation process. However, geographic considerations were incorporated into the technical evaluation through the assessment of each vendor’s proposed resource commitments and the Eversource service territories they were able and willing to support. This allowed the Company to consider the vendors’ anticipated ability to provide resources within the required geographic areas without assigning speculative travel costs based solely on corporate office locations. While cost remains an important consideration, Wire Down Guard services are provided during emergency response situations where public safety and response readiness are critical. Accordingly, the Company evaluates both pricing and operational capabilities, including resource availability and geographic coverage, to ensure qualified personnel can be deployed in a timely manner to protect the public and support restoration activities. For the reasons described above,
  6. Page 56 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-397 Page 3 of 3 the Company did not perform a separate quantitative assessment of travel costs based solely on vendor headquarters locations.
  7. Page 57 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-398 Page 1 of 3 Date Filed: October 27, 2026 Witness: John P. Dipaola-Tromba, Sean D. Redding, Jenna M. Turner, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE-TRAVEL) Refer to Response to EOE-193, subsection ‘a’. The initial interrogatory requested the Company to “provide emails or other correspondence obtained during the initial review to support the hours billed. Additionally, identify the total incremental costs for the hours billed in excess of the estimated travel.” Respond to the following: a. Confirm that the Company does not have emails or other correspondence obtained during the initial review to support the hours billed. If not confirmed, provide the requested documentation. b. Provide an unlocked Excel spreadsheet calculating the hours and corresponding costs billed in excess of the estimated travel. As referenced within the Company’s response to EOE-130, the analysis should include the Company’s 1.3 hour factor used to compute the assumed benchmark. Response: As referenced in the Company’s response to EOE-130 i (emphasis added): “the Company applies the 1.3 hours factor to account for, among other things, the slower speed of fully loaded line trucks that travel as a convoy and make more frequent stops than a conventional sedan vehicle. The Company further evaluates the reasonableness of travel time based on its experience and professional judgment on an event-by-event basis. These additional layers of analysis are necessary because Google Maps does not account for factors and variables that are known to impact travel time. Thus, Google Maps cannot, and should not, be relied upon as the sole measure of travel time.” The 1.3 hours factor does not account for the impact of severe weather on travel time; rather, the factor of 1.3 hours to compute a reasonable benchmark for actual travel time during normal travel conditions. The associated travel time, and the factors addressed in the Company’s response to EOE-130, is a component of the mobilization and demobilization process; however, mobilization and demobilization also include “muster time”. Muster time is a broad, general term that includes crew preparation, pre-trip safety briefings, and DOT pre-trip and post-trip inspections, among other factors.
  8. Page 58 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-398 Page 2 of 3 In reference to Confidential Exhibit ACCT-2 (CLP-1A-2)(MS24A), pages 104-142, the Asplundh Tree crews in question traveled through periods of heavy, wet snow, and heavy rainfall and high winds throughout the duration of their travel on January 9, 2024. During travel, particularly in hazardous weather conditions, communication is not conducted in a documentable manner. Vendor supervision will typically call with updates on their travel progress if it is safe to do so while traveling. They do not send emails during this period of time and, therefore, that documentation is not available to provide. Considering muster time and stops for fuel, meal breaks, restroom breaks, traffic, and weather, the Company determined the billable hours for mobilization and demobilization were reasonable and approved them. All of the requested data is available to EOE in the invoices and associated timesheets that pertain to Tree Crew vendors for the MS24A event. The Company’s processes are constructed to obtain and use those records for validating payment, subject to review and sign off by Eversource Arborist, who has contemporaneous knowledge of the work performed. The Company’s financial systems do not record invoiced amounts by data field, for each data point included on the invoices or the associated timesheets. Therefore, extracting and compiling this information from the timesheets in the manner sought by EOE would require extensive manual efforts that can be performed by EOE or EOE’s consultant, if information in that format assists EOE in putting forth its case. Prior Referenced Response: i EOE-130 Question: (VENDOR TRAVEL) Explain the Company’s travel review process for external vendors to include any assumptions for determining whether mobilization/demobilization travel time would be considered reasonable (i.e. in relation to Google/MapQuest estimates), how estimates would be increased by escalation factors, whether the review process differs for different vendors or types of vendors, and whether the Company has performed a study supporting that policy. Additionally, identify if the Company has changed its position outlined within its supplemental response to OCC-41 from Docket No. 25-12-13. EOE-130 Response: The Company applies the formula described below to determine whether line and vegetation crews can mobilize, travel and arrive on a timeline to assist productively in restoration. The Company uses a formula to calculate daily travel time capability of a line crew traveling at 60 mph for 10 hours (maximum drive time), or approximately 600 miles per day. Based on the expected duration of the restoration, the Company will procure crews factoring in this travel time when validating invoices. The Company looks at the location of mobilization, the 600 miles per day and any external factors that may come into play to determine what is a reasonable travel time when reviewing and approving invoices.
  9. Page 59 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-398 Page 3 of 3 Application of the above formula combined with the overall projected impact of the weather event (i.e. duration of restoration, number of potentially impacted states, availability of local or regional resources) enables the Company to determine, on an event by event basis, what travel time is reasonable. Due to size, refueling and possible weather/traffic delays, actual daily mileage of a bucket truck may differ from 600 miles per day. Google Maps is a useful reference point for determining travel time. However, the accuracy and reliability of Google Maps data is subject to qualification in its terms of use, and therefore it should not be relied upon as the exclusive measure of reasonable travel time. In Docket No. 25-12-13 the Company responded to OCC-041 and associated attachments provided here for reference as EOE-130, Attachment 1. Page 2 of OCC-041-SP01, Attachment 1, (which is page 4 of 24 of EOE-130, Attachment 1), is the Google Maps End User Additional Terms of Service (“Google Maps T&Cs”), and states that: “When you use Google Maps map data, traffic, directions, and other content, you may find that actual conditions differ from the map results and content, so exercise your independent judgment and use Google Maps at your own risk.” The Google Maps T&Cs further provide that end users of Google Maps must accept the Google Terms of Service, which is attached hereto as OCC-041-SP01, Attachment 2, (which is page 5 of 24 of EOE-130, Attachment 1). Page 13 of OCC-041-SP01, Attachment 2, (which is page 17 of 24 of EOE-130, Attachment 1), presents the following warranty disclaimer: TO THE EXTENT ALLOWED BY APPLICABLE LAW, WE PROVIDE OUR SERVICES “AS IS” WITHOUT ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING THE IMPLIED WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, AND NON-INFRINGEMENT. FOR EXAMPLE, WE DON’T MAKE ANY WARRANTIES ABOUT THE CONTENT OR FEATURES OF THE SERVICES, INCLUDING THEIR ACCURACY, RELIABILITY, AVAILABILITY, OR ABILITY TO MEET YOUR NEEDS. DON’T RELY ON THE SERVICES FOR MEDICAL, LEGAL, FINANCIAL, OR OTHER PROFESSIONAL ADVICE. ANY CONTENT REGARDING THOSE TOPICS IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY AND IS NOT A SUBSTITUTE FOR ADVICE FROM A QUALIFIED PROFESSIONAL. As the Company has explained in its response to several discovery responses in Docket Nos. 24- 03-30 and 25-12-13, all provided here for ease of reference as EOE-130, Attachment 2, (see, e.g., OCC-031; EOE-501; EOE-517; EOE536; and EOE-0590), Google Maps and its underlying algorithms do not incorporate vehicle sizes and dimensions, the safe operating speed of contractor vehicles traveling in a convoy, fuel capacity/efficiency, activities that do not include actual driving, such as refueling, safety rest breaks, and meal breaks, and/or different commercial vehicle types (e.g., pick-up trucks, various sized bucket trucks, including diesel models, lifters, pole trailers, diggers/derricks, etc.) in travel time calculations. Each of these factors can affect the actual time it takes for a contractor to arrive at the contractor’s designated location in the Company’s service territory and, therefore, are appropriate for consideration in the cost validation process. Accordingly, the Company uses the estimated time calculated by Google Maps for car travel as a data point and multiplies that figure by a factor of 1.3 hours to compute a reasonable benchmark for actual travel time. The Company applies the 1.3 hours factor to account for, among other things, the slower speed of fully loaded line trucks that travel as a convoy and make more frequent stops than a conventional sedan vehicle. The Company further evaluates the reasonableness of travel time based on its experience and professional judgment on an event-by-event basis. These additional layers of analysis are necessary because Google Maps does not account for factors and variables that are known to impact travel time. Thus, Google Maps cannot, and should not, be relied upon as the sole measure of travel time.
  10. Page 60 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-399 Page 1 of 1 Date Filed: October 27, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin, Leanne M. Landry, Craig Dikeman and Matthew J. Correia Request from: Office of Education, Outreach, and Enforcement Question: (EXHIBIT B PRICING SCHEDULE) Refer to Response to EOE-209, Att.1. Provide a complete listing of vendors subject to the referenced Exhibit B document and identify the specific dates in which the Exhibit B documents became effective within each vendor’s contract. Specifically, the Exhibit B documents referenced are those which permit equipment to be billed at 50% during standby. Additionally, cite the location of each respective Exhibit B or provide the corresponding executed documents. Response: Please refer to EOE-399, Attachment 1. The Company has provided a complete listing of contractors subject to the referenced Exhibit B Pricing Schedule provisions, which permit equipment to be billed at 50% of the applicable rate during standby, along with the corresponding effective periods. The listed vendors were subject to the Exhibit B template provided in EOE-209, Attachment 1. In certain instances, a contractor may have entered into a newer agreement while an existing purchase order continued to be governed by an earlier agreement or Pricing Schedule. In those instances, the terms applicable to a particular charge were determined by the agreement and Pricing Schedule supporting the purchase order under which the services were authorized and performed. Accordingly, the date of a contractor’s newer agreement may not, by itself, determine the terms applicable to every charge incurred after that date. Please refer to EOE-209, Attachment 1, for a copy of the applicable Exhibit B Pricing Schedule template. This document reflects the applicable contractual provisions for the effective periods identified for each contractor listed in EOE-399, Attachment 1.
38 pages match

As listed on the current system

Corres. 11/16/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (PURA Set 13, EOE Set 8)

This filing on the current system (opens in a new tab)