Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery Compilation (PURA Set 13, EOE Set 8)

Files3

Search terms highlighted
Eversource rate increase is on 38 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
  1. Page 68 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-401 Page 7 of 7 b. c. Work Report Procedure (Procedure) provided at EOE-022, Att.5. Additionally, referring to pp. 309, 314-316, explain why the vendor was not required to complete the information within boxes 24-26 (i.e., tracked hours per OMS event) as outlined within the Procedure. Cite the location of the vendor’s contractual Pricing Schedule Exhibit (i.e., typically referred to as Exhibit A). The contract provided at OCC-044, Att.2 (Confidential), starting at p. 5472 includes a List of Exhibits at p. 5478 which references the Pricing Schedule as Exhibit B but was unable to locate the document. Referring to pp. 306-308, 310-313, explain why the equipment was charged during standby when the Company’s Master Service Agreement omits billing of equipment during standby. Additionally, identify the amount ($) of equipment that was charged for standby. EOE-244 Response: a. Although the contractor did not utilize the Eversource Contractor Storm Daily Time & Work Report referenced in the applicable procedure, the documentation provided contained the key information necessary to support the billed charges, the majority of which consisted of standby hours. The supporting records included contractor details, hours worked, job locations, and required signatures. In conjunction with the Company's internal review controls and verification procedures, this documentation provided a sufficient basis for the invoice approver to validate the accuracy, reasonableness, and appropriateness of the charges. b. The vendor’s contractual Exhibit B Pricing Schedule was inadvertently omitted from the materials originally submitted due to a clerical error during the submission process. The Exhibit B Pricing Schedule is now being provided as EOE-244, Attachment 1, CONFIDENTIAL. c. Under the applicable Master Service Agreement, contractors are entitled to payment for equipment at 50% of the applicable equipment rate while on standby, as provided in Section 3.6, page 5 of EOE-244, Attachment 1 CONFIDENTIAL (Exhibit B Pricing Schedule). Accordingly, the equipment charges associated with standby were billed pursuant to the applicable contractual standby provisions. For purposes of contractor timekeeping, a “standby” designation may reflect the operational status of the crew at a particular point in time and does not necessarily indicate that the crew or associated equipment was inactive or demobilized. During these periods, contractor resources may remain fully mobilized at the designated work or staging location, with personnel and equipment committed to Company operations and prepared to immediately perform assigned work. For example, resources may be awaiting the next ticket or work assignment, awaiting further direction from the Company, or transitioning between assignments while remaining available to support ongoing operations. Although the contractor’s crew may refer to this time as “standby” on the timesheet, the resources remain deployed and unavailable for other work. Consistent with the contract, a total of $9,528 was charged for equipment associated with labor hours categorized as standby.
  2. Page 69 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-402 Page 1 of 1 Date Filed: October 26, 2026 Witness: John P. Dipaola-Tromba, Sean D. Redding, Jenna M. Turner, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-15, pp. 116-118 and Response to EOE-229. EOE’s initial interrogatory incorrectly cited pp. 119-121 in lieu of pp. 116-118. Referring to pp. 116-118, please explain how the vendor was permitted to bill for nine hours on January 12, 2024, when they recorded work hours between 7am and 3pm (total of eight hours). To the extent that additional hour related to travel to the crew’s “reporting or parking location,” provide documentation to support this position and explain why the time reporting was inconsistent for the remaining days. As part of the response, please identify the impact of billing an extra hour (OT) for each employee. Response: Referring to Confidential Exhibit ACCT-2 (CLP-1A-15)(MS24A), pages 116-118, the tree crew in question was utilizing an overnight parking location on Lakeside Avenue in New Canaan. The estimated travel time from Flax Hill Road, Norwalk, to Lakeside Avenue, New Canaan, is approximately 25-minutes for a bucket truck under normal traffic conditions and approximately 45-minutes for a bucket truck during Friday afternoon traffic conditions. This does not include post-trip inspections required at the end of the shift. Please refer to Confidential Exhibit ACCT-2 (CLP-1A-15)(MS24A) on page 117. There is no “impact of billing an extra hour (OT) for each employee”. The Company Arborist corrected timesheet from 33-OT “Payable Hours” to 30-OT “Billable Hours”. The three-hour reduction is a culmination of one hour corrected from OT to ST on January 9, 20204, one hour corrected from OT to ST on January 10, 2024, and one hour corrected from OT to ST on January 12, 2024. The conversion of OT to ST was due to the hours worked within the 07:00 to 16:00 storm normal working hours.
  3. Page 70 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-403 Page 1 of 1 Date Filed: October 27, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-P-CARDS) Refer to Response to EOE-260. In support of selection ‘b’, the Company provided two identical submissions (Att.1 Redacted and Att.2 Redacted), inclusive of the receipts for the same date and with the same payment ID (p. 7). Identify if the selection was duplicated. If not duplicated, provide the omitted receipt for the second $3,729 charge. As part of the response, please also provide a copy of the p-card statement showing two charges of the same amount. Response: The charges for Dave & Charlies Hometown Deli are not duplicates. The order for 170 breakfast sandwiches was split between two transactions. One transaction was entered on January 9 at 11:35 a.m., and the second transaction was entered later that day at 12:01 p.m.. Rather than re-entering each item a second time, the vendor processed the second transaction as a single total charge of $3,729.81. Please refer to EOE-403, Attachment 1, which provides supporting documentation for the second transaction.
  4. Page 71 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-404 Page 1 of 2 Date Filed: October 28, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-P-CARDS) Refer to Response to EOE-260. In support of selection ‘d’, the Company provided five receipts detailing different dates (Att.3 of 1/9/24; Att.4 of 2/13/24; Att.5 of 1/5/24; Att.6 of 1/9/24; and Att.7 of 1/10/24) with minimal details regarding underlying unit costs. Respond to the following: a. Explain how meal charges applicable to 1/5/24 (prior to the storm event) and 2/13/24 (approximately one month after the storm event) are applicable to MS24A. b. Provide an unlocked Excel spreadsheet detailing the number of meals, the type of meal (breakfast, lunch, dinner), and the average cost per meal. Additionally, compare the average cost per meal to the amounts detailed within the Eversource Restaurant Meal Policy provided at EOE-058, Att.1 Redacted and, if applicable, identify the amounts paid in excess of the policy. Response: a. In preparing this response, the Company has determined that the P-Card transaction on 1/5/24 was attributed to a late December 2023 storm. The Company will supplement Exhibit ACCT-2(CLP-1)(MS24A), P-Card tab, line 115 to remove the charge in the amount of $2,216. In preparing this response, the Company confirmed directly with Newtown Deli that the PCard transaction identified on line 116, in the amount of $9,499.00, and associated with a receipt dated February 13, 2024, pertains to goods and/or services provided on January 10, 2024, in support of the MS24A storm event. Although the receipt reflects a transaction date of February 13, 2024, services were procured and utilized during the storm response effort and were therefore appropriately charged to this event. b. Please refer to EOE-403 Attachment 1 for the details of cost by meal for the P-card transactions on Exhibit ACCT-2(CLP-1)(MS24A), P-Card tab, line 113, line 114, and line 116. In preparing this response, the Company confirmed with Newtown Deli and Food and Lodging Lead that the P-Card transaction identified on Line 117, in the amount of $6,333, was associated with services provided for Event MS24A. However, the vendor was unable to provide additional
  5. Page 72 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-404 Page 2 of 2 details regarding the specific meal service associated with this charge. Additionally, the employee who made the purchase has since retired from the Company, and no further supporting information is available.
  6. Page 73 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-405 Page 1 of 1 Date Filed: November 03, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Office of Education, Outreach, and Enforcement Question: (PHOTOGRAPHY) Refer to Response to EOE-238. Identify if any of the photography costs included either within the Company’s storm recovery request or the Company’s test year amounts have produced work product (i.e., photographs) that have been used in the Company’s shareholder funded advertising. Response: None of the photography costs included in either the Company’s storm-cost recovery request or test year amounts comprising the cost of service in this proceeding pertain to a “work product” used in any “shareholder funding advertising.”
  7. Page 74 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-406 Page 1 of 2 Date Filed: October 27, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE) Refer to Response to EOE-234 and Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-16, pp. 207. The Company’s response to subsection ‘b’ concluded that the “car vs pole” reference within the signed timesheet was a “documentation” error and provided an OMS report (i.e., Att.1) to support this position. Respond to the following: a. Explain how this type of “documentation” error was not identified during the Company’s review. b. Explain why the Company believes that it is more accurate to rely on the OMS system in lieu of a signed Eversource Contractor Storm Daily Time & Work Report. c. Discuss if the Company is capable of querying the OMS system to identify instances where the OMS system identified “car vs pole” activity. If the OMS system is able to be queried, provide an unlocked Excel spreadsheet detailing all references to “car vs pole” or similar terminology for the period of January 2024 through March 2025 with similar details as reflected within EOE-234, Att.1. If possible, please also include the work order number details. Response: a. The Company identified the discrepancy during its review of supporting timesheets, validated the correct information, and processed the invoice accordingly. The Company’s controls operated as designed, identifying and addressing the documentation error before final processing and payment. b. The Company does not treat any single data source as conclusive or controlling over all other sources. The Company’s review process incorporates multiple sources of information to assess the accuracy and completeness of contractor-submitted timesheets and documentation. While a signed Daily Time & Work Report is a key component of this review, additional records (including OMS data and other documentation, when available) may be used if questions arise. Taken together, these records provide a more complete basis for invoice validation and are considered collectively to substantiate contractor activities. OMS is not relied upon exclusively, or in place of contractor documentation, but it serves as one of several tools supporting the Company’s review and reconciliation process.
  8. Page 75 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-406 Page 2 of 2 c. Please refer to EOE-406, Attachment 1, for an unlocked Excel spreadsheet detailing all references to “car vs pole” for the period of January 2024 through March 2025. Included in the spreadsheet are the corresponding OMS event numbers, as the OMS system identifies events using event numbers as the available reference field.
  9. Page 76 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-407 Page 1 of 2 Date Filed: November 02, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE/FLEET) Refer to Responses to EOE-177, Att.1 and EOE-251. The Company’s response to EOE-251, subsection ‘a’ identified that the vendor (i.e., SOS) was staged in Massachusetts to obtain Eversource Storm Fleet vehicles. The Company’s response to EOE-177, Att.1 identified a total of 68 Fleet units available for Connecticut and 49 units were used by SOS. Respond to the following: a. Identify the specific location(s) where the Connecticut Fleet vehicles (i.e., 68 vehicles) were located. If any vehicles were located in Massachusetts, explain why. b. Explain why the SOS vendor was not mobilized directly to a Connecticut Fleet location in lieu of the Massachusetts location. c. Referring to Confidential Exhibit ACCT-2 CLP-1A-19, pp. 819-820, 822-824, and 827-828, identify the incremental cost impact resulting from the vendor being required to remobilize from Massachusetts to Connecticut and return vehicles, including the “extra time to return trucks” as referenced on pp. 827-828. As part of the response, please provide supporting calculations. Response: a. The Storm Fleet vehicles are parked in Newington, Connecticut, Shrewsbury, Massachusetts, and Hooksett, New Hampshire. There may be situations where contractors utilize vehicles from Massachusetts for CT restoration if necessary. b. The SOS contractor mobilized directly to Connecticut. The reference to Shrewsbury, Massachusetts, as the ending location on the timesheet was most likely an inadvertent documentation error. The General Foreman, who was responsible for completing the timesheet, was also one of the individuals responsible for retrieving a pickup truck from the Contractor facility in Shrewsbury, Massachusetts. As such, the General Foreman mostly likely inadvertently recorded Shrewsbury as the ending location based on his subsequent travel, rather than Hartford, Connecticut, which was the actual ending location for the crews’ billable activities.
  10. Page 77 of 105

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-407 Page 2 of 2 Upon arrival in Connecticut, the personnel responsible for retrieving the pickup trucks from Massachusetts completed that travel on their own time, outside of Eversource-billable hours. Eversource provides bucket trucks for storm restoration activities but does not provide the additional vehicles contractors may require, such as pickup trucks for General Foreman and Safety personnel. Accordingly, the contractor was responsible for obtaining those vehicles. The travel to Shrewsbury was therefore unrelated to the crews’ mobilization to Connecticut and did not result in any additional charges to Eversource. The Company confirms that the crews mobilized directly to Connecticut and that Eversource was not billed for the subsequent travel to Massachusetts to retrieve the pickup trucks. c. The Company reviewed Confidential Exhibit ACCT-2 CLP-1A-19, including pages 819820, 822-824, and 827-828. The contractor used the “Description of Work” column to document activities associated with returning Eversource-owned bucket trucks. Because the contractor was using Eversource equipment, it was required to return the equipment in accordance with Eversource’s procedures and guidelines. When the contractors were officially released from receiving additional work tickets at 11:32 a.m. on January 10, they attempted to return the bucket trucks to the secured Eversource location where the trucks were housed. Upon arrival, Eversource personnel were not immediately available to facilitate the return. The approximately two-hour period between the crews’ release and the completion of the return process therefore included both travel from the crews’ standby location to the Eversource yard and time associated with waiting to return the trucks. The timesheet detail does not separately quantify those components. The Company’s review determined that the contractor did not charge for travel associated with returning its company-owned pickup trucks to Massachusetts. The contractor also did not charge Eversource for the travel associated with retrieving those pickup trucks from Shrewsbury. Accordingly, there was no incremental cost impact associated with the contractor’s travel to or from Massachusetts.
38 pages match

As listed on the current system

Corres. 11/16/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (PURA Set 13, EOE Set 8)

This filing on the current system (opens in a new tab)