Discovery Compilation (PURA Set 13, EOE Set 8)
Files3
Docket No. 26-05-10 Discovery Compilation November 16 2026.pdf
PDF · 133 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation November 16 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation November 16 2026.pdf
EOE Set 8_COMBINED.pdf
PDF · 1012 KB · 105 pagesText searchable
Download EOE Set 8_COMBINED.pdfRead the text of EOE Set 8_COMBINED.pdf
PURA Set 13_COMBINED.pdf
PDF · 1.5 MB · 144 pagesText searchable
Download PURA Set 13_COMBINED.pdfRead the text of PURA Set 13_COMBINED.pdf
Page 84 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-410 Page 1 of 2 Date Filed: October 27, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE) Refer to Response to EOE-205 and Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-9, pp. 182-226. Respond to the following: a. Comparing EOE-205 Att.1 with Att.2, confirm that the vendor did not bill for equipment during standby. If confirmed, identify if this was another vendor billing error similar to the Company’s response to EOE-201 or if there is a different rationale. If not confirmed, please discuss. b. Referring to EOE-205, Att.1, confirm that the vendor’s billing for 12 hours of standby “waiting for Lodging Information” without assignments resulted in an incremental cost of $91,689. If not confirmed, identify the increment impact and provide supporting calculations. c. Referring to EOE-205, subsection ‘d’, the Company confirmed that “the contractor’s timesheet did not fully conform to the Company’s requirements” but didn’t explain why the Eversource reviewer did not require the information to be completed prior to approval. Please respond. Response: a. In preparing this response, the Company confirmed that the contractor did not bill for equipment during standby hours, although this would have been an allowable charge. A review of the supporting documentation confirms that no charges were included on the invoice. Accordingly, the omission of equipment standby charges reflects an invoicing error by the contractor, resulting in the contractor billing fewer equipment hours than would have otherwise been permissible under the applicable contract terms. b. Yes. The identified standby hours were associated with labor resources that were retained and available to respond to operational needs during the event. Based on the applicable labor rates and the hours identified as standby activity, the total cost attributable to these standby labor resources is $91,689.00. On January 5th Eversource Sent a hiring notice to the Contractor stating for them to arrive, “No later than January 9th no later than 1800 hrs. and ready to work by 0600 on the 10th of January.” The Contractor, concerned of traveling in very poor weather conditions, arrived at 10am and was on standby till 10pm for a total of 12hrs of standby.Page 85 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-410 Page 2 of 2 c. The invoice reviewer evaluated the information provided in the timesheet with the ERFC and determined that the timesheet contained sufficient detail to substantiate the work performed and justify approval of the invoice. With the ERFC’s first hand knowledge, it was determined that there was sufficient evidence that the invoice could be approved.Page 86 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-411 Page 1 of 3 Date Filed: October 26, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Response to EOE-203 and Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-9, pp. 136-139. Respond to the following: a. Referring to EOE-203 subsection ‘a’, provide the requested pre-authorization for use of the mini excavator. If documented pre-authorization does not exist, please confirm. b. Referring to EOE-203 subsection ‘a’, specify if the vendor required the use of the mini excavator or if the device was solely available. c. Referring to EOE-203 subsection ‘b’, clarify if the vendor would have been eligible for a meal stipend both in a situation where they did receive a Company-provided meal or in a situation where they could have received a Company provided meal, but chose not to. d. Referring to EOE-203 subsection ‘c’, provided the additional records referenced to include the “dispatch information”. Response: a. Referring to the Company’s response to EOE-203 i, the Company authorized the use of these services through its storm restoration vendor as part of the overall restoration effort. Communication with vendors is primarily conducted by phone and coordinated in quick succession to have all resources staged at the onset of the event. Documented “preauthorization” does not exist as the Office of Education, Outreach, and Enforcement is requesting. b. The Company requested that the equipment be available for storm response efforts. If the Company does not secure the equipment, vendors may utilize this equipment for state, municipal, or private residential jobs and it would be unavailable when needed. There are blocked roads and other debris intensive events in nearly every storm even where mini excavators are extremely useful in clearing the debris quickly and efficiently. Please refer to the Company’s response to EOE-203, part c, where the Company indicates that the Eversource Connecticut Emergency Restoration Tree Contractor Work Location reports may have been missed during the scanning process. The reports cannot be located immediately but may be supplemented as they are located. c. The vendor would not be eligible for a per meal or per diem expense in a situation where “they could have received a Company provided meal but chose not to;” however, there arePage 87 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-411 Page 2 of 3 many situations where a tree crew may be unable to receive a Company provided meal. Please refer to the Company’s response to EOE-203, subpart b, where the Company describes when these situations may arise. d. The Company Arborist receives tree crew requests through multiple avenues during storm response, including phone calls, texts, the Outage Management System (“OMS”), and discussions in the Emergency Operation Centers (“EOC”) and Area Work Centers (“AWC”). The event location information and details would typically be recorded via handwritten notes and dispatched to the tree crews by phone. The handwritten notes are used to track tree crews during a storm restoration event and referenced during the timesheet approval process. The Arborist dispatch notes are no longer needed after the timesheets are approved, are not stored in centralized location, and cannot be provided as requested. Prior Referenced Response: i EOE-203 Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-9, pp. 136139. The Company reported two incremental charges in the combined amount of $47,132 for the Distinctive Gardens & Tree Care LLC vendor. Respond to the following: a. b. c. Referring to p. 136, explain why the mini excavator was required for storm remediation purposes. As part of the response, provide any pre-authorizations from the Eversource arborist. Identify if meals were available to the vendor employees during their support of the MS24A event and, if available, explain why the vendor would also be permitted to charge a per diem amount. Explain why the supporting documents did not include Eversource Connecticut Emergency Restoration Tree Contractor Work Location reports and provide copies of the reports detailing the assignments. EOE-203 Response: a. During storm response, mini excavators may be used to remove large trunk sections and other woody debris from roadways, when necessary. Mini excavators can improve restoration efficiency. Large-diameter trunk sections that would otherwise require significant time for ground crews to cut, move, and stage manually can often be shifted in minutes, allowing roads to be reopened faster and restoration resources to be deployed to additional outage locations. The Company authorized the use of these services through its storm restoration contractor as part of the overall restoration effort. Because the work was performed to facilitate blocked-road clearing and the safe restoration of electric service, the associated costs were appropriately incurred by the Company as storm remediation expense. b. The vendor was staged at the area work center (“AWC”) and would have appropriately had access to available food; however, meals at the AWC do not always cover all personnel present at the location. Tree crews may be actively working on event restoration activities when meals are provided at the AWC. The time requiredPage 88 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-411 Page 3 of 3 to break down the tree crew’s worksite and return to the AWC for a meal would not benefit customers or decrease restoration time when utilizing a meal per diem would be more efficient. c. The Eversource Connecticut Emergency Restoration Tree Contractor Work Location reports may have been missed during the scanning process. The reports cannot be located immediately but may be supplemented as they are located. The Company Arborist reviewed and approved the vendor timesheet as a result of their direct supervision and knowledge of the tree crews working each shift during the restoration process. The Company verifies storm-related work using additional records, including timesheets, dispatch information, and field oversight, and therefore does not rely solely on the Eversource Connecticut Emergency Restoration Tree Contractor Work Location reports for validation purposes.Page 89 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-412 Page 1 of 2 Date Filed: October 27, 2026 Witness: John P. Dipaola-Tromba, Sean D. Redding, Jenna M. Turner, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Response to EOE-232 and Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-16, pp. 135-151. Explain why the vendor was not required to submit details regarding their mobilization and demobilization. As part of the response, provide details on the vendor’s travel and corresponding billing. Additionally, explain how the Eversource reviewer was able to contemporaneously assess the appropriateness of the billed travel hours. Response: Referring to the Company’s response to EOE-232 i and Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 (CLP-1A-16)(MS24A), at pages 135-151, the vendor would have been required to submit supporting documentation regarding the mobilization and demobilization during the review process; however, the supporting documentation may have been missed during the scanning process as the invoices were submitted for payment. The vendor referred to in Confidential Exhibit ACCT-2 (CLP-1A-16)(MS24A), at pages 135-151, were non-local, Lucas Tree crews from South Carolina (pages 138, 146, 148, and 150) and North Carolina (140, 142, and 144). The North Carolina Lucas Tree crews mobilized from Washington, NC, to Guilford, CT, which is a 10.0-hour drive for a non-commercial vehicle under normal driving conditions. The South Carolina Lucas Tree crews mobilized from Gilbert, SC, to Guilford, CT, which is 12.5-hour drive for a non-commercial vehicle under normal driving conditions. Including muster time and stops for fuel, meal breaks, restroom breaks, and traffic, the billable hours for mobilization and demobilization were approved. Prior Referenced Response: i EOE-232 Question: (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-16, pp. 135151. The Company reported an incremental charge of $93,805 for the Lucas Tree Experts vendor. The charge was supported by multiple timesheets that reference activities starting on January 7, 2024 (several days prior to the storm event) and includes Eversource Connecticut Emergency Restoration Tree Contractor Work Location reports that identify remediation at consistent locations for the duration of the activity (see e.g., p. 139, remediation on 1/7, 1/8, 1/10, and 1/11 occurred at “New rd, Nt-Nt” or “New, 1-2”). Respond to the following:Page 90 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-412 Page 2 of 2 a. b. c. d. e. i Referring to pp. 139, 141, 143, 145, 147, 149, and 151, explain whether each of the referenced Eversource Connecticut Emergency Restoration Tree Contractor Work Location reports were fully completed in accordance with the Company’s expectations. As part of the response, explain why most of the activity was solely characterized as “Vine” and does not include additional details on the underlying Trees. Explain what “New rd, Nt-Nt” or “New, 1-2” represents as included within the various timesheets and Eversource Connecticut Emergency Restoration Tree Contractor Work Location reports (i.e., pp. 138-151). Identify the total monetary impact of all services represented as “New rd, Nt-Nt” or “New, 1-2”. Referring to pp. 138, 145, 148, and 150, explain the specific storm-related services performed on January 78th (i.e., days prior to the MS24A event) and explain why the vendor was permitted to perform services on a Sunday, at higher billable rates. Identify the total amount of per diems that the vendor was permitted to bill and explain why these expenses were warranted for storm remediation purposes. As part of the response, cite the contract provision that permits per diems for storm remediation purposes. EOE-232 Response: a. Lucas Tree’s electronic Eversource Connecticut Emergency Restoration Tree Contractor Work Location sheet is an electronic form developed and maintained by the contractor. The system contains required fields that must be completed before an entry can be submitted. As a result, when crews are performing stormrelated work that is not associated with a specific ticket or work location, they cannot leave those fields blank. In these cases, crews may enter “Vine” as a placeholder value to satisfy the system’s data-entry requirements. “Vine” does not represent a specific work location or activity; rather, it is an administrative entry used when crews are engaged in storm-related work but are not responding to a particular ticket. The Company verifies storm-related work using additional records, including timesheets, dispatch information, and field oversight, and therefore does not rely solely on the placeholder entry for validation purposes. b. New Rd is the location of the Madison Area Work Center (AWC). It signifies the tree crew was on shift and located at the work center. “Nt-Nt” is a default blank field for pole numbers. If there are no pole numbers recorded, the system prints “Nt-Nt”. c. The tree crew’s work hours are not broken down by event locations so this time cannot be separated out. d. The tree crews referred to in Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-16 on pages 135-151 were non-local tree crews from South Carolina (pages 138, 146, 148, and 150) and North Carolina (140, 142, and 144). The tree crews were mobilizing and travelling from South Carolina and North Carolina to Connecticut on January 7-8, 2024. e. Contractor tree crews receive meals or meal per diems during active storm response per contract agreements. Lucas Tree’s contract for non-local tree crews includes a per diem of $25 per meal per day (up to 3 meals per day). The $75 per diem charged is appropriate per the contract provisions.Page 91 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-413 Page 1 of 1 Date Filed: October 27, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE; WIRE GUARDS) Refer to Response to EOE-236 and Exhibit ACCT2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-16, pp. 214-225. Specific to subsection ‘d’, provide the requested “documentation to support the specific efforts performed by the Company to obtain local wire down guard crews in lieu of those throughout the northeast.” If documentation (i.e., emails) does not exist, explain why. Response: Eversource first contacts local wire guard resources, including contractors already working onsystem prior to the storm event. Eversource reaches out directly to these resources to determine availability and secure staffing for storm wire guard assignments. If local and on-system resources are exhausted or are unavailable to meet operational needs, the Company then secures additional wire guard resources based on established Tiered contractor rankings. Additional vendors are then engaged using the Company's tiered contractor selection approach, with rankings established through the competitive RFP process and overall vendor evaluation. Resources are secured based on the next best available qualified vendor in accordance with those established rankings. The Company does not maintain documentation that tracks efforts to obtain local wire guard crews versus crews located outside the service territory. Resource availability is typically confirmed through real-time storm response coordination, including direct phone calls.Page 92 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-414 Page 1 of 3 Date Filed: October 26, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Response to EOE-225, and Exhibit ACCT-2 CLP-1, and Confidential Exhibits CLP-1A 13, through CLP-1A-14. Referring to EOE-225, subsection ‘c’, the Company cited its response to EOE-130, for a broad explanation of situations that could impact travel time. Please provide the specific documentation (i.e., emails) available to the Eversource reviewer contemporaneously with their initial review to support billing of 12 hours for both mobilization and demobilization. If documentation (i.e., emails) does not exist, explain why. Response: This question conveys a lack of clarity on the components of mobilization and demobilization. The associated travel time (and the factors addressed in the Company’s response to EOE-130 i) are just some components of the mobilization and demobilization process. However, mobilization and demobilization also includes “muster time.” Muster time is a term that refers to a range of activities such as crew preparation, pre-trip safety briefings, DOT pre-trip and post-trip inspections and numerous other tasks that go with a lineworker’s craft of infrastructure work. Regarding the invoices referenced in Confidential Exhibits ACCT-2(CLP-1A 13)(MS24A), through ACCT-2 (CLP-1A-14)(MS24A), Lewis Tree Service’s external tree crew contract specifically includes language that allows for up to four hours of billing per crew member for muster time in addition to the travel time. Please refer to OCC-044, Attachment 2, at page 3226, for an example of the language included under “MANPOWER CHARGE SCHEDULE.” Considering muster time and stops for fuel, meal breaks, restroom breaks and traffic, the Company determined that the billable hours for mobilization and demobilization were reasonable and appropriate for approval. Prior Referenced Response: i EOE-130 Question: (VENDOR TRAVEL) Explain the Company’s travel review process for external vendors to include any assumptions for determining whether mobilization/demobilization travel time would be considered reasonable (i.e. in relation to Google/MapQuest estimates), how estimates would be increased by escalation factors, whether the review process differs for different vendors or types of vendors, and whether the Company has performed a study supporting that policy. Additionally, identify if the Company has changed its position outlined within its supplemental response to OCC-041, from Docket No. 25-12-13.Page 93 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-414 Page 2 of 3 EOE-130 Response: The Company applies the formula described below to determine whether line and vegetation crews can mobilize, travel and arrive on a timeline to assist productively in restoration. The Company uses a formula to calculate daily travel time capability of a line crew traveling at 60 mph for 10 hours (maximum drive time), or approximately 600 miles per day. Based on the expected duration of the restoration, the Company will procure crews factoring in this travel time when validating invoices. The Company looks at the location of mobilization, the 600 miles per day and any external factors that may come into play to determine what is a reasonable travel time when reviewing and approving invoices. Application of the above formula combined with the overall projected impact of the weather event (i.e. duration of restoration, number of potentially impacted states, availability of local or regional resources) enables the Company to determine, on an event by event basis, what travel time is reasonable. Due to size, refueling and possible weather/traffic delays, actual daily mileage of a bucket truck may differ from 600 miles per day. Google Maps is a useful reference point for determining travel time. However, the accuracy and reliability of Google Maps data is subject to qualification in its terms of use, and therefore it should not be relied upon as the exclusive measure of reasonable travel time. In Docket No. 25-12-13, the Company responded to OCC-041 and associated attachments provided here for reference as EOE130, Attachment 1. Page 2, of OCC-041-SP01, Attachment 1 (which is page 4 of 24 of EOE-130 Attachment 1), is the Google Maps End User Additional Terms of Service (“Google Maps T&Cs”), and states that: “When you use Google Maps map data, traffic, directions, and other content, you may find that actual conditions differ from the map results and content, so exercise your independent judgment and use Google Maps at your own risk.” The Google Maps T&Cs further provide that end users of Google Maps must accept the Google Terms of Service, which is attached hereto as OCC-041-SP01, Attachment 2 (which is page 5 of 24, of EOE-130, Attachment 1). Page 13, of OCC-041-SP01, Attachment 2 (which is page 17 of 24, of EOE-130, Attachment 1), presents the following warranty disclaimer: TO THE EXTENT ALLOWED BY APPLICABLE LAW, WE PROVIDE OUR SERVICES “AS IS” WITHOUT ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING THE IMPLIED WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, AND NON-INFRINGEMENT. FOR EXAMPLE, WE DON’T MAKE ANY WARRANTIES ABOUT THE CONTENT OR FEATURES OF THE SERVICES, INCLUDING THEIR ACCURACY, RELIABILITY, AVAILABILITY, OR ABILITY TO MEET YOUR NEEDS. DON’T RELY ON THE SERVICES FOR MEDICAL, LEGAL, FINANCIAL, OR OTHER PROFESSIONAL ADVICE. ANY CONTENT REGARDING THOSE TOPICS IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY AND IS NOT A SUBSTITUTE FOR ADVICE FROM A QUALIFIED PROFESSIONAL. As the Company has explained in its response to several discovery responses in Docket Nos. 24- 03-30, and 25-1213, all provided here for ease of reference as EOE-130, Attachment 2 (see, e.g., OCC-031; EOE-501; EOE-517; EOE536; and EOE-0590), Google Maps and its underlying algorithms do not incorporate vehicle sizes and dimensions, the safe operating speed of contractor vehicles traveling in a convoy, fuel capacity/efficiency, activities that do not include actual driving, such as refueling, safety rest breaks, and meal breaks, and/or different commercial vehicle types (e.g., pick-up trucks, various sized bucket trucks, including diesel models, lifters, pole trailers, diggers/derricks, etc.) in travel time calculations. Each of these factors can affect the actual time it takes for a contractor to arrive at the contractor’s designated location in the Company’s service territory and, therefore, are appropriate for consideration in the cost validation process. Accordingly, the Company uses the estimated time calculated by Google Maps for car travel as a data point and multiplies that figure by a factor of 1.3 hours to compute a reasonable benchmark for actual travel time. The Company applies the 1.3 hours factor to account for, among other things, the slower speed of fully loaded line trucks that travel as a convoy and make more frequent stops than a conventional sedan vehicle. The Company further evaluates the reasonableness of travel time based on its experience and professional judgment on an
As listed on the current system
Corres. 11/16/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (PURA Set 13, EOE Set 8)