Discovery Compilation (PURA Set 13, EOE Set 8)
Files3
Docket No. 26-05-10 Discovery Compilation November 16 2026.pdf
PDF · 133 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation November 16 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation November 16 2026.pdf
EOE Set 8_COMBINED.pdf
PDF · 1012 KB · 105 pagesText searchable
Download EOE Set 8_COMBINED.pdfRead the text of EOE Set 8_COMBINED.pdf
PURA Set 13_COMBINED.pdf
PDF · 1.5 MB · 144 pagesText searchable
Download PURA Set 13_COMBINED.pdfRead the text of PURA Set 13_COMBINED.pdf
Page 90 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-412 Page 2 of 2 a. b. c. d. e. i Referring to pp. 139, 141, 143, 145, 147, 149, and 151, explain whether each of the referenced Eversource Connecticut Emergency Restoration Tree Contractor Work Location reports were fully completed in accordance with the Company’s expectations. As part of the response, explain why most of the activity was solely characterized as “Vine” and does not include additional details on the underlying Trees. Explain what “New rd, Nt-Nt” or “New, 1-2” represents as included within the various timesheets and Eversource Connecticut Emergency Restoration Tree Contractor Work Location reports (i.e., pp. 138-151). Identify the total monetary impact of all services represented as “New rd, Nt-Nt” or “New, 1-2”. Referring to pp. 138, 145, 148, and 150, explain the specific storm-related services performed on January 78th (i.e., days prior to the MS24A event) and explain why the vendor was permitted to perform services on a Sunday, at higher billable rates. Identify the total amount of per diems that the vendor was permitted to bill and explain why these expenses were warranted for storm remediation purposes. As part of the response, cite the contract provision that permits per diems for storm remediation purposes. EOE-232 Response: a. Lucas Tree’s electronic Eversource Connecticut Emergency Restoration Tree Contractor Work Location sheet is an electronic form developed and maintained by the contractor. The system contains required fields that must be completed before an entry can be submitted. As a result, when crews are performing stormrelated work that is not associated with a specific ticket or work location, they cannot leave those fields blank. In these cases, crews may enter “Vine” as a placeholder value to satisfy the system’s data-entry requirements. “Vine” does not represent a specific work location or activity; rather, it is an administrative entry used when crews are engaged in storm-related work but are not responding to a particular ticket. The Company verifies storm-related work using additional records, including timesheets, dispatch information, and field oversight, and therefore does not rely solely on the placeholder entry for validation purposes. b. New Rd is the location of the Madison Area Work Center (AWC). It signifies the tree crew was on shift and located at the work center. “Nt-Nt” is a default blank field for pole numbers. If there are no pole numbers recorded, the system prints “Nt-Nt”. c. The tree crew’s work hours are not broken down by event locations so this time cannot be separated out. d. The tree crews referred to in Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-16 on pages 135-151 were non-local tree crews from South Carolina (pages 138, 146, 148, and 150) and North Carolina (140, 142, and 144). The tree crews were mobilizing and travelling from South Carolina and North Carolina to Connecticut on January 7-8, 2024. e. Contractor tree crews receive meals or meal per diems during active storm response per contract agreements. Lucas Tree’s contract for non-local tree crews includes a per diem of $25 per meal per day (up to 3 meals per day). The $75 per diem charged is appropriate per the contract provisions.Page 91 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-413 Page 1 of 1 Date Filed: October 27, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE; WIRE GUARDS) Refer to Response to EOE-236 and Exhibit ACCT2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-16, pp. 214-225. Specific to subsection ‘d’, provide the requested “documentation to support the specific efforts performed by the Company to obtain local wire down guard crews in lieu of those throughout the northeast.” If documentation (i.e., emails) does not exist, explain why. Response: Eversource first contacts local wire guard resources, including contractors already working onsystem prior to the storm event. Eversource reaches out directly to these resources to determine availability and secure staffing for storm wire guard assignments. If local and on-system resources are exhausted or are unavailable to meet operational needs, the Company then secures additional wire guard resources based on established Tiered contractor rankings. Additional vendors are then engaged using the Company's tiered contractor selection approach, with rankings established through the competitive RFP process and overall vendor evaluation. Resources are secured based on the next best available qualified vendor in accordance with those established rankings. The Company does not maintain documentation that tracks efforts to obtain local wire guard crews versus crews located outside the service territory. Resource availability is typically confirmed through real-time storm response coordination, including direct phone calls.Page 92 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-414 Page 1 of 3 Date Filed: October 26, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Response to EOE-225, and Exhibit ACCT-2 CLP-1, and Confidential Exhibits CLP-1A 13, through CLP-1A-14. Referring to EOE-225, subsection ‘c’, the Company cited its response to EOE-130, for a broad explanation of situations that could impact travel time. Please provide the specific documentation (i.e., emails) available to the Eversource reviewer contemporaneously with their initial review to support billing of 12 hours for both mobilization and demobilization. If documentation (i.e., emails) does not exist, explain why. Response: This question conveys a lack of clarity on the components of mobilization and demobilization. The associated travel time (and the factors addressed in the Company’s response to EOE-130 i) are just some components of the mobilization and demobilization process. However, mobilization and demobilization also includes “muster time.” Muster time is a term that refers to a range of activities such as crew preparation, pre-trip safety briefings, DOT pre-trip and post-trip inspections and numerous other tasks that go with a lineworker’s craft of infrastructure work. Regarding the invoices referenced in Confidential Exhibits ACCT-2(CLP-1A 13)(MS24A), through ACCT-2 (CLP-1A-14)(MS24A), Lewis Tree Service’s external tree crew contract specifically includes language that allows for up to four hours of billing per crew member for muster time in addition to the travel time. Please refer to OCC-044, Attachment 2, at page 3226, for an example of the language included under “MANPOWER CHARGE SCHEDULE.” Considering muster time and stops for fuel, meal breaks, restroom breaks and traffic, the Company determined that the billable hours for mobilization and demobilization were reasonable and appropriate for approval. Prior Referenced Response: i EOE-130 Question: (VENDOR TRAVEL) Explain the Company’s travel review process for external vendors to include any assumptions for determining whether mobilization/demobilization travel time would be considered reasonable (i.e. in relation to Google/MapQuest estimates), how estimates would be increased by escalation factors, whether the review process differs for different vendors or types of vendors, and whether the Company has performed a study supporting that policy. Additionally, identify if the Company has changed its position outlined within its supplemental response to OCC-041, from Docket No. 25-12-13.Page 93 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-414 Page 2 of 3 EOE-130 Response: The Company applies the formula described below to determine whether line and vegetation crews can mobilize, travel and arrive on a timeline to assist productively in restoration. The Company uses a formula to calculate daily travel time capability of a line crew traveling at 60 mph for 10 hours (maximum drive time), or approximately 600 miles per day. Based on the expected duration of the restoration, the Company will procure crews factoring in this travel time when validating invoices. The Company looks at the location of mobilization, the 600 miles per day and any external factors that may come into play to determine what is a reasonable travel time when reviewing and approving invoices. Application of the above formula combined with the overall projected impact of the weather event (i.e. duration of restoration, number of potentially impacted states, availability of local or regional resources) enables the Company to determine, on an event by event basis, what travel time is reasonable. Due to size, refueling and possible weather/traffic delays, actual daily mileage of a bucket truck may differ from 600 miles per day. Google Maps is a useful reference point for determining travel time. However, the accuracy and reliability of Google Maps data is subject to qualification in its terms of use, and therefore it should not be relied upon as the exclusive measure of reasonable travel time. In Docket No. 25-12-13, the Company responded to OCC-041 and associated attachments provided here for reference as EOE130, Attachment 1. Page 2, of OCC-041-SP01, Attachment 1 (which is page 4 of 24 of EOE-130 Attachment 1), is the Google Maps End User Additional Terms of Service (“Google Maps T&Cs”), and states that: “When you use Google Maps map data, traffic, directions, and other content, you may find that actual conditions differ from the map results and content, so exercise your independent judgment and use Google Maps at your own risk.” The Google Maps T&Cs further provide that end users of Google Maps must accept the Google Terms of Service, which is attached hereto as OCC-041-SP01, Attachment 2 (which is page 5 of 24, of EOE-130, Attachment 1). Page 13, of OCC-041-SP01, Attachment 2 (which is page 17 of 24, of EOE-130, Attachment 1), presents the following warranty disclaimer: TO THE EXTENT ALLOWED BY APPLICABLE LAW, WE PROVIDE OUR SERVICES “AS IS” WITHOUT ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING THE IMPLIED WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, AND NON-INFRINGEMENT. FOR EXAMPLE, WE DON’T MAKE ANY WARRANTIES ABOUT THE CONTENT OR FEATURES OF THE SERVICES, INCLUDING THEIR ACCURACY, RELIABILITY, AVAILABILITY, OR ABILITY TO MEET YOUR NEEDS. DON’T RELY ON THE SERVICES FOR MEDICAL, LEGAL, FINANCIAL, OR OTHER PROFESSIONAL ADVICE. ANY CONTENT REGARDING THOSE TOPICS IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY AND IS NOT A SUBSTITUTE FOR ADVICE FROM A QUALIFIED PROFESSIONAL. As the Company has explained in its response to several discovery responses in Docket Nos. 24- 03-30, and 25-1213, all provided here for ease of reference as EOE-130, Attachment 2 (see, e.g., OCC-031; EOE-501; EOE-517; EOE536; and EOE-0590), Google Maps and its underlying algorithms do not incorporate vehicle sizes and dimensions, the safe operating speed of contractor vehicles traveling in a convoy, fuel capacity/efficiency, activities that do not include actual driving, such as refueling, safety rest breaks, and meal breaks, and/or different commercial vehicle types (e.g., pick-up trucks, various sized bucket trucks, including diesel models, lifters, pole trailers, diggers/derricks, etc.) in travel time calculations. Each of these factors can affect the actual time it takes for a contractor to arrive at the contractor’s designated location in the Company’s service territory and, therefore, are appropriate for consideration in the cost validation process. Accordingly, the Company uses the estimated time calculated by Google Maps for car travel as a data point and multiplies that figure by a factor of 1.3 hours to compute a reasonable benchmark for actual travel time. The Company applies the 1.3 hours factor to account for, among other things, the slower speed of fully loaded line trucks that travel as a convoy and make more frequent stops than a conventional sedan vehicle. The Company further evaluates the reasonableness of travel time based on its experience and professional judgment on anPage 94 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-414 Page 3 of 3 event-by-event basis. These additional layers of analysis are necessary because Google Maps does not account for factors and variables that are known to impact travel time. Thus, Google Maps cannot, and should not, be relied upon as the sole measure of travel time.Page 95 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-415 Page 1 of 3 Date Filed: October 26, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-TREE) Refer to Responses to EOE-227, and EOE-228, Exhibit ACCT-2 CLP-1, and Confidential Exhibit ACCT-2 CLP-1A-15, pp. 53-54 and 58-59. The Company confirmed that the post storm remediation was not documented through OMS and that “[t]he Eversource Arborist would not have approved the timesheet if they did not direct the crew to use….” Respond to the following: a. Referring to EOE-227/EOE-228, subsection ‘c’, explain why all tree related damage is not input within the Company’s Outage Management System (OMS) for post-storm remediation. b. Referring to EOE-227, subsection ‘d’, provide documentation of the Eversource Arborist “direction” and explain why the Disk Chipper and Chip Truck were specifically necessary for MS24A storm remediation purposes. Additionally, provide the requested “incremental amount associated with this equipment.” c. Referring to EOE-228, subsection ‘d’, provide the requested “documentation to support the Company’s pre-authorization of the additional chainsaw charges and specifically identify the incremental amount associated with this equipment.” Response: a. The Company’s Vegetation Management personnel only utilize the Outage Management System (“OMS”) while activated in their respective storm-response roles and do not operate within OMS while conducting and organizing post-storm patrols or while overseeing post-storm remediation tree work. In 2024, the Company Arborists would have conducted and organized post-storm patrols with physical maps. Vegetation Management has since transitioned to an Environmental Systems Research institute (“ESRI”) Geographic Information System (“GIS”)-based post-storm patrol process in 2026. b. The signature on the invoice is the documentation that the Company Arborist directed the vendor to utilize the chip truck and disk chipper. The Company Arborists are working in highly dynamic situations involving the physical identification and remediation of storm damage in order to avoid customer outages caused by continuing vegetation impacts. The “tree-by-tree” work of the Company Arborists help to contain isolated outages by eliminating damaged vegetation on a proactive, intensive basis. By necessity, the Company Arborists are delegated to push post-storm vegetation work out to contractorsPage 96 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-415 Page 2 of 3 via written lists, emails, texts or phone calls and work to address issues in an efficient manner. Reviewing the associated work locations, the Company Arborist may have approved the use of the chipper and chip truck on January 8-9, 2024, and January 11-12, 2024, due to the roadside topography of the properties, limited drop zone areas available, and roadside snow load at the time of mitigation. This would have required storm debris to be placed in the roadway, resulting in a public safety hazard, or introduced risk to the tree crew’s safety. The total incremental amount associated with the disk chipper and chip truck is $1,010.52. Please note that these charges are itemized directly on the invoice. Please refer to Exhibit ACCT-2 (CLP-1A-15)(MS24A), at page 53. c. Please refer to the response to EOE-231 i, (emphasis added): It is an established practice for contractor tree crews to bill for larger chainsaws during storm restoration activities. The use of larger-bar chainsaws when removing large-diameter trees improves operational efficiency and enhances worker safety by allowing the work to be performed quicker and with less risk to the operator. The chainsaws billed on the referenced invoices are larger than the standard chainsaws provided on each bucket truck, consistent with the applicable contract provisions. Because tree crews cannot determine the size and removal requirements of a tree until they arrive at the work location, requiring a separate trip to obtain a larger chainsaw could delay restoration efforts and result in additional travel costs. Pre-authorization for utilizing a larger chainsaw during storm-response activities is not required as it is an established practice. Requiring pre-authorization would hinder storm restoration activities as the tree crew would not know that a larger chainsaw was needed until they arrived at the outage location and evaluated the situation. If a larger chainsaw was required, the tree crew would need to leave the outage event, drive to a centralized location where chainsaws would be stored, select and inspect the chainsaw, and drive back to the outage event before the tree crew was able to start their job briefing and perform the associated tree work. Pre-authorization to utilize larger chainsaws would not be operationally efficient or beneficial to our customers. The total incremental amount associated with the larger chainsaws is $80.91. Please note that these charges are itemized directly on the invoice. Please refer to Exhibit ACCT-2 (CLP-1A-15)(MS24A), at page 58. Prior Referenced Response:Page 97 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-415 Page 3 of 3 EOE-231 Question: i (MS24A-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-1, and Confidential Exhibits ACCT-2 CLP-1A-15 through CLP-1A-16, Rows 373-376, 393. The Company reported various incremental charges for the Lewis Tree Service Inc vendor. Each of the invoices included billing for extra chainsaws. Identify if the extra chainsaws were pre-authorized by the Eversource arborist and identify the total incremental amounts. If pre-authorization occurred, please provide documentation, along with explanations for why the extra equipment was necessary. EOE-231 Response: It is an established practice for contractor tree crews to bill for larger chainsaws during storm restoration activities. The use of larger-bar chainsaws when removing large-diameter trees improves operational efficiency and enhances worker safety by allowing the work to be performed quicker and with less risk to the operator. The chainsaws billed on the referenced invoices are larger than the standard chainsaws provided on each bucket truck, consistent with the applicable contract provisions. Because tree crews cannot determine the size and removal requirements of a tree until they arrive at the work location, requiring a separate trip to obtain a larger chainsaw could delay restoration efforts and result in additional travel costs. Accordingly, billing for a larger chainsaw is permitted for the entire shift when utilized, as that equipment resource is dedicated to the assigned crew and is therefore unavailable for use on other work during that period. The associated chainsaw charges were reviewed and approved by the Eversource Arborist through the timesheet approval process, confirming that use of the equipment was appropriate for the work performed.Page 98 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-416 Page 1 of 4 Date Filed: October 27, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE) Refer to Response to EOE-239, Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-17, pp. 100-151. Respond to the following: a. Provide a redacted version of the referenced documentation. b. Referring to subsection ‘a’ and pp. 118-121 and pp. 134-136, explain why the vendor was permitted to submit Eversource Contractor Storm Daily Time & Work Reports without completing any Event Start Times (box 24) and Event End Times (box 25). c. Referring to subsection ‘a’ and pp. 118-121 and pp. 134-136, explain how the “number of tickets and the various locations and the various locations that these crews had to travel to and from” would support the hours billed. As part of the response, please provide copies of OMS tickets or other documentation and demonstrate how this information verifies the accuracy of the hours billed for each vendor employee. d. Referring to subsection ‘b’, and p. 150-151, clarify the Company’s response where the Company referenced “4 hours of travel” for the referenced example but the documentation depicts 6.5 hours. Does the increased number of hours billed for mobilization change the Company’s position? Response: a. Please refer to the Redacted Bulk Material filed on September 1, 2026 as Supplement for New Applications to locate the redacted Exhibit CLP-STORM-ACCT-2(CLP-1A17)(MS24A). b. Boxes 24 and 25 should have been filled out. However, the reviewer was able to independently verify the reported start time of 6:00 a.m. from the documentation submitted and confirm the reported end time of 12:30 p.m. through Eversource’s original response to EOE-239 i, subpart (a). Because the Timesheets contained sufficient information and evidence to validate the hours worked, the reviewer determined that the omission of Boxes 24 and 25 did not deprive the Company of information necessary to substantiate the claimed work time and the Company therefore approved the invoice. c. Please refer to EOE-416, Attachment 1 for the events that were covered by Midcon during the MS24A event. These crews covered events inside the Norwalk Area Work CenterPage 99 of 105
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-08 Date Issued October 13, 2026 EOE-416 Page 2 of 4 ranging well within the times that their timesheet specified. The crews did not complete their final work assignment until 1:09pm on 1/10/2024. After cleaning up the work site, this lines up with their time sheet end time. d. Please refer to EOE-239-RV01 ii. There was an error in the Company’s response and 4 hours should have been typed as 6.5 hours. Prior Referenced Responses: i EOE-239 Question: (MS24A-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-17, pp. 100151. The Company reported an incremental charge of $1,285,629 for the Midcon Energy Services Inc vendor. The charge applies to travel (i.e., mobilization and demobilization), standby, and work. Respond to the following: a. b. c. d. Referring to pp. 118-121 and pp. 134-136, explain why the vendor was permitted to submit Eversource Contractor Storm Daily Time & Work Reports without completing any Event Start Times (box 24) and Event End Times (box 25). As part of the response, explain how the Company was able to verify the accuracy of the reported travel time (box 10), standby time (box 11), and work time (box 12). Referring to p. 150-151 (as a 1st example), explain why the vendor was permitted to bill for 6.5 hours of mobilization from Beacon Falls CT to Windsor CT and four hours for demobilization when that commute would typically take less than 1 hour, or less than 1.5 hours after applying a 1.3 factor increase. As part of the response, provide any communication between the Company and the vendor that occurred prior to the approval of the invoice substantiating the travel hours billed. Referring to p. 137-138 (as a 2nd example), explain why the vendor was permitted to bill for four hours of demobilization from Norwalk CT to Windsor CT when that commute would typically take less than 1.5 hours, or less than 2 hours after applying a 1.3 factor increase. As part of the response, provide any communication between the Company and the vendor that occurred prior to the approval of the invoice substantiating the travel hours billed. Referring to pp. 101-105, provide the information within an unlocked Excel spreadsheet and supplement each of the travel hours billed to the Company (i.e., mobilization on 1/9/24, travel on 1/10/24, and demobilization, on 1/10/24) with details for the starting and ending locations, the number of miles between the two locations, and provide any communication between the Company and the vendor that occurred prior to the approval of the invoice substantiating the travel hours billed. EOE-239 Response: a. The Company confirmed that this crew arrived onsite for their first shift on 01/10/2024 at 6:00am. These crews traveled from Windsor, CT to their first location, which was to Norwalk, CT confirming that the stated travel time of 2 hours was well within the approved travel time. There was no standby time submitted on these timesheets. Based on the number of tickets and the various locations that these crews had to travel to and from, the 6.5 hours of working time would be appropriate and was therefore approved. b. The Mobilization timesheets from Beacon Fall, CT to Windsor, CT were submitted at 4 hours of travel. This travel did occur during rush hour traffic and it was communicated via the Mobilization timesheet that they
As listed on the current system
Corres. 11/16/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (PURA Set 13, EOE Set 8)