Discovery Compilation (PURA Set 13, EOE Set 8)
Files3
Docket No. 26-05-10 Discovery Compilation November 16 2026.pdf
PDF · 133 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation November 16 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation November 16 2026.pdf
EOE Set 8_COMBINED.pdf
PDF · 1012 KB · 105 pagesText searchable
Download EOE Set 8_COMBINED.pdfRead the text of EOE Set 8_COMBINED.pdf
PURA Set 13_COMBINED.pdf
PDF · 1.5 MB · 144 pagesText searchable
Download PURA Set 13_COMBINED.pdfRead the text of PURA Set 13_COMBINED.pdf
Page 123 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-137 Page 3 of 6 Please note that this approach is also consistent with prior PURA ratemaking practice on this matter. See, e.g., the Decision dated June 29, 2011, in Docket No. 10-12-02, Application of Yankee Gas Services Company for Amended Rate Schedules, at 104, citing decisions in Docket No. 06-12-02PH01, Application of Yankee Gas Services Company for a Rate Increase – Revenue Requirement and Docket No. 04-06-01, Application of Yankee Gas Services Company for a Rate Case. In addition, in Yankee Gas’ most recent rate case in Docket No. 24-12-01 PURA authorized a capital structure appropriately consisting only of equity and long-term debt. Please refer to RRU-137, Attachment 1, for the quarterly short-term debt balance for the years 2023 through the present. Please refer to the response to RRU-136 i for a discussion of CL&P’s short-term borrowing. CL&P borrows short-term from its parent, Eversource Energy, via a $600 million intercompany revolving credit facility agreement CL&P Inter-Company Credit Facility. The maturity date of the short-term borrowing under the CL&P Inter-Company Credit Facility is the earlier of: (1) on demand by Eversource but not to exceed 364 days; or (2) the maturity date of the Revolving Credit Facility. b. No. The running outstanding balance does not need to be paid down to $0 by December 31 every year. The Company’s sources and uses of cash change daily, and short-term borrowings increase and decrease as differences in the timing of cash receipts and cash requirements arise and are resolved. December 31 is simply one point in that continuing cash cycle and has no particular relationship to the Company’s funding requirements or the maturity of its short-term borrowings. As short-term debt balances increase, the Company periodically pays down those balances with permanent sources of capital, consisting of long-term debt and equity. These periodic payments of outstanding short-term debt balances are critical to preserve short-term borrowing capacity and the liquidity necessary to operate the businesses and respond to changing cash requirements. Figure 1, below, provides additional context by comparing the Company’s short-term debt balance with significant uses of cash, including Construction Work in Progress (“CWIP”), under- or over-recoveries associated with distribution cost-reconciling mechanisms, and deferred storm costs.Page 124 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-137 Page 4 of 6 Figure 1 As shown in Figure 1, from 2017 through 2025, the combined average monthly balance of these items substantially exceeded the Company’s average short-term debt balance in the past five years. CWIP alone averaged approximately $468 million per month over the period, compared with average short-term debt of approximately $123 million per month. That comparison is significant. Even CWIP alone substantially exceeded the Company’s short-term debt balance over the period. Short-term debt therefore cannot remain outstanding indefinitely to fund longer-term cash requirements. As balances increase, the Company must periodically replace short-term debt with long-term debt and equity, both to finance those longer-term requirements and to restore short-term borrowing capacity for temporary cash needs as they arise. Moreover, Figure 1 does not even include the Company’s distribution rate base presented in this proceeding. Accordingly, the average balance of short-term debt is not sufficient to fund CWIP alone, much less CWIP and annual distribution tracker under-recoveries and deferred storm costs and the Company’s in-service distribution assets. Any conclusion that short-term debt provides sustained financing for those assets is therefore simply incorrect. It is contrary to basic principles of finance and the manner in which the Company actually finances its business. Preserving short-term borrowing capacity is critical because the Company must be positioned to respond to significant cash requirements in the course of operating its distribution system. Storm restoration costs, changes in energy costs, construction expenditures and the timing of payments for taxes, interest and other operating costs can create substantial funding requirements that rarely coincide with cash received fromPage 125 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-137 Page 5 of 6 customers. Some of these requirements are relatively predictable, while others, particularly significant weather events, are not. The timing and magnitude of those requirements can also change quickly. Operating at or near the short-term debt limit on a sustained basis would reduce the Company’s ability to respond to emerging circumstances. This is precisely why the Company does not, and cannot, operate in this manner. The short-term nature of the debt is determined by the terms of the underlying borrowings, not whether the outstanding balance happens to reach zero on December 31. As described above, borrowings under the CL&P Inter-Company Credit Facility mature on the earlier of demand by Eversource, subject to a period not exceeding 364 days, or the maturity date of the Revolving Credit Facility. Accordingly, an outstanding balance may remain under the facility at year-end while the underlying borrowings remain short-term obligations. Prior Referenced Response: i RRU-136 Question: (SHORT-TERM DEBT) Application, Ex. CL&P REVREQ-2, Schs. D-1.0–D-5.0. Explain the Company’s process of obtaining and using short-term debt. Specifically, discuss the following: a. b. Whether, and how, this process has changed since the Company’s last rate case. Indicate whether there is a formal corporate facility set up to accommodate the Company's need for short-term debt. Which entity controls the facility, if any? RRU-136 Response: Eversource Energy parent uses its available capital resources to provide loans to its direct and indirect subsidiaries through inter-company revolving credit agreements to assist in meeting their short-term borrowing needs. Eversource Energy parent has a $2 billion Commercial Paper Program allowing it to issue commercial paper as a form of shortterm debt. This $2 billion resource is used to cover the cash requirements of all six of the operating affiliates, including CL&P, as well as Eversource Energy, the Eversource Energy Service Company and all other non-regulated affiliates within the holding company structure. CL&P borrows short-term from its parent, Eversource Energy, via a $600 million inter-company revolving credit facility agreement (“CL&P Inter-Company Credit Facility”). The borrowing rates CL&P pays on the CL&P InterCompany Credit Facility track the rates Eversource Energy parent pays on its Commercial Paper Program. This CL&P Inter-Company Credit Facility is the primary source of short-term borrowings for CL&P. In addition to the CL&P Inter-Company Credit Facility, CL&P, along with Eversource Energy parent, Public Service Company of New Hampshire, NSTAR Gas Company, Yankee Gas Services Company and Eversource Gas Company of Massachusetts, are parties to a five-year $2 billion revolving credit facility, which terminates on October 11, 2031 (“Revolving Credit Facility”). CL&P’s borrowings on the Revolving Credit Facility are limited to a maximum amount of $600 million. This Revolving Credit Facility serves to backstop Eversource parent's $2 billion Commercial Paper Program. The revolving credit facility is administered by Bank of America, N.A. and is comprised of 16 banks which have different levels of loan commitments. There are no borrowings under the Revolving Credit Facility.Page 126 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-137 Page 6 of 6 The Eversource Energy Service Company Treasury Department manages the funding needs of all Eversource subsidiaries, including CL&P. CL&P’s process for obtaining short-term debt has not changed since the last rate case.Page 127 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-138 Page 1 of 2 Date Filed: November 03, 2026 Witness: Matthew P. Fallon Request from: Public Utilities Regulatory Authority Question: (LONG TERM DEBT) Provide a narrative describing the Company's efforts to refinance its existing long-term debt. Response: CL&P’s outstanding long-term debt is redeemable prior to each series’ respective Par Call Date, via make-whole provisions. A make-whole provision permits the long-term debt to be redeemed at any time prior to the Par Call Date, in whole or in part, at the option of CL&P, provided CL&P pays to the investors at the time of redemption a price calculated using the applicable treasury rate plus a spread of 50 basis points. The premium paid at the time of the redemption would fully compensate the investors for the forgone interest income. On or after each series Par Call Date (1, 3 or 6 months prior to the maturity date based on the tenor of the bonds), CL&P may redeem the respective series of bonds in whole or in part, at the option of CL&P, at a redemption price of 100% of the principal amount of the bonds being redeemed. In advance of each series Par Call Date, the Company evaluates if it would be economic to redeem the bonds. For example, most recently, CL&P’s $400 million, 0.75% 2020 Series A, first mortgage bonds matured on December 1, 2025. The Par Call Date of the 2020 Series A Bonds was November 1, 2025, allowing the bonds to be redeemed at a redemption price of 100% of the principal on or after November 1, 2025. However, as prevailing long-term debt rates were higher than the 2020 Series A bonds 0.75% coupon rate, the bonds were not redeemed early, given that doing so would not have been economic. Please refer to Table 1, below, for the details of CL&P’s outstanding long-term debt, including each series Par Call Date.Page 128 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-138 Page 2 of 2 Table 1 AMOUNT ISSUED The Connecticut Light And Power Company First Mortgage Bonds 2004 Series B $130,000,000 2005 Series B $100,000,000 2006 Series A $250,000,000 2007 Series B $150,000,000 2007 Series D $100,000,000 2014 Series A $475,000,000 2015 Series A $350,000,000 2017 Series A $500,000,000 2018 Series A $800,000,000 2021 Series A $425,000,000 2023 Series A $500,000,000 2023 Series B $300,000,000 2024 Series A $350,000,000 2024 Series B $300,000,000 2025 Series A $400,000,000 COUPON RATE(%) DATE ISSUED DATE DUE PAR CALL DATE 5.750 5.625 6.350 5.750 6.375 4.300 4.150 3.200 4.000 2.050 5.250 4.900 4.650 4.950 4.950 9/15/2004 4/7/2005 6/7/2006 3/27/2007 9/17/2007 4/24/2014 5/20/2015 3/10/2017 3/28/2018 6/30/2021 1/10/2023 7/6/2023 1/23/2024 8/13/2024 1/13/2025 9/15/2034 4/1/2035 6/1/2036 3/1/2037 9/1/2037 4/15/2044 6/1/2045 3/15/2027 4/1/2048 7/1/2031 1/15/2053 7/1/2033 1/1/2029 8/15/2034 1/15/2030 9/15/2034 4/1/2035 6/1/2036 3/1/2037 9/1/2037 10/15/2043 12/1/2044 12/15/2026 10/1/2047 4/1/2031 7/15/2052 4/1/2033 12/1/2028 5/15/2034 12/15/2029Page 129 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-139 Page 1 of 2 Date Filed: November 03, 2026 Witness: Ann Bulkley Request from: Public Utilities Regulatory Authority Question: (FINANCIAL DATA) Summarize the changes to economic and financial indicators that have taken place, since January 1, 2019, using the table below as a guide. Please provide all source documents for the information provided. Financial/Economic Indicator Gross Domestic Product (GDP-PI) Consumer Price Index (CPI) Unemployment Rate (National) Unemployment Rate (Connecticut) US Treasury Bills (90 day) US Treasury Bills (180 day) US Treasury Bonds (10 year) US Treasury Bonds (20 year) US Treasury Bonds (30 year) Market-to-book ratios for the Company Market-to-book ratios for the Parent Company with public common equity Market -to-book ratios for the Electric utility Industry Dividend Yield-ES Source Percentage change 1/01/2019 to 01/01/2019 6/30/2026 6/30/026Page 130 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-139 Page 2 of 2 Dividend Yield-Electric Industry Average 5-year projected EPS Growth Rate-Electric Industry Average 5-year retention EPS Growth Rate-Electric Industry Average Federal Corporate Tax Rate Beta- Electric Industry Average Capital StructureCL&P Capital Structure-Electric Industry Average Value Line Financial Strength-Electric Bond Rating-Electric Industry Average Cost of Debt-CL&P Cost of Debt-Electric Industry Average Response: Please refer to RRU-139, Attachment 1, for the requested information.Page 131 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RSR-058 Page 1 of 1 Date Filed: October 30, 2026 Witness: Leanne M. Landry and Jeffrey D. Turano Request from: Public Utilities Regulatory Authority Question: (PLANT ADDITIONS) Application, Ex. CLP-ADDITIONS-4, Ex.CLP-ADDITIONS-4 Supplemental, Ex. CLP-Additions-1, p. 56. Identify and provide in an unlocked spreadsheet a list of all projects associated with plant additions related to distributed generation (DG) and energy efficiency (EE) investments. Provide the information for each project showing the following: a. b. c. d. All new additions, on a monthly basis; Whether the project is related to DG or EE; Which portion of the project is reimbursable; and Reference to the project’s location in Exhibit CLP-ADDITIONS-4. Response: Please refer to RSR-058, Attachment 1, which identifies each project associated with distributed generation (DG), including the corresponding line references in Exhibit CLP-ADDITIONS-4, and the Exhibit CLP-ADDITIONS-4 Supplemental filings. Energy efficiency projects are 100% expense and will not be included in Exhibit CLP-ADDITIONS-4. The attachment also identifies the reimbursable portion of each project, as reflected in the applicable Project Authorization Forms (PAFs). The Company notes that information regarding new plant additions on a monthly basis for 2026 is provided as part of the Company’s supplemental filings.Page 132 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RSR-059 Page 1 of 4 Date Filed: November 06, 2026 Witness: David L. Gladey, John P. Dipaola-Tromba, Steven Lamontagne, Leanne M. Landry, Elli Ntakou and Jeffrey D. Turano Request from: Public Utilities Regulatory Authority Question: (PLANT ADDITIONS) Application, Ex. CLP-ADDITIONS-1, p. 63. Provide the following regarded the “Direct Buried Replacement” projects: a. Documentation supporting the statement: “on an industry-wide basis that much of the original XLP and HMP-insulated primary cable installed in the DB system had not achieved its engineered life expectancy.” b. An exhibit showing the engineered life expectancy by type (e.g., XLP, HMP-insulated) and vintage of direct-buried (DB) assets on the Company’s system; c. An exhibit showing the actual service life of all the Company’s DB plant at the time of replacement for the years 2017 through 2026 (to-date). d. An unlocked spreadsheet showing the number and duration of premature DB cable failures by year and their contribution to blue-sky SAIDI and SAIFI performance. Response: a. The statement that much of the original XLPE and HMP-insulated primary cable installed in the distribution system had not yet achieved its engineered life expectancy is supported by industry research, utility operating experience, and cable-aging studies conducted by EPRI, NEETRAC, cable manufacturers, and other industry researchers. Studies of distribution cable performance have generally identified expected service lives in the range of 30 to 40 years for early-generation XLPE and HMP cable designs under normal operating conditions, while recognizing that actual service life is highly dependent on installation type, operating environment, loading, exposure to moisture, and cable construction. Industry experience has demonstrated that cable age alone is not a reliable indicator of end of life. Premature failures in some early cable installations were often associated with factors such as water-treeing, contamination, manufacturing deficiencies, shield defects, or moisture ingress rather than the intrinsic exhaustion of the insulation system. Soil type and installation, i.e. direct buried versus cable in conduit, are significant to the overall life expectancy of a underground cable. As a result, many XLPE and HMP cable circuits have remained electrically serviceable beyond their original design expectations.
As listed on the current system
Corres. 11/16/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (PURA Set 13, EOE Set 8)