  1. Page 125 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-137 Page 5 of 6 customers. Some of these requirements are relatively predictable, while others, particularly significant weather events, are not. The timing and magnitude of those requirements can also change quickly. Operating at or near the short-term debt limit on a sustained basis would reduce the Company’s ability to respond to emerging circumstances. This is precisely why the Company does not, and cannot, operate in this manner. The short-term nature of the debt is determined by the terms of the underlying borrowings, not whether the outstanding balance happens to reach zero on December 31. As described above, borrowings under the CL&P Inter-Company Credit Facility mature on the earlier of demand by Eversource, subject to a period not exceeding 364 days, or the maturity date of the Revolving Credit Facility. Accordingly, an outstanding balance may remain under the facility at year-end while the underlying borrowings remain short-term obligations. Prior Referenced Response: i RRU-136 Question: (SHORT-TERM DEBT) Application, Ex. CL&P REVREQ-2, Schs. D-1.0–D-5.0. Explain the Company’s process of obtaining and using short-term debt. Specifically, discuss the following: a. b. Whether, and how, this process has changed since the Company’s last rate case. Indicate whether there is a formal corporate facility set up to accommodate the Company's need for short-term debt. Which entity controls the facility, if any? RRU-136 Response: Eversource Energy parent uses its available capital resources to provide loans to its direct and indirect subsidiaries through inter-company revolving credit agreements to assist in meeting their short-term borrowing needs. Eversource Energy parent has a $2 billion Commercial Paper Program allowing it to issue commercial paper as a form of shortterm debt. This $2 billion resource is used to cover the cash requirements of all six of the operating affiliates, including CL&P, as well as Eversource Energy, the Eversource Energy Service Company and all other non-regulated affiliates within the holding company structure. CL&P borrows short-term from its parent, Eversource Energy, via a $600 million inter-company revolving credit facility agreement (“CL&P Inter-Company Credit Facility”). The borrowing rates CL&P pays on the CL&P InterCompany Credit Facility track the rates Eversource Energy parent pays on its Commercial Paper Program. This CL&P Inter-Company Credit Facility is the primary source of short-term borrowings for CL&P. In addition to the CL&P Inter-Company Credit Facility, CL&P, along with Eversource Energy parent, Public Service Company of New Hampshire, NSTAR Gas Company, Yankee Gas Services Company and Eversource Gas Company of Massachusetts, are parties to a five-year $2 billion revolving credit facility, which terminates on October 11, 2031 (“Revolving Credit Facility”). CL&P’s borrowings on the Revolving Credit Facility are limited to a maximum amount of $600 million. This Revolving Credit Facility serves to backstop Eversource parent's $2 billion Commercial Paper Program. The revolving credit facility is administered by Bank of America, N.A. and is comprised of 16 banks which have different levels of loan commitments. There are no borrowings under the Revolving Credit Facility.
  2. Page 126 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-137 Page 6 of 6 The Eversource Energy Service Company Treasury Department manages the funding needs of all Eversource subsidiaries, including CL&P. CL&P’s process for obtaining short-term debt has not changed since the last rate case.
  3. Page 127 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-138 Page 1 of 2 Date Filed: November 03, 2026 Witness: Matthew P. Fallon Request from: Public Utilities Regulatory Authority Question: (LONG TERM DEBT) Provide a narrative describing the Company's efforts to refinance its existing long-term debt. Response: CL&P’s outstanding long-term debt is redeemable prior to each series’ respective Par Call Date, via make-whole provisions. A make-whole provision permits the long-term debt to be redeemed at any time prior to the Par Call Date, in whole or in part, at the option of CL&P, provided CL&P pays to the investors at the time of redemption a price calculated using the applicable treasury rate plus a spread of 50 basis points. The premium paid at the time of the redemption would fully compensate the investors for the forgone interest income. On or after each series Par Call Date (1, 3 or 6 months prior to the maturity date based on the tenor of the bonds), CL&P may redeem the respective series of bonds in whole or in part, at the option of CL&P, at a redemption price of 100% of the principal amount of the bonds being redeemed. In advance of each series Par Call Date, the Company evaluates if it would be economic to redeem the bonds. For example, most recently, CL&P’s $400 million, 0.75% 2020 Series A, first mortgage bonds matured on December 1, 2025. The Par Call Date of the 2020 Series A Bonds was November 1, 2025, allowing the bonds to be redeemed at a redemption price of 100% of the principal on or after November 1, 2025. However, as prevailing long-term debt rates were higher than the 2020 Series A bonds 0.75% coupon rate, the bonds were not redeemed early, given that doing so would not have been economic. Please refer to Table 1, below, for the details of CL&P’s outstanding long-term debt, including each series Par Call Date.
  4. Page 128 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-138 Page 2 of 2 Table 1 AMOUNT ISSUED The Connecticut Light And Power Company First Mortgage Bonds 2004 Series B $130,000,000 2005 Series B $100,000,000 2006 Series A $250,000,000 2007 Series B $150,000,000 2007 Series D $100,000,000 2014 Series A $475,000,000 2015 Series A $350,000,000 2017 Series A $500,000,000 2018 Series A $800,000,000 2021 Series A $425,000,000 2023 Series A $500,000,000 2023 Series B $300,000,000 2024 Series A $350,000,000 2024 Series B $300,000,000 2025 Series A $400,000,000 COUPON RATE(%) DATE ISSUED DATE DUE PAR CALL DATE 5.750 5.625 6.350 5.750 6.375 4.300 4.150 3.200 4.000 2.050 5.250 4.900 4.650 4.950 4.950 9/15/2004 4/7/2005 6/7/2006 3/27/2007 9/17/2007 4/24/2014 5/20/2015 3/10/2017 3/28/2018 6/30/2021 1/10/2023 7/6/2023 1/23/2024 8/13/2024 1/13/2025 9/15/2034 4/1/2035 6/1/2036 3/1/2037 9/1/2037 4/15/2044 6/1/2045 3/15/2027 4/1/2048 7/1/2031 1/15/2053 7/1/2033 1/1/2029 8/15/2034 1/15/2030 9/15/2034 4/1/2035 6/1/2036 3/1/2037 9/1/2037 10/15/2043 12/1/2044 12/15/2026 10/1/2047 4/1/2031 7/15/2052 4/1/2033 12/1/2028 5/15/2034 12/15/2029
  5. Page 129 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-139 Page 1 of 2 Date Filed: November 03, 2026 Witness: Ann Bulkley Request from: Public Utilities Regulatory Authority Question: (FINANCIAL DATA) Summarize the changes to economic and financial indicators that have taken place, since January 1, 2019, using the table below as a guide. Please provide all source documents for the information provided. Financial/Economic Indicator Gross Domestic Product (GDP-PI) Consumer Price Index (CPI) Unemployment Rate (National) Unemployment Rate (Connecticut) US Treasury Bills (90 day) US Treasury Bills (180 day) US Treasury Bonds (10 year) US Treasury Bonds (20 year) US Treasury Bonds (30 year) Market-to-book ratios for the Company Market-to-book ratios for the Parent Company with public common equity Market -to-book ratios for the Electric utility Industry Dividend Yield-ES Source Percentage change 1/01/2019 to 01/01/2019 6/30/2026 6/30/026
  6. Page 130 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-139 Page 2 of 2 Dividend Yield-Electric Industry Average 5-year projected EPS Growth Rate-Electric Industry Average 5-year retention EPS Growth Rate-Electric Industry Average Federal Corporate Tax Rate Beta- Electric Industry Average Capital StructureCL&P Capital Structure-Electric Industry Average Value Line Financial Strength-Electric Bond Rating-Electric Industry Average Cost of Debt-CL&P Cost of Debt-Electric Industry Average Response: Please refer to RRU-139, Attachment 1, for the requested information.
  7. Page 131 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RSR-058 Page 1 of 1 Date Filed: October 30, 2026 Witness: Leanne M. Landry and Jeffrey D. Turano Request from: Public Utilities Regulatory Authority Question: (PLANT ADDITIONS) Application, Ex. CLP-ADDITIONS-4, Ex.CLP-ADDITIONS-4 Supplemental, Ex. CLP-Additions-1, p. 56. Identify and provide in an unlocked spreadsheet a list of all projects associated with plant additions related to distributed generation (DG) and energy efficiency (EE) investments. Provide the information for each project showing the following: a. b. c. d. All new additions, on a monthly basis; Whether the project is related to DG or EE; Which portion of the project is reimbursable; and Reference to the project’s location in Exhibit CLP-ADDITIONS-4. Response: Please refer to RSR-058, Attachment 1, which identifies each project associated with distributed generation (DG), including the corresponding line references in Exhibit CLP-ADDITIONS-4, and the Exhibit CLP-ADDITIONS-4 Supplemental filings. Energy efficiency projects are 100% expense and will not be included in Exhibit CLP-ADDITIONS-4. The attachment also identifies the reimbursable portion of each project, as reflected in the applicable Project Authorization Forms (PAFs). The Company notes that information regarding new plant additions on a monthly basis for 2026 is provided as part of the Company’s supplemental filings.
  8. Page 132 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RSR-059 Page 1 of 4 Date Filed: November 06, 2026 Witness: David L. Gladey, John P. Dipaola-Tromba, Steven Lamontagne, Leanne M. Landry, Elli Ntakou and Jeffrey D. Turano Request from: Public Utilities Regulatory Authority Question: (PLANT ADDITIONS) Application, Ex. CLP-ADDITIONS-1, p. 63. Provide the following regarded the “Direct Buried Replacement” projects: a. Documentation supporting the statement: “on an industry-wide basis that much of the original XLP and HMP-insulated primary cable installed in the DB system had not achieved its engineered life expectancy.” b. An exhibit showing the engineered life expectancy by type (e.g., XLP, HMP-insulated) and vintage of direct-buried (DB) assets on the Company’s system; c. An exhibit showing the actual service life of all the Company’s DB plant at the time of replacement for the years 2017 through 2026 (to-date). d. An unlocked spreadsheet showing the number and duration of premature DB cable failures by year and their contribution to blue-sky SAIDI and SAIFI performance. Response: a. The statement that much of the original XLPE and HMP-insulated primary cable installed in the distribution system had not yet achieved its engineered life expectancy is supported by industry research, utility operating experience, and cable-aging studies conducted by EPRI, NEETRAC, cable manufacturers, and other industry researchers. Studies of distribution cable performance have generally identified expected service lives in the range of 30 to 40 years for early-generation XLPE and HMP cable designs under normal operating conditions, while recognizing that actual service life is highly dependent on installation type, operating environment, loading, exposure to moisture, and cable construction. Industry experience has demonstrated that cable age alone is not a reliable indicator of end of life. Premature failures in some early cable installations were often associated with factors such as water-treeing, contamination, manufacturing deficiencies, shield defects, or moisture ingress rather than the intrinsic exhaustion of the insulation system. Soil type and installation, i.e. direct buried versus cable in conduit, are significant to the overall life expectancy of a underground cable. As a result, many XLPE and HMP cable circuits have remained electrically serviceable beyond their original design expectations.
  9. Page 133 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RSR-059 Page 2 of 4 EPRI asset demographic information indicates that significant populations of XLPE and HMP cable remain in service at ages exceeding 35 years and, in many cases, beyond 50 years. In addition, recent evaluations of approximately 40-year-old service-aged cable have found that many cable systems continue to exhibit acceptable electrical and material performance. Accordingly, while replacement of direct-buried cable may be warranted based on reliability performance, failure history, condition assessment results, operational risk, or broader asset management considerations. The type of failures and overall service age of direct buried cable is supportive of some of the following industry documentation such as the following: EPRI Research – EPRI’s work implicitly recognizes that cable age alone is not equivalent to end-of-life and that remaining-life assessment is both possible and necessary because many assets survive beyond their nominal design life. 1. EPRI Distribution Cable Research EPRI's Distribution Cable Research Digest has long cited approximately 40 years as the expected service life of modern underground medium-voltage cable systems. EPRI has also sponsored extensive work on remaining-life estimation for XLPE cables, including Estimation of Remaining Life of XLPE-Insulated Cables and related aging-model studies designed specifically to assess service life beyond original installation dates. 2. EPRI Asset Demographics Data EPRI's current distribution asset demographic database shows that 25% of HMWPE assets are older than 57 years and 25% of XLPE assets are older than 46 years, which demonstrates that large populates of these cable types remain in service well beyond what many utilities historically considered their normal 30-40 year design life. Please refer to RSR-059, Attachment 1. NEETRAC Research – NEETRAC projects support the argument that replacement programs often targeted cables because of specific condition concerns and failure risk rather than because the insulation had necessarily consumed its full engineering life. 1. NEETRAC Historical Assessment of XLPE Life NEETRAC's paper Long-Life XLPE Insulated Power Cable notes that when medium-voltage XLPE cable was first introduced, utilities expected: "20 or even 30 years" of reliable service. Please refer to RSR-059, Attachment 2.
  10. Page 134 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RSR-059 Page 3 of 4 The paper further explains that many early failures were caused by water-treeing mechanisms, manufacturing deficiencies, contamination, and moisture-related degradation rather than fundamental exhaustion of the polyethylene insulation system. Please refer to RSR-059, Attachment 2. NEETRAC states that improvements in materials and manufacturing greatly improved longterm performance and reliability. Please refer to RSR-059, Attachment 2. 2. Recent NEETRAC / Alabama Power 40-Year Field Evaluation One of the most valuable recent studies examined TR-XLPE cable removed after approximately 40 years of continuous service from Alabama Power's Galleria Mall system: • Installed in 1985 • Evaluated after ~40 years in service • Included electrical and material performance testing • Specifically designed to assess cable condition near the historically expected servicelife threshold, please refer to RSR-059, Attachment 3. The study's purpose was to determine whether cable approaching or exceeding the traditional 40-year design-life expectation remained fit for service. b. The Company does not maintain the information necessary to produce the requested exhibit. Installation vintage information is unavailable for a significant portion of the Company's direct-buried cable assets, and insulation type information is incomplete for many assets. As a result, the Company is unable to reliably classify all direct-buried assets by both vintage and insulation type and therefore cannot produce the requested exhibit. c. As it relates to the Company's Direct Buried Replacement Program, the Company’s plant assets replaced and retired are accounted for under the mass-distribution property method. Under such a method, the Company’s plant accounting system utilizes the group method of depreciation and retirement, rather than a direct one-for-one matching principle of individual asset additions and retirements for each utility property. Please refer to OCC-793 i for further discussion on the Broad Group Procedure that the Company utilizes to depreciate and retire its utility property. Therefore, because the specific vintage year of each retired unit is not identifiable, the Company is unable to provide the actual service life of all the Company's Direct Buried utility property when these individual units are removed and retired during the years 2017 through 2026.

As listed on the current system

Corres. 11/16/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (PURA Set 13, EOE Set 8)

This filing on the current system (opens in a new tab)