Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery Compilation (PURA Set 13, EOE Set 8)

Files3

Search terms highlighted
Eversource rate increase is on 38 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
38 pages match
  1. Page 35 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-103 Page 1 of 1 Date Filed: October 30, 2026 Witness: Ann Bulkley Request from: Public Utilities Regulatory Authority Question: (PROXY GROUP) Bulkley Pre-Filed Test.. Provide a list of Electric companies that were considered but excluded from the Company's proxy group and the rationale for each exclusion. Response: Please refer to RRU-103, Attachment 1 CONFIDENTIAL, for the requested information. Ms. Bulkley relied on five screening criteria to establish a proxy group that is reasonably comparable to the Company. In reviewing the attachment, the companies with a score of 5 were included in the proxy group. Any company that did not meet all criteria were not considered comparable and were eliminated from the proxy group.
  2. Page 36 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-104 Page 1 of 2 Date Filed: October 30, 2026 Witness: Ann Bulkley Request from: Public Utilities Regulatory Authority Question: (PROXY GROUP) Bulkley Pre-Filed Test.. Provide the capital structure of the Company's proposed proxy group using the holding company’s capital structure. If the utility in the proxy group does not have a holding company, or if there are multiple lines of ownership (i.e., holding companies and ultimate parent companies), provide the capital structure for each of the subsidiaries and holding companies. Response: Ms. Bulkley’s testimony provides an analysis of the capital structures of the utility operating companies owned and operated by the proxy group companies. For reference in authorizing a capital structure in this proceeding for CL&P, the capital structures of the utility operating companies are the correct comparative benchmark as those capital structures properly reflect the operating risks of a utility company, like CL&P, whereas the holding company capital structures are not comparative and do not reflect the necessary operating risks for a utility company. Capitalization at the holding company level typically includes unregulated operations and often reflects the diversification of the holding company across multiple regulatory jurisdictions and is not therefore comparable to the Company. Ms. Bulkley’s testimony explains why the operating company capital structures are the appropriate benchmarks to rely on for comparison. However, to be responsive to this request, please refer to RRU-104, Attachment 1 CONFIDENTIAL, providing the capital structure for each proxy group company at the holding company level, using the market value of debt and equity. The market value of debt and equity was used for consistency with data relied on to develop the cost of equity models such as the DCF and the CAPM. For example, Ms. Bulkley’s constant growth DCF analysis relies on the share prices for each of the companies in her proxy group, which is the market value of equity. Similarly, Ms. Bulkley’s CAPM analysis relied on beta coefficients, which are calculated using the returns of each company in the proxy group based on that company’s market value. Since the cost of equity models rely on the market value of equity, the estimated cost of equity would reflect the financial risk of the market value debt-to-equity ratio and not the book value debt-to-equity. Therefore, if the book value is used, and the book value of debt and equity deviates from the market value of debt and equity, the expected return on book equity will be much different than the
  3. Page 37 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-104 Page 2 of 2 expected return on the market value of equity, which is the estimate produced by the DCF and CAPM models. As a result, it is the market value of debt and equity and not the book value of debt and equity that should be relied on when estimating the capital structure for each company in Ms. Bulkley’s proxy group at the holding company level. Lastly, it must be emphasized that short-term debt may be included in the computation of capital structures at the holding company level, but is not appropriate for inclusion in capital structure at the operating company level where long-lived assets are actually paid for and held using permanent sources of capital. Utility holding companies and utility operating companies are very distinct entities in terms of their capital funding and overall capitalization and there is no theoretical or actual basis for imputing the capital structure of the holding company to the operating company, which is engaged in the financing of rate base.
  4. Page 38 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-105 Page 1 of 1 Date Filed: October 30, 2026 Witness: Ann Bulkley Request from: Public Utilities Regulatory Authority Question: (PROXY GROUP) Provide an exhibit that shows the percentage of annual regulated electric distribution revenue to total company revenue and annual regulated utility revenue to total company revenue for each company in the proposed proxy group. Response: Please refer to RRU-105, Attachment 1 CONFIDENTIAL, for the requested information.
  5. Page 39 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-106 Page 1 of 1 Date Filed: October 28, 2026 Witness: Ann Bulkley Request from: Public Utilities Regulatory Authority Question: (PROXY GROUP) Provide an exhibit that shows the bond rating and rating agency for each company in the proposed proxy group. For each proposed proxy company with a Moody’s bond rating of Baa3/BBB- or lower, explain why that company should be accepted as a proxy company. Response: Please refer to RRU-106, Attachment 1. All companies in Ms. Bulkley's proxy group have ratings equal to or higher than Baa3/BBB-.
  6. Page 40 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-107 Page 1 of 2 Date Filed: October 28, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Public Utilities Regulatory Authority Question: (FTE ALLOCATIONS) Provide a detailed summary explaining how the Company allocates Full Time Equivalent (FTE) positions between distribution rates and other rate mechanisms (i.e., RAM Mechanisms, Conservation and Load Management, etc.). Additionally, provide a narrative on how the Company intends to handle FTEs on a forward looking basis once new distribution rates are approved. Response: Please note that all employees charge their labor costs in accordance with the Company’s cost charging policies, which are designed to (1) directly assign costs where possible; (2) when costs cannot be direct charged they should be allocated via a causal-based cost charging methodology; and (3) when costs cannot be direct charged or allocated using causal-based cost charging methodologies, the common allocator should be used. Further, when the Company has included internal labor costs as part of the costs for which it is seeking recovery through another rate mechanism such as those included in the RAM, those labor costs are for incremental full-time equivalents (“FTEs”) who have been hired as a result of newly established or altered programs that PURA has ordered the Company to support or perform since its last base distribution rate case in Docket No. 17-10-46. As such, these programs and the associated labor costs incurred to administer them are incremental to the level of costs being recovered through distribution rates set in the Docket No. 17-10-46 base distribution rate case. When the incremental FTEs work on these programs, they ensure their time is charged to the correct Company and program which is then reviewed and approved by their supervisor. To the extent the incremental FTEs hired to support these programs work on other non-incremental work, they would charge their time accordingly and such cost would not be recovered through the RAM. As part of this proceeding, the Company is proposing to roll into base distribution rates the cost of FTEs which are incremental to current base distribution rates and have been recovered in the Company’s RAM. These FTEs were either hired after the Company’s last base distribution rate case into newly established roles or were transferred into newly established roles, which were created after the last rate case. These FTEs were hired to support various initiatives such as energy storage solutions, innovative energy solutions, electric vehicle programs, shared clean energy facility initiatives, low/zero emission renewable energy certificates and residential/non-residential solar programs.
  7. Page 41 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-107 Page 2 of 2 The Company views the interim recovery of incremental FTEs through the RAM as a best practice. There have been numerous instances where, in order for PURA initiatives to move forward, the Company has had to hire incremental resources and has incurred incremental costs. The costs of implementing and administering these programs cannot be included in base distribution rates if such programs do not exist at the time of the base distribution rate case. As described elsewhere in this filing, the Company is proposing to implement a Performance Based Multi-Year Rate Plan (“PBMRP”) as part of this proceeding, inclusive of an exogenous factor to allow for rate adjustments up or down for exogenous events that impose costs (or reduce them) to a level of significance warranting a rate change. The Company has proposed the exogenous cost threshold will be set at 0.5 percent of distribution revenues. Therefore, if PURA adopts the Company’s proposed PBMRP, additional FTE costs to support new programs or initiatives would be eligible for recovery upon a showing that they have exceeded the exogenous cost threshold. Finally, please note that Conservation and Load Management employees are not included in the Company’s base distribution rate request as they charge their time to the Conservation and Load Management line of business and not the distribution line of business. Further, the Company is not proposing to roll Conservation and Load Management employees into base distribution rates in this proceeding. Costs associated with the administration of energy efficiency programs, including the Conservation and Load Management FTEs supporting such programs, will continue to be collected through the Conservation Adjustment Mechanism (“CAM”) charge included within the Combined Public Benefits Charge on customers’ bills.
  8. Page 42 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-108 Page 1 of 1 Date Filed: October 30, 2026 Witness: Danielle J. Munson Request from: Public Utilities Regulatory Authority Question: (EMPLOYEE BENEFITS) Ex. CLP-REVREQ-2, Sch. C-3.12. Provide an explanation for the allocation methodology used to distribute costs from EESCO across each of the employee benefit cost categories listed on Schedule C-3.12, page 1. Show the total costs incurred on the EESCO level for each category prior to the allocation and the associated calculation that derives the Test Year. Response: For an explanation of the allocation methodologies, please refer to RRU-108, Attachment 1, for Eversource Energy Service Company (“ESC”) FERC Form 60 annual filing that present these methodologies on Schedule XXI. Please also refer to EOE-066, Attachment 1, for the ESC Cost Allocation Manual and additional details regarding the allocation methodologies and a list of rate codes. Please refer to RRU-108, Attachment 2, for the 2025 Test Year ESC allocation methodologies and allocation rate codes used to distribute costs to each of the employee benefit categories listed on Schedule C-3.12, page 1. The Labor Misc 1 methodology was utilized to allocate costs to the subsidiaries and business segments as the cost causation of benefit costs relates to Eversource Energy Service Company employees; therefore, distributed labor is the methodology utilized to allocate these costs. The Labor Misc 2 methodology was utilized for benefit costs that also relate to the operating company employees.
  9. Page 43 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-109 Page 1 of 2 Date Filed: October 28, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Public Utilities Regulatory Authority Question: (EMPLOYEE BENEFITS) Ex. CLP-REVREQ-2, Sch. WP C-3.12, pp. 2-12. For each page of Schedule C-3.12, provide an explanation for how the Company calculated the pro forma adjustments. Explain the methodology or factor used in each case for calculating the capitalized portion for both CL&P and EESCO. Response: The Company’s explanations for the expense portion of the Employee Benefits pro forma adjustments are listed below. The Company notes there are no pro forma adjustments in pages 4 through 11, of Schedule C-3.12. • Healthcare (Page 2): The CL&P and ESC Test Year pro forma healthcare expense was calculated using the 2026 working rates (i.e. cost per employee), and applying them to actual employee healthcare plan elections as of 12/31/2025. The pro forma adjustment represents the difference between the 2025 Test Year Healthcare expense and the calculated Test Year pro forma healthcare expense. • Disability (Page 3): The CL&P and ESC Test Year pro forma adjustment represents the removal of a non-recurring reserve adjustment for Long Term Disability expense. • Benefit Consultant, Actuarial Fees, and Other Benefits (Page 12): The ESC Test Year pro forma adjustment represents the removal of certain other benefit expense and consulting services expense that are not representative of a test year level of expense necessary to provide safe and reliable service. The Company’s explanations for the capitalized portion of the Employee Benefits pro forma adjustments are listed below: • Pages 2 to 12: The Test Year pro forma adjustment related to the capitalized portion incorporates the capitalization rate as shown in RRU-015, Attachment 1, at page 2, and is 52.36% capitalization (47.64% O&M) for CL&P Direct and 28.07% capitalization (71.93% O&M) for ESC Allocated charges. Please note, not all costs are subject to capitalization, and therefore the overall capitalization percentage for the schedule may not
  10. Page 44 of 144

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-109 Page 2 of 2 align. For further detail regarding the capitalized portion for each page (pages 2-12) of the Employee Benefits schedule, please refer to RRU-044, Attachment 3.

As listed on the current system

Corres. 11/16/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (PURA Set 13, EOE Set 8)

This filing on the current system (opens in a new tab)