Discovery Compilation (PURA Set 13, EOE Set 8)
Files3
Docket No. 26-05-10 Discovery Compilation November 16 2026.pdf
PDF · 133 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation November 16 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation November 16 2026.pdf
EOE Set 8_COMBINED.pdf
PDF · 1012 KB · 105 pagesText searchable
Download EOE Set 8_COMBINED.pdfRead the text of EOE Set 8_COMBINED.pdf
PURA Set 13_COMBINED.pdf
PDF · 1.5 MB · 144 pagesText searchable
Download PURA Set 13_COMBINED.pdfRead the text of PURA Set 13_COMBINED.pdf
Page 76 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-127 Page 3 of 3 neither eliminates the operational requirements, uncertainty, or execution risk inherent in running the distribution business.Page 77 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-128 Page 1 of 1 Date Filed: October 30, 2026 Witness: Ann Bulkley Request from: Public Utilities Regulatory Authority Question: (ROE-PROXY GROUP) Bulkley Pre-Filed Test. For each member of the Company’s Proxy Group, provide the market to book ratio and price earnings ratio on a monthly basis for 2025 and 2026. Response: Please refer to RRU-128, Attachment 1 CONFIDENTIAL, for the requested information.Page 78 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-129 Page 1 of 1 Date Filed: October 29, 2026 Witness: Ann Bulkley Request from: Public Utilities Regulatory Authority Question: (ROE-PROXY GROUP) Bulkley Pre-Filed Test. Based on companies followed by Value Line in the Value Line Utility Electric utility space, identify the electric companies followed by Value Line but eliminated from the Company’s Proxy Group. Response: Please refer to RRU-103, Attachment 1 CONFIDENTIAL, for the requested information.Page 79 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-130 Page 1 of 1 Date Filed: October 29, 2026 Witness: Ann Bulkley Request from: Public Utilities Regulatory Authority Question: (ROE-DCF) Bulkley Pre-Filed Test., pp. 24–32. Is there a time period during which the Company believes the constant growth discounted cash flow (DCF) model loses its reliability? Provide the time period and market circumstances. Response: Ms. Bulkley has not conducted a time series analysis of the DCF results. However, interest rates and utility share prices are inversely correlated, which means that increases in interest rates result in declines in the share prices of utilities and vice versa. For example, in an increasing interest rate environment, the utility sector would be expected to underperform the broader market with a likely decrease in the share prices of utilities occurring. Consequently, in an increasing interest rate environment, the DCF model, which relies on historical stock prices, will likely understate the cost of equity as utility stock prices decline and their dividend yields increase.Page 80 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-131 Page 1 of 2 Date Filed: November 02, 2026 Witness: Ann Bulkley Request from: Public Utilities Regulatory Authority Question: (ROE-PROXY GROUP) Bulkley Pre-Filed Test., pp. 32–37. What are the economic conditions that would lead the Company to conclude more weight should be afforded to Capital Asset Pricing Model (CAPM)- based methods? Explain. Response: As discussed in the Company’s response to RRU-130 i, given the inverse relationship between interest rates and utility share prices, the DCF model will likely understate the cost of equity during the forward-looking rate period when interest rates are expected to increase because the DCF model relies on historical share prices. However, the CAPM can be estimated using projected interest rates as the estimate of the risk-free rate and therefore, will produce an estimate of the cost of equity that better reflects expected market conditions in an increasing interest rate environment. Given the effect that market conditions can have on each model, certain jurisdictions have broadened dependence on multiple models including the Federal Energy Regulatory Commission, and the state utility regulatory commissions in Minnesota, Michigan, Iowa, Washington, New Jersey and Pennsylvania. Specifically, Ms. Bulkley is aware that the Pennsylvania Public Utility Commission has recently concluded that the capital market conditions of high inflation and increasing interest rates has resulted in the DCF model understating the utility cost of equity, and that weight should be placed on risk premium models, such as the CAPM, in the determination of the ROE (see, Penn. Pub. Util. Comm’n et.al. v, Aqua Penn. Wastewater Inc., Pennsylvania Public Utility Commission, Docket Nos. R-2021-3027385 and R-2021-3027386, Opinion and Order, May 12, 2022). See also Penn. Pub. Util. Comm’n et.al. v, Columbia Water., Pennsylvania Public Utility Commission, Docket Nos. R-2023-3040258, Opinion and Order, January 18, 2024). Prior Referenced Response: i RRU-130 Question: (ROE-DCF) Bulkley Pre-Filed Test., pp. 24–32. Is there a time period during which the Company believes the constant growth discounted cash flow (DCF) model loses its reliability? Provide the time period and market circumstances.Page 81 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-131 Page 2 of 2 RRU-130 Response: Ms. Bulkley has not conducted a time series analysis of the DCF results. However, interest rates and utility share prices are inversely correlated, which means that increases in interest rates result in declines in the share prices of utilities and vice versa. For example, in an increasing interest rate environment, the utility sector would be expected to underperform the broader market with a likely decrease in the share prices of utilities occurring. Consequently, in an increasing interest rate environment, the DCF model, which relies on historical stock prices, will likely understate the cost of equity as utility stock prices decline and their dividend yields increase.Page 82 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-132 Page 1 of 15 Date Filed: November 03, 2026 Witness: Rima Hyder and Matthew P. Fallon Request from: Public Utilities Regulatory Authority Question: (FINANCIAL) Describe the Company’s current financial condition as compared to that of the Company’s circumstances at the time of its last rate case. Also, explain any improvements and/or other changes to its financial condition. Response: Since the Company’s last rate case, in 2018, the Company’s financial position has remained viable, although weakening over time due to the need for substantial and continuing capital resources to fund base levels of investment, pay for storm response, and withstand large differences in the timing of recovery through the respective reconciling rate mechanisms. Since 2018, the financial demands on the Distribution business have changed materially. The Company has continued to operate and invest in the distribution system while experiencing sustained under-earning, higher costs, substantial timing-related regulatory balances, and materially greater investment and financing requirements. Those conditions have been particularly impactful given the significant distribution investment required over the period ahead. From the Company’s perspective, the question is asking whether the Company has the recurring financial capacity necessary to provide safe and reliable distribution service, finance the investment program presented in this proceeding, and meet the operating challenges ahead. The strong cash-flow metrics reported by CL&P in 2025 are favorable, but benefited materially from collections of prior-period under-recoveries that, by their nature, are not recurring. CL&P’s liquidity, ratings, and access to capital provide relevant context, but do not define the Company’s financial condition of its distribution operations. To answer that question, it is necessary to understand not only the Company’s current financial position, but also how it reached that position and what will be required going forward. In 2018, PURA approved the financially supportive framework established by settlement with OCC and PURA’s PRO unit, which was widely recognized by ratings agencies and investor analysts as a constructive outcome. However, the Company has experienced subsequent weakening in recurring distribution financial performance as investment, costs and financing requirements have increased. In the sections below, the Company discusses the influencing factors for its current financial conditions.Page 83 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-132 Page 2 of 15 1. Financial and Regulatory Conditions Subsequent to Docket No. 17-10-46, and the 2018 Rate Settlement. The comparison of current circumstances to the 2018 rate case requires consideration of three distinct periods. First, during the 2015-2017 pre-case period, Connecticut regulation was not viewed as uniformly supportive. Fitch, for example, characterized the framework as somewhat challenging or restrictive. 1 Then came the 2018 Rate Settlement. The 2018 Rate Settlement was viewed as materially improving the framework applicable to the Company by establishing a more forward-looking and predictable basis for distribution revenues that benefitted credit quality. Moody’s, for example, stated that it viewed the settlement as a positive, credit-supportive development. 2 Lastly, the post-settlement period that followed has been marked by sustained under-earning, larger financing requirements, accumulated regulatory balances and greater dependence on individual regulatory rulings deciding the availability of timely and adequate recovery. The 2018 Rate Settlement provides a useful example of how a ratemaking framework can strengthen the Company’s financial position, while also mitigating the impact-on customers. The 2018 Rate Settlement was a multi-year rate plan encompassing forward test years and providing a $124.7 million phased-in increase in base distribution revenues, consisting of increases of $64.3 million effective May 1, 2018; $31.1 million effective May 1, 2019; and $29.2 million effective May 1, 2020. The 2018 Rate Settlement also set an authorized ROE of 9.25%, and a capital structure founded on the Company’s own capitalization of 53% equity and 47% long-term debt. As noted above, Moody’s described this settlement as credit supportive. Moody’s explained that “[s]ettlement agreements generally benefit a utility’s earnings and cash flow by reducing regulatory lag, the interval between a utility’s costs and investments and their recovery from customers through an increase in rates.” At the same time, Moody’s specifically observed that “the phased-in rate increase mitigated some of the immediate rate effect on customers.” The 2018 Rate Settlement therefore demonstrated that financial support and customer affordability need not be competing objectives, which was positively viewed by the marketplace. It showed that a forwardlooking framework can improve the alignment of revenues with costs and investment while managing the timing of the resulting customer impact. 3 The 2018 Rate Settlement’s treatment by the rating agencies reinforces that point. Moody’s viewed the settlement as credit supportive, while S&P later viewed the approximately $125 million multiyear rate increase and associated capital structure as favorable for credit quality. 4 These 1 2 3 4 Fitch Ratings, Connecticut Light and Power Company, Rating Report (Apr. 20, 2016), p. 2. Moody’s Ratings, Connecticut Light & Power Company: Credit Opinion (June 28, 2022), p. 4. Id, p. 4. S&P Global Ratings, Connecticut Light & Power Company, February 25, 2019, p. 2.Page 84 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-132 Page 3 of 15 assessments are relevant, not because the current proceeding should reproduce the 2018 Rate Settlement, but because the credit-rating assessments highlight the financial characteristics that made that framework effective, which were: forward-looking cost recognition, greater revenue predictability, reduced regulatory lag, and implementation over time to mitigate impacts on customers. The 2018 Rate Settlement also provided a useful contrast to the Aquarion rate case discussed in the Company’s response to ALLCO-142. i The subsequent Aquarion rating action highlights the potential credit consequences of an adverse rate-case outcome, whereas the Company’s 2018 Rate Settlement illustrates the exact opposite. The OCC’s description of the settlement at that time reinforces that point. The OCC estimated total bill impacts of 2.47%, 0.81%, and 0.61% for Rate Years 1, 2, and 3, respectively. 5 That balance of sufficient revenue support for the utility and mitigating impacts for customers is also evident over the longer period following the settlement. As shown in Figure 2 of Exhibit CLP-IAP-1, the significant volatility in customer bills in recent years has occurred primarily outside the distribution charge, particularly in supply and public-benefit costs. 6 Distribution service has represented between 19% and 30% of the total customer bill over the past five years and approximately 25% currently. 7 At the same time, the 2018 framework was expressly designed to cover base levels of investment on an affordable basis. Through the multiyear rate plan and ESI mechanism, customer bill impacts associated with ESI were limited to less than $2 per month each year, on average, over 2018-2025 while providing recovery of costs associated with $2.7 billion of invested net capital for infrastructure upgrades. 8 The significance of the 2018 Rate Settlement is therefore broader than its immediate financial effect. It provides a real-life, historical example of a framework that supported the Company’s financial requirements and substantial system investment while smoothing the customer impact over time. Moody’s recognized the same balance, describing the settlement as a credit supportive one that “mitigated some of the immediate rate effect on customers.” 9 The final scheduled base-revenue increase under the 2018 Rate Settlement became effective in May 2020. The Company thereafter continued to invest in the distribution system, supported by the ongoing ESI, although operating expense was increasing and regulatory deferral balances were growing more significant. The current proceeding presents a different and more demanding set of financial and investment circumstances, but the underlying principle remains relevant – a forwardConnecticut Office of Consumer Counsel, PURA Approves Settlement Agreements in Eversource Energy Rate Case; New Rates Are Effective on May 1, 2018 (May 1, 2018), pp. 1-2. 6 Exhibit CLP-IAP-1, July 14, 2026, p. 22, Figure 2 7 Exhibit CLP-ELP-1, July 14, 2026, p. 30 8 Exhibit CLP-ELP-1, July 14, 2026, p. 77 9 Moody’s Ratings, Connecticut Light & Power Company: Credit Opinion (June 28, 2022), p. 4. 5Page 85 of 144
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-13 Date Issued October 16, 2026 RRU-132 Page 4 of 15 looking ratemaking framework can support the Company’s financial capacity and necessary system investment, while managing and mitigating the timing and magnitude of the customer impact. 2. Persistent Distribution Under-Earning An important indicator of recurring distribution financial performance is the Company’s earned return on equity. The Company has not earned its 9.25% authorized return in any year since the 2018 Rate Settlement was approved, although the Company experienced two years of relative strength (2020 and 2021). As shown below, the degree of under-earning has increased materially over time, as needed investment has been maintained, operating costs have increased, and the Company has had to bear the cost of financing regulatory deferrals. The annual results reported in the Company’s response to EOE-062 ii illustrate the regression: Table 1 Return on Equity Year 2018 2019 2020 2021 2022 2023 2024 2025 Earned ROE 8.98% 8.70% 9.03% 9.09% 8.33% 7.35% 6.13% 6.51% Authorized ROE 9.25% 9.25% 9.25% 9.25% 9.25% 9.25% 9.25% 9.25% Shortfall 0.27% 0.55% 0.22% 0.16% 0.92% 1.90% 3.12% 2.74% The comparison is instructive. From 2018 through 2021, the Company’s earned ROE remained below, but generally near, its authorized return. The average shortfall over that period was approximately 30 basis points. Beginning in 2022, the gap widened materially. The Company earned 8.33% in 2022; 7.35% in 2023; 6.13% in 2024; and 6.51% in 2025, as compared to the authorized ROE of 9.25%. 10 Over those four years, the average shortfall increased to approximately 217 basis points. These are not isolated annual results. These results show a sustained weakening in the recurring financial performance of CL&P’s distribution business since the period immediately following the 2018 Rate Settlement. 10 CL&P Response to EOE-062, filed August 14, 2026.
As listed on the current system
Corres. 11/16/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (PURA Set 13, EOE Set 8)