Discovery Compilation (CIEC Set 9).
Filed by Keegan Werlin LLP2 files
Part of docket 26-05-10Files2
Docket No. 26-05-10 Discovery Compilation November 17 2026.pdf
PDF · 133 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation November 17 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation November 17 2026.pdf
CIEC Set 9_COMBINED.pdf
PDF · 775 KB · 31 pagesText searchable
Download CIEC Set 9_COMBINED.pdfRead the text of CIEC Set 9_COMBINED.pdf
Search terms highlighted
Eversource rate increase is on 3 pages of the text below, highlighted. Go to the first matchClear highlighting
Page 11 of 31
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-041 Page 2 of 3 For a full breakdown of “Improved Restoration – Significant Storms” please refer to CLP-AMI-3, page 65, Section (b)(6) – Early Outage Detection which explains the calculation methodology, inputs, and assumptions on how these figures are created. b) The average annual amortization expenses related to storm restoration (equal to $211.177 million for Rate year 1) were included in Exhibit ACOS CLP-Exhibit-2 (Confidential), Table 9. These costs were treated as the rest of other amortization expenses and were allocated to rate classes according to the allocations of total rate base by class. Therefore, classification between demand and customer-related implicitly followed the same classification as the sum of the components that make up the overall rate base. c) As provided in Exhibit CLP-AMI-3, including referenced sections and pages 85-92, the Company has quantified and provided descriptions of benefits on a customer-class levelPage 12 of 31
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-041 Page 3 of 3 and with respect to advanced rate design that would extend to various components of service at a rate class and individual customer level, but not for these specific rate classes. d) Please refer to the Company’s response in subpart (c).Page 13 of 31
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-042 Page 1 of 1 Date Filed: November 12, 2026 Witness: Amparo Nieto Request from: Connecticut Industrial Energy Consumers Question: Please refer to the ACOS Direct Testimony at page 6, lines 11-25. a. Please provide the meter weighting factors and average installed meter cost by rate class used to develop the meter plant allocation factor, together with the supporting workpapers in Excel format with formulas intact. b. Please state whether, and how, the Company would update those weighting factors to reflect the cost of AMI meters by rate class once AMI meters are deployed. Response: a. Please refer to the Company’s response to RRU-033 i. b. In the ACOS, the AMI meter weighting factors would be updated to reflect the relative differences in installed cost, in current dollars, applicable at the time of deployment, including any communication modules. Prior Referenced Response: i RRU-033 Question: (ACOS) Application, Ex. CLP-ACOS-1, Dir. Test. Nieto, p. 7. Provide the average installed meter cost for each rate class. Include the underlying calculations, assumptions and supporting documentation in the response. RRU-033 Response: The detailed underlying calculations, assumptions and supporting documentation are included in RRU-033, Attachment 1.Page 14 of 31
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-043 Page 1 of 1 Date Filed: November 12, 2026 Witness: Amparo Nieto Request from: Connecticut Industrial Energy Consumers Question: Please refer to the ACOS Direct Testimony at page 6, lines 1-10. a. Please explain how the demand allocators for primary and secondary distribution facilities exclude the loads of customers that take service at primary or transmission voltage from the allocation of facilities at lower voltage levels. b. Please provide the class NCP demands used for each demand allocator, by voltage level. c. Please identify the number of Rate 39 customers served at each delivery voltage and the number of Rate 57 customers served at each delivery voltage. Response: a. The demand allocators for Primary facilities include the total distribution class NCP corresponding to each class. The demand allocators for the Secondary facilities exclude the portion of the NCP load associated with customers served at Primary; this is approximated using the ratio of secondary customers to total distribution customers in the class. All of the demand allocators refer to NCP of customers that take service at distribution level; no NCP for transmission-connected customers was included. b. The class NCP demands used for each demand allocator by voltage level are included in Exhibit CLP ACOS-2 Confidential, in tab "Appendix 1.B Allocator_Input". See rows 20 and 21, for allocators "NCP_P" and "NCP_S", respectively. c. The number of Rate 39 distribution customers is 3, all served at Primary. The number of Rate 57 distribution customers is 72, all served at Primary voltagePage 15 of 31
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-044 Page 1 of 1 Date Filed: November 12, 2026 Witness: Amparo Nieto Request from: Connecticut Industrial Energy Consumers Question: Please refer to the ACOS Direct Testimony at page 7, lines 11-25, and page 8, lines 1-4. a. Please provide, by rate class, the change in revenue requirement at equalized rates of return that would result from classifying all costs in FERC Accounts 364 through 368 as demandrelated (i.e., the “basic customer method”), relative to the Company’s MDS method, together with supporting workpapers in Excel format. b. Please provide any other analysis the Company has performed in this proceeding of the effect of the basic customer method on class rates of return. Response: a. Please refer to OCC-729, Attachment 2 CONFIDENTIAL. b. Please refer to OCC-729, Attachment 2 CONFIDENTIAL. No additional analysis was completed.Page 16 of 31
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-045 Page 1 of 1 Date Filed: November 12, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Connecticut Industrial Energy Consumers Question: Please refer to the Rates Panel Testimony at page 30, lines 6-12. a. Please identify each non-distribution component of the rates applicable to large commercial and industrial customers that the Company considers time-varying and that, as stated at lines 6-8, “provide additional incentive and opportunity for customer benefit through efficient utilization of electric service.” b. Please state the Company’s position on a requirement that EDR participants take service under a new TOU rate with time-differentiated distribution, transmission and generation charges that has not yet been designed or approved, and explain the basis for that position. c. Please state whether the Company’s billing system can currently bill an EDR participant’s incremental load under a different rate structure than the participant’s pre-existing load. Response: a. The transmission, non-bypassable FMCC, CTA and energy supply components of service are all priced on a time-varying (time-of-day) basis. While supply rates depend on whether a customer takes Last Resort Service or competitive supply, these time varying structures are mandatory for larger customers who would take service under the EDR (e.g., Rate 55Rate 58). b. To the extent such rate is a general service rate and is the only option compared with existing offerings (that would continue to be available or applicable in the future), it would seem, hypothetically, it would be inevitable that a future EDR participant would be on a time-differentiated rate offering, one way or another (noting, the context of the question contemplates distribution as a time-varying rate, which currently applies for only intermediate, large and MHD EV TOU rate customers). c. Billing capabilities are currently limited in this regard. The Company performs special handling (i.e., manual) billing for Rate 39 customers, where load is bifurcated, analyzed in detail, and billed under two different rate structures.Page 17 of 31
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-046 Page 1 of 1 Date Filed: November 12, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Connecticut Industrial Energy Consumers Question: Please refer to the Rates Panel Testimony at page 29, lines 1-12, and page 31, lines 5-6, and Exhibit CLP-RATES-3 at pages 38-40. a. Please identify any transmission or supply cost associated with an EDR participant’s incremental load that the Company expects would be borne by customers other than the EDR participant, and explain why. b. Please confirm that, under the Terms and Conditions for Electric Suppliers at pages 38-40 of Exhibit CLP-RATES-3, the hourly load of an EDR participant, including its coincident peak capacity values, would be assigned to the participant’s electric supplier (including Standard Service or Last Resort Service) for ISO-NE settlement. c. Please state whether interconnection, system upgrade or make-ready costs paid directly by an EDR participant (including through a contribution in aid of construction) would be included as a cost of serving the incremental load in determining whether revenues exceed incremental cost of service or in determining the discount cap. Response: a. The referenced Rates Panel Testimony on pages 29 and 31 refer to Distribution Service. The charges for transmission and supply for the incremental load of an EDR participant would be the responsibility of that participant, consistent with the applicable rate schedule for service to such participant, and with the applicable provisions of the Company’s terms and conditions of service, including those cited in Exhibit CLP-RATES-3. b. The Company expects that the future provisions of the referenced terms and conditions, and the application of those provisions in determining hourly load and electric supplier assignment would apply in a like manner as current practice, absent any changes in proposed terms and conditions relative to current terms and conditions, or to future practices as applied to an individual customer’s electric supplier service arrangement or in supplier load assignment methodologies. c. Yes. Determination of the portion of upfront costs paid by the EDR participant would be included in the evaluation to determine the level of discount. This can also be viewed as; the level of discount would have a bearing on the portion of such costs that would be paid directly by the participant.Page 18 of 31
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-047 Page 1 of 2 Date Filed: November 12, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Connecticut Industrial Energy Consumers Question: Please refer to the Rates Panel Testimony at page 24, lines 18-22, and page 25, lines 1-8. a. Please state whether the Company has a definition of “data center” or “large-scale computational load” that it would use to determine whether a customer’s load is data center load. If so, provide it. b. Please identify the number of inquiries the Company has received since January 1, 2024 regarding new or expanded load from (i) data centers and (ii) manufacturing or other industrial customers, by size range. Response: a. Please see the Company’s response to CIEC-036 i. b. Such information is not readily available. Prior Referenced Response: i CIEC-036 Question: With reference to the Panel’s response to OCC-464, explain whether: a. b. The term “large-scale computational loads” includes only data centers, or if it also may be applied to other non-residential loads. There are specific criteria that Eversource uses to define what constitutes a “data center”? If the answer is in the affirmative, provide and explain the criteria. CIEC-036 Response: a. The Company’s response relied on “data center” as the context for what is meant by the term “large scale computational load” referred to. b. There may be many different types of customers and loads whose characteristics fall within the classification of a data center. The State of Connecticut’s Office of Legislative research report, “Data Center Energy Impacts and State Responses” refers to a description of a data center as, generally, “a physical facility that houses and runs large computer systems.” The report further provides: “A data center typically containsPage 19 of 31
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-047 Page 2 of 2 multiple computer servers, data storage devices, and network equipment to store, manage, process, and transmit large amounts of data”. 1 The term “large-scale” provides additional specificity regarding what might be attributable to a specific data center. As stated in response to OCC-464, the Company believes the appropriate treatment of such loads, including whether a specific rate or customer-specific terms are warranted should be determined through deliberations with state agencies when that load materializes. “Data Center Energy Impacts and State Responses”, Connecticut General Assembly, Office of Legislative Research, 2025-R-0164, Mary Fitzpatrick, October 14, 2025 1Page 20 of 31
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-048 Page 1 of 3 Date Filed: November 12, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Connecticut Industrial Energy Consumers Question: Please refer to the Rates Panel Testimony at page 22, lines 14-21. a. Please confirm that any shortfall in actual distribution revenue relative to the authorized revenue target, regardless of its cause, would be reconciled through the RDM. b. Please confirm that, as proposed, the RDM rate would be a single per-kWh rate applied to all rate classes, including Rate 39, Rate 57 and Rate 58. c. For each of the Company’s last three RDM reconciliation filings, please provide the total RDM amount and the amount recovered from or credited to each rate class, including Rate 39, Rate 57 and Rate 58. d. Please explain how a reduction in distribution revenue resulting from a heat pump rate, such as Rate 6 or Rate HP, would be recovered between rate cases, and identify the share that would be recovered from non-residential rate classes. Response: a. Differences in revenue between actual and target, and flow through of such differences for charges or credits through the RDM are subject to a prudence review and authorization by PURA. b. Yes, as proposed and as is currently designed, the RDM rate would be a single per-kWh rate applied to all rate classes, including Rate 39, Rate 57 and Rate 58. c. Please refer to Table 1 for the requested information, which has been provided in previous RAM filings: Table 1 Rate 1 Rate 5 Rate 7 Rate 18 Rate 27 2024 2025 2026 (DN 24-01-03) (DN 25-01-03) (DN 26-01-03) $15,426,873 $7,990,329 $870,234 $3,256,347 $1,686,621 $183,691 $10,701 $5,543 $604 $1,443 $748 $81 $165,744 $85,847 $9,350
As listed on the current system
Corres. 11/17/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (CIEC Set 9).