  1. Page 1 of 16

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-14 Date Issued October 20, 2026 UPA-081 Page 1 of 4 Date Filed: November 20, 2026 Witness: Douglas P. Horton Request from: Public Utilities Regulatory Authority Question: (F-FACTOR) Exhibit CLP-TSP-1; Exhibit CLP-TSP-3; Interrog. Resp. EOE-156. Identify, for each program or sub-program in Exhibit CLP-TSP-3, whether the Company proposes to recover associated capital investments through: (1) base rates, (2) the F-factor mechanism described in the response to Interrogatory EOE-156 and its attachments, or (3) another cost-recovery mechanism. For each program identified as F-factor eligible, provide annual capital additions, expected plantin-service dates, and the corresponding annual F-factor revenue requirement reflected in the Company’s filing. Response: The Company’s capital program is designed around the level of system performance that the Targeted System Performance (“TSP”) plan will support. This is discussed in Exhibit CLP-TSP3, addressing the value and purpose of each category of investment. Program classifications do not correlate to a specific rate mechanism – meaning that there are no programs that would be recovered in one mechanism, while other programs are recovered through another mechanism. If PURA were to accept and approve the Company’s proposed PBMRP, then all capital additions placed in service prior to December 1, 2026 would be recovered through base rates effective July 1, 2027. On that same date, the Company’s F-Factor would take effect, with an annual adjustment each year on that same date for the duration of the PBMRP. The F-Factor taking effect on July 1, 2027, would be designed to reflect the prospective revenue requirement on capital investment not captured in base distribution rates as part of the rate case in this proceeding (for instance if base rates are set to include investments through December 31, 2026, the F Factor going into effect on July 1, 2027, would be calculated based on the prospective revenue requirement for forecasted capital expenditures between January 1, 2027, and June 30, 2028). The F-Factor is intended to provide adequate revenue support for all prospective capital expenditures, except and unless PURA authorizes (or requires) a new program that is not currently reflected in the TSP. The capital expenditures to be supported by the F Factor are summarized in Figure 7 of Exhibit CLP-ELP-1 in the Company’s initial filing, pasted below for ease of reference.
  2. Page 2 of 16Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-14 Date Issued October 20, 2026 UPA-081 Page 2 of 4 The Company’s response to OCC-858 i provides annual forecasted capital investment for 2027 through 2031, by category and by program, and explains the relationship between forecast expenditures and plant additions. During the PBMRP, the F-Factor would provide incremental revenue support for the capital program based on eligible plant additions placed into service, subject to a downward-only reconciliation. The associated revenue requirement would be limited to the lesser of the cumulative approved forecast or cumulative actual eligible plant in service. Cumulative capital investment above the forecast would therefore not increase the amount of F-Factor support during the initial PBMRP term. Instead, capital investment above forecast, or otherwise incomplete investment, would not be eligible for recovery until the next base-rate proceeding is conducted.
  3. Page 3 of 16

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-14 Date Issued October 20, 2026 UPA-081 Page 3 of 4 Incremental capital programs not contemplated in the current forecast, including, for example, additional investments arising from AMI, EV programs and other specifically identified initiatives would require appropriate regulatory treatment, such as being added to the F-Factor allowance established for the current forecast. Because the F-Factor supports the Company’s distribution capital program rather than establishing separate allowances for individual programs, the F Factor is not calculated at a program level. The distinction between base-rate recovery and F-Factor support establishes the starting point in Rate Year 1, by determining which capital investment is already reflected in base rates. Thereafter, the focus shifts to the capital program contemplated by the approved forecast, with the F-Factor providing incremental revenue support as eligible capital is placed in service, subject to the downward-only reconciliation. Then, in the next base-rate proceeding, all capital additions placed in service and recovered through the F Factor during the term of the PBMRP would transfer into base rates for recovery, same as would occur in any rate case. Prior Referenced Response: i OCC-858 Question: Refer to Exhibit CLP-ELP-1, figure 7. Please explain whether the amounts shown in Figure 7 are capital expenditures versus plant additions. Please explain any differences in the nature, or timing of the amounts shown in Figure 7 and the amounts of plant addition that would be used in comparing [i.e., determining “lessor of”] annual plant addition costs in the annual reconciliation filings. a. Please identify, in disaggregated table form, all of the component costs included in each category of the amounts shown in Figure 7. OCC-858 Response: Plant additions and capital expenditures represent two different ways of viewing the same underlying investment. Capital expenditures are generally organized and managed around specific business objectives, programs, projects, or asset installation efforts, such as substation expansions, feeder rebuilds, pole replacement programs, or other distribution system investments. Capital expenditures are incurred over the course of project execution and may span multiple months or years depending on project scope, complexity, and construction schedules. Plant additions, by contrast, are recognized when utility assets are placed in service and meet the applicable accounting criteria for recording as utility plant. Accordingly, a plant addition is generally recorded at a specific point in time, whereas the associated capital expenditures may have been incurred over an extended period. The Company develops its forecast of plant additions using its capital investment plans, project schedules, anticipated in-service dates when possible, and historical experience. However, actual in-service dates may differ from forecasted in-service dates (where available) due to changes in project scope, construction sequencing, permitting, material
  4. Page 4 of 16

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-14 Date Issued October 20, 2026 UPA-081 Page 4 of 4 availability, operational considerations, weather, or other factors. Consequently, the timing of annual plant additions may differ from the timing of annual capital expenditures. While such timing differences may occur in any given year, over a multi-year period it is reasonable to expect that plant additions, together with associated cost of removal, will generally track with capital expenditures. The amounts shown in Figure 7 are forecasted capital expenditures associated with the Company’s planned investment programs. As stated in its response to OCC-423i and other interrogatories, the Company’s annual F-Factor reconciliation would consider specifically the plant additions actually placed in-service through the calendar year-end prior to a given annual filing. For subpart (a) of this request, please refer to OCC-858, Attachment 1.
  5. Page 5 of 16Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-14 Date Issued October 20, 2026 UPA-082 Page 1 of 12 Date Filed: November 17, 2026 Witness: Douglas P. Horton Request from: Public Utilities Regulatory Authority Question: (TFP Study) Exhibit CLP-PBR-2; Exhibit CLP-ELP-1, p. 65; Interrog. Resp. OCC-560; Interrog. Resp. EOE-156, Att. 1 and Att. 2. Provide a complete, unlocked Excel model, mirroring the structure, transparency, and level of detail provided in the response to Interrogatory EOE-156 and its Attachments 1 and 2, that evaluates the longer term revenue requirement and rate impacts of the Company’s proposed capital recovery under three (3) scenarios, each carried through the end of the PBMRP term and through the subsequent proceeding in which capital is incorporated into the Company’s rate base. For each scenario, provide all supporting calculations, formulas, and monthly and annual outputs, and clearly identify all assumptions with citations to the Company’s filing. Scenario 1 — F-Factor Scenario with 5% Over-Forecast Capital Additions Using the Company’s F-Factor methodology described in its response to Interrogatory EOE- 156: a. Apply a 5% increase to the capital investment forecast underlying the TSP and Figure 7 of Exhibit CLP-ELP-1. b. Recalculate the monthly and annual F-Factor revenue requirements under the Company’s proposed mechanism, including the downward-only reconciliation. c. Extend the analysis through the subsequent rate case (which the Company assumes to take effect July 1, 2031 in its response to Interrogatory EOE-156), and show: i. the rollover of accumulated unrecovered plant into new base rates, ii. the rate-year capital included at that point, and iii. the resulting revenue requirement in the first-rate year of the subsequent case. d. Provide the long-run cumulative revenue requirement customers would pay under the FFactor scenario. Scenario 2 — Traditional Cost-of-Service (COS) Treatment of the Same Capital Profile Using the same capital additions (including the 5% overage): a. Model recovery under a traditional COS framework with no F-Factor. b. Assume capital is added to rate base at the next feasible rate-effective date(s) consistent with previous COS practices. c. Extend the model through the next rate case and show: i. rate-base additions and retirements, ii. depreciation, ADIT, property taxes, and cost-of-capital components, iii. the revenue requirement in the first rate year of the subsequent rate case, and iv. the cumulative long-run cost to customers.
  6. Page 6 of 16

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-14 Date Issued October 20, 2026 UPA-082 Page 2 of 12 Scenario 3 — CT-Bar Scenario Using the Same Capital Inputs Applying the CT-Bar mechanism as reflected in the July 15, 2025 Proposed Final Decision in Docket No. 21-05-15RE01, PURA Investigation into Revenue Adjustment Mechanisms for a Performance-Based Regulation Framework: a. Use the same 5% over-forecast capital additions; b. Calculate the CT-Bar capital revenue requirement (monthly and annual); c. Model the transition into the subsequent rate case, including how CT-Bar balances are incorporated into new base rates; and d. Provide the resulting longer term revenue requirement and customer cost trajectory. For all three scenarios, please also: a. Provide a side-by-side comparison table showing: i. annual and cumulative revenue requirements; ii. ROE impacts; iii. customer bill impacts; and iv. total revenue requirement in the subsequent rate case’s first rate year. b. Identify and explain any assumptions that differ across the scenarios. c. Provide all linkages, formulas, and internal references in the Excel model, consistent with Attachment 1 of the Company’s response to Interrogatory EOE-156. d. Confirm whether any scenario requires adjustments to the forecasted capital funding requirements (Exhibit CLP-ELP-1, Figure 7) or the TSP, and explain the basis for any adjustment. Response: Please refer to UPA-082 Attachments 1 through 12. Attachments 1 through 6 assume that actual capital investment will be five percent above forecasted levels, as requested in UPA-082. Attachments 7 through 12 repeat the analysis, assuming the level of forecasted capital. Within each group, the attachments compare the following scenarios: • Company’s proposed PBMRP, including F Factor, • Traditional cost-of-service ratemaking without any multi-year plan, • PFD-RE01 Unmodified, as defined below, • PFD-RE01 with the X-Factor adjustment reflected in Attachments 5 and 11, • PFD-RE01 with CT-bar modified to include WACC-related revenue support as reflected in Attachments 6 and 12.
  7. Page 7 of 16

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-14 Date Issued October 20, 2026 UPA-082 Page 3 of 12 Please refer to the following index of attachments: Attachment Index Description Plant Additions 5% above forecast Attachment 1 Plant Additions as forecast Attachment 7 Company’s proposed PBMRP Attachment 2 Attachment 8 Traditional cost-of-service ratemaking Attachment 3 Attachment 9 RE01 Unmodified Attachment 4 Attachment 10 RE01 with a 1.39% X-Factor Attachment 5 Attachment 11 RE01 with WACC Support Through CT-Bar Attachment 6 Attachment 12 Summary comparison Ratemaking decisions have a greater impact than simply establishing new rates to take effect at the end of the statutory review period. Rates remain in effect while the utility continues to operate and maintain its system, make necessary capital investments, place new assets in service, depreciate existing assets, incur taxes and other operating costs, and finance those requirements. Traditional cost-of-service ratemaking addresses changes in revenue requirements through periodic rate cases and the regulator’s decisions on cost recovery inherently drive utility decisions on operations, investments and serving customers thereafter. Where the ratemaking framework is not devised with an eye to the future (and incentivizing beneficial utility conduct thereafter), a sequential rate case will be the result. Similarly, a multi-year rate plan inclusive of a stay-out provision does not eliminate those costs or the need to finance them. Rather, the stay-out seeks to harness financial motives by giving the utility an opportunity to improve its financial results through cost control, productivity and efficiency rather than returning immediately to a general rate case to establish new rates and revenues to support infrastructure investment. A multi-year framework must therefore do at least two things at once. The multi-year framework must be designed to keep revenues reasonably aligned with the costs and investment requirements of the business, while at the same time not distorting or undermining the incentives for the utility to control costs and improve efficiency over the stay-out period. If revenues simply tracked actual costs dollar for dollar, much of the incentive created by the multi-year stay-out would disappear. Conversely, if revenues become too disconnected from costs and investment requirements, and the resulting gap grows beyond what can reasonably be addressed through efficiency gains, then the stay-out becomes penalizing for the utility and self-defeating to the framework. Thus, the benefits to customers of a multi-year
  8. Page 8 of 16

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-14 Date Issued October 20, 2026 UPA-082 Page 4 of 12 stay-out depend upon a balanced structure within which the Company has an opportunity to sustain itself within the framework. The scenarios requested in this question are well-designed to provide a useful way to test whether different ratemaking frameworks can keep revenues reasonably aligned with the requirements of the Distribution business, while preserving meaningful efficiency incentives. The Company appreciates this question for that reason. The same system must be operated, the same service obligations met, and the same core investment made and financed whether under traditional costof-service rate cycle or under a multi-year rate plan. By holding those requirements constant while changing the ratemaking treatment, the requested comparisons help isolate the consequences of the framework itself. A framework that provides less revenue in a particular year does not mean the underlying cost disappeared. It changes the timing of revenue support and the amount of the underlying requirements the Company must finance during the stay-out. Those differences affect the opportunity to earn the authorized rate of return. They also allow the scenarios to test not simply which framework produces lower rates in a particular year, but how each framework distributes financial pressure and customer impacts over time. To achieve this objective, the Company therefore applied common assumptions across the scenarios, as follows. • Except where specifically noted, each scenario assumes approval of the Company’s proposed going-in revenue requirement, which means that the results shown will vary (perhaps significantly) as the approved revenue requirement diminishes from the level proposed by the Company. • Similarly, storm cost recovery is assumed to operate as intended, such that future storm revenues equal future storm costs rather than allowing additional under-recoveries to accumulate. Attachments 1 through 6 apply the requested assumption that actual capital investment is five percent above forecast, while Attachments 7 through 12 use the forecasted capital investment at levels presented in this proceeding. Comparing the 5% higher-capital and forecast-capital scenarios separates the effect of higher investment from the effect of the ratemaking mechanics. If the relationships among the frameworks persist at forecast capital, they cannot be attributed simply to the five-percent higher-investment assumption. The financial comparison focuses on the Company’s ROE deficit relative to the assumed authorized return on equity rather than the absolute earned ROE. In that regard, the question is not whether any particular ROE is sufficient in isolation. It is how much financial exposure each framework creates, what produces that exposure, and whether management can reasonably affect it through efficiency and performance on a going forward basis. Measuring the deficit from the same assumed authorized return provides a common reference point. Some deficit is neither
  9. Page 9 of 16Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-14 Date Issued October 20, 2026 UPA-082 Page 5 of 12 surprising nor necessarily undesirable on its own. The objective is not to eliminate financial exposure, but to maintain a reasonable balance between the financial discipline created by that exposure and the revenue support necessary to sustain the stay-out so that management can reasonably influence business results while keeping revenues sufficiently aligned with the underlying requirements of the business. Maintaining that balance is essential to a workable stayout. As the balance erodes, the stay-out itself becomes increasingly difficult to sustain, since an unbalanced framework will further erode over time, creating a wider gap between authorized and earned ROE. Customer impacts provide the other side of the comparison. Lower near-term rates achieved by deferring revenue support associated with the costs incurred to provide service may increase both the Company’s financing burden during the stay-out and the rate increase customers ultimately face. The two measures (i.e., utility ROE and customer bill impacts) therefore must remain sustainable together over time. Whether the resulting framework remains financially sustainable over the stay-out also has significance beyond these projected results. Rating agencies are closely following Connecticut regulatory developments and this proceeding. Moody’s has described the pending general rate filing as an “important barometer” of progress regarding regulatory support, while S&P includes a constructive outcome in this proceeding and timely recovery through the Company’s distribution rate-adjustment mechanism among its base-case assumptions. 1 2 These observations do not prescribe a particular PBR mechanism. They do, however, show that the timing and predictability of regulatory recovery and the financial sustainability of the resulting framework are relevant to CL&P’s prospective credit profile. Scenario 1: Company’s Proposed PBMRP The Company’s proposal recognizes that different components of utility costs change for different reasons. In the Company’s proposal, I-X-CD is designed to address operating costs and the corresponding opportunity for productivity and efficiency. The F-Factor addresses necessary core infrastructure investment, subject to a cap and downward-only reconciliation during the PBMRP, while other mechanisms address specific risks not appropriately captured by either. The mechanisms work together without reconciling revenues to the Company’s actual cost of service. The Company therefore remains financially exposed to costs or investment above the revenue Moody’s Ratings, Connecticut Light and Power Company: Update to Credit Analysis (June 30, 2026), p. 4; 1 2 S&P Global Ratings, Connecticut Light & Power Co. (July 23, 2026), pp. 2, 5.
  10. Page 10 of 16Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-14 Date Issued October 20, 2026 UPA-082 Page 6 of 12 support provided through the plan, preserving the incentive to outperform rather than simply passing actual experience through to customers. The projected ROE deficits quantify that financial exposure. By Rate Year 4, the Company’s proposed PBMRP produces an ROE deficit of approximately 73 basis points when capital investment is five percent above forecast and approximately 40 basis points at forecast capital. Those deficits demonstrate that the proposal does not simply adjust revenues to preserve the assumed authorized return. Nor should it. Investment above forecast does not increase the FFactor cap, so the Company will need to make and finance that additional investment without additional F-Factor revenue during the PBMRP. Moreover, in the event that the capital investment is greater than five percent, the impact to the Company becomes more severe. The Company’s proposal also produces the smoothest progression of projected customer impacts among the alternatives. Under the requested 5-percent-higher capital assumption, annual total-bill impacts during the four-year plan range from approximately 1.05 percent to 1.52 percent. The Company’s proposal does not produce the lowest increase in every year. It produces a more measured progression while leaving meaningful financial pressure on the Company throughout the stay-out. The proposal thus illustrates the balance at the center of the PBR design question: preserving meaningful exposure to performance without allowing the relationship between revenues and the underlying requirements of the business to become unsustainable. Scenario 2: Traditional Cost-of-Service Ratemaking Traditional cost-of-service ratemaking addresses the same requirements through periodic rebasing rather than relying on a multi-year revenue formula. As costs and investment move beyond amounts reflected in existing rates, another rate case rebases revenues to a more current cost of service. Under the assumptions used here, doing so requires another rate case every eighteen months. Customer adjustments are less frequent but materially larger, while the ROE deficit increases between proceedings and narrows when rates are reset. Periodic rebasing also changes the incentive. Comprehensive rate cases require substantial resources from the Company, PURA, OCC, and other parties, but the more fundamental difference is that a rate case resets the financial relationship within which management has been operating. If preparation for the next proceeding begins almost as soon as the prior case concludes, there is little time for a focus on cost control, productivity and performance to formulate and produce results before revenues are rebased again. Traditional ratemaking effectively restores revenues to a current cost of service, but frequent rebasing limits the sustained incentive a multi-year framework is intended to create. That tradeoff provides an important reference point for the remaining scenarios: extending the stay-out creates a greater opportunity for incentives to operate, but only if the framework remains workable long enough for them to do so.
Words on different pages
4 pages match

As listed on the current system

Corres. 11/23/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (PURA Set 14, PURA Set 16, OCC Set 30)

This filing on the current system (opens in a new tab)