Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Discovery Compilation (PURA Set 14, PURA Set 16, OCC Set 30)

Files4

Search terms highlighted
Eversource rate increase is on 11 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
7 pages match
Words on different pages
4 pages match
  1. Page 14 of 47Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-992 Page 1 of 2 Date Filed: November 10, 2026 Witness: Jared A. Lawrence and Jason Tharp Request from: Office of Consumer Counsel Question: (BRIDGE METERS) Please refer to the Response to OCC-943, where the Company states that bridge meters can facilitate time of use rates. Please clarify that the singular barrier to a current customer on a bridge meter being on a time of use rate is the Company’s “supporting billing system and interval data management system.” If this is not the singular barrier, please describe all other barriers. Response: TOU rates require meters that record interval data, which bridge meters can record. The interval data management system (MV-90) is responsible for calling and validating interval data information, including for TOU customers. The MV-90 system normally communicates with meters via analog phone lines or cellular modems. It is technically possible for bridge meters to communicate interval data via the AMR ERT module to a meter reader vehicle. But transmitting interval data opposed to simple register reads takes much longer. Adding interval data collection to meter reading routes would reduce the number of meters a route can handle, resulting in additional AMR drive-by meter readers collecting the interval data. Eversource decided that the added cost for system upgrades to support collecting interval data from drive-by meter reading along with the increasing meter readers to support more time intensive interval read collection were not prudent and ran counter to moving to an eventual AMI solution. The traditional method for obtaining interval data from bridge meters is to set up the AMI 1.0 network and collect the interval data wirelessly without the need for meter reader collection. But multiple intermediary systems are required between bridge meters (or AMI meters) and the billing system. One intermediary system is typically referred to as meter data management system (MDMS) and is responsible for housing the interval data for the billing system to retrieve and render bills. Another intermediary system is the head-end system responsible for calling the bridge meters (or AMI meters) to obtain the interval data. It is a significant effort to set up both the headend system and an MDMS and integrate them with the billing system. In short, there are significant investments required for either method of collecting interval data from bridge meters. If the Company collected the interval data from AMR drive-by meter readers, Eversource would need to upgrade the meter reading collection system, the MV-90 system, and add more meter readers. If the Company stood up the AMI 1.0 network to collect the interval data, Eversource would need to implement a head end system, MDMS, and make changes to the billing system and MV-90 system. This represents the bare minimum for enabling TOU billing with
  2. Page 15 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-992 Page 2 of 2 bridge meters, but an AMI infrastructure offers many other benefits that would entail many more system integrations to realize those benefits.
  3. Page 16 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-993 Page 1 of 1 Date Filed: November 10, 2026 Witness: Jared A. Lawrence and Sean P. Noonan Request from: Office of Consumer Counsel Question: (METER BILLING SYSTEM) Please indicate the month and year the Company’s current billing system was installed and the month and year of any updates. Response: The Company has two billing systems for Connecticut electric accounts C2, and CT Large Power Billing. The main application is a system called C2 which was built in-house by Eversource in 2008. This system is used to bill most of the Company’s commercial and residential customer accounts. The C2 system cannot accommodate working with AMI meters, making the overall upgrade to a cohesive singular CIS application necessary. The Company’s other system is called CT Large Power Billing and was implemented around 2008. This system manually bills a very small number of complex and mostly commercial accounts through a mostly manual process. CT Large Power Billing will be retired in Q2 of 2027, and the customers will begin billing through C2 via an add-on tool to calculate the billing determinates. Over the years, numerous enhancements, upgrades and fixes have been implemented to each of these systems to keep the systems running and to meet the Company’s service obligations.
  4. Page 17 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-994 Page 1 of 1 Date Filed: November 10, 2026 Witness: Jared A. Lawrence and Sean P. Noonan Request from: Office of Consumer Counsel Question: (INTERVAL DATA MANAGEMENT SYSTEM) Please indicate the month and year the Company’s current interval data management system was installed and the month and year of any updates. Response: The Company uses a combination of field collection applications and a meter data management system to collect and store CT Electric meter data. There are two field collection applications, FCS, which was implemented in July 2015 and MV90, which was implemented in October 2006. FCS collects AMR and bridge meter data but does not function as a Meter Data Management System (MDMS) within the program’s capabilities. MV90 supports TOU meters and is a MDMS, however it is not compatible with AMI meters and lacks the technological advancements to accommodate working with AMI meters. Field Collection Applications: • FCS: implemented July 2015 • MV90: implemented October 2006 Meter Data Management: • MDMS: implemented April 2014 Over the years, numerous enhancements, upgrades and fixes have been implemented to each of these systems to keep the systems running and to meet the Company’s service obligations.
  5. Page 18 of 47Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-995 Page 1 of 4 Date Filed: November 10, 2026 Witness: Jared A. Lawrence and Jason Tharp Request from: Office of Consumer Counsel Question: (BRIDGE METERS) Please provide the Authority decision and/or ruling approving the Company installing the 467,145 bridge meters it has installed. Response: The Company does not require PURA’s approval for installation of bridge meters. The installation of meters is a basic function of utility service, falling into the category of capital investment that PURA reviews on the basis of prudence at the time that recovery of the investment is requested in rate base. On the CL&P system, implementation of bridge meters proceeded on the basis of a business case contemplating the obsolescence of automated meter reading (“AMR”) technology and the opportunity to obtain enhanced functionality on the distribution system, as the evaluation of implementation of Advanced Metering Infrastructure (“AMI”) took place in Docket No. 17-1203RE02 over an extended time frame (2019-2024). The installation of bridge meters does not involve the need for a comprehensive implementation plan involving the integration of new backoffice information systems and accelerated installation across the entire customer base, which are the circumstances that drive the need for an associated cost-recovery mechanism and other approvals of PURA to support that type of implementation. Specifically, beginning in 2017, the Company began to evaluate the installation of “bridge” meters to replace a portion of its hard-to-reach AMR meters with a goal of increasing operational efficiencies for service disconnects and reconnects; decreasing the amount of customer write-offs and bad debts through more and faster remote disconnects; and addressing the “failure curve” for meters at or approaching end of life. Bridge meters are AMR meters with remote turn-on and turnoff capability through the Company’s existing meter reading system. Bridge meters can also be used for specialty applications, including net and demand readings. An AMR meter with specialty applications added to it – like the capability to measure demand – is more expensive than purchasing a bridge meter and programming it to perform specialty applications. This is due to the fact that AMR technology is antiquated and requires more expensive components than the more flexible bridge meter. Because the Company’s existing metering infrastructure was at its end-of-life and therefore prone to error or failure, replacement was necessary in order to avoid billing inaccuracies or estimates. With the success of the bridge-meter project in meeting operational and bad-debt reduction goals, the Company increased the level of meter-related capital expenditures in 2018, 2019 and 2020,
  6. Page 19 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-995 Page 2 of 4 and migrated to remote-disconnect capable meters as its meter of choice for all replacement installations. To this day, bridge meters continue to offer significant safety and operational benefits with their ability to remotely read and operate when access is an issue, which is common in metro areas. The Company expects to continue to utilize both bridge-meter technology and AMR meter technology pending full implementation of AMI. Specific benefits of bridge-metering technology include the following: Remote disconnect/reconnect switch: • Many of the residential meter types include a remote disconnect/reconnect switch. That switch can be operated by agents of Eversource without the need to physically access the meter. The agents must still visit the premises to get close to the meter for the signal to reach. • The disconnect feature is primarily used to decrease the amount of customer write-offs and bad debt. Allowing employees to disconnect the meter without physical access helps in situations where access is prevented or unsafe conditions. • The primary benefit of the remote reconnect feature is the ability to restore power to the customer without requiring the customer to be home to grant access when the meter is located inside. Automatic demand reset: • Legacy meter types require the Meter Reader to perform manual demand resets monthly so the meter can correctly record demand values for applicable customers/rates. The bridge meter can automatically reset the demand value when the meter is read each month. This cuts down the time and effort involved with reading these meter configurations. Polyphase phase angles: • Polyphase bridge meters have the added benefit of providing phase angle data when meter data is extracted. Phase angle data is used to troubleshoot metering or service issues. There have been examples of equipment errors being detected with phase angle data. Meter feature standardization: • Prior to bridge meters, the Company used different meter types for demand customers, net customers, net demand customers and production meters. Multiplying each of these needs across the various service configurations results in dozens of different meter types. The
  7. Page 20 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-995 Page 3 of 4 bridge meter is able to handle all these billing requirements with the same meter which greatly simplifies inventory and reduces meter inventory shortages. Annual installations are summarized as follows: Year 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Total Installed Bridge Meters 5,161 50,292 85,581 105,285 54,345 21,291 16,426 29,710 69,896 18,237 13,222 469,446 Installed AMR Meters 39,086 28,224 17,958 3,798 1 20,476 35,157 14,852 3,784 1,432 173 164,941 The table above provides a breakdown of all bridge and AMR meters that are currently physically installed in Connecticut. The different rows separate meters into the year they were purchased. The total quantities differ from the 467,145 figure referenced due to minor fluctuations in reporting of installed and removed meters which occur on a daily basis. Additionally, it is necessary to highlight that the methodology of categorizing physically installed meters broken out by purchase year, matches previously filed meter breakdowns. Since there are natural delays between purchasing and installing meters in the field, it may appear as if past stated vintages are increasing (i.e. there is an increase in 2025 meters than previously stated). This variance is due to reporting on meters that were purchased in 2025 were physically installed in the field in 2026. This is true for all years resulting in older vintage volumes decreasing, and newer vintage meter volumes increasing each time this analysis is performed. Going forward - with the implementation of AMI - advances in the industry throughout the previous decade have enabled additional capabilities in AMI meters at comparable cost, increasing the relative cost-effectiveness of an AMI system. Modern AMI meters now leverage advancements in mesh network technology and 4G LTE and 5G communication technologies, enabling near real-time data sharing through device-to-device communication. This facilitates greater situational awareness for the utility. Equipped with more powerful processors and expanded storage, these meters can download applications and run analytical algorithms to address various use cases, such as mapping meters to transformers and providing customers with detailed
  8. Page 21 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-995 Page 4 of 4 insights into their energy usage. Additionally, modern AMI meters are capable of grid-edge computation, processing vast amounts of data to produce actionable insights for both the customers and the grid. The meters can autonomously decide which data to send back to the utility, optimizing network utilization and reducing the amount of time needed to process, analyze, and make decisions based on that data. Advanced AMI use cases now include neutral monitoring, connectivity model verification, and advanced load disaggregation, alongside traditional capabilities such as remote connect/disconnect, internal metering, tamper detection, and power loss and restoration notifications. The Company’s meter replacement strategy aims to provide all customers in the territory with equal access to the benefits the AMI deployment.
  9. Page 22 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-996 Page 1 of 1 Date Filed: November 10, 2026 Witness: Jared A. Lawrence and Jason Tharp Request from: Office of Consumer Counsel Question: (METERS) Please provide for each year from 2018 through the present the average unit cost of each type: of AMR meter(s) the Company installed; each type of bridge meter(s) the Company installed; and each type of AMI meter(s) the Company installed. Response: Please refer to Table 1 below for the requested information: Table 1: Average Unit Cost of Installed Meter by Type Meter Type Legacy AMR Legacy AMR Bridge AMR Bridge AMR AMI AMI Service 2018 2019 2020 2021 2022 2023 2024 2025 Self-Contained Transformer Rated $138 $200 $180 $38 $37 $41 $35 $38 $97 $121 $0 $145 $72 $75 $77 $90 Self-Contained Transformer Rated Self-Contained Transformer Rated $127 $115 $118 $107 $115 $143 $139 $125 $176 $0 $161 $0 $188 $0 $187 $0 $187 $0 $186 $0 $197 $0 $199 $0 $0 $0 $0 $0 $0 $0 $0 $0
  10. Page 23 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-997 Page 1 of 2 Date Filed: November 10, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry, John G. Griffin, Craig Dikeman and Matthew J. Correia Request from: Office of Consumer Counsel Question: (MS24E) Please refer to the Response to OCC-955. a. Please cite to the contractual provision contained in the contract with E-J Electric provided in response to OCC-44 that permits the vendor to begin billing at double time while traveling to a job work site. b. Where was this crew housed/staying on the night of March 11, 2024? Response: a. Please refer to OCC-044, Attachment, at 2 page 1153 which includes the list of exhibits referenced within the contract with E-J Electric. The Exhibit B Pricing Schedule was not included with the E-J Electric MSA provided in OCC-044 i. Please refer to EOE-206, Attachment 1, for a copy of the Exhibit B Pricing Schedule applicable to the E-J Electric contract cited above. Please refer to Exhibit B Pricing Schedule, Section 4.4 Emergency Response Work, section (a); “Owner shall compensate Contractor for Emergency Response Work assigned to Contractor based on Contractor’s applicable Emergency Response rates from the commencement of such Emergency Response Work at the Site through the termination of Emergency Response Work at the Site, excluding rest time during that period. Emergency Response rates for labor shall be rates equal to the Double Time Rates set forth in Appendix PS-6 PRICING SCHEDULE - T&M.” b. Per Exhibit ACC-2(CLPI-5A-2)(MS24E), at page 157, the crews self-lodged at the Holiday Inn Express in Rocky Hill. Prior Referenced Response i OCC-044 Question: (Contracts) For all external line crews and vegetation contractors whose costs are reflected in the storms in this docket and for all current external line crews, please provide all contracts and addendums thereto in effect from January 1, 2024, to the present.

As listed on the current system

Corres. 11/23/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (PURA Set 14, PURA Set 16, OCC Set 30)

This filing on the current system (opens in a new tab)