  1. Page 3 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-984 Page 3 of 3 For the Test Year in this proceeding, please provide: a. the number of residential electric customers with a heat pump as their primary heating source; b. the total electricity consumption (kWh) of these customers; c. the total electric delivery revenue attributable to these customers, in the aggregate. The Company may provide this information either as a summary table or as the underlying billing and customer data necessary to derive it (e.g., anonymized billing-quality data identifying each customer's heating source, together with that customer's kWh consumption and delivery revenue for the period). Please provide this information in CSV format or in live Microsoft Excel format (with all formulae intact). If the Company does not possess the information necessary to produce any of the three items requested (heat pump customer count, consumption, or delivery revenue), please state specifically which item(s) the Company is unable to provide, and explain in detail why not for each. If the Company is not able to produce all three items requested for the Test Year, but is able to do so for a different time period, please provide these figures for the most recent time period available. CLF-SC-003 Response: Since the Company does not track the heating sources of its customers, the Company has evaluated data collected from Energy Efficiency rebates issued to customers who (1) installed a qualifying heat pump at their residence and (2) submitted for a rebate. This information does not represent all customers who may have heat pumps. a. Evaluation of data from rebate program which began in 2023 indicates there have been approximately 4,400 customers who have received heat pump rebates that indicate full displacement of other heat sources and use heat pumps as their primary heating source. b. The Company does not know the total number of residential electric customers utilizing heat pumps as their primary heating source during the Test Year and accordingly is unable to query those customers’ total kWh consumption or determine or estimate total delivery revenue. c. Refer to the Company’s response to subpart (b), above.
  2. Page 4 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-985 Page 1 of 1 Date Filed: November 10, 2026 Witness: John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (STORM OVERTIME) Please refer to the Response to OCC-945, Attachment 1. Please complete the same for all storms in 2024. Response: Please refer to OCC-985, Attachment 1, for an unlocked excel file which includes employee’s job title and storm role for all 2024 storms. Please refer to EOE-040, Attachment 3, for description of storm roles.
  3. Page 5 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-986 Page 1 of 1 Date Filed: November 10, 2026 Witness: Jessica B. Cain and Daniel M. Traynor Request from: Office of Consumer Counsel Question: (AFFORDABILTY) Please refer to the Response to OCC-957, Attachment 1. a. Please indicate the all-in rate used in each assumed monthly bill. b. Please provide the same calculation assuming 1200 kWh/month usage for Rate 5. Response: a. The all-in rates used for each assumed monthly bill are: • Rate 1: $0.28976 per kWh, plus Customer Charge ($12.36) • Rate 5: $0.26412 per kWh, plus Customer Charge ($30.00) • Rate 7 1: i. On Peak Usage: $0.35510 per kWh ii. Off-Peak Usage: $0.26282 per kWh iii. Customer Charge: $12.36 b. Please refer to OCC-986, Attachment 1, for the requested information. 1 Rate 7 monthly bill amount based off 26.5% On-Peak Usage, and 73.5% Off-Peak Usage.
  4. Page 6 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-987 Page 1 of 1 Date Filed: November 10, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Office of Consumer Counsel Question: (USAGE) Please provide the average residential customer (separated by Rate 1 and Rate 5, excluding Rate 7) usage for each month of the calendar years 2021-to present. Response: Please refer to OCC-987, Attachment 1, for the Rate 1 and Rate 5 average residential customer usage (kWh) for each month of the calendar years 2021 to present.
  5. Page 7 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-988 Page 1 of 1 Date Filed: November 09, 2026 Witness: Christopher Leigh Request from: Office of Consumer Counsel Question: (CYBERSECURITY) Please refer to the Response to OCC-768. There the Company indicated “Yes” to the question of if it had ever determined, through its vendor security review process, that a prospective or existing vendor’s security controls or practices were insufficient; however, the Company answered the remaining of the question regarding only what “may” occur in such circumstances, not what did occur. Please indicate from 2018 to the present: a. each incident in which the Company determined through its vendor security review process that a vendor’s security controls or practices were insufficient; b. what services that vendor provided; c. what specific security deficiencies were identified; d. whether the vendor was permitted to proceed or continue providing services; and e. what specific action(s) the Company took in response. Response: The Company reviewed its Vendor Risk Management records for the period January 1, 2018 through the present to identify instances in which a prospective or existing vendor was determined through the vendor security review process to have security controls or practices that did not meet the Company's requirements. Please refer to OCC-988, Attachment 1 CONFIDENITAL, for the results of the Company’s vendor assessments. In each of the instances, the Company's Vendor Risk Management process identified the relevant concern through the due diligence review and resulted in the vendor either not proceeding with the contemplated engagement or being subject to additional requirements or conditions before the engagement could proceed. The Company also identified vendor reviews during this period that were closed or classified as rejected for reasons other than a determination of inadequate cybersecurity controls, including vendor non-responsiveness and instances where the vendor was not ultimately selected. Those records have not been included in OCC-988, Attachment 1 CONFIDENIAL.
  6. Page 8 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-989 Page 1 of 2 Date Filed: November 10, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Office of Consumer Counsel Question: (BOARD OF DIRECTORS) Please refer to the Response to OCC-263. Is the Company stating that there are no costs or compensation associated with the Board of Directors paid for by CL&P ratepayers? If there are any costs, please provide for the years 2021-2025 and describe. Response: The Company clarifies that there were two separate asks in the interrogatory request OCC-263 i relevant to the current interrogatory. First the Company addressed the “total expenses associated with… CL&P… board of directors that are direct charged and allocated to the Company” in which the Company replied in the first paragraph of the response that “The Board of Directors of the Connecticut Light and Power Company have never, nor do they now receive any meeting fees, reimbursable expenses, benefits, stock options, or meeting costs as it relates to the Company’s meetings or for their service on its Board.” Therefore, there are no costs included within the Company’s cost of service related to the CL&P board of directors. The second portion of interrogatory request OCC-263 asked the Company to “[p]rovide the total expenses associated with Eversource…and any other board of directors that are direct charged and allocated to the Company”. That portion of the interrogatory was responded to in the second paragraph of the response, in which the Company details costs incurred for the Board of Trustees for Eversource Energy in the Test Year. Further, OCC-263, Attachment 1, displays costs from years 2021-2025. Eversource Energy Board of Trustee costs sought for approval are shown in Exhibit CLPREVREQ-1, at page 70 as “Trustee Retainer Fees of $290,000, and Restricted Stock Units of $225,000.” These costs can also be found in Exhibit CLP-REVREQ-2, Schedule C-3.4. To reiterate, costs other than Trustee retainer fees and trustee restricted stock units have been excluded from the Company’s cost of service. Prior Referenced Response i OCC-263 Question:
  7. Page 9 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-989 Page 2 of 2 (Board of Director Expenses) Provide the total expenses associated with Eversource, CL&P and any other boards of directors that are direct charged and allocated to the Company including but not limited to fees, retainers, reimbursements, benefits, stock options, travel, meeting costs, etc. for each of the years 2021, 2022, 2023, 2024, 2025 and the amount included in the rate year. OCC-263 Response: The Board of Directors of the Connecticut Light and Power Company have never, nor do they receive any meeting fees, reimbursable expenses, benefits, stock options, or meeting costs as it relates to the Company’s meetings or for their service on its Board. For costs related to the Eversource Energy Board of Trustees from 2021 through the Rate Year, please see OCC-263, Attachment 1. Note the Company incurred expenses of $515,000 in the Test Year and in the Rate Year associated with Board of Trustees expenses. Please see CLP-REVREQ-2, Schedule C-3.4, and the Prefiled Testimony at Exhibit CLP-REVREQ-1, at page 70, for additional information on Board of Trustees expenses.
  8. Page 10 of 47Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-990 Page 1 of 3 Date Filed: November 10, 2026 Witness: Jared A. Lawrence and Jason Tharp Request from: Office of Consumer Counsel Question: (BRIDGE METERS) Please list and explain all functions of the bridge meter(s) the Company uses (i.e., not functions that the meter is capable of, but functions that the Company uses) that differ from an AMR meter. Response: Please refer to the Company’s response to information request OCC-995 i. Referenced Response i OCC-995 Question: (BRIDGE METERS) Please provide the Authority decision and/or ruling approving the Company installing the 467,145 bridge meters it has installed. OCC-995 Response: The Company does not require PURA’s approval for installation of bridge meters. The installation of meters is a basic function of utility service, falling into the category of capital investment that PURA reviews on the basis of prudence at the time that recovery of the investment is requested in rate base. On the CL&P system, implementation of bridge meters proceeded on the basis of a business case contemplating the obsolescence of automated meter reading (“AMR”) technology and the opportunity to obtain enhanced functionality on the distribution system, as the evaluation of implementation of Advanced Metering Infrastructure (“AMI”) took place in Docket No. 17-12-03RE02 over an extended time frame (2019-2024). The installation of bridge meters does not involve the need for a comprehensive implementation plan involving the integration of new back-office information systems and accelerated installation across the entire customer base, which are the circumstances that drive the need for an associated cost-recovery mechanism and other approvals of PURA to support that type of implementation. Specifically, beginning in 2017, the Company began to evaluate the installation of “bridge” meters to replace a portion of its hard-to-reach AMR meters with a goal of increasing operational efficiencies for service disconnects and reconnects; decreasing the amount of customer write-offs and bad debts through more and faster remote disconnects; and addressing the “failure curve” for meters at or approaching end of life. Bridge meters are AMR meters with remote turn-on and turn-off capability through the Company’s existing meter reading system. Bridge meters can also be used for specialty applications, including net and demand readings. An AMR meter with specialty applications added to it – like the capability to measure demand – is more expensive than purchasing a bridge meter and programming it to perform specialty applications. This is due to the fact that AMR technology is antiquated and requires more expensive components than the more flexible bridge meter. Because the Company’s existing metering
  9. Page 11 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-990 Page 2 of 3 infrastructure was at its end-of-life and therefore prone to error or failure, replacement was necessary in order to avoid billing inaccuracies or estimates. With the success of the bridge-meter project in meeting operational and bad-debt reduction goals, the Company increased the level of meter-related capital expenditures in 2018, 2019 and 2020, and migrated to remote-disconnect capable meters as its meter of choice for all replacement installations. To this day, bridge meters continue to offer significant safety and operational benefits with their ability to remotely read and operate when access is an issue, which is common in metro areas. The Company expects to continue to utilized both bridge-meter technology and AMR meter technology pending full implementation of AMI. Specific benefits of bridge-metering technology include the following: Remote disconnect/reconnect switch: • Many of the residential meter types include a remote disconnect/reconnect switch. That switch can be operated by agents of Eversource without the need to physically access the meter. The agents must still visit the premises to get close to the meter for the signal to reach. • The disconnect feature is primarily used to decrease the amount of customer write-offs and bad debt. Allowing employees to disconnect the meter without physical access helps in situations where access is prevented or unsafe conditions. • The primary benefit of the remote reconnect feature is the ability to restore power to the customer without requiring the customer to be home to grant access when the meter is located inside. Automatic demand reset: • Legacy meter types require the Meter Reader to perform manual demand resets monthly so the meter can correctly record demand values for applicable customers/rates. The bridge meter can automatically reset the demand value when the meter is read each month. This cuts down the time and effort involved with reading these meter configurations. Polyphase phase angles: • Polyphase bridge meters have the added benefit of providing phase angle data when meter data is extracted. Phase angle data is used to troubleshoot metering or service issues. There have been examples of equipment errors being detected with phase angle data. Meter feature standardization: • Prior to bridge meters, the Company used different meter types for demand customers, net customers, net demand customers and production meters. Multiplying each of these needs across the various service configurations results in dozens of different meter types. The bridge meter is able to handle all these billing requirements with the same meter which greatly simplifies inventory and reduces meter inventory shortages. Annual installations are summarized as follows:
  10. Page 12 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-990 Page 3 of 3 Year 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Total Installed Bridge Meters 5,161 50,292 85,581 105,285 54,345 21,291 16,426 29,710 69,896 18,237 13,222 469,446 Installed AMR Meters 39,086 28,224 17,958 3,798 1 20,476 35,157 14,852 3,784 1,432 173 164,941 The table above provides a breakdown of all bridge and AMR meters that are currently physically installed in Connecticut. The different rows separate meters into the year they were purchased. The total quantities differ from the 467,145 figure referenced due to minor fluctuations in reporting of installed and removed meters which occur on a daily basis. Additionally, it is necessary to highlight that the methodology of categorizing physically installed meters broken out by purchase year, matches previously filed meter breakdowns. Since there are natural delays between purchasing and installing meters in the field, it may appear as if past stated vintages are increasing (i.e. there is an increase in 2025 meters than previously stated). This variance is due to reporting on meters that were purchased in 2025 were physically installed in the field in 2026. This is true for all years resulting in older vintage volumes decreasing, and newer vintage meter volumes increasing each time this analysis is performed. Going forward – with the implementation of AMI - advances in the industry throughout the previous decade have enabled additional capabilities in AMI meters at comparable cost, increasing the relative cost-effectiveness of an AMI system. Modern AMI meters now leverage advancements in mesh network technology and 4G LTE and 5G communication technologies, enabling near real-time data sharing through device-to-device communication. This facilitates greater situational awareness for the utility. Equipped with more powerful processors and expanded storage, these meters can download applications and run analytical algorithms to address various use cases, such as mapping meters to transformers and providing customers with detailed insights into their energy usage. Additionally, modern AMI meters are capable of grid-edge computation, processing vast amounts of data to produce actionable insights for both the customers and the grid. The meters can autonomously decide which data to send back to the utility, optimizing network utilization and reducing the amount of time needed to process, analyze, and make decisions based on that data. Advanced AMI use cases now include neutral monitoring, connectivity model verification, and advanced load disaggregation, alongside traditional capabilities such as remote connect/disconnect, internal metering, tamper detection, and power loss and restoration notifications. The Company’s meter replacement strategy aims to provide all customers in the territory with equal access to the benefits the AMI deployment.