Discovery Compilation (PURA Set 14, PURA Set 16, OCC Set 30)
Files4
Docket No. 26-05-10 Discovery Compilation November 23 2026.pdf
PDF · 133 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation November 23 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation November 23 2026.pdf
PURA Set 14_COMBINED.pdf
PDF · 564 KB · 16 pagesText searchable
Download PURA Set 14_COMBINED.pdfRead the text of PURA Set 14_COMBINED.pdf
PURA Set 16_COMBINED.pdf
PDF · 384 KB · 12 pagesText searchable
Download PURA Set 16_COMBINED.pdfRead the text of PURA Set 16_COMBINED.pdf
OCC Set 30_COMBINED.pdf
PDF · 568 KB · 47 pagesText searchable
Download OCC Set 30_COMBINED.pdfRead the text of OCC Set 30_COMBINED.pdf
Page 33 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-1004 Page 3 of 3 EOE-051 Response: Please refer to EOE-051, Attachment 1, for an unlocked spreadsheet providing the requested details for vendor spend and bidding information. Please note that the scope of information requested is substantial, extending well beyond the confines of this rate proceeding. Accordingly, to align the Company’s preparation of the requested information with the scope of this proceeding, the Company is providing information for the following time periods: 1. For capitalized costs, the Company has compiled and is providing the requested information for the time period 2018-2025, which is in alignment with the plant additions that are requested for inclusion in rate base. 2. For operating and maintenance expense, the Company has compiled and is providing the requested information for the time period 2023-2025, which is in alignment with the Company’s test year (calendar year 2025), plus two additional historical years. 3. For storm-restoration expense associated with the deferred storm costs requested for recovery in this docket, the Company has compiled and is providing the requested information for the time period 2024-2025. Please note that supporting procurement records are maintained at the Purchase Order or Contract level rather than the Supplier level. Consequently, certain suppliers may have competitively bid transactions, as well as transactions supported by Sole Source Justification. For each contract, the Company has provided the most recent contract effective date. The Company’s systems do not track records based on the most recent bid completion date. This is a detail that the Company can research and provide on a sample basis, upon request.Page 34 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-1005 Page 1 of 2 Date Filed: November 10, 2026 Witness: Brendan J. O’Brien, Garrett J. Murray, Jeffrey M. Pugliese and Mark P. Baldwin Request from: Office of Consumer Counsel Question: (ECONOMIC DEVELOPMENT FEES) Please refer to the Response to OCC-70, where the Company states, “The purpose of the Company's membership with these organizations is to facilitate a mutual assistance network among member utilities, which enables companies to mobilize personnel and equipment to support major restoration efforts.” a. Is the Company stating in this Response that membership in these organizations is necessary for mutual aid? b. Do these organizations contribute to storm restoration in any manner other than mutual aid from other utilities? If so, please describe. c. For the test year, please indicate for each storm if the Company relied on these organizations in its storm response and describe how. Response: a. No. The Company is not stating that membership in these organizations is required in order to receive mutual assistance. Rather, the Company's participation in organizations such as the Edison Electric Institute (EEI) and the associated regional mutual assistance networks provide an established framework and coordination process through which electric utilities can efficiently request, offer, and deploy restoration resources during major outage events. The mutual assistance program is a voluntary partnership among electric companies that facilitates the sharing of skilled personnel, contractors, and specialized equipment when significant restoration efforts are required. b. Yes. In addition to facilitating the exchange of mutual assistance resources, organizations such as EEI support storm restoration preparedness and response by: • Developing and managing mutual assistance procedures, applications, and agreements that enable rapid resource requests and deployment. • Coordinating communication between affected and assisting utilities before, during, and after major events, including situational awareness and information sharing regarding storm impacts, resource availability, and travel restrictions.Page 35 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-1005 Page 2 of 2 • Maintaining regional networks that allow utilities to identify available crews, equipment, and contractor resources. • Conducting industry emergency management forums, preparedness activities, exercises, and post response assessment efforts that help improve future restoration operations. c. For the 14 storm events that occurred during the test year, the Company did not secure restoration resources through the mutual assistance process facilitated by the Edison Electric Institute (EEI) or its affiliated regional network, the North Atlantic Mutual Assistance Group (NAMAG.) The Company actively participated in NAMAG coordination and situational awareness activities before, during, and after significant weather events. Specifically, the Company participated in mutual assistance and situational awareness conference calls associated with the January 9th storm, the April 3rd – 4th storm, and the August 9th severe weather event. The Company also participated in industry calls related to Hurricane Helene and Hurricane Milton, which created significant restoration demands across multiple regions of the United States and affected the nationwide availability of utility and contractor resources.Page 36 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-1006 Page 1 of 2 Date Filed: November 12, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (Storm MS24J – Civil Crews) Refer to Exhibit ACCT-2 (CLP-11A-2) (MS24J) and ACCT-2 (CLP-11A-3) (MS24J). The following pertains to invoices from Charter Oak Utility Constructors Inc.: a. Per review of invoices #38621 & #38705 and associated Excavation Job Forms, the work performed under work orders #RPEX0011 and #82780347. Provide additional context and explain how this work order relates to storm MS24J. If this work order number does not relate to the storm event, why was this included within the storm recovery costs? b. Per review of invoice #38649, the work was performed on 8/19/24. Explain how the work performed within this form relates to storm MS24J given the work was performed during the timing of a minor storm event according to the data provided from EOE-0 Attachment 1. c. Per review of invoice #38921, the work was performed on 9/6/24. Explain how the work performed within this form relates to storm MS24J given the work was performed after the storm event. How did the Company know this related to MS24J with other minor storms occurring after MS24J that could have caused the damage? Response: Referring to Exhibit ACCT-2 (CLP-11) (MS24J), Outside Line Contractors, lines 176, 181, 182, 183, Charter Oak Utility Constructors LLC, in the total amount of $35,029. a. The work charges shown on lines 176 and 181 occurred during the timeframe of storm preparation activities immediately prior to the declaration of the ERP for MS24J. Without additional context to tie it more directly to MS24J, the Company has elected to remove the charges totaling $30,339 and will supplement Exhibit ACCT-2 (CLP-11) (MS24J), accordingly. b. Please reference OCC-1006, Attachment 1 CONFIDENTIAL, for the OMS details related to this event. During the storm event, repairs were made at the impacted location. The Company hired Charter Oak Utility Constructors LLC to return and perform the needed repair. Please note that the OMS details reference the Town of Manchester, as this particular location is right on the Manchester and South Windsor town lines.Page 37 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-1006 Page 2 of 2 c. Please refer to OCC-1006, Attachment 2 CONFIDENTIAL, for the OMS details related to this event. During the storm event, repairs were made at the impacted location. The Company hired Charter Oak Utility Constructors LLC to return to the property and repair the property impacted by the equipment.Page 38 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-1007 Page 1 of 1 Date Filed: November 12, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (Storm MS24J – Civil Crews) Refer to Exhibit ACCT-2 (CLP-11A-3) (MS24J). The following pertains to invoice #N0817224B from HI Stone & Son, Inc. Per review of the Excavation Job Form, there is no submission date, work completion date, signature by the contractor, or signature by the Eversource approver and the form has work order #RMOU0011. Explain how the Company verified the invoices and work performed by these crews without reviewing the work or having a reference date. If additional support or information is to be considered regarding this work, please provide and explain why it was not originally included. Response: Referring to Exhibit ACCT-2 (CLP-11) (MS24J), Outside Line Contractors, at Line 211, HI Stone & Son, Inc, in the amount $3,632. The work charges are for the repair of damages resulting from a lightning strike on August 8, 2026, shortly prior to the declaration of the ERP for MS24J. Without additional context to tie this damage to MS24J, the Company has elected to remove the charges totaling $3,632, and will supplement Exhibit CLP-7 (MS24J), to remove line 211, accordingly.Page 39 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-1008 Page 1 of 1 Date Filed: November 10, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (Storm MS24J – Civil Crews) Refer to Exhibit ACCT-2 (CLP-11A-4) (MS24J). The following pertains to KTI Utility Construction & Maintenance LLC. The description within the invoice notes work performed on 10/16/2024 and the invoice date of 10/19/24. Explain how the work performed within this invoice relates to storm MS24J given the work was performed two months after the event and other minor storm events occurred after MS24J that could have caused that damage. If additional information was utilized to determine the applicability to MS24J, please provide. Response: On 8/10/2024 during the MS24J storm, the damage occurred at 10 Spring House Rd in Greenwich. This is shown in event #5483661. There was damage to the off-road pole which was sent to KTI to hand dig and set a new pole. This was not the priority in the heat of the storm as the customer had power when this was sent to KTI. Other work was prioritized over this damage related to restoring power, therefore it was scheduled and completed at a later date.Page 40 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-1009 Page 1 of 1 Date Filed: November 09, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (Storm MS24J – Civil Crews) Refer to Exhibit ACCT-2 (CLP-11A-7) (MS24J). The following pertains to McAllen Construction Inc. Per review of invoice #642024, only one event had a work order related to MS24J. Explain how the Company determined $6,525 of the cost related to MS24J per ACCT-2 (CLP-11) (MS24J) CONFIDENTIAL, when the invoice recorded only $3,019.92. Response: Referring to Exhibit ACCT-2 (CLP-11)(MS24J), Outside Line Contractors, at Line 398, McAllen Construction Inc, in the amount of $6,525. At the time the work was performed, the vendor did not have the applicable storm work order number and therefore billed the work using the OMS event number provided by the Company. During the Company's internal review process, the OMS event number identified on the invoice was cross-referenced to Company records and confirmed to be associated with MS24J. Please refer to OCC-1009, Attachment 1, for the OMS details related to Event# 5481707. Based on this review and validation of the charges, the Company determined that $6,525 of the invoiced costs were attributable to MS24J.Page 41 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-1010 Page 1 of 2 Date Filed: November 09, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (Storm MS24J – Police & Traffic Control) Refer to Exhibit ACCT-2 (CLP-11A-1) (MS24J) and ACCT-2 (CLP-11A-2) (MS24J). The following pertains to C C Security Corp: a. Per review of invoice #60622, the work performed relates to multiple events and it is unclear which field work orders relate to MS24J. Identify which work orders apply to MS24J within the invoice, if any. b. Per review of invoice #60625, the work performed relates to multiple events and it is unclear which field work orders relate to MS24J. Considering only the work orders labeled MS24J011, explain how the Company determined $4,395 of the cost related to MS24J per ACCT-2 (CLP-11) (MS24J) CONFIDENTIAL. Provide a breakout of the total costs to be considered related to MS24J for this invoice. Response: Referring to Exhibit ACCT-2 (CLP-11)(MS24J), Outside Line Contractors, at Lines 154-155, C C Security Corp, in the combined amount of $4,930. a. In reference to invoice #60622, the vendor utilized work order RMOX0011 for two separate jobs performed on 8/9/24 because the applicable storm work order had not yet been provided at the time the work was performed. Through the Company's internal review process, the charges were verified and updated to reflect the correct storm event of MS24J. b. In reference to invoice #60625, while preparing a response, it was determined that a portion of these charges are not part of the MS24J event. Please refer to Table 1, for the breakdown that reflects the correct total amount of $1,635 that is related to MS24J. The Company will supplement Exhibit ACCT-2 (CLP-11)(MS24J) line 155 to reflect the corrected amount of $1,635.Page 42 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-1010 Page 2 of 2 Table 1 Exhibit ACCT-2 (CLP-11) Page # 15 15 21 26 34 34 Cost $337.50 $150.00 $300.00 $412.50 $300.00 $135.00
As listed on the current system
Corres. 11/23/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (PURA Set 14, PURA Set 16, OCC Set 30)