Discovery Compilation (PURA Set 14, PURA Set 16, OCC Set 30)
Files4
Docket No. 26-05-10 Discovery Compilation November 23 2026.pdf
PDF · 133 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation November 23 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation November 23 2026.pdf
PURA Set 14_COMBINED.pdf
PDF · 564 KB · 16 pagesText searchable
Download PURA Set 14_COMBINED.pdfRead the text of PURA Set 14_COMBINED.pdf
PURA Set 16_COMBINED.pdf
PDF · 384 KB · 12 pagesText searchable
Download PURA Set 16_COMBINED.pdfRead the text of PURA Set 16_COMBINED.pdf
OCC Set 30_COMBINED.pdf
PDF · 568 KB · 47 pagesText searchable
Download OCC Set 30_COMBINED.pdfRead the text of OCC Set 30_COMBINED.pdf
Page 38 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-1007 Page 1 of 1 Date Filed: November 12, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (Storm MS24J – Civil Crews) Refer to Exhibit ACCT-2 (CLP-11A-3) (MS24J). The following pertains to invoice #N0817224B from HI Stone & Son, Inc. Per review of the Excavation Job Form, there is no submission date, work completion date, signature by the contractor, or signature by the Eversource approver and the form has work order #RMOU0011. Explain how the Company verified the invoices and work performed by these crews without reviewing the work or having a reference date. If additional support or information is to be considered regarding this work, please provide and explain why it was not originally included. Response: Referring to Exhibit ACCT-2 (CLP-11) (MS24J), Outside Line Contractors, at Line 211, HI Stone & Son, Inc, in the amount $3,632. The work charges are for the repair of damages resulting from a lightning strike on August 8, 2026, shortly prior to the declaration of the ERP for MS24J. Without additional context to tie this damage to MS24J, the Company has elected to remove the charges totaling $3,632, and will supplement Exhibit CLP-7 (MS24J), to remove line 211, accordingly.Page 39 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-1008 Page 1 of 1 Date Filed: November 10, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (Storm MS24J – Civil Crews) Refer to Exhibit ACCT-2 (CLP-11A-4) (MS24J). The following pertains to KTI Utility Construction & Maintenance LLC. The description within the invoice notes work performed on 10/16/2024 and the invoice date of 10/19/24. Explain how the work performed within this invoice relates to storm MS24J given the work was performed two months after the event and other minor storm events occurred after MS24J that could have caused that damage. If additional information was utilized to determine the applicability to MS24J, please provide. Response: On 8/10/2024 during the MS24J storm, the damage occurred at 10 Spring House Rd in Greenwich. This is shown in event #5483661. There was damage to the off-road pole which was sent to KTI to hand dig and set a new pole. This was not the priority in the heat of the storm as the customer had power when this was sent to KTI. Other work was prioritized over this damage related to restoring power, therefore it was scheduled and completed at a later date.Page 40 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-1009 Page 1 of 1 Date Filed: November 09, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (Storm MS24J – Civil Crews) Refer to Exhibit ACCT-2 (CLP-11A-7) (MS24J). The following pertains to McAllen Construction Inc. Per review of invoice #642024, only one event had a work order related to MS24J. Explain how the Company determined $6,525 of the cost related to MS24J per ACCT-2 (CLP-11) (MS24J) CONFIDENTIAL, when the invoice recorded only $3,019.92. Response: Referring to Exhibit ACCT-2 (CLP-11)(MS24J), Outside Line Contractors, at Line 398, McAllen Construction Inc, in the amount of $6,525. At the time the work was performed, the vendor did not have the applicable storm work order number and therefore billed the work using the OMS event number provided by the Company. During the Company's internal review process, the OMS event number identified on the invoice was cross-referenced to Company records and confirmed to be associated with MS24J. Please refer to OCC-1009, Attachment 1, for the OMS details related to Event# 5481707. Based on this review and validation of the charges, the Company determined that $6,525 of the invoiced costs were attributable to MS24J.Page 41 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-1010 Page 1 of 2 Date Filed: November 09, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (Storm MS24J – Police & Traffic Control) Refer to Exhibit ACCT-2 (CLP-11A-1) (MS24J) and ACCT-2 (CLP-11A-2) (MS24J). The following pertains to C C Security Corp: a. Per review of invoice #60622, the work performed relates to multiple events and it is unclear which field work orders relate to MS24J. Identify which work orders apply to MS24J within the invoice, if any. b. Per review of invoice #60625, the work performed relates to multiple events and it is unclear which field work orders relate to MS24J. Considering only the work orders labeled MS24J011, explain how the Company determined $4,395 of the cost related to MS24J per ACCT-2 (CLP-11) (MS24J) CONFIDENTIAL. Provide a breakout of the total costs to be considered related to MS24J for this invoice. Response: Referring to Exhibit ACCT-2 (CLP-11)(MS24J), Outside Line Contractors, at Lines 154-155, C C Security Corp, in the combined amount of $4,930. a. In reference to invoice #60622, the vendor utilized work order RMOX0011 for two separate jobs performed on 8/9/24 because the applicable storm work order had not yet been provided at the time the work was performed. Through the Company's internal review process, the charges were verified and updated to reflect the correct storm event of MS24J. b. In reference to invoice #60625, while preparing a response, it was determined that a portion of these charges are not part of the MS24J event. Please refer to Table 1, for the breakdown that reflects the correct total amount of $1,635 that is related to MS24J. The Company will supplement Exhibit ACCT-2 (CLP-11)(MS24J) line 155 to reflect the corrected amount of $1,635.Page 42 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-1010 Page 2 of 2 Table 1 Exhibit ACCT-2 (CLP-11) Page # 15 15 21 26 34 34 Cost $337.50 $150.00 $300.00 $412.50 $300.00 $135.00Page 43 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-1011 Page 1 of 1 Date Filed: November 12, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (Storm MS24J – Police & Traffic Control) Refer to Exhibit ACCT-2 (CLP-11A-2) (MS24J). The following pertains to Certified Utility Services Inc invoice #22531, p. 128. Explain how the flagger work recorded as part of this invoice related to MS24J given it occurred after the storm (8/15/2024). Response: Referring to Exhibit ACCT-2 (CLP-11) (MS24J), Outside Line Contractors, at Line 165, Certified Utility Services Inc, in the amount of $864. The OMS event started on August 13th (August 15th is the date of the final repair). Based on this information, the Company is electing to remove the amount of $864 and will supplement Exhibit CLP-11 (MS24J), accordingly.Page 44 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-1012 Page 1 of 1 Date Filed: November 12, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (Storm MS24J – Police & Traffic Control) Refer to Exhibit ACCT-2 (CLP-11A-3) (MS24J). The following pertains to Elite Flaggers LLC invoice #576, p. 102. Explain how the flagger work recorded as part of this invoice related to MS24J given it occurred two weeks after the storm (8/23/2024) and no work order is recorded identifying it as work related to MS24J. Response: Referring to Exhibit ACCT-2 (CLP-11) (MS24J), Outside Line Contractors, at Line 201, Elite Flaggers LLC, in the amount of $1,600. Without additional context, the Company has elected to supplement Exhibit CLP-11 (MS24J) to remove line 201 in the amount of $1,600.Page 45 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-1013 Page 1 of 1 Date Filed: November 10, 2026 Witness: John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (Storm MS24J - P-CARDS) Refer to Exhibit ACCT-2 (CLP-11) (MS24J) CONFIDENTIAL, PCard tab. Provide documentation to support the following P-Card expenses. As part of the response, please provide a description of the purchase, relevant invoices, and other supporting documents demonstrating the necessity and applicability of each charge to the MS24J event. a. b. c. d. e. f. Row 39, Dave & Charles Homet, $169 Row 95, Portofinos, $129 Row 129, Newtown Deli LLC, $6,389 Row 144, Texas Roadhouse, $160 Row 164, The Village Table, $1,854 Row 171, WM Supercenter, $217 Response: Referring to Exhibit ACCT-2 (CLP-11) (MS24J) CONFIDENTIAL, P-Card tab, please refer to the following for the requested information: • Please refer to OCC-1013, Attachment 1, for a summary, description and location for the documentation supporting each cost. • Please refer to OCC-1013, Attachment 2, for all receipts supporting each charge for MS24J. Upon responding to this question there was an error found within this question for Row 95, Portofino’s, $129. The correct total amount is $201.Page 46 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-1014 Page 1 of 2 Date Filed: November 10, 2026 Witness: John G. Griffin and Leanne M. Landry Request from: Office of Consumer Counsel Question: (Storm MS24J – Employee Expense Reimbursement) Refer to Exhibit ACCT-2 (CLP-11) (MS24J) CONFIDENTIAL, Empl. Expense&Other tab. Provide documentation to support the following employee expenses. As part of the response, please provide a description of the purchase, relevant invoices, and other supporting documents demonstrating the necessity and applicability of each cost to the MS24J event. a. b. c. d. e. Row 40, Employee Reimbursement, $182 Row 87, Employee Reimbursements, $1,142 Row 139, Employee Reimbursement, $586 Row 181, Meals - Employee Reimbursement, $35 Row 235, Meals – Employee Reimbursement, $50 Response: Referring to Exhibit ACCT-2 (CLP-11) (MS24J) CONFIDENTIAL, Empl. Expense&Other. Please refer to OCC-1014, Attachment 1, for a summary of purchases and descriptions of transactions. In addition, please refer to OCC-1014, Attachment 2, for all receipts directly associated with this event MS24J and OCC-1014, Attachment 3, for expenses under $25.00. Please note that lines 139, 181 and 235 include expenses under the amount of $25.00. Pursuant to the Company’s Employee Expense Policy, receipts are not required for individual expenses below $25.00. This threshold reflects the Company’s determination that the administrative burden associated with collecting, reviewing, and retaining receipts for nominal-value transactions exceeds the corresponding control benefit. To mitigate the risk of circumvention through multiple small-dollar submissions, all de minimis expenses must be submitted through the Workforce system rather than Workday. The Workforce system provides centralized tracking, requires supervisory review and approval contemporaneous with the expense submission, and facilitates monitoring for unusual or potentially duplicative expense patterns. The expenses identified above were submitted in accordance with the applicable provisions of the Employee Expense Policy and were reviewed and approved by the employees’ supervisors throughPage 47 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-1014 Page 2 of 2 the Workforce system. As part of that approval process, the supervisors confirmed that the expenses were incurred in connection with storm restoration activities. Accordingly, these expenses represent properly incurred storm-related costs and are eligible for recovery Although properly attributed to the storm event and incurred for work associated with the storm event, the Company has elected to remove the following cost totaling $1,142 from this event. • The Company will supplement Exhibit ACCT-2 (CLP-11) (MS24J) to remove line 87 in the amount of $1,142.
As listed on the current system
Corres. 11/23/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (PURA Set 14, PURA Set 16, OCC Set 30)