Discovery Compilation (PURA Set 14, PURA Set 16, OCC Set 30)
Files4
Docket No. 26-05-10 Discovery Compilation November 23 2026.pdf
PDF · 133 KB · 1 pageText searchable
Download Docket No. 26-05-10 Discovery Compilation November 23 2026.pdfRead the text of Docket No. 26-05-10 Discovery Compilation November 23 2026.pdf
PURA Set 14_COMBINED.pdf
PDF · 564 KB · 16 pagesText searchable
Download PURA Set 14_COMBINED.pdfRead the text of PURA Set 14_COMBINED.pdf
PURA Set 16_COMBINED.pdf
PDF · 384 KB · 12 pagesText searchable
Download PURA Set 16_COMBINED.pdfRead the text of PURA Set 16_COMBINED.pdf
OCC Set 30_COMBINED.pdf
PDF · 568 KB · 47 pagesText searchable
Download OCC Set 30_COMBINED.pdfRead the text of OCC Set 30_COMBINED.pdf
Page 8 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-989 Page 1 of 2 Date Filed: November 10, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Office of Consumer Counsel Question: (BOARD OF DIRECTORS) Please refer to the Response to OCC-263. Is the Company stating that there are no costs or compensation associated with the Board of Directors paid for by CL&P ratepayers? If there are any costs, please provide for the years 2021-2025 and describe. Response: The Company clarifies that there were two separate asks in the interrogatory request OCC-263 i relevant to the current interrogatory. First the Company addressed the “total expenses associated with… CL&P… board of directors that are direct charged and allocated to the Company” in which the Company replied in the first paragraph of the response that “The Board of Directors of the Connecticut Light and Power Company have never, nor do they now receive any meeting fees, reimbursable expenses, benefits, stock options, or meeting costs as it relates to the Company’s meetings or for their service on its Board.” Therefore, there are no costs included within the Company’s cost of service related to the CL&P board of directors. The second portion of interrogatory request OCC-263 asked the Company to “[p]rovide the total expenses associated with Eversource…and any other board of directors that are direct charged and allocated to the Company”. That portion of the interrogatory was responded to in the second paragraph of the response, in which the Company details costs incurred for the Board of Trustees for Eversource Energy in the Test Year. Further, OCC-263, Attachment 1, displays costs from years 2021-2025. Eversource Energy Board of Trustee costs sought for approval are shown in Exhibit CLPREVREQ-1, at page 70 as “Trustee Retainer Fees of $290,000, and Restricted Stock Units of $225,000.” These costs can also be found in Exhibit CLP-REVREQ-2, Schedule C-3.4. To reiterate, costs other than Trustee retainer fees and trustee restricted stock units have been excluded from the Company’s cost of service. Prior Referenced Response i OCC-263 Question:Page 9 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-989 Page 2 of 2 (Board of Director Expenses) Provide the total expenses associated with Eversource, CL&P and any other boards of directors that are direct charged and allocated to the Company including but not limited to fees, retainers, reimbursements, benefits, stock options, travel, meeting costs, etc. for each of the years 2021, 2022, 2023, 2024, 2025 and the amount included in the rate year. OCC-263 Response: The Board of Directors of the Connecticut Light and Power Company have never, nor do they receive any meeting fees, reimbursable expenses, benefits, stock options, or meeting costs as it relates to the Company’s meetings or for their service on its Board. For costs related to the Eversource Energy Board of Trustees from 2021 through the Rate Year, please see OCC-263, Attachment 1. Note the Company incurred expenses of $515,000 in the Test Year and in the Rate Year associated with Board of Trustees expenses. Please see CLP-REVREQ-2, Schedule C-3.4, and the Prefiled Testimony at Exhibit CLP-REVREQ-1, at page 70, for additional information on Board of Trustees expenses.Page 10 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-990 Page 1 of 3 Date Filed: November 10, 2026 Witness: Jared A. Lawrence and Jason Tharp Request from: Office of Consumer Counsel Question: (BRIDGE METERS) Please list and explain all functions of the bridge meter(s) the Company uses (i.e., not functions that the meter is capable of, but functions that the Company uses) that differ from an AMR meter. Response: Please refer to the Company’s response to information request OCC-995 i. Referenced Response i OCC-995 Question: (BRIDGE METERS) Please provide the Authority decision and/or ruling approving the Company installing the 467,145 bridge meters it has installed. OCC-995 Response: The Company does not require PURA’s approval for installation of bridge meters. The installation of meters is a basic function of utility service, falling into the category of capital investment that PURA reviews on the basis of prudence at the time that recovery of the investment is requested in rate base. On the CL&P system, implementation of bridge meters proceeded on the basis of a business case contemplating the obsolescence of automated meter reading (“AMR”) technology and the opportunity to obtain enhanced functionality on the distribution system, as the evaluation of implementation of Advanced Metering Infrastructure (“AMI”) took place in Docket No. 17-12-03RE02 over an extended time frame (2019-2024). The installation of bridge meters does not involve the need for a comprehensive implementation plan involving the integration of new back-office information systems and accelerated installation across the entire customer base, which are the circumstances that drive the need for an associated cost-recovery mechanism and other approvals of PURA to support that type of implementation. Specifically, beginning in 2017, the Company began to evaluate the installation of “bridge” meters to replace a portion of its hard-to-reach AMR meters with a goal of increasing operational efficiencies for service disconnects and reconnects; decreasing the amount of customer write-offs and bad debts through more and faster remote disconnects; and addressing the “failure curve” for meters at or approaching end of life. Bridge meters are AMR meters with remote turn-on and turn-off capability through the Company’s existing meter reading system. Bridge meters can also be used for specialty applications, including net and demand readings. An AMR meter with specialty applications added to it – like the capability to measure demand – is more expensive than purchasing a bridge meter and programming it to perform specialty applications. This is due to the fact that AMR technology is antiquated and requires more expensive components than the more flexible bridge meter. Because the Company’s existing meteringPage 11 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-990 Page 2 of 3 infrastructure was at its end-of-life and therefore prone to error or failure, replacement was necessary in order to avoid billing inaccuracies or estimates. With the success of the bridge-meter project in meeting operational and bad-debt reduction goals, the Company increased the level of meter-related capital expenditures in 2018, 2019 and 2020, and migrated to remote-disconnect capable meters as its meter of choice for all replacement installations. To this day, bridge meters continue to offer significant safety and operational benefits with their ability to remotely read and operate when access is an issue, which is common in metro areas. The Company expects to continue to utilized both bridge-meter technology and AMR meter technology pending full implementation of AMI. Specific benefits of bridge-metering technology include the following: Remote disconnect/reconnect switch: • Many of the residential meter types include a remote disconnect/reconnect switch. That switch can be operated by agents of Eversource without the need to physically access the meter. The agents must still visit the premises to get close to the meter for the signal to reach. • The disconnect feature is primarily used to decrease the amount of customer write-offs and bad debt. Allowing employees to disconnect the meter without physical access helps in situations where access is prevented or unsafe conditions. • The primary benefit of the remote reconnect feature is the ability to restore power to the customer without requiring the customer to be home to grant access when the meter is located inside. Automatic demand reset: • Legacy meter types require the Meter Reader to perform manual demand resets monthly so the meter can correctly record demand values for applicable customers/rates. The bridge meter can automatically reset the demand value when the meter is read each month. This cuts down the time and effort involved with reading these meter configurations. Polyphase phase angles: • Polyphase bridge meters have the added benefit of providing phase angle data when meter data is extracted. Phase angle data is used to troubleshoot metering or service issues. There have been examples of equipment errors being detected with phase angle data. Meter feature standardization: • Prior to bridge meters, the Company used different meter types for demand customers, net customers, net demand customers and production meters. Multiplying each of these needs across the various service configurations results in dozens of different meter types. The bridge meter is able to handle all these billing requirements with the same meter which greatly simplifies inventory and reduces meter inventory shortages. Annual installations are summarized as follows:Page 12 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-990 Page 3 of 3 Year 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Total Installed Bridge Meters 5,161 50,292 85,581 105,285 54,345 21,291 16,426 29,710 69,896 18,237 13,222 469,446 Installed AMR Meters 39,086 28,224 17,958 3,798 1 20,476 35,157 14,852 3,784 1,432 173 164,941 The table above provides a breakdown of all bridge and AMR meters that are currently physically installed in Connecticut. The different rows separate meters into the year they were purchased. The total quantities differ from the 467,145 figure referenced due to minor fluctuations in reporting of installed and removed meters which occur on a daily basis. Additionally, it is necessary to highlight that the methodology of categorizing physically installed meters broken out by purchase year, matches previously filed meter breakdowns. Since there are natural delays between purchasing and installing meters in the field, it may appear as if past stated vintages are increasing (i.e. there is an increase in 2025 meters than previously stated). This variance is due to reporting on meters that were purchased in 2025 were physically installed in the field in 2026. This is true for all years resulting in older vintage volumes decreasing, and newer vintage meter volumes increasing each time this analysis is performed. Going forward – with the implementation of AMI - advances in the industry throughout the previous decade have enabled additional capabilities in AMI meters at comparable cost, increasing the relative cost-effectiveness of an AMI system. Modern AMI meters now leverage advancements in mesh network technology and 4G LTE and 5G communication technologies, enabling near real-time data sharing through device-to-device communication. This facilitates greater situational awareness for the utility. Equipped with more powerful processors and expanded storage, these meters can download applications and run analytical algorithms to address various use cases, such as mapping meters to transformers and providing customers with detailed insights into their energy usage. Additionally, modern AMI meters are capable of grid-edge computation, processing vast amounts of data to produce actionable insights for both the customers and the grid. The meters can autonomously decide which data to send back to the utility, optimizing network utilization and reducing the amount of time needed to process, analyze, and make decisions based on that data. Advanced AMI use cases now include neutral monitoring, connectivity model verification, and advanced load disaggregation, alongside traditional capabilities such as remote connect/disconnect, internal metering, tamper detection, and power loss and restoration notifications. The Company’s meter replacement strategy aims to provide all customers in the territory with equal access to the benefits the AMI deployment.Page 13 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-991 Page 1 of 1 Date Filed: November 10, 2026 Witness: Jared A. Lawrence and Jason Tharp Request from: Office of Consumer Counsel Question: (BRIDGE METERS) Please provide an unlocked Excel file indicating: the date the Company installed each of the 467,145 bridge meters; if the account associated with the meter is commercial or residential; and the bridge meters’ manufacturer and model number. Please additionally provide all manufacturer’s guides and/or specifications for the meters/model numbers listed. Response: Please refer to OCC-991, Attachment 1, for the requested information. Additionally, please refer to OCC-99,1 Attachment 2, and OCC-991, Attachment 3, for additional manufacturer details on the installed meter types. OCC-991, Attachment 1, provides a breakdown of all bridge meters that are currently physically installed in Connecticut. The different rows separate meters into the year they were purchased, the customer rate class, manufacturer meter type, and if the meter is used as a solar production meter. The total quantities differ from the 467,145 figure referenced due to minor fluctuations in reporting of installed and removed meters which occurs on a daily basis. Additionally, it is necessary to highlight that the methodology of categorizing physically installed meters broken out by purchase year, matches previously filed meter breakdowns. Since there are natural delays between purchasing and installing meters in the field, it may appear as if past stated vintages are increasing (i.e. there is an increase in 2025 meters than previously stated). This variance is due to reporting on meters that were purchased in 2025 were physically installed in the field in 2026. This is true for all years resulting in older vintage volumes decreasing, and newer vintage meter volumes increasing each time this analysis is performed.Page 14 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-992 Page 1 of 2 Date Filed: November 10, 2026 Witness: Jared A. Lawrence and Jason Tharp Request from: Office of Consumer Counsel Question: (BRIDGE METERS) Please refer to the Response to OCC-943, where the Company states that bridge meters can facilitate time of use rates. Please clarify that the singular barrier to a current customer on a bridge meter being on a time of use rate is the Company’s “supporting billing system and interval data management system.” If this is not the singular barrier, please describe all other barriers. Response: TOU rates require meters that record interval data, which bridge meters can record. The interval data management system (MV-90) is responsible for calling and validating interval data information, including for TOU customers. The MV-90 system normally communicates with meters via analog phone lines or cellular modems. It is technically possible for bridge meters to communicate interval data via the AMR ERT module to a meter reader vehicle. But transmitting interval data opposed to simple register reads takes much longer. Adding interval data collection to meter reading routes would reduce the number of meters a route can handle, resulting in additional AMR drive-by meter readers collecting the interval data. Eversource decided that the added cost for system upgrades to support collecting interval data from drive-by meter reading along with the increasing meter readers to support more time intensive interval read collection were not prudent and ran counter to moving to an eventual AMI solution. The traditional method for obtaining interval data from bridge meters is to set up the AMI 1.0 network and collect the interval data wirelessly without the need for meter reader collection. But multiple intermediary systems are required between bridge meters (or AMI meters) and the billing system. One intermediary system is typically referred to as meter data management system (MDMS) and is responsible for housing the interval data for the billing system to retrieve and render bills. Another intermediary system is the head-end system responsible for calling the bridge meters (or AMI meters) to obtain the interval data. It is a significant effort to set up both the headend system and an MDMS and integrate them with the billing system. In short, there are significant investments required for either method of collecting interval data from bridge meters. If the Company collected the interval data from AMR drive-by meter readers, Eversource would need to upgrade the meter reading collection system, the MV-90 system, and add more meter readers. If the Company stood up the AMI 1.0 network to collect the interval data, Eversource would need to implement a head end system, MDMS, and make changes to the billing system and MV-90 system. This represents the bare minimum for enabling TOU billing withPage 15 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-992 Page 2 of 2 bridge meters, but an AMI infrastructure offers many other benefits that would entail many more system integrations to realize those benefits.Page 16 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-993 Page 1 of 1 Date Filed: November 10, 2026 Witness: Jared A. Lawrence and Sean P. Noonan Request from: Office of Consumer Counsel Question: (METER BILLING SYSTEM) Please indicate the month and year the Company’s current billing system was installed and the month and year of any updates. Response: The Company has two billing systems for Connecticut electric accounts C2, and CT Large Power Billing. The main application is a system called C2 which was built in-house by Eversource in 2008. This system is used to bill most of the Company’s commercial and residential customer accounts. The C2 system cannot accommodate working with AMI meters, making the overall upgrade to a cohesive singular CIS application necessary. The Company’s other system is called CT Large Power Billing and was implemented around 2008. This system manually bills a very small number of complex and mostly commercial accounts through a mostly manual process. CT Large Power Billing will be retired in Q2 of 2027, and the customers will begin billing through C2 via an add-on tool to calculate the billing determinates. Over the years, numerous enhancements, upgrades and fixes have been implemented to each of these systems to keep the systems running and to meet the Company’s service obligations.Page 17 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-30 Date Issued October 27, 2026 OCC-994 Page 1 of 1 Date Filed: November 10, 2026 Witness: Jared A. Lawrence and Sean P. Noonan Request from: Office of Consumer Counsel Question: (INTERVAL DATA MANAGEMENT SYSTEM) Please indicate the month and year the Company’s current interval data management system was installed and the month and year of any updates. Response: The Company uses a combination of field collection applications and a meter data management system to collect and store CT Electric meter data. There are two field collection applications, FCS, which was implemented in July 2015 and MV90, which was implemented in October 2006. FCS collects AMR and bridge meter data but does not function as a Meter Data Management System (MDMS) within the program’s capabilities. MV90 supports TOU meters and is a MDMS, however it is not compatible with AMI meters and lacks the technological advancements to accommodate working with AMI meters. Field Collection Applications: • FCS: implemented July 2015 • MV90: implemented October 2006 Meter Data Management: • MDMS: implemented April 2014 Over the years, numerous enhancements, upgrades and fixes have been implemented to each of these systems to keep the systems running and to meet the Company’s service obligations.
As listed on the current system
Corres. 11/23/2026 [26-05-10] (Keegan Werlin LLP) - Discovery Compilation (PURA Set 14, PURA Set 16, OCC Set 30)