Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 7, 8, 9, 10, 12

Files5

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting
1 page match
Words on different pages
Words on different pages

Text of CLF-AC-010_Final.pdf

Extracted from the file · 3 pages · 7,450 characters

Words on different pages
  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CLF-AC-01 Date Issued September 16, 2026 CLF-AC-012 Page 1 of 1 Date Filed: September 30, 2026 Witness: Digaunto Chatterjee, Lavelle A. Freeman, and Gerhard Walker Request from: CLF and Acadia Center Question: (Performance-based Regulation) Refer to Exhibit CLP-TSP-1, Table of Contents, Section II (“State of the CL&P Distribution System”). a. Please confirm whether or not the load forecast underlying Exhibits CLP-TSP-1, and CLPTSP-3, includes the three scenarios (low, middle/baseline, high) proposed by Section III.C.6, of the RE03 Proposed Final Decision No. 2. b. Please confirm whether or not that load forecast underlying Exhibits CLP-TSP-1, and CLPTSP-3, includes the specific 90/10, 50/50, and net-adjusted-energy forecasts proposed by Section III.C.6, of the RE03 Proposed Final Decision No. 2. c. If the answer to subpart (a) or (b) is no, please identify with specificity each respect in which the Company’s load forecast differs. Response: a. No, it does not. The Company creates a load forecast based on an econometric model that considers a 50/50 and a 90/10 weather scenario for the 3-day weighted average temperature humidity index, of which only the 90/10 weather scenario is considered for planning. No sensitivities are considered for the out of model adjustments. b. The load forecast underlying exhibits CLP-TSP-1, and CLP-TSP-3, are driven by the 90/10 weather scenario for planning. The Company prepares both 90/10, 50/50, and net-adjustedenergy forecasts at the system and substation level; regional and feeder level forecasts are not created. c. Please see subparts a. and b., above.

As listed on the current system

Question(s) Answered 7, 8, 9, 10, 12 (The Connecticut Light and Power Company) Date Filed: 09/30/2026

This filing on the current system (opens in a new tab)