Interrogatory responses
Answers to questions 10, 11, 12, 14, 16, 19
Files7
ALLCO-010_Final.pdf
PDF · 145 KB · 1 pageText searchable
Download ALLCO-010_Final.pdfRead the text of ALLCO-010_Final.pdf
ALLCO-011_Final.pdf
PDF · 196 KB · 3 pagesText searchable
Download ALLCO-011_Final.pdfRead the text of ALLCO-011_Final.pdf
ALLCO-012_Final.pdf
PDF · 148 KB · 2 pagesText searchable
Download ALLCO-012_Final.pdfRead the text of ALLCO-012_Final.pdf
ALLCO-014_Final.pdf
PDF · 86 KB · 1 pageText searchable
Download ALLCO-014_Final.pdfRead the text of ALLCO-014_Final.pdf
ALLCO-016_Final.pdf
PDF · 84 KB · 1 pageText searchable
Download ALLCO-016_Final.pdfRead the text of ALLCO-016_Final.pdf
ALLCO-016 Attachment 1.pdf
PDF · 78 KB · 1 pageText searchable
Download ALLCO-016 Attachment 1.pdfRead the text of ALLCO-016 Attachment 1.pdf
ALLCO-019_Final.pdf
PDF · 174 KB · 3 pagesText searchable
Download ALLCO-019_Final.pdfRead the text of ALLCO-019_Final.pdf
Text of ALLCO-014_Final.pdf
Extracted from the file · 1 page · 1,592 characters
Page 1
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set ALLCO-01 Date Issued August 20, 2026 ALLCO-016 Page 1 of 1 Date Filed: September 04, 2026 Witness: Andrew C. Belden Request from: ALLCO Question: State, for each year 2020 through 2025, the number and aggregate MW of DER interconnection applications that would be excluded from the proposed Level 1 DER Interconnection Processing metric because they "require electric power system modifications" (Exhibit CLP-CUSTOMER-1 at 34 n.22), as a count and as a percentage of all applications and of all applied-for MW, and explain the basis for excluding such projects from a metric intended to measure interconnection performance. Response: Please refer to ALLCO-016, Attachment 1, which specifies the number, percentage, and MW of Level 1 DER interconnection applications that required electric power system modifications. These projects are proposed to be excluded from the Level 1 DER Interconnection Processing PIM since they represent time periods outside the scope of a standard project. In addition, the system modification process is not tracked in PowerClerk to the level of detail the PIM requires, which is designed to only track the time requiring Company action.
Text of ALLCO-016 Attachment 1.pdf
Extracted from the file · 1 page · 627 characters
Text of ALLCO-019_Final.pdf
Extracted from the file · 3 pages · 5,641 characters
As listed on the current system
Question(s) Answered 10, 11, 12, 14, 16, 19 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/04/2026