Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

Search terms highlighted
Eversource rate increase is on 7 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
7 pages match
  1. Page 24 of 54

    The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 24 of 54 We do not question the value of statistical methods like Dr. Lowry‘s for scholarly research.19 But we question the effectiveness of such methods in the context of an adversarial proceeding among interested parties where every element of subjective or expert choice (and in a complex econometric analysis there are many) opens the door to esoteric debate among experts. 4. 49. “Lack of Experience” Regarding this last criticism, Exhibit 0077.00.NERA-566 contains the CVs of the Project Team which we invite Dr. Cronin to review. 50. That said, it appears as though Dr. Cronin‘s criticism pertains to his own experience in Ontario (which he discusses at page 86), where he ―visited many of the Ontario LDCs during 1st Generation across the province … and held in-depth discussions with the municipal electric utilities (MEUs), particularly those that had [been] identified as the leaders in efficiency based on the data collected from these LDCs as part of the OEG‘s operational assessment.‖ 51. Dr. Cronin‘s discussions with Ontario‘s utilities may indeed have had some useful purpose in that province‘s regulatory restructuring effort. But we would not endeavor to perform such on-site interviews as a substitute for consistent and reliable operating and financial data collected from utilities over many years as available in the FERC Form 1. Personal interviews and local company data collection are not components of a reliable and replicable TFP growth study that can serve as the basis for the kind of PBR plan that the AUC seeks in this case. 19 Indeed, Dr. Makholm‘s 1986 Ph.D. dissertation included an econometric ―decomposition‖ of a TFP index number study, using Form 1 data, into its explanatory components that is very much like the kind of econometric analysis that Dr. Lowry describes. 24
  2. Page 25 of 54

    The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 25 of 54 IV. The Proposed PBR Plans 52. In this section of our report, we summarize and compare the PBR plans offered by the Utilities and interveners against what is usual and/or common, versus those elements that are unusual and/or uncommon. In this respect, we have been asked to use our experience and understanding to form a basis for a critical evaluation of those plans. 53. The first item in our discussion concerns relevant jurisdictions. In this respect, we limit our analysis to North American regulatory practices for energy utilities. That is, we discuss and exclude consideration of those PBR practices abroad (in the United Kingdom and Australia in particular) where the basic institutional framework for regulation differs materially from that in Canada and the United States. 54. Limiting our analysis to North American energy utility regulation, we then turn to common and uncommon features in the utilities‘ and interveners‘ plans. First we identify what other regulators have done in the relevant jurisdictions given the types of proposals made by either Utilities or interveners. Second, we compare the key provisions of the plans offered by the Utilities and interveners to those practices. Third, we discuss the pros and cons of the key provisions of each utility or intervener proposal given the forgoing discussion. A. 55. Relevant Jurisdictions As a method of regulating prices, what is known as PBR in North America arose subsequent to the privatizations in the United Kingdom (UK) in the 1980s. Privatization has been one of the more important economic developments of the last two decades as governments 25
  3. Page 26 of 54

    The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 26 of 54 try to improve utility services and end the drain on public funds. 20 As Professors Bias and Perotti state: Large privatization programs have occurred in the recent decades both in developed and developing countries. The main explanation has been that privatization leads to increased productivity and profitability, a consensus view which a vast empirical literature has confirmed.21 56. The trend toward privatization effectively began in the UK in 1979. The 1970s were an economically unstable time for the UK. The country was experiencing oil shocks along with the rest of the world, and expenditures were growing faster than revenues. Having committed not to curtail health and social security expenditures, the government was forced to cut public sector investment. Additionally, to counter the inflationary surge that resulted from the rise in oil prices, the government held down utility prices, causing utilities to experience cash flow problems and investment declines. For the government of Prime Minister Margaret Thatcher (newly elected in 1979) privatization emerged as an attractive solution to fiscal problems. 57. In addition to starting the worldwide trend in privatization generally, the UK also popularized a method of tariff regulation in water, electricity, gas and telecommunications called ―RPI-X‖ or ―price cap‖ regulation there.22 According to Armstrong, et al: First applied to British Telecom (BT) in 1984, RPI-X regulation now exists for British Gas (BG), British Airports Authority (BSS), the regional water companies, and, in the electricity industry, the National Grid Company and the regional distribution and supply companies. [note omitted] Almost fifty firms in Britain 20 Nobel Laureate, Economist Gary S. Becker notes that ―[t]he privatization revolution sweeping the world surely ranks among the remarkable economic developments of the past few decades.‖ Gary S. Becker, ―Surprises in a World According to Adam Smith,‖ Business Week, August 17, 1992, p. 16. 21 Biais, B., and Perotti, E., ―Machiavellian Privatization,‖ The American Economic Review, Volume 92, No 1 (March 2002), page 240. 22 The economic literature uses various synonymous terms for price cap regulation. Other terms include CPI-X regulation, RPI-X regulation, performance-based ratemaking (PBR). 26
  4. Page 27 of 54

    The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 27 of 54 are subject to RPI – X, and the system has attracted considerable international interest.23 58. Following its popularity in the UK, price cap regulation was adopted in the United States for ATT in 1989 and for other gas and electricity companies in the United States and Canada subsequently. 59. The application of somewhat similar PBR pricing formulae, however, mask to a large extent the considerable underlying institutional differences upon which price regulation was based in the UK (and other jurisdictions that looked to the UK for regulatory guidance, such as Australia and Argentina). It is well known that neither the UK nor the other jurisdictions that began regulation with the UK-inspired privatization efforts have the constitutional, accounting and administrative institutions that define regulation in Canada and the United States.24 60. Probably the most useful way to signal that the institutions upon which basic regulation is based are quite different than in Canada and the United States than abroad concerns the source of the X-factor. In current practice in both the UK and Australia, the X-factor does not come from a TFP growth study but rather is a way to synchronize current prices (or revenues) with long-term economic forecasts (up to 8 years, depending on the formula period) of capital and operating costs. 61. Such forecasts of long-term costs are contrary to the ―known and measurable‖ standard that lies at the base of utility regulation in North America. 25 Ofgem (the UK regulator), in a recent price review, backed-out the X-factor as the value that would permit current prices to 23 Armstrong, M., Cowan, S., and Vickers, J., Regulatory Reform: Economic Analysis and British Experience, The MIT Press, Cambridge Massachusetts (1994), page 165. 24 ―Gordon and Makholm‖, pp. 32-34. 25 ―An agency is justifiably skeptical of budget cost estimates as a basis for ratemaking. It will rely on test period results to adjustment for known or reasonably expected changes.‖ - Goodman, Leonard Saul. The Process of Ratemaking. Volume I, Public Utilities Reports, Inc. Vienna, VA. 1998, p. 281. 27
  5. Page 28 of 54

    The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 28 of 54 trend toward the forecast costs for electricity distributors ending 2015.26 Australia defines its Xfactor the same way, as the method of truing-up projected costs with projected revenues during the formula period.27 62. In neither case does the X-factor relate to a measure of industry productivity growth, as such, and in both cases the transition of regulated prices over the formula period follows forecasts of the type that we believe no regulator of energy utilities in the Canada or the United States has ever countenanced. Quite apart from the merits of the way those other regulators control utility prices, we are of the view that regulators in those other jurisdictions respond to substantially different regulatory institutions that argue against direct comparison to themselves in a PBR case. 63. In any event, there are sufficient North American examples of precedent and practices regarding the application of PBR for energy companies. As a result, we do not conclude that the search for patterns of common or uncommon practices among regulators would be helped by using example outside North America where regulators live in very different institutional environments. 26 Ofgem (2009) on the electricity distribution price control for April 2010 to March 2015 (Distribution Price Control Review 5). Reference 149/09, 7 December, 2009. Starting on page 57 of that report, which is available online, are the tables for each electricity distribution business, showing how the X-factor in its regulatory formula is calculated. It shows a forecast of costs in prices of 07/08, and the X-factor that achieves the same revenue as costs with a smoothly rising trend (―profiled‖) from year to year. See: ttp://www.ofgem.gov.uk/Pages/MoreInformation.aspx?docid=371&refer=Networks/ElecDist/PriceCntrls/DPCR 5 27 ―[t]he X-factor must be designed to equalise (in terms of net present value) the revenue to be earned by the Distribution Network Service Provider from the provision of standard control services over the regulatory control period with the provider‘s total revenue requirement for the regulatory control period.‖ See Australian national rules for electricity distribution (Chapter 6, National Electricity Rules), clause 6.5.9 of Chapter 6, entitled ―The X-factor.‖ The report can be found on the Australian regulator‘s website: www.aemc.gov.au. 28
  6. Page 29 of 54

    The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 29 of 54 B. 64. PBR Regulatory Precedent in Canada and the United States There is a reasonable history among regulators in the United States and Canada regarding the parameters that become part of PBR plans. Table 3, below, presents a summary of those plans. 29
  7. Page 30 of 54

    The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 30 of 54 Table 3. Cap-Based PBR Precedents for North-American Energy Utilities Province/ State Country Alberta Company ENMAX Power Service covered 1 Cap Type Start Year Term (Years) Cost Scope 2 X Factor Includes Stretch Factor? Inflation 3 Flow through provisions / Y Factor? Capex provisions / K Factor? Z Factor? Earnings Sharing Mechanism Efficiency Carry-Over Mechanism? Re-openers/ Off-ramps? Electricity T & D Price 2007 7 Comprehensive 1.2% Yes Yes 1 Yes 1 Yes 50-50 for excess earnings No Yes Gas D Revenue 1998 3 Comprehensive 2.0%-3.0% No CPI-BC Yes 2 Yes 2 Yes 50-50, no deadband No No Penalties Annual review only Gas D Revenue 2004 4 Comprehensive No Yes 3 No Yes 50-50, no deadband Yes 1 Yes Various standards and incentives 3 Annual review Assessment only 4 ND Financial incentives 5 Electricity G, T & D Revenue 1996 4 Comprehensive No No 50-50, no deadband No Electricity G, T & D Revenue 2000 3 Comprehensive 2.0% No CPI-BC Yes 5 Yes 4 No No No Electricity G, T & D Revenue 2007 2 Partial (O&M) 2.0% No CPI-BC No NA Yes 50-50, no deadband No ND Annual review Gas D Revenue 2000 3 Partial (O&M) 1.1% Yes No NA Yes No No Yes 1 Yes 7 Gas D Revenue 2008 5 Comprehensive Implicit in inflation NA CPI-Ontario GDPPICanada•A; 0.45 ? A ? 0.60 Yes 6 Yes 5 Yes 50-50 sharing of excess earnings No Yes No 8 Gas D Price 2001 3 Comprehensive 2.5% No GDPPI-Canada Yes 7 No Yes No Yes Penalties 9 Gas D Price 2008 5 Comprehensive 1.8% No GDPPI-Canada Yes 8 No Yes 50-50 sharing around deadband Variable/asymmetric sharing of excess earnings No No 10 Electricity D Price 2000 3 Comprehensive 1.25% Yes IPI No No Yes 50-50 sharing of excess earnings No No No No explicit financial incentives Electricity D Price 2007 3 Comprehensive 1.0% No GDPPI-Canada No No Yes None No No 12 Electricity D Price 2010 3 Comprehensive 0.9-1.3% Yes GDPPI-Canada No Yes 6 Yes No No Yes No Reporting requirements only Electricity G, T & D Electricity and gas G, T & D Electricity and gas D Price 1994 3 Comprehensive 1.4% No IPI Yes 9 No Yes No No Revenue 1994 5 Partial (O&M) 0.9-1.1% No IPI No Yes 7 Yes No Yes Rewards & penalties Rewards & penalties Price 1999 3 Comprehensive 1.1%-1.4% Yes/No IPI Other* No Yes No Yes Penalties 16 So. Cal. Edison Electricity T & D Price 1997 5 Comprehensive 1.2%-1.6% No CPI No No Yes No Variable/asymmetric sharing around deadband Variable/asymmetric sharing around deadband Variable/asymmetric sharing around deadband No Yes Penalties 17 So. Cal. Gas Gas T & D Revenue 1997 5 Comprehensive 2.1%-2.5% Yes IPI Other** No Yes Variable/asymmetric sharing around deadband No Yes Penalties 18 Bangor Gas Gas D Price 2000 10 Comprehensive 0.5% No GDP-PI No No No 50-50 sharing of excess earnings No No No 19 Bangor Hydro Electric Electricity D Price 1998 3 Comprehensive 1.2% No GDP-PI Yes 10 No Yes 50/50 sharing around deadband No No No 20 Electricity T & D Price 1995 5 Comprehensive 0.5%-1.0% Yes GDP-PI Yes 11 No Yes 50/50 sharing around deadband No No Penalties 21 Electricity D Price 2001 7 Comprehensive 2.0%-2.9% No GDP-PI No No Yes 50-50 sharing of below specified earnings level No No Penalties 22 Electricity D Price 2009 7 Comprehensive 1.0% No GDP-PI Yes 12 Yes 8 Yes Yes, 50-50 sharing above 11% ROE No No Penalties 23 Berkshire Gas Gas D Price 2002 10 Comprehensive 1.0% Yes GDP-PI No No Yes None No No No 24 Blackstone Gas Gas D Price 2005 5 Comprehensive 0.5% No GDP-PI No No Yes 50-50 sharing around deadband No No Penalties 25 Gas D Price 1996 5 Comprehensive 1.5% Yes GDP-PI No No Yes 75-25 shareholders-ratepayers sharing around deadband No No Penalties 26 Penalties & rewards 27 Canada Enbridge Gas Union Gas Ontario Ontario electricity distribution companies PacifiCorp San Diego Gas & Electric Maine Central Maine Power Massachusett s Oregon 1 Boston Gas 1 2 Yes 4 Yes 3 Gas D Price 2004 5 Comprehensive 0.4% Yes GDP-PI No No Yes 75-25 shareholders-ratepayers sharing around deadband No No Columbia Gas of Mass. Gas D Price 2006 10 Comprehensive 0.5% Yes GDP-PI No No Yes 75-25 shareholders-ratepayer sharing around deadband No No NSTAR Electric PacifiCorp Electricity D Electricity D Price Revenue 2007 1998 7 3 Comprehensive Comprehensive 0.5%-0.75% 0.3% Yes No GDP-PI GDP-PI No Yes 13 No No Yes Yes Deadband with 50-50 sharing Deadband No No Yes No "G" stands for "generation," "T" for "transmission," and "D" for "distribution." This sample does not include so-called "stair-step" plans or plans with only rate freezes. Notes - efficiency carry-over mechanism: "Comprehensive" means the cap applies to all costs/rates; "partial" means the cap only applies to some costs/rates. This sample only includes plans with X factors. 1 2 "IPI" is any utility- or utility-industry-specific price index Notes - X factor Notes - re-openers/off-ramps: 4 See "Sources" table 1 Stated X factor is implicit in SDG&E's "growth/productivity adjustment" 1 2 Only applies to second half of plan. Notes - flow through provisions / Y Factor: 11 13 14 15 Penalties & rewards Penalties & other incentives Penalties & rewards Off-ramp can be requested by company. Notes - capex provisions / K factor: 1 For SAS rates in the distribution tariff, TAC Deferral Account, and AESO load settlement costs 2 "Cost of Defined Required Incremental Activities" (not specified) plus a variety of deferral accounts 3 Various deferral accounts 2 "Capital Efficiency Mechanism" and allowal for Commission approval of certain capital additions. 4 Flow through of "variations in property tax, capital tax and AFUDC from the target costs" 3 Can apply for recovery of "extraordinary" capex Recovery of "extraordinary" O&M expenses, flow through of variances from forecasted income tax rates, 4 Recovery of "extraordinary" capex and deferrals of regulatory and other small misc. costs 5 Flow through of incremental capex related to attachment of natural gas-fired power generation projects, classified as Y factor For adjustments for weather impacts on average use in addition to "[r]outine adjustments" including expenses for DSM, CIS, 6 Incremental Capital Module Materiality Threshold--necessity of capital-related rate relief determined through formula. upstream gas, upstream transportation and storage, and tax changes, and various deferral accounts. 7 Separate cap for capital-related revenue 7 For gas-related costs and changes related to ROE 8 Price cap adjusted for net capital gains/losses 8 For adjustments for weather impacts on average use in addition to "[r]outine adjustments" including expenses for DSM, CIS, upstream gas, upstream transportation, and storage, and various deferral accounts 9 For changes in accounting of DSM and taxes 6 6 "Two-year phase out of the final year capital benefit" 3 5 2 CPI-BC CPI-BC (O&M), CPI-Canada (Capex) Fortis BC U.S. 1 50%-66% of Inflation 3.0-4.0% (O&M), 2.0% (Capex); 0% for all costs in last year British Columbia U.S. Source Canadian EU CPI / Alberta Average Hourly Earnings, 50/50 weighting Terasen Gas Inc. California Service Quality Provisions 1 For transmission rates, includes a "G" factor which accounts for prudent investments in transmission growth. Plan also includes a municipal rider for capital "requirements" for distribution operations, with an annual maximum of $15 million. 30 28 29 30 4
  8. Page 31 of 54

    The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 31 of 54 Notes - flow through provisions / Y Factor: For SAS rates in the distribution tariff, TAC Deferral Account, and AESO load settlement costs 2 "Cost of Defined Required Incremental Activities" (not specified) plus a variety of deferral accounts 3 Various deferral accounts 4 Flow through of "variations in property tax, capital tax and AFUDC from the target costs" 3 Can apply for recovery of "extraordinary" capex 5 Recovery of "extraordinary" O&M expenses, flow through of variances from forecasted income tax rates, 4 Recovery of "extraordinary" capex and deferrals of regulatory and other small misc. costs 5 Flow through of incremental capex related to attachment of natural gas-fired power generation projects, classified as Y factor For adjustments for weather impacts on average use in addition to "[r]outine adjustments" including expenses for DSM, CIS, 6 Incremental Capital Module Materiality Threshold--necessity of capital-related rate relief determined through formula. Separate cap for capital-related revenue Price cap adjusted for net capital gains/losses 6 2 upstream gas, upstream transportation and storage, and tax changes, and various deferral accounts. 7 For gas-related costs and changes related to ROE 8 8 For adjustments for weather impacts on average use in addition to "[r]outine adjustments" including expenses for DSM, CIS, upstream gas, upstream transportation, and storage, and various deferral accounts 9 For changes in accounting of DSM and taxes True ups for misc. expenses related to power purchasing For DSM, accounting changes, Electric Lifeline Program, and a few misc. items 11 ** 1 For transmission rates, includes a "G" factor which accounts for prudent investments in transmission growth. Plan also includes a municipal rider for capital "requirements" for distribution operations, with an annual maximum of $15 million. "Capital Efficiency Mechanism" and allowal for Commission approval of certain capital additions. 7 10 * Notes - capex provisions / K factor: 1 12 For accounting, regulatory, or tax changes, plus a deferral account for tree trimming 13 For DSM Tree-trimming and some other misc. costs are excluded from SDG&E's rate indexing mechanism and appear to be recovered through balancing accounts. Some costs, such as "catastrophic event costs, environmental remediation costs, low-emission vehicle program costs, mandated social program costs, and regulatory transition costs" are recovered outside of the PBR mechanism. 31
  9. Page 32 of 54

    The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 32 of 54 65. For Canada, we list PBR plans for various firms in Alberta, British Columbia and Ontario. In the United States, we list plans employed in California, Maine, Massachusetts and Oregon. In Canada, the plans were rather evenly split between price and revenue caps (either of which is acceptable in our opinion, as long as the traditional and reasonable adjustments are made to the quantities over which average revenues are computed); price caps were the dominant type of PBR plan in the United States. Consumer prices index were the most common inflation factor in Canada, while GDP-PI was dominant in the United States. Almost all plans were comprehensive (i.e., applying to all costs), with only three examples of plans pertaining only to operating and maintenance costs. The X-factors were positive in all cases. Almost all plans had a Z-factor and some had various versions of pass-through provisions in Y-factors and K-factors. Almost all had some form of earnings sharing. Two had an efficiency carry-over mechanism and most had some sort of reward/penalty for service quality. 66. Table 4, below, presents the PBR proposals for the Utilities and interveners. 32
  10. Page 33 of 54

    The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 33 of 54 Table 4. Key Components of Applicants' PBR Proposals Party Service covered Cap Type Start Year ATCO Electric Electricity distribution Price 2013 ATCO Gas AltaGas Utilities Gas distribution Revenue 2013 Term (years) Cost Scope 1 4 5 Comprehensive Comprehensive X Factor Includes Stretch Factor? -2.0% No -2.0% No K Factor or Capital FlowZ Y Factor? through? Factor? Inflation .65*(AWE-Alberta) + .35*(EUCPI-Distribution) .57*(AWE-Alberta) + .43(CPI-Alberta) Yes Gas distribution Revenue 2013 5 Comprehensive -1.3% No .57*(AWE-Alberta) + .43(CPI-Alberta) EPCOR Distribution & Transmission Electricity transmission & distribution Revenue (trans.), Price (dist.) 2013 5 Comprehensive -0.8% 1 Yes .2*(CPI-Alberta) + 0.8(AHE-Alberta) FortisAlberta Electricity distribution Price 2013 5 Comprehensive -1.0% 2 No .39*(EUCPI-Canada*.29) + 0.61*(AHEAlberta) City of Calgary Does not recommend PBR. Consumers Coalition of Alberta Gas distribution Revenue 2013 5 Comprehensive 1.32-1.69% Yes CPI-Alberta or GDPIPI (FDD) IPCAA 1 Electricity distribution Consumer Advocate Does not recommend PBR. 1 2 Yes 1 Yes Yes Earnings Sharing Mechanism Efficiency Carry-Over ReService Mechanism openers/ Quality ? Off-ramps? Proposal Yes 50-50 sharing outside deadband Yes Yes Rule 002 Yes 50-50 sharing outside deadband Yes Yes Rule 002 Variable sharing outside deadband No Yes Rule 002 Penalties within Yes Yes plan 1 No Yes Rule 002 Yes No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No 50-50 sharing outside deadband No No No No "Comprehensive" means the cap applies to all costs/rates. Notes - Party 1 The IPCAA PBR plan will only include general and administrative costs of non-power system assets and activities and they do not offer specific comments on PBR factors. Notes - X Factor 1 Only applied to O&M component of expenses/rates. 2 FortisAlberta requests a X factor of -2.5% if disallowed flow-through of "externally driven" capital expenditures. Notes - Inflation 1 Only applied to O&M component of expenses/rates. 2 CCA does not offer a specific inflation formula. Notes - Service Quality Proposal 1 The inclusion of penalties within the PBR plan would disallow penalties from Rule 002. 33
Words on different pages

As listed on the current system

Question(s) Answered 140 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)