Page 26 of 54
The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 26 of 54 try to improve utility services and end the drain on public funds. 20 As Professors Bias and Perotti state: Large privatization programs have occurred in the recent decades both in developed and developing countries. The main explanation has been that privatization leads to increased productivity and profitability, a consensus view which a vast empirical literature has confirmed.21 56. The trend toward privatization effectively began in the UK in 1979. The 1970s were an economically unstable time for the UK. The country was experiencing oil shocks along with the rest of the world, and expenditures were growing faster than revenues. Having committed not to curtail health and social security expenditures, the government was forced to cut public sector investment. Additionally, to counter the inflationary surge that resulted from the rise in oil prices, the government held down utility prices, causing utilities to experience cash flow problems and investment declines. For the government of Prime Minister Margaret Thatcher (newly elected in 1979) privatization emerged as an attractive solution to fiscal problems. 57. In addition to starting the worldwide trend in privatization generally, the UK also popularized a method of tariff regulation in water, electricity, gas and telecommunications called ―RPI-X‖ or ―price cap‖ regulation there.22 According to Armstrong, et al: First applied to British Telecom (BT) in 1984, RPI-X regulation now exists for British Gas (BG), British Airports Authority (BSS), the regional water companies, and, in the electricity industry, the National Grid Company and the regional distribution and supply companies. [note omitted] Almost fifty firms in Britain 20 Nobel Laureate, Economist Gary S. Becker notes that ―[t]he privatization revolution sweeping the world surely ranks among the remarkable economic developments of the past few decades.‖ Gary S. Becker, ―Surprises in a World According to Adam Smith,‖ Business Week, August 17, 1992, p. 16. 21 Biais, B., and Perotti, E., ―Machiavellian Privatization,‖ The American Economic Review, Volume 92, No 1 (March 2002), page 240. 22 The economic literature uses various synonymous terms for price cap regulation. Other terms include CPI-X regulation, RPI-X regulation, performance-based ratemaking (PBR). 26Page 27 of 54
The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 27 of 54 are subject to RPI – X, and the system has attracted considerable international interest.23 58. Following its popularity in the UK, price cap regulation was adopted in the United States for ATT in 1989 and for other gas and electricity companies in the United States and Canada subsequently. 59. The application of somewhat similar PBR pricing formulae, however, mask to a large extent the considerable underlying institutional differences upon which price regulation was based in the UK (and other jurisdictions that looked to the UK for regulatory guidance, such as Australia and Argentina). It is well known that neither the UK nor the other jurisdictions that began regulation with the UK-inspired privatization efforts have the constitutional, accounting and administrative institutions that define regulation in Canada and the United States.24 60. Probably the most useful way to signal that the institutions upon which basic regulation is based are quite different than in Canada and the United States than abroad concerns the source of the X-factor. In current practice in both the UK and Australia, the X-factor does not come from a TFP growth study but rather is a way to synchronize current prices (or revenues) with long-term economic forecasts (up to 8 years, depending on the formula period) of capital and operating costs. 61. Such forecasts of long-term costs are contrary to the ―known and measurable‖ standard that lies at the base of utility regulation in North America. 25 Ofgem (the UK regulator), in a recent price review, backed-out the X-factor as the value that would permit current prices to 23 Armstrong, M., Cowan, S., and Vickers, J., Regulatory Reform: Economic Analysis and British Experience, The MIT Press, Cambridge Massachusetts (1994), page 165. 24 ―Gordon and Makholm‖, pp. 32-34. 25 ―An agency is justifiably skeptical of budget cost estimates as a basis for ratemaking. It will rely on test period results to adjustment for known or reasonably expected changes.‖ - Goodman, Leonard Saul. The Process of Ratemaking. Volume I, Public Utilities Reports, Inc. Vienna, VA. 1998, p. 281. 27Page 28 of 54
The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 28 of 54 trend toward the forecast costs for electricity distributors ending 2015.26 Australia defines its Xfactor the same way, as the method of truing-up projected costs with projected revenues during the formula period.27 62. In neither case does the X-factor relate to a measure of industry productivity growth, as such, and in both cases the transition of regulated prices over the formula period follows forecasts of the type that we believe no regulator of energy utilities in the Canada or the United States has ever countenanced. Quite apart from the merits of the way those other regulators control utility prices, we are of the view that regulators in those other jurisdictions respond to substantially different regulatory institutions that argue against direct comparison to themselves in a PBR case. 63. In any event, there are sufficient North American examples of precedent and practices regarding the application of PBR for energy companies. As a result, we do not conclude that the search for patterns of common or uncommon practices among regulators would be helped by using example outside North America where regulators live in very different institutional environments. 26 Ofgem (2009) on the electricity distribution price control for April 2010 to March 2015 (Distribution Price Control Review 5). Reference 149/09, 7 December, 2009. Starting on page 57 of that report, which is available online, are the tables for each electricity distribution business, showing how the X-factor in its regulatory formula is calculated. It shows a forecast of costs in prices of 07/08, and the X-factor that achieves the same revenue as costs with a smoothly rising trend (―profiled‖) from year to year. See: ttp://www.ofgem.gov.uk/Pages/MoreInformation.aspx?docid=371&refer=Networks/ElecDist/PriceCntrls/DPCR 5 27 ―[t]he X-factor must be designed to equalise (in terms of net present value) the revenue to be earned by the Distribution Network Service Provider from the provision of standard control services over the regulatory control period with the provider‘s total revenue requirement for the regulatory control period.‖ See Australian national rules for electricity distribution (Chapter 6, National Electricity Rules), clause 6.5.9 of Chapter 6, entitled ―The X-factor.‖ The report can be found on the Australian regulator‘s website: www.aemc.gov.au. 28Page 29 of 54
The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 29 of 54 B. 64. PBR Regulatory Precedent in Canada and the United States There is a reasonable history among regulators in the United States and Canada regarding the parameters that become part of PBR plans. Table 3, below, presents a summary of those plans. 29Page 30 of 54
The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 30 of 54 Table 3. Cap-Based PBR Precedents for North-American Energy Utilities Province/ State Country Alberta Company ENMAX Power Service covered 1 Cap Type Start Year Term (Years) Cost Scope 2 X Factor Includes Stretch Factor? Inflation 3 Flow through provisions / Y Factor? Capex provisions / K Factor? Z Factor? Earnings Sharing Mechanism Efficiency Carry-Over Mechanism? Re-openers/ Off-ramps? Electricity T & D Price 2007 7 Comprehensive 1.2% Yes Yes 1 Yes 1 Yes 50-50 for excess earnings No Yes Gas D Revenue 1998 3 Comprehensive 2.0%-3.0% No CPI-BC Yes 2 Yes 2 Yes 50-50, no deadband No No Penalties Annual review only Gas D Revenue 2004 4 Comprehensive No Yes 3 No Yes 50-50, no deadband Yes 1 Yes Various standards and incentives 3 Annual review Assessment only 4 ND Financial incentives 5 Electricity G, T & D Revenue 1996 4 Comprehensive No No 50-50, no deadband No Electricity G, T & D Revenue 2000 3 Comprehensive 2.0% No CPI-BC Yes 5 Yes 4 No No No Electricity G, T & D Revenue 2007 2 Partial (O&M) 2.0% No CPI-BC No NA Yes 50-50, no deadband No ND Annual review Gas D Revenue 2000 3 Partial (O&M) 1.1% Yes No NA Yes No No Yes 1 Yes 7 Gas D Revenue 2008 5 Comprehensive Implicit in inflation NA CPI-Ontario GDPPICanada•A; 0.45 ? A ? 0.60 Yes 6 Yes 5 Yes 50-50 sharing of excess earnings No Yes No 8 Gas D Price 2001 3 Comprehensive 2.5% No GDPPI-Canada Yes 7 No Yes No Yes Penalties 9 Gas D Price 2008 5 Comprehensive 1.8% No GDPPI-Canada Yes 8 No Yes 50-50 sharing around deadband Variable/asymmetric sharing of excess earnings No No 10 Electricity D Price 2000 3 Comprehensive 1.25% Yes IPI No No Yes 50-50 sharing of excess earnings No No No No explicit financial incentives Electricity D Price 2007 3 Comprehensive 1.0% No GDPPI-Canada No No Yes None No No 12 Electricity D Price 2010 3 Comprehensive 0.9-1.3% Yes GDPPI-Canada No Yes 6 Yes No No Yes No Reporting requirements only Electricity G, T & D Electricity and gas G, T & D Electricity and gas D Price 1994 3 Comprehensive 1.4% No IPI Yes 9 No Yes No No Revenue 1994 5 Partial (O&M) 0.9-1.1% No IPI No Yes 7 Yes No Yes Rewards & penalties Rewards & penalties Price 1999 3 Comprehensive 1.1%-1.4% Yes/No IPI Other* No Yes No Yes Penalties 16 So. Cal. Edison Electricity T & D Price 1997 5 Comprehensive 1.2%-1.6% No CPI No No Yes No Variable/asymmetric sharing around deadband Variable/asymmetric sharing around deadband Variable/asymmetric sharing around deadband No Yes Penalties 17 So. Cal. Gas Gas T & D Revenue 1997 5 Comprehensive 2.1%-2.5% Yes IPI Other** No Yes Variable/asymmetric sharing around deadband No Yes Penalties 18 Bangor Gas Gas D Price 2000 10 Comprehensive 0.5% No GDP-PI No No No 50-50 sharing of excess earnings No No No 19 Bangor Hydro Electric Electricity D Price 1998 3 Comprehensive 1.2% No GDP-PI Yes 10 No Yes 50/50 sharing around deadband No No No 20 Electricity T & D Price 1995 5 Comprehensive 0.5%-1.0% Yes GDP-PI Yes 11 No Yes 50/50 sharing around deadband No No Penalties 21 Electricity D Price 2001 7 Comprehensive 2.0%-2.9% No GDP-PI No No Yes 50-50 sharing of below specified earnings level No No Penalties 22 Electricity D Price 2009 7 Comprehensive 1.0% No GDP-PI Yes 12 Yes 8 Yes Yes, 50-50 sharing above 11% ROE No No Penalties 23 Berkshire Gas Gas D Price 2002 10 Comprehensive 1.0% Yes GDP-PI No No Yes None No No No 24 Blackstone Gas Gas D Price 2005 5 Comprehensive 0.5% No GDP-PI No No Yes 50-50 sharing around deadband No No Penalties 25 Gas D Price 1996 5 Comprehensive 1.5% Yes GDP-PI No No Yes 75-25 shareholders-ratepayers sharing around deadband No No Penalties 26 Penalties & rewards 27 Canada Enbridge Gas Union Gas Ontario Ontario electricity distribution companies PacifiCorp San Diego Gas & Electric Maine Central Maine Power Massachusett s Oregon 1 Boston Gas 1 2 Yes 4 Yes 3 Gas D Price 2004 5 Comprehensive 0.4% Yes GDP-PI No No Yes 75-25 shareholders-ratepayers sharing around deadband No No Columbia Gas of Mass. Gas D Price 2006 10 Comprehensive 0.5% Yes GDP-PI No No Yes 75-25 shareholders-ratepayer sharing around deadband No No NSTAR Electric PacifiCorp Electricity D Electricity D Price Revenue 2007 1998 7 3 Comprehensive Comprehensive 0.5%-0.75% 0.3% Yes No GDP-PI GDP-PI No Yes 13 No No Yes Yes Deadband with 50-50 sharing Deadband No No Yes No "G" stands for "generation," "T" for "transmission," and "D" for "distribution." This sample does not include so-called "stair-step" plans or plans with only rate freezes. Notes - efficiency carry-over mechanism: "Comprehensive" means the cap applies to all costs/rates; "partial" means the cap only applies to some costs/rates. This sample only includes plans with X factors. 1 2 "IPI" is any utility- or utility-industry-specific price index Notes - X factor Notes - re-openers/off-ramps: 4 See "Sources" table 1 Stated X factor is implicit in SDG&E's "growth/productivity adjustment" 1 2 Only applies to second half of plan. Notes - flow through provisions / Y Factor: 11 13 14 15 Penalties & rewards Penalties & other incentives Penalties & rewards Off-ramp can be requested by company. Notes - capex provisions / K factor: 1 For SAS rates in the distribution tariff, TAC Deferral Account, and AESO load settlement costs 2 "Cost of Defined Required Incremental Activities" (not specified) plus a variety of deferral accounts 3 Various deferral accounts 2 "Capital Efficiency Mechanism" and allowal for Commission approval of certain capital additions. 4 Flow through of "variations in property tax, capital tax and AFUDC from the target costs" 3 Can apply for recovery of "extraordinary" capex Recovery of "extraordinary" O&M expenses, flow through of variances from forecasted income tax rates, 4 Recovery of "extraordinary" capex and deferrals of regulatory and other small misc. costs 5 Flow through of incremental capex related to attachment of natural gas-fired power generation projects, classified as Y factor For adjustments for weather impacts on average use in addition to "[r]outine adjustments" including expenses for DSM, CIS, 6 Incremental Capital Module Materiality Threshold--necessity of capital-related rate relief determined through formula. upstream gas, upstream transportation and storage, and tax changes, and various deferral accounts. 7 Separate cap for capital-related revenue 7 For gas-related costs and changes related to ROE 8 Price cap adjusted for net capital gains/losses 8 For adjustments for weather impacts on average use in addition to "[r]outine adjustments" including expenses for DSM, CIS, upstream gas, upstream transportation, and storage, and various deferral accounts 9 For changes in accounting of DSM and taxes 6 6 "Two-year phase out of the final year capital benefit" 3 5 2 CPI-BC CPI-BC (O&M), CPI-Canada (Capex) Fortis BC U.S. 1 50%-66% of Inflation 3.0-4.0% (O&M), 2.0% (Capex); 0% for all costs in last year British Columbia U.S. Source Canadian EU CPI / Alberta Average Hourly Earnings, 50/50 weighting Terasen Gas Inc. California Service Quality Provisions 1 For transmission rates, includes a "G" factor which accounts for prudent investments in transmission growth. Plan also includes a municipal rider for capital "requirements" for distribution operations, with an annual maximum of $15 million. 30 28 29 30 4Page 31 of 54
The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 31 of 54 Notes - flow through provisions / Y Factor: For SAS rates in the distribution tariff, TAC Deferral Account, and AESO load settlement costs 2 "Cost of Defined Required Incremental Activities" (not specified) plus a variety of deferral accounts 3 Various deferral accounts 4 Flow through of "variations in property tax, capital tax and AFUDC from the target costs" 3 Can apply for recovery of "extraordinary" capex 5 Recovery of "extraordinary" O&M expenses, flow through of variances from forecasted income tax rates, 4 Recovery of "extraordinary" capex and deferrals of regulatory and other small misc. costs 5 Flow through of incremental capex related to attachment of natural gas-fired power generation projects, classified as Y factor For adjustments for weather impacts on average use in addition to "[r]outine adjustments" including expenses for DSM, CIS, 6 Incremental Capital Module Materiality Threshold--necessity of capital-related rate relief determined through formula. Separate cap for capital-related revenue Price cap adjusted for net capital gains/losses 6 2 upstream gas, upstream transportation and storage, and tax changes, and various deferral accounts. 7 For gas-related costs and changes related to ROE 8 8 For adjustments for weather impacts on average use in addition to "[r]outine adjustments" including expenses for DSM, CIS, upstream gas, upstream transportation, and storage, and various deferral accounts 9 For changes in accounting of DSM and taxes True ups for misc. expenses related to power purchasing For DSM, accounting changes, Electric Lifeline Program, and a few misc. items 11 ** 1 For transmission rates, includes a "G" factor which accounts for prudent investments in transmission growth. Plan also includes a municipal rider for capital "requirements" for distribution operations, with an annual maximum of $15 million. "Capital Efficiency Mechanism" and allowal for Commission approval of certain capital additions. 7 10 * Notes - capex provisions / K factor: 1 12 For accounting, regulatory, or tax changes, plus a deferral account for tree trimming 13 For DSM Tree-trimming and some other misc. costs are excluded from SDG&E's rate indexing mechanism and appear to be recovered through balancing accounts. Some costs, such as "catastrophic event costs, environmental remediation costs, low-emission vehicle program costs, mandated social program costs, and regulatory transition costs" are recovered outside of the PBR mechanism. 31Page 32 of 54
The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 32 of 54 65. For Canada, we list PBR plans for various firms in Alberta, British Columbia and Ontario. In the United States, we list plans employed in California, Maine, Massachusetts and Oregon. In Canada, the plans were rather evenly split between price and revenue caps (either of which is acceptable in our opinion, as long as the traditional and reasonable adjustments are made to the quantities over which average revenues are computed); price caps were the dominant type of PBR plan in the United States. Consumer prices index were the most common inflation factor in Canada, while GDP-PI was dominant in the United States. Almost all plans were comprehensive (i.e., applying to all costs), with only three examples of plans pertaining only to operating and maintenance costs. The X-factors were positive in all cases. Almost all plans had a Z-factor and some had various versions of pass-through provisions in Y-factors and K-factors. Almost all had some form of earnings sharing. Two had an efficiency carry-over mechanism and most had some sort of reward/penalty for service quality. 66. Table 4, below, presents the PBR proposals for the Utilities and interveners. 32Page 33 of 54
The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 33 of 54 Table 4. Key Components of Applicants' PBR Proposals Party Service covered Cap Type Start Year ATCO Electric Electricity distribution Price 2013 ATCO Gas AltaGas Utilities Gas distribution Revenue 2013 Term (years) Cost Scope 1 4 5 Comprehensive Comprehensive X Factor Includes Stretch Factor? -2.0% No -2.0% No K Factor or Capital FlowZ Y Factor? through? Factor? Inflation .65*(AWE-Alberta) + .35*(EUCPI-Distribution) .57*(AWE-Alberta) + .43(CPI-Alberta) Yes Gas distribution Revenue 2013 5 Comprehensive -1.3% No .57*(AWE-Alberta) + .43(CPI-Alberta) EPCOR Distribution & Transmission Electricity transmission & distribution Revenue (trans.), Price (dist.) 2013 5 Comprehensive -0.8% 1 Yes .2*(CPI-Alberta) + 0.8(AHE-Alberta) FortisAlberta Electricity distribution Price 2013 5 Comprehensive -1.0% 2 No .39*(EUCPI-Canada*.29) + 0.61*(AHEAlberta) City of Calgary Does not recommend PBR. Consumers Coalition of Alberta Gas distribution Revenue 2013 5 Comprehensive 1.32-1.69% Yes CPI-Alberta or GDPIPI (FDD) IPCAA 1 Electricity distribution Consumer Advocate Does not recommend PBR. 1 2 Yes 1 Yes Yes Earnings Sharing Mechanism Efficiency Carry-Over ReService Mechanism openers/ Quality ? Off-ramps? Proposal Yes 50-50 sharing outside deadband Yes Yes Rule 002 Yes 50-50 sharing outside deadband Yes Yes Rule 002 Variable sharing outside deadband No Yes Rule 002 Penalties within Yes Yes plan 1 No Yes Rule 002 Yes No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No 50-50 sharing outside deadband No No No No "Comprehensive" means the cap applies to all costs/rates. Notes - Party 1 The IPCAA PBR plan will only include general and administrative costs of non-power system assets and activities and they do not offer specific comments on PBR factors. Notes - X Factor 1 Only applied to O&M component of expenses/rates. 2 FortisAlberta requests a X factor of -2.5% if disallowed flow-through of "externally driven" capital expenditures. Notes - Inflation 1 Only applied to O&M component of expenses/rates. 2 CCA does not offer a specific inflation formula. Notes - Service Quality Proposal 1 The inclusion of penalties within the PBR plan would disallow penalties from Rule 002. 33Page 34 of 54
The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 34 of 54 C. Common Features of PBR Plans for Canadian and US Energy Distributors 67. PBR plans typically adjust revenues or prices by the following items: Inflation – X-factor ± Z-factor ± ESM ± SQ where ESM is an earnings sharing mechanism, and SQ is a service quality incentive. These make up the common features of PBR plans, and all are included in the applicants‘ proposals in AUC Proceeding ID 566. 1. 68. Inflation All companies propose to escalate rates by an inflation index reflecting inflation in labor and materials prices, respectively. The index used to reflect increases in the prices of labor is either the Average Weekly Earnings (―AWE‖) or Average Hourly Earnings (―AHE‖), both for Alberta. The index used to reflect materials is either the Electric Utility Construction Price Index (―EU CPI‖) (with some variation) or the Consumer Price Index for Alberta. 69. While the most common inflation index used in PBR plans is the Gross Domestic Product Price Index (for either Canada or the United States depending on the location of the plan), using a weighted average of input prices is not uncommon. Five of the 30 plans surveyed have utility or utility-industry-specific input price indexes. Perhaps more importantly, the AUC has already approved a similar inflation index for ENMAX Power‘s PBR plan (one half EU CPI, one half AHE). 2. 70. X-factor The proposed X-factors on the part of the utilities range from -0.8 percent to -2.0 percent. Only one X-factor includes a stretch factor (0.2 percent, for EDTI). EPCOR‘s X-factor is also meant to reflect partial factor productivity because it only applies to the O&M portion of the 34Page 35 of 54
The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 35 of 54 company‘s price cap formula. None of the cap-based PBR plans we surveyed contained negative X-factors. Indeed, almost all of the X-factors were positive. Plan X-factors averaged around 1 percent, similar to the NERA TFP estimate. 3. 71. Z-factor Every company proposes a Z-factor. These typically account for force majeure events and have a materiality threshold, which specifies how much (in dollars) the event must impact the utility in order to be passed through to rate holders as a Z-factor addition. Ninety percent of the plans had Z factors. The Z-factors here were not identical—some allowed for the pass through of different events than others—but in general the plans permitted Utilities to recover the costs of unforeseeable events with material impacts. 4. 72. Earnings Sharing/Re-openers All proposals, except that of EPCOR, include an earnings sharing mechanism (ESM). Three of the four ESMs include symmetrical earnings sharing around a ROE ―deadband.‖ The ESM proposal of AltaGas is slightly more complicated and atypical: after the actual ROE reaches a certain level above or below the approved ROE, earnings are shared 60/40 among shareholders and ratepayers, respectively. One half of the PBR precedents had ESMs with 50-50 sharing. A little over one third had deadbands. Others had variable sharing (e.g., 60-40 or 2575), sharing of all earnings above or below a ROE, or sharing of only excess earnings (i.e., earnings above a certain ROE). 5. 73. Service Quality All but one company proposes to continue regulating service quality under AUC Rule 002. The exception is EPCOR, which proposes to implement a new set of service-quality standards and potential penalties within its PBR plan. Rule 002 does not contain any explicit 35
As listed on the current system
Question(s) Answered 140 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/09/2026