The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 31 of 54 Notes - flow through provisions / Y Factor: For SAS rates in the distribution tariff, TAC Deferral Account, and AESO load settlement costs 2 "Cost of Defined Required Incremental Activities" (not specified) plus a variety of deferral accounts 3 Various deferral accounts 4 Flow through of "variations in property tax, capital tax and AFUDC from the target costs" 3 Can apply for recovery of "extraordinary" capex 5 Recovery of "extraordinary" O&M expenses, flow through of variances from forecasted income tax rates, 4 Recovery of "extraordinary" capex and deferrals of regulatory and other small misc. costs 5 Flow through of incremental capex related to attachment of natural gas-fired power generation projects, classified as Y factor For adjustments for weather impacts on average use in addition to "[r]outine adjustments" including expenses for DSM, CIS, 6 Incremental Capital Module Materiality Threshold--necessity of capital-related rate relief determined through formula. Separate cap for capital-related revenue Price cap adjusted for net capital gains/losses 6 2 upstream gas, upstream transportation and storage, and tax changes, and various deferral accounts. 7 For gas-related costs and changes related to ROE 8 8 For adjustments for weather impacts on average use in addition to "[r]outine adjustments" including expenses for DSM, CIS, upstream gas, upstream transportation, and storage, and various deferral accounts 9 For changes in accounting of DSM and taxes True ups for misc. expenses related to power purchasing For DSM, accounting changes, Electric Lifeline Program, and a few misc. items 11 ** 1 For transmission rates, includes a "G" factor which accounts for prudent investments in transmission growth. Plan also includes a municipal rider for capital "requirements" for distribution operations, with an annual maximum of $15 million. "Capital Efficiency Mechanism" and allowal for Commission approval of certain capital additions. 7 10 * Notes - capex provisions / K factor: 1 12 For accounting, regulatory, or tax changes, plus a deferral account for tree trimming 13 For DSM Tree-trimming and some other misc. costs are excluded from SDG&E's rate indexing mechanism and appear to be recovered through balancing accounts. Some costs, such as "catastrophic event costs, environmental remediation costs, low-emission vehicle program costs, mandated social program costs, and regulatory transition costs" are recovered outside of the PBR mechanism. 31Page 32 of 54
The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 32 of 54 65. For Canada, we list PBR plans for various firms in Alberta, British Columbia and Ontario. In the United States, we list plans employed in California, Maine, Massachusetts and Oregon. In Canada, the plans were rather evenly split between price and revenue caps (either of which is acceptable in our opinion, as long as the traditional and reasonable adjustments are made to the quantities over which average revenues are computed); price caps were the dominant type of PBR plan in the United States. Consumer prices index were the most common inflation factor in Canada, while GDP-PI was dominant in the United States. Almost all plans were comprehensive (i.e., applying to all costs), with only three examples of plans pertaining only to operating and maintenance costs. The X-factors were positive in all cases. Almost all plans had a Z-factor and some had various versions of pass-through provisions in Y-factors and K-factors. Almost all had some form of earnings sharing. Two had an efficiency carry-over mechanism and most had some sort of reward/penalty for service quality. 66. Table 4, below, presents the PBR proposals for the Utilities and interveners. 32Page 33 of 54
The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 33 of 54 Table 4. Key Components of Applicants' PBR Proposals Party Service covered Cap Type Start Year ATCO Electric Electricity distribution Price 2013 ATCO Gas AltaGas Utilities Gas distribution Revenue 2013 Term (years) Cost Scope 1 4 5 Comprehensive Comprehensive X Factor Includes Stretch Factor? -2.0% No -2.0% No K Factor or Capital FlowZ Y Factor? through? Factor? Inflation .65*(AWE-Alberta) + .35*(EUCPI-Distribution) .57*(AWE-Alberta) + .43(CPI-Alberta) Yes Gas distribution Revenue 2013 5 Comprehensive -1.3% No .57*(AWE-Alberta) + .43(CPI-Alberta) EPCOR Distribution & Transmission Electricity transmission & distribution Revenue (trans.), Price (dist.) 2013 5 Comprehensive -0.8% 1 Yes .2*(CPI-Alberta) + 0.8(AHE-Alberta) FortisAlberta Electricity distribution Price 2013 5 Comprehensive -1.0% 2 No .39*(EUCPI-Canada*.29) + 0.61*(AHEAlberta) City of Calgary Does not recommend PBR. Consumers Coalition of Alberta Gas distribution Revenue 2013 5 Comprehensive 1.32-1.69% Yes CPI-Alberta or GDPIPI (FDD) IPCAA 1 Electricity distribution Consumer Advocate Does not recommend PBR. 1 2 Yes 1 Yes Yes Earnings Sharing Mechanism Efficiency Carry-Over ReService Mechanism openers/ Quality ? Off-ramps? Proposal Yes 50-50 sharing outside deadband Yes Yes Rule 002 Yes 50-50 sharing outside deadband Yes Yes Rule 002 Variable sharing outside deadband No Yes Rule 002 Penalties within Yes Yes plan 1 No Yes Rule 002 Yes No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No 50-50 sharing outside deadband No No No No "Comprehensive" means the cap applies to all costs/rates. Notes - Party 1 The IPCAA PBR plan will only include general and administrative costs of non-power system assets and activities and they do not offer specific comments on PBR factors. Notes - X Factor 1 Only applied to O&M component of expenses/rates. 2 FortisAlberta requests a X factor of -2.5% if disallowed flow-through of "externally driven" capital expenditures. Notes - Inflation 1 Only applied to O&M component of expenses/rates. 2 CCA does not offer a specific inflation formula. Notes - Service Quality Proposal 1 The inclusion of penalties within the PBR plan would disallow penalties from Rule 002. 33Page 34 of 54
The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 34 of 54 C. Common Features of PBR Plans for Canadian and US Energy Distributors 67. PBR plans typically adjust revenues or prices by the following items: Inflation – X-factor ± Z-factor ± ESM ± SQ where ESM is an earnings sharing mechanism, and SQ is a service quality incentive. These make up the common features of PBR plans, and all are included in the applicants‘ proposals in AUC Proceeding ID 566. 1. 68. Inflation All companies propose to escalate rates by an inflation index reflecting inflation in labor and materials prices, respectively. The index used to reflect increases in the prices of labor is either the Average Weekly Earnings (―AWE‖) or Average Hourly Earnings (―AHE‖), both for Alberta. The index used to reflect materials is either the Electric Utility Construction Price Index (―EU CPI‖) (with some variation) or the Consumer Price Index for Alberta. 69. While the most common inflation index used in PBR plans is the Gross Domestic Product Price Index (for either Canada or the United States depending on the location of the plan), using a weighted average of input prices is not uncommon. Five of the 30 plans surveyed have utility or utility-industry-specific input price indexes. Perhaps more importantly, the AUC has already approved a similar inflation index for ENMAX Power‘s PBR plan (one half EU CPI, one half AHE). 2. 70. X-factor The proposed X-factors on the part of the utilities range from -0.8 percent to -2.0 percent. Only one X-factor includes a stretch factor (0.2 percent, for EDTI). EPCOR‘s X-factor is also meant to reflect partial factor productivity because it only applies to the O&M portion of the 34Page 35 of 54
The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 35 of 54 company‘s price cap formula. None of the cap-based PBR plans we surveyed contained negative X-factors. Indeed, almost all of the X-factors were positive. Plan X-factors averaged around 1 percent, similar to the NERA TFP estimate. 3. 71. Z-factor Every company proposes a Z-factor. These typically account for force majeure events and have a materiality threshold, which specifies how much (in dollars) the event must impact the utility in order to be passed through to rate holders as a Z-factor addition. Ninety percent of the plans had Z factors. The Z-factors here were not identical—some allowed for the pass through of different events than others—but in general the plans permitted Utilities to recover the costs of unforeseeable events with material impacts. 4. 72. Earnings Sharing/Re-openers All proposals, except that of EPCOR, include an earnings sharing mechanism (ESM). Three of the four ESMs include symmetrical earnings sharing around a ROE ―deadband.‖ The ESM proposal of AltaGas is slightly more complicated and atypical: after the actual ROE reaches a certain level above or below the approved ROE, earnings are shared 60/40 among shareholders and ratepayers, respectively. One half of the PBR precedents had ESMs with 50-50 sharing. A little over one third had deadbands. Others had variable sharing (e.g., 60-40 or 2575), sharing of all earnings above or below a ROE, or sharing of only excess earnings (i.e., earnings above a certain ROE). 5. 73. Service Quality All but one company proposes to continue regulating service quality under AUC Rule 002. The exception is EPCOR, which proposes to implement a new set of service-quality standards and potential penalties within its PBR plan. Rule 002 does not contain any explicit 35Page 36 of 54
The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 36 of 54 penalties; it only states that utilities must justify any failure to meet performance standards and potentially correct for those failures. Of the PBR plans filed in this proceeding, the majority have built-in service-quality incentives. The remaining plans have only assessments/reporting requirements or no built-in measures at all. For those plans without built-in SQ provisions, we did not determine whether the utilities were already required to report SQ under a regulation akin to AUC Rule 002. D. 74. Uncommon Features of the Utilities’ and Interveners’ PBR Plans Three key components of the applicants‘ proposals are atypical. These components—K- factors, Y-factors, and efficiency-carryover mechanisms (―ECMs‖) are not usually found in PBR plans. As above, we compare the provisions in the applicants‘ proposals to those found in the precedents surveyed in Table 3. 1. 75. K-factor All proposals include capital expenditure (―capex‖) provisions that, following the lead of some applicants, we label as ―K-factors.‖28 The general purpose of K-factors is to flow through capital expenditures into rates. K-factor provisions are generally not included in PBR plans because they can dampen efficiency incentives. The Ontario Energy Board (OEB) summarized the rationale for the non-inclusion of K-factors in its rejection of a K-factor for the second generation PBR plan for Ontario electricity distributors: Typically, an incentive regulation mechanism is intended to encompass both capital and operating costs. This increases incentives for operating performance. In a capital intensive business such as electricity distribution, containing capital expenditures is a key to good cost management. The addition of a capital investment factor would mean that incentive [sic] under the price cap mechanism would be significantly reduced because the factor would address incremental 28 Such capital expenditure provisions are also referred to as ―Major Projects‖ factors or included for flow through in the ―Y-factor‖ category. 36Page 37 of 54
The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 37 of 54 capital spending separately and outside of the price cap. Further, it would unduly complicate the application, reporting, and monitoring requirements for 2nd Generation IRM because it would require special consideration to be implemented effectively.29 76. Despite the common label, applicants‘ K-factor proposals vary in scope. Four of the five proposals are based on forecasts, while one (FortisAlberta's) is based on incurred costs. In addition, proposals specify to varying degree which capital expenditures are subject to flow through. On one end of the spectrum, we observe EDTI proposing to flow through all of its forecasted capital additions; on the other end, FortisAlberta only proposes to flow through a relatively narrow specification of ―externally driven‖ capital expenditures. Table 5. Applicants' Proposals for the Recovery of Future Capital Expenditures Company Proposal for recovery of capital expenditures ATCO Electric Flow-through of forecasted capital additions for "reliability," "end of life," and "clearance and safety" programs, in addition to "material capital investment that is unique in nature or not easily forecastable or not within ATCO Electric's Control", "buildings over $10 million," and the "impact of 2012 additions" (for inclusion in 2013) ATCO Gas Flow-through of forecasted capital additions - type/amount of additions not specified; also flow-through of "material capital investment that is unique in nature" such as "major buildings over $10 million" and CIS replacement AltaGas Utilities Flow-through of annually forecasted capital expenditures related to reliability and safety EPCOR Distribution and Transmission Flow-through of forecasted capital additions, with one initial forecast and midPBR-term forecast FortisAlberta Flow-through of "externally driven" capital expenditures including: distribution line moves, substation associated upgrades, AESO contributions, IPP interconnections 77. Few of the plans surveyed had provisions similar to the capital recovery mechanisms proposed by the applicants in the instant proceeding. We describe these provisions below and in doing so compare them to the applicants‘ proposals. 29 OEB, December 20, 2006 Report of the Board on Cost of Capital and 2 nd Generation Incentive Regulation for Ontario‘s Electricity Distributors, p. 37. 37Page 38 of 54
The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 38 of 54 78. Only San Diego Gas & Electric‘s 1994 PBR plan flows through capital expenditures via a formula outside the (I-X) framework. But this formula is nowhere akin to the proposed Kfactors. For one, the formula only appears to allow for recovery of average capital expenditures, not above average or extraordinary capital expenditures. In addition, the formula is part of a partial PBR plan, in which the ―I - X‖ component of the plan only applies to O&M expenditures—unlike all of the plans in the instant proceeding, save EDTI‘s. 79. ENMAX Power‘s PBR plan includes a ―G‖ factor that flows through prudent capital expenditures on transmission plant. The G-factor is required for unique reasons, as stated in Decision 2009-035: ―The G-factor is proposed to ‗recover the necessary increase in revenue requirement related to infrastructure growth of the transmission system since, unlike the distribution revenue requirement, the Transmission revenue requirement does not increase automatically with load growth,‖ because EPC only has one transmission customer, the Alberta Electric System Operator (AESO). The plan also includes a municipal rider that allows for a maximum annual addition of $15 million in funds for capex ―requirements.‖ 80. Two of the plans—both for FortisBC—allowed for approval of ―extraordinary‖ capital additions. Note these plans were not pre-approvals, but only allowed for recovery of capital expenditures due to circumstances beyond the utility‘s control and subject to Commission approval. FortisBC‘s plan starting in 1996 allowed the company to apply for recovery of extraordinary capital expenditure, which the company did indeed do in 1999 for Y2K and CIS projects. FortisBC‘s plan starting in 2000 was more inclusive: it permitted the recovery of significant amounts of ―extraordinary‖ capital expenditures—over half of the total forecasted capital expenditures for the PBR term. This latter plan is perhaps the most extensive of capital 38Page 39 of 54
The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 39 of 54 provisions surveyed and also lends most precedence to the plans proposed in the instant proceeding. 2. 81. Y-factor All proposals include a comprehensive ―Y-factor.‖ As described by the AUC in Decision 2009-035 approving ENMAX Power‘s PBR plan, Y-factors ―arise from cost elements that are not unforeseen one time events. Flow-through items arise in the normal course of business, but are such that the company has no control over them‖ (p. 55) (our emphasis). 82. Like the proposed ―K-factors,‖ the Y-factor proposals differ significantly from plan to plan, as shown in Table 6: 39Page 40 of 54
The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 40 of 54 Table 6. Applicants’ Proposals for Recovery of Y-factor Costs Company ATCO Gas Y-Factor Flow-Through Items AESO load settlement costs, system access service payments, distribution to transmission contributions, defined benefit pension plan, income tax items, VOO, rate hearing costs, reserve for injuries and damages, vegetation management costs, head office cost allocation percentage, "new" CIS replacement, REA purchases, changes in depreciation and financing rates, and impacts of regulatory decisions Hearing costs, UCA assessments, reserve for injuries and damages, variable pay program, transmission costs, defined benefit pension plan, weather impacts, load balancing, income tax deductible capital costs, production abandonment costs, changes in the head-office cost-allocation percentage, "transmission driven" costs, costs from acquisitions of natural gas co-ops or other gas distribution systems, changes in depreciation and financing rates, and the impacts of regulatory decisions AltaGas Utilities Hearing costs, UCA and AUC assessments, implementation of a code compliant Natural Gas Settlement, DSM, income tax timing differences, changes in accounting standards, potential introduction of automated meter reading, management fees for 2011 generic cost of capital proceeding, and the acquisition of a new gas system with significant impacts on ROE EPCOR Distribution and Transmission AESO load settlements; AESO directed projects; property, business, and linear taxes; AUC tariff billing and load settlement initiatives, hearing cost reserves; generic cost of capital changes; "any generic proceeding that impacts operations or T&C's," and self insurance FortisAlberta AESO load settlement costs, AUC Rule 026 deferrals, hearing costs, selfinsurance, impacts of reassessment by the Canada Revenue Agency, exchange-rate changes for ongoing metering project, commission rule changes, farm transmission costs, depreciation changes, interest-rate changes on longterm debt, income taxes payable, impacts of regulatory decisions, and "true up amounts between initial and final rates for any given year" ATCO Electric 83. Comprehensive Y-factors like the proposals above are indeed unusual. However, thirteen of the thirty plans we surveyed contained some ―flow-through‖ items. Those Y-factor precedents are highly variable. Typical items include: (1) the continuation of some deferral accounts, (2) demand-side management (DSM) costs, (3) customer information system (CIS) costs, and (4) tree-trimming expenses. (Deferral accounts, however, have varied significantly from plan to plan; regulators appear to have approved them on a case-by-case basis. On average, the proposed deferral accounts may be more comprehensive and hence more prone to blunt efficiency incentives than deferral accounts included in previously approved PBR plans.) In addition, 40
As listed on the current system
Question(s) Answered 140 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/09/2026