The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 35 of 54 company‘s price cap formula. None of the cap-based PBR plans we surveyed contained negative X-factors. Indeed, almost all of the X-factors were positive. Plan X-factors averaged around 1 percent, similar to the NERA TFP estimate. 3. 71. Z-factor Every company proposes a Z-factor. These typically account for force majeure events and have a materiality threshold, which specifies how much (in dollars) the event must impact the utility in order to be passed through to rate holders as a Z-factor addition. Ninety percent of the plans had Z factors. The Z-factors here were not identical—some allowed for the pass through of different events than others—but in general the plans permitted Utilities to recover the costs of unforeseeable events with material impacts. 4. 72. Earnings Sharing/Re-openers All proposals, except that of EPCOR, include an earnings sharing mechanism (ESM). Three of the four ESMs include symmetrical earnings sharing around a ROE ―deadband.‖ The ESM proposal of AltaGas is slightly more complicated and atypical: after the actual ROE reaches a certain level above or below the approved ROE, earnings are shared 60/40 among shareholders and ratepayers, respectively. One half of the PBR precedents had ESMs with 50-50 sharing. A little over one third had deadbands. Others had variable sharing (e.g., 60-40 or 2575), sharing of all earnings above or below a ROE, or sharing of only excess earnings (i.e., earnings above a certain ROE). 5. 73. Service Quality All but one company proposes to continue regulating service quality under AUC Rule 002. The exception is EPCOR, which proposes to implement a new set of service-quality standards and potential penalties within its PBR plan. Rule 002 does not contain any explicit 35Page 36 of 54
The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 36 of 54 penalties; it only states that utilities must justify any failure to meet performance standards and potentially correct for those failures. Of the PBR plans filed in this proceeding, the majority have built-in service-quality incentives. The remaining plans have only assessments/reporting requirements or no built-in measures at all. For those plans without built-in SQ provisions, we did not determine whether the utilities were already required to report SQ under a regulation akin to AUC Rule 002. D. 74. Uncommon Features of the Utilities’ and Interveners’ PBR Plans Three key components of the applicants‘ proposals are atypical. These components—K- factors, Y-factors, and efficiency-carryover mechanisms (―ECMs‖) are not usually found in PBR plans. As above, we compare the provisions in the applicants‘ proposals to those found in the precedents surveyed in Table 3. 1. 75. K-factor All proposals include capital expenditure (―capex‖) provisions that, following the lead of some applicants, we label as ―K-factors.‖28 The general purpose of K-factors is to flow through capital expenditures into rates. K-factor provisions are generally not included in PBR plans because they can dampen efficiency incentives. The Ontario Energy Board (OEB) summarized the rationale for the non-inclusion of K-factors in its rejection of a K-factor for the second generation PBR plan for Ontario electricity distributors: Typically, an incentive regulation mechanism is intended to encompass both capital and operating costs. This increases incentives for operating performance. In a capital intensive business such as electricity distribution, containing capital expenditures is a key to good cost management. The addition of a capital investment factor would mean that incentive [sic] under the price cap mechanism would be significantly reduced because the factor would address incremental 28 Such capital expenditure provisions are also referred to as ―Major Projects‖ factors or included for flow through in the ―Y-factor‖ category. 36Page 37 of 54
The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 37 of 54 capital spending separately and outside of the price cap. Further, it would unduly complicate the application, reporting, and monitoring requirements for 2nd Generation IRM because it would require special consideration to be implemented effectively.29 76. Despite the common label, applicants‘ K-factor proposals vary in scope. Four of the five proposals are based on forecasts, while one (FortisAlberta's) is based on incurred costs. In addition, proposals specify to varying degree which capital expenditures are subject to flow through. On one end of the spectrum, we observe EDTI proposing to flow through all of its forecasted capital additions; on the other end, FortisAlberta only proposes to flow through a relatively narrow specification of ―externally driven‖ capital expenditures. Table 5. Applicants' Proposals for the Recovery of Future Capital Expenditures Company Proposal for recovery of capital expenditures ATCO Electric Flow-through of forecasted capital additions for "reliability," "end of life," and "clearance and safety" programs, in addition to "material capital investment that is unique in nature or not easily forecastable or not within ATCO Electric's Control", "buildings over $10 million," and the "impact of 2012 additions" (for inclusion in 2013) ATCO Gas Flow-through of forecasted capital additions - type/amount of additions not specified; also flow-through of "material capital investment that is unique in nature" such as "major buildings over $10 million" and CIS replacement AltaGas Utilities Flow-through of annually forecasted capital expenditures related to reliability and safety EPCOR Distribution and Transmission Flow-through of forecasted capital additions, with one initial forecast and midPBR-term forecast FortisAlberta Flow-through of "externally driven" capital expenditures including: distribution line moves, substation associated upgrades, AESO contributions, IPP interconnections 77. Few of the plans surveyed had provisions similar to the capital recovery mechanisms proposed by the applicants in the instant proceeding. We describe these provisions below and in doing so compare them to the applicants‘ proposals. 29 OEB, December 20, 2006 Report of the Board on Cost of Capital and 2 nd Generation Incentive Regulation for Ontario‘s Electricity Distributors, p. 37. 37Page 38 of 54
The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 38 of 54 78. Only San Diego Gas & Electric‘s 1994 PBR plan flows through capital expenditures via a formula outside the (I-X) framework. But this formula is nowhere akin to the proposed Kfactors. For one, the formula only appears to allow for recovery of average capital expenditures, not above average or extraordinary capital expenditures. In addition, the formula is part of a partial PBR plan, in which the ―I - X‖ component of the plan only applies to O&M expenditures—unlike all of the plans in the instant proceeding, save EDTI‘s. 79. ENMAX Power‘s PBR plan includes a ―G‖ factor that flows through prudent capital expenditures on transmission plant. The G-factor is required for unique reasons, as stated in Decision 2009-035: ―The G-factor is proposed to ‗recover the necessary increase in revenue requirement related to infrastructure growth of the transmission system since, unlike the distribution revenue requirement, the Transmission revenue requirement does not increase automatically with load growth,‖ because EPC only has one transmission customer, the Alberta Electric System Operator (AESO). The plan also includes a municipal rider that allows for a maximum annual addition of $15 million in funds for capex ―requirements.‖ 80. Two of the plans—both for FortisBC—allowed for approval of ―extraordinary‖ capital additions. Note these plans were not pre-approvals, but only allowed for recovery of capital expenditures due to circumstances beyond the utility‘s control and subject to Commission approval. FortisBC‘s plan starting in 1996 allowed the company to apply for recovery of extraordinary capital expenditure, which the company did indeed do in 1999 for Y2K and CIS projects. FortisBC‘s plan starting in 2000 was more inclusive: it permitted the recovery of significant amounts of ―extraordinary‖ capital expenditures—over half of the total forecasted capital expenditures for the PBR term. This latter plan is perhaps the most extensive of capital 38Page 39 of 54
The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 39 of 54 provisions surveyed and also lends most precedence to the plans proposed in the instant proceeding. 2. 81. Y-factor All proposals include a comprehensive ―Y-factor.‖ As described by the AUC in Decision 2009-035 approving ENMAX Power‘s PBR plan, Y-factors ―arise from cost elements that are not unforeseen one time events. Flow-through items arise in the normal course of business, but are such that the company has no control over them‖ (p. 55) (our emphasis). 82. Like the proposed ―K-factors,‖ the Y-factor proposals differ significantly from plan to plan, as shown in Table 6: 39Page 40 of 54
The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 40 of 54 Table 6. Applicants’ Proposals for Recovery of Y-factor Costs Company ATCO Gas Y-Factor Flow-Through Items AESO load settlement costs, system access service payments, distribution to transmission contributions, defined benefit pension plan, income tax items, VOO, rate hearing costs, reserve for injuries and damages, vegetation management costs, head office cost allocation percentage, "new" CIS replacement, REA purchases, changes in depreciation and financing rates, and impacts of regulatory decisions Hearing costs, UCA assessments, reserve for injuries and damages, variable pay program, transmission costs, defined benefit pension plan, weather impacts, load balancing, income tax deductible capital costs, production abandonment costs, changes in the head-office cost-allocation percentage, "transmission driven" costs, costs from acquisitions of natural gas co-ops or other gas distribution systems, changes in depreciation and financing rates, and the impacts of regulatory decisions AltaGas Utilities Hearing costs, UCA and AUC assessments, implementation of a code compliant Natural Gas Settlement, DSM, income tax timing differences, changes in accounting standards, potential introduction of automated meter reading, management fees for 2011 generic cost of capital proceeding, and the acquisition of a new gas system with significant impacts on ROE EPCOR Distribution and Transmission AESO load settlements; AESO directed projects; property, business, and linear taxes; AUC tariff billing and load settlement initiatives, hearing cost reserves; generic cost of capital changes; "any generic proceeding that impacts operations or T&C's," and self insurance FortisAlberta AESO load settlement costs, AUC Rule 026 deferrals, hearing costs, selfinsurance, impacts of reassessment by the Canada Revenue Agency, exchange-rate changes for ongoing metering project, commission rule changes, farm transmission costs, depreciation changes, interest-rate changes on longterm debt, income taxes payable, impacts of regulatory decisions, and "true up amounts between initial and final rates for any given year" ATCO Electric 83. Comprehensive Y-factors like the proposals above are indeed unusual. However, thirteen of the thirty plans we surveyed contained some ―flow-through‖ items. Those Y-factor precedents are highly variable. Typical items include: (1) the continuation of some deferral accounts, (2) demand-side management (DSM) costs, (3) customer information system (CIS) costs, and (4) tree-trimming expenses. (Deferral accounts, however, have varied significantly from plan to plan; regulators appear to have approved them on a case-by-case basis. On average, the proposed deferral accounts may be more comprehensive and hence more prone to blunt efficiency incentives than deferral accounts included in previously approved PBR plans.) In addition, 40Page 41 of 54
The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 41 of 54 several of the proposed ―Y-factor‖ items—namely, accounting, legislative, regulatory, or tax changes—are often flowed through to rates as Z factors instead of ―Y‖ factors. 84. A number of the Canadian PBR plans have some noteworthy Y-factor items. Most notably, that of ENMAX Power allows for flow through of SAS rates in the distribution tariff, the TAC deferral account, and AESO load settlement costs. FortisAlberta‘s 2000 PBR plan flows through some minor ―extraordinary‖ O&M expenses, but they amount to significantly less than what the applicants propose in this proceeding. Enbridge‘s second generation plan includes flowthrough of CIS and DSM, tax changes, and the continuation of numerous deferral accounts. PBR regimes for Terasen Gas and FortisBC also contain Y-factor provisions. 3. 85. Efficiency Carryover Three of the five submissions include an ―efficiency carryover mechanism.‖ Such mechanisms appear to be generally unprecedented in PBR. To our knowledge, only one plan had a provision similar to the ―efficiency carryover mechanisms‖ proposed in the instant proceeding. 4. 86. The Growth of “Trackers” Both the K-factor and Y-factor elements in the Utilities‘ PBR plans have more or less similarity to automatic adjustments, or more colloquially ―trackers,‖ in the context of ratemaking. Because we think that there is merit in asking for certain kind of tracked cost recovery, even if not in the context of a PBR plan as such, we think it is useful to describe such plans as have developed recently among regulators in the United States. 87. Commissions have traditionally used automatic adjustment clauses to allow retail rates to change because of fuel/gas cost changes or taxes: 41Page 42 of 54
The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 42 of 54 Adjustment clauses typically are allowed for exceptional expenses, such as fuel or purchased gas by a LDC, and occasionally taxes other than income taxes, where the particular costs are a major element of the overall costs of the utility, fluctuate widely, and are outside the utility‘s control.30 88. More recently, regulatory commissions have adopted other adjustment clauses to allow for the recovery of specific investments outside a normal rate case, and capital trackers are such an example. Capital trackers allow a regulated firm to recover qualified investments quicker and more efficiently than a normal rate case. Trackers are used in various situations where the typical regulatory rate case provides an inadequate mechanism to adjust rates in response to increased investment in infrastructure. Capital trackers help ensure that the company in question has the financial standing necessary to invest in infrastructure needed to provide efficient, safe, adequate, and reliable service to its customers, in both good markets and bad, both now and in the long run. The objective of a cost recovery mechanism is to reverse the regulatory lag associated with infrastructure investment. 89. The basic idea of a capital tracker is to recover the costs of qualified infrastructure investments incurred between rate cases through an asset tracker. The definition of ―qualified investments‖ varies; for example, the definition for People‘s Gas looks at qualified additions that have not been included in rate base associated with replacing aged facilities.31 The definition of ―qualified‖ infrastructure investments is specifically tailored to the specific needs of the company. 30 Goodman, Leonard Saul. The Process of Ratemaking. Volume II, Public Utilities Reports, Inc. Vienna, VA. 1998. Page 1207. 31 The program defines qualified investments as, ―replacement mains and related appurtenances such as services, meters, regulators, measuring and regulating stations, city-gate check stations, and other ancillary infrastructure.‖ 42Page 43 of 54
The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 43 of 54 90. Capital trackers are used to recover the costs of a classified, pre-approved set of infrastructure investments. The tracker does not include all infrastructure investments, rather only infrastructure investments that meet the classifications set at the on-set of the tracker; all other infrastructure investments are recovered in the company‘s next rate case proceeding. A ―qualified investment‖ is an investment that meets the pre-set conditions for inclusion in the asset tracker. Typically, the proposed accounts included in a capital tracker go beyond the scope of routine investments required to support existing infrastructure. Qualified investments are specific, non-routine investments recovered outside of the normal rate case proceeding. A list of examples of approved capital cost recovery trackers for both gas and electric distribution companies appears in the Appendix. 91. The typical review process for a capital tracker varies by jurisdiction and the type of infrastructure tracker in question. Some trackers are subject to prudence reviews in the case of cost overruns. In other cases, no adjustments are made if costs are higher than originally anticipated in the budget, and the company is forced to suffer from the cost overrun. In between these extremes are mechanisms in which the variation between the budgeted amount of the investment and the actual expenditure is shared between the company and its customers. Finally, specific investments may require specific review processes in order to ensure the effectiveness of the program, such as investment in smart grid. Trackers for smart grid investments, for example, often employ penalty/rewards that encourage effective investment and use of the smart grid system. 43Page 44 of 54
The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 44 of 54 E. 92. Pros and Cons of the Proposed PBR Plan Elements In this section, we comment on the forms and parameters of the proposed PBR plans from the Utilities and interveners. In assessing each proposal, we are driven by the goals of objectivity, administrative efficiency, and usefulness of plan elements as innovations from traditional regulation supporting longer regulatory lag and enhanced incentives. 1. 93. Inflation An inflation index should be exogenous, reasonably reflecting the cost behavior facing the industry. It should also be based on publicly available information, frequently updated, transparent and easy to understand. In addition, we echo the Commission‘s statement in Decision 2009-035 (p. 30): Such an index should reflect changes in the costs experienced by as large a sample of distribution and transmission companies as possible. The Commission recognizes that the development of such an index can be made extremely complex by attempts to track discretely inflation rates for multiple cost elements and also recognizes that increased complexity does not necessarily lead to a superior index. The Commission recognizes that the Ontario Energy Board experimented with the development of such an inflation index and ultimately rejected it. (p. 30) 94. There is rarely any particular contention surrounding the inflation component of PBR plans, as objective and reliable price indexes are readily available both for input and output prices. None of the proposals from the Utilities or interveners appear problematic in this regard. 2. 95. X-Factor For PBR plans in North America, the X-factor draws the most attention—precisely because reasonable expectations about the future prospects for productivity growth in any industry are difficult to predict objectively. Such is the reason why regulators often-enough rely on index number studies to gauge productivity growth. Those productivity growth studies 44