Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 140

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

Search terms highlighted
Eversource rate increase is on 7 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
7 pages match
  1. Page 41 of 54

    The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 41 of 54 several of the proposed ―Y-factor‖ items—namely, accounting, legislative, regulatory, or tax changes—are often flowed through to rates as Z factors instead of ―Y‖ factors. 84. A number of the Canadian PBR plans have some noteworthy Y-factor items. Most notably, that of ENMAX Power allows for flow through of SAS rates in the distribution tariff, the TAC deferral account, and AESO load settlement costs. FortisAlberta‘s 2000 PBR plan flows through some minor ―extraordinary‖ O&M expenses, but they amount to significantly less than what the applicants propose in this proceeding. Enbridge‘s second generation plan includes flowthrough of CIS and DSM, tax changes, and the continuation of numerous deferral accounts. PBR regimes for Terasen Gas and FortisBC also contain Y-factor provisions. 3. 85. Efficiency Carryover Three of the five submissions include an ―efficiency carryover mechanism.‖ Such mechanisms appear to be generally unprecedented in PBR. To our knowledge, only one plan had a provision similar to the ―efficiency carryover mechanisms‖ proposed in the instant proceeding. 4. 86. The Growth of “Trackers” Both the K-factor and Y-factor elements in the Utilities‘ PBR plans have more or less similarity to automatic adjustments, or more colloquially ―trackers,‖ in the context of ratemaking. Because we think that there is merit in asking for certain kind of tracked cost recovery, even if not in the context of a PBR plan as such, we think it is useful to describe such plans as have developed recently among regulators in the United States. 87. Commissions have traditionally used automatic adjustment clauses to allow retail rates to change because of fuel/gas cost changes or taxes: 41
  2. Page 42 of 54Match

    The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 42 of 54 Adjustment clauses typically are allowed for exceptional expenses, such as fuel or purchased gas by a LDC, and occasionally taxes other than income taxes, where the particular costs are a major element of the overall costs of the utility, fluctuate widely, and are outside the utility‘s control.30 88. More recently, regulatory commissions have adopted other adjustment clauses to allow for the recovery of specific investments outside a normal rate case, and capital trackers are such an example. Capital trackers allow a regulated firm to recover qualified investments quicker and more efficiently than a normal rate case. Trackers are used in various situations where the typical regulatory rate case provides an inadequate mechanism to adjust rates in response to increased investment in infrastructure. Capital trackers help ensure that the company in question has the financial standing necessary to invest in infrastructure needed to provide efficient, safe, adequate, and reliable service to its customers, in both good markets and bad, both now and in the long run. The objective of a cost recovery mechanism is to reverse the regulatory lag associated with infrastructure investment. 89. The basic idea of a capital tracker is to recover the costs of qualified infrastructure investments incurred between rate cases through an asset tracker. The definition of ―qualified investments‖ varies; for example, the definition for People‘s Gas looks at qualified additions that have not been included in rate base associated with replacing aged facilities.31 The definition of ―qualified‖ infrastructure investments is specifically tailored to the specific needs of the company. 30 Goodman, Leonard Saul. The Process of Ratemaking. Volume II, Public Utilities Reports, Inc. Vienna, VA. 1998. Page 1207. 31 The program defines qualified investments as, ―replacement mains and related appurtenances such as services, meters, regulators, measuring and regulating stations, city-gate check stations, and other ancillary infrastructure.‖ 42
  3. Page 43 of 54

    The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 43 of 54 90. Capital trackers are used to recover the costs of a classified, pre-approved set of infrastructure investments. The tracker does not include all infrastructure investments, rather only infrastructure investments that meet the classifications set at the on-set of the tracker; all other infrastructure investments are recovered in the company‘s next rate case proceeding. A ―qualified investment‖ is an investment that meets the pre-set conditions for inclusion in the asset tracker. Typically, the proposed accounts included in a capital tracker go beyond the scope of routine investments required to support existing infrastructure. Qualified investments are specific, non-routine investments recovered outside of the normal rate case proceeding. A list of examples of approved capital cost recovery trackers for both gas and electric distribution companies appears in the Appendix. 91. The typical review process for a capital tracker varies by jurisdiction and the type of infrastructure tracker in question. Some trackers are subject to prudence reviews in the case of cost overruns. In other cases, no adjustments are made if costs are higher than originally anticipated in the budget, and the company is forced to suffer from the cost overrun. In between these extremes are mechanisms in which the variation between the budgeted amount of the investment and the actual expenditure is shared between the company and its customers. Finally, specific investments may require specific review processes in order to ensure the effectiveness of the program, such as investment in smart grid. Trackers for smart grid investments, for example, often employ penalty/rewards that encourage effective investment and use of the smart grid system. 43
  4. Page 44 of 54Match

    The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 44 of 54 E. 92. Pros and Cons of the Proposed PBR Plan Elements In this section, we comment on the forms and parameters of the proposed PBR plans from the Utilities and interveners. In assessing each proposal, we are driven by the goals of objectivity, administrative efficiency, and usefulness of plan elements as innovations from traditional regulation supporting longer regulatory lag and enhanced incentives. 1. 93. Inflation An inflation index should be exogenous, reasonably reflecting the cost behavior facing the industry. It should also be based on publicly available information, frequently updated, transparent and easy to understand. In addition, we echo the Commission‘s statement in Decision 2009-035 (p. 30): Such an index should reflect changes in the costs experienced by as large a sample of distribution and transmission companies as possible. The Commission recognizes that the development of such an index can be made extremely complex by attempts to track discretely inflation rates for multiple cost elements and also recognizes that increased complexity does not necessarily lead to a superior index. The Commission recognizes that the Ontario Energy Board experimented with the development of such an inflation index and ultimately rejected it. (p. 30) 94. There is rarely any particular contention surrounding the inflation component of PBR plans, as objective and reliable price indexes are readily available both for input and output prices. None of the proposals from the Utilities or interveners appear problematic in this regard. 2. 95. X-Factor For PBR plans in North America, the X-factor draws the most attention—precisely because reasonable expectations about the future prospects for productivity growth in any industry are difficult to predict objectively. Such is the reason why regulators often-enough rely on index number studies to gauge productivity growth. Those productivity growth studies 44
  5. Page 45 of 54

    The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 45 of 54 require the meticulous gathering and processing of large data sets and are reasonably costly to perform. But they have a solid scholarly foundation that pre-dates their use for PBR plans, and they are capable of being readily updated in the future rate cases that such PBR plans call for. Most of all, such productivity growth studies are objective—a preeminent requirement given the money at stake over the multi-year runs of PBR plans and the role of the regulator as a quasijudicial arbiter of the traditional clash of interests between utility investor-owners and the public served by those utilities. Objectivity is the most important criterion—ability to replicate in the future is second. 96. The utility X-factor proposals offered by the Utilities cannot be labeled objective, in one of two ways. The first is the truncation of our study without an objective basis for doing so, which we discuss at length above. The second is in the ad hoc selection of productivity index numbers not representative of the industry in question or also for time periods that are not drawn from objective or scholarly sources outside this case—much the same issue as the truncation of our study. We do not mean to be excessively critical of the various discussions offered by Dr. Carpenter for ATCO, Dr. Cicchetti for Epcor, Dr. Schoech and Mr. Canfield for AltaGas, or Ms. Freyer for Fortis Alberta. However, the X-factors that they offer are based on time periods or sources that cannot be freed from these analysts‘ subjective judgment. For a parameter that will affect ratepayer bills for multiple years, we conclude that any deviation from objectivity is a drawback. 97. The X-factors recommended by the Utilities are uniformly negative. The theory upon which PBR is based, which draws from the pressures facing competitive firms, makes no distinction or restriction for the sign of the X-factor. But there are two practical considerations concerning what the Utilities have recommended in this regard. First, as an empirical matter, 45
  6. Page 46 of 54Match

    The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 46 of 54 negative X-factors are outside the realm of experience for PBR plans in North America. Second, we do not think that it would be misplaced for the AUC to question the imposition of a PBR plan that would dictate a period of automatic real price (or revenue) increase in light of the utility industry‘s very longstanding experience with the opposite trend. 98. Dr. Lowry and his PEG colleagues, for the CCA, perform an index number study of the same type as ours, using a 14 year period for measuring gas distributions costs. We do not know whether that is the longest possible time period available for the data used for that study, as the case with the NERA study. While we support Dr. Lowry‘s method, and we appreciate his suggestions for improvements for our own, we also note that he uses input data that he considers proprietary. Without those proprietary data, his study is not replicable by others—either now or at the time of the next base rate case when the parameters of the PBR regime would be subject to re-set. In any event, the X-factor that Dr. Lowry recommends is in the range that one would consider acceptable given experience for other energy utilities in North America. 99. Dr. Lowry also includes an econometric analysis to predict TFP growth that he describes as ―more customized to business conditions in Alberta.‖ Because any econometric analysis of the factors that contribute to the size of the TFP growth numbers in a index study is unavoidably the result of many judgments that are difficult for non-specialists to understand, we would not recommend such econometric analyses for the purpose of setting the level of consumer prices in a PBR plan—as opposed to econometric studies for peer-reviewed scholarly research. 100. We have no opinion on the stretch factor recommended by Dr. Cicchetti. Ultimately, stretch factors are subjective judgments on the extent to which, given the history of the utilities in a jurisdiction, the change to PBR may spur innovation and cost reduction not shown 46
  7. Page 47 of 54

    The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 47 of 54 previously. We have not studied the Alberta utilities for such purposes, and hence we cannot offer an opinion. 3. 101. Z-Factor Regulators commonly use Z-factors to protect utilities against material events outside of their control—just as competitors in an industry would all adjust prices for exogenous cost changes that affect them all. All of the Utilities and interveners propose a Z-factor, and we support the practice. 4. 102. Earnings sharing/Re-openers An ESM reduces the risk of a PBR plan unintentionally tipping the regulatory balance in favor of customers or shareholders. As the AUC stated in Decision 2009-035, p. 57: [m]ost parties [in the ENMAX PBR application] suggested that earnings sharing should be adopted if the Commission considers that there is a significant risk of setting the productivity target either too high or too low. UCA in particular noted that PBR design errors, such as mistaken estimates of potential productivity, can result in sizeable increases in regulated monopolies‘ profits. … The earnings sharing mechanism was viewed by parties as an important safety measure to limit such increases. 103. We agree. While an ESM can reduce efficiency incentives, it may be prudent to include them to reduce regulatory risk. 50-50 sharing of earnings of excess earnings and earnings shortfalls is the most common sharing agreement and does not favor either customers or shareholders. Including a ―deadband‖ within which utilities do not share deviations in earnings improves efficiency incentives, but increases financial risks for customers and shareholders alike. 47
  8. Page 48 of 54

    The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 48 of 54 104. Under certain circumstances, the PBR plan may warrant amendments or termination before the end of the term of the plan. All of the applicants propose re-openers and off-ramps to amend or adjust the PBR plan if circumstances warrant such a change. Re-openers and off-ramps are common aspects of incentive plans, and we recommend such a mechanism in the current plan. 105. Earnings sharing reduces the incentives to the company, as when earnings are shared the company keeps less than the full profit it earns. Regulatory ―recontracting,‖ and the threat of it, also reduces the company‘s incentives. A balance between these two needs could include no sharing whatsoever. The early U.S. telecommunications plans featured earnings sharing mechanisms (along with relatively broad Z-factors and duration of less than 5 years). Since 1994, the duration until the first review for new plans has been five years or longer. Similarly, although earnings sharing was fairly common in early plans, no plan adopted after 1993 has included sharing.32 106. Earnings sharing can lend stability to a PBR regime, particularly one that is in its first generation. At the outset, no one can say with certainty that the parameters set will prove to be the right ones—parameters that result in the company having a reasonable opportunity to earn a fair return on its investments while still not rewarding the company unduly. The stabilizing effect of earnings sharing can be depicted as in Figure 2. 32 Tardiff, T. and Taylor, W.E., ―Revising Price Caps: The Next Generation of Incentive Regulation Plans,‖ Topics in Regulatory Economics and Policy, Crew, Michael A. (Ed.), Vol. 24, Springer, 1997. 48
  9. Page 49 of 54

    The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 49 of 54 Figure 2. Ex Post Profit Sharing Ex Post Profit Sharing ROR Range A 6.4-10.0 0.00 B 10.0-13.0 0.50 C > 13.0 0.75 kept Price Cap Recontracting Prevention (rebate) = 0.75 8.2% = 0 A 107. Sharing Line = 0.5 B C reported In Figure 2, 8.2 percent is shown as the target cost of capital for illustrative purposes.33 The dead band is 1.8 percent. If the company earns between 6.4 and 10 percent, there is no profit-sharing. If the company earns between 10 and 13 percent, it shares one half of the profits earned in that interval. If the company earns in excess of 13 percent, it shares one half of the profits from 10 to 13 percent plus 75 percent of the profits above 13 percent. In the Figure, losses are treated symmetrically. 108. The shaded area is the size of the rebate. The rebate dampens both the company‘s profits and losses. This dampening effect grows as the reported profits deviate by a greater degree from the allowed return. The rebate lessens the incentive to recontract. This protection from recontracting grows. It does so as achieved profits for the year deviate from what was expected when the profit sharing regime was set up. 33 This is purely as an illustration. Actual capital costs for utilities in Canada are higher. 49
  10. Page 50 of 54Match

    The Connecticut Light and Power d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-140 Attachment 1 Page 50 of 54 109. The cost of earnings sharing is that, to the extent sharing is in effect (i.e., outside the dead band), it dampens the incentives of a company to innovate to cut costs and expand sales. That is, some efficiency incentives are given up in return for a more stable regime. In Figure 2, the sharing line slopes upward, but at a decreasing rate as we move away from the origin (denoting that the sharing percentage increases). At expected profit levels, little or no sharing takes place and companies have full incentive to maximize profits. As profits increase, the level of sharing increases as well. The shape of this sharing line can help to provide a natural stability for PBR plans. 5. 110. Service Quality We agree with the perspectives of Dr. Cicchetti for Epcor and Dr. Lowry for the CCA on the question of service quality—that a plan to include a balance of rewards and penalties is a useful part of a PBR regime. To be sure, AUC Rule 002 is a reasonable benchmark for maintaining safe, adequate, and reliable service in the public interest. Nevertheless, PBR is driven by a belief in the power of profit incentives, and we are not in possession of any information that would lead us to conclude that balanced rewards and penalties—which dominate among North American PBR plans—are unwise to implement in Alberta. 6. 111. K-Factor Among the Utilities, the stated goal of K-factors is to ensure that the companies recover prudent capital expenditures. Of course, the regulatory compact generally specifies that utilities recover prudently-incurred costs in a in a reliable and timely manner. But PBR plans generally do not include K-factor provisions. The OEB, for its part, described the rationale for excluding such elements for the second generation PBR plan for Ontario electricity distributors: 50