Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 142

Files8

Search terms highlighted
Eversource rate increase is on 67 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of ALLCO-142 Attachment 3.pdf

Extracted from the file · 1 page · 916 characters

Text of ALLCO-142 Attachment 4.pdf

Extracted from the file · 1 page · 667 characters

Text of ALLCO-142 Attachment 5.pdf

Extracted from the file · 109 pages · 262,818 characters

19 pages match
  1. Page 15 of 73

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-142 Attachment 6 Page 15 of 73 Infrastructure and Project Finance Moody's Ratings Factors that could lead to downgrade CL&P could be downgraded if Connecticut regulatory decisions continue to be contentious or unsupportive of credit quality or if CL&P's financial performance deteriorates such that its ratio of CFO pre-W/C to debt falls below 17% on a sustained basis. Key indicators Exhibit 2 Connecticut Light and Power Company (The) 2020 2021 2022 2023 2024 4.9x 6.0x 6.9x 4.6x 4.8x 6.6x CFO Pre-W/C / Debt 14.6% 20.4% 23.6% 13.8% 16.4% 23.0% CFO Pre-W/C – Dividends / Debt 13.0% 12.4% 16.7% 7.4% 10.3% 14.1% Debt / Capitalization 40.4% 38.2% 36.4% 39.1% 38.7% 39.5% CFO Pre-W/C + Interest / Interest LTM Mar-25 All data based on adjusted financial data, which follow our Financial Statement Adjustments in the Analysis of Nonfinancial Corporations methodology. LTM = Last 12 months. Source: Moody's Financial Metrics™ Profile Headquartered in Berlin, CT, The Connecticut Light and Power Company is the state's largest regulated electric transmission and distribution utility and serves about 1.3 million customers. CL&P is the largest operating subsidiary of Eversource Energy (Baa2 negative) with total assets of about $16.9 billion as of 31 March 2025. CL&P's operations are regulated by the Connecticut Public Utilities Regulatory Authority (PURA) and the Federal Energy Regulatory Commission (FERC). Eversource is a public utility holding company of regulated electric and gas T&D and water utilities in the New England region serving approximately 4.6 million electric, natural gas and water customers. With headquarters in Hartford, CT, and Boston, MA, Eversource has a total rate base of about $30 billion. CL&P’s other affiliated companies include regulated electric utilities; NSTAR Electric Company (A2 negative), Public Service Company of New Hampshire (PSNH, A3 stable); natural gas distribution companies, Yankee Gas Services Company (YGS, Baa1 stable), Eversource Gas of MA (EGMA) and NSTAR Gas; as well as water companies, Aquarion Company, which operates regulated water utilities Aquarion Water Company of Connecticut (AWC-CT, Baa1 stable), Aquarion Water Company of Massachusetts and Aquarion Water Company of New Hampshire. 3 27 June 2025 Connecticut Light and Power Company (The): Update following downgrade to Baa1
  2. Page 16 of 73

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-142 Attachment 6 Page 16 of 73 Moody's Ratings Infrastructure and Project Finance Exhibit 3 Eversource Energy's service territories Source: Company fillings Detailed credit considerations Distribution assets operate in a challenging and unsupportive Connecticut regulatory environment The Connecticut regulatory regime has become more challenging over the last few years, and has been characterized by high political scrutiny as well as inconsistent regulatory decisions and rate case outcomes. CL&P has been under-earning its authorized ROE for several years largely driven by a distribution rate freeze that has been in place since the company's settlement agreement with PURA in the aftermath of the public and political backlash that occurred after Tropical Storm Isaias in 2020. Although there are a few supportive state regulatory provisions in place, including multiyear rate plans, revenue decoupling and purchased power cost recovery mechanisms, the rate freeze has negated many of these provisions. CL&P is in the process of rebuilding its relationship with key stakeholders including state regulators and customers. For further discussion see Deterioration in Connecticut regulatory support pressures metrics and credit quality. CL&P operates under an earnings sharing mechanism, or ESM, that is in place until the company's next general distribution rate proceeding, expected in 2026. Under the ESM, earnings above a 9.25% ROE are to be shared equally with ratepayers. Any amounts due to customers under the terms of the ESM are first to be used to reduce various regulatory assets associated with certain unamortized environmental remediation costs. The remaining amounts due to customers are then used to offset the cost of catastrophic storms. CL&P operates under a decoupling mechanism that reconciles the amounts recovered from customers, on an annual basis, with the distribution revenue requirement set by the PURA. The utility also benefits from a core capital tracker that allows for timely recovery of the utility’s capital investments for core capital projects of up to $300 million for each year after 2020 until its next rate case proceeding. In October 2020, Connecticut passed Public Act 20-5 (House Bill 7006). Among other things, the new law required PURA to open a proceeding to evaluate and eventually implement performance based rate regulation (PBR) for the state's utilities. HB 7006 added more uncertainty to the Connecticut regulatory environment since a PBR framework could worsen the consistency and predictability of the state's regulatory environment, the timeliness of cost recovery and the utilities' financial profiles. In addition, the law extended the 4 27 June 2025 Connecticut Light and Power Company (The): Update following downgrade to Baa1
  3. Page 17 of 73Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-142 Attachment 6 Page 17 of 73 Moody's Ratings Infrastructure and Project Finance PURA's deadlines for rate case decisions to about a year, from about six months, which is a credit negative with regard to the timeliness of cost recovery. PURA is conducting the PBR proceeding in two phases. In April 2023, PURA issued a final decision on the first phase and identified various objectives to guide the development of a PBR framework and adoption. The decision commenced Phase 2 by initiating three dockets focused on revenue adjustment mechanisms, performance metrics and integrated distribution system planning with final decisions expected in late 2025. In June 2023, Connecticut also enacted Public Act No. 23-102 (Substitute Senate Bill No. 7), which increased the regulatory authority of the PURA and could have additional credit negative implications for the state's utilities and increase regulatory lag for cost recovery. The legislation is not retroactive and did not result in immediate changes in rates but may impact future rate case proceedings. Some of the final provisions include the selection of the PURA chair by the Governor; four-year rate case filing requirements; additional requirements needed to file rate case settlements; and the elimination of CL&P's capital tracker for new plant additions for rate case proceedings filed after July 2023. Substantial regulatory lag and uncertainty with regard to deferred storm costs recovery On 11 March 2024, CL&P filed a request for prudency review of approximately $634 million of catastrophic storm costs for 24 weather events occurring between 2018 through 2021. On 31 December 2024, CL&P filed a supplement to its prudency review application to request evaluation of an additional $173 million of costs for nine additional catastrophic storms and two additional pre-staging events from 1 January 2022 through 31 January 2023, for a total of $807 million of deferred storm costs. PURA, along with Staff, continues to review evidence provided for the costs reported by CL&P and procedural hearings are ongoing with an expected decision from PURA in the third quarter of 2025. PURA will determine the amount of these costs that are deemed prudent which will ultimately be recovered by CL&P, but the timing of this recovery will not be established until a formal rate case proceeding which may not occur until after the storm cost prudency review is completed. As of 31 December 2024, CL&P had a total of $1.12 billion of deferred storm costs as a regulatory asset balance. The remaining storm cost balance in excess of the $807 million already included in the prudency review will be addressed in future rate case proceedings. Virtually all other state regulatory jurisdictions provide their utilities with much more expedited and timely recovery of costs incurred during storms. Senate Bill 1560 was introduced by the Connecticut State Legislature on 10 April 2025. The bill provides a framework for electric distribution companies to recover stranded and storm-related costs through securitization, specifically by issuing rate reduction bonds in order to mitigate the financial burden on customer rates. Utilities would apply for financing orders from PURA which would allow them to issue the bonds and utilize the proceeds to recover the deferred costs. Based on how the bill is written, PURA would have 60 days to respond to financing applications filed by utilities. The bill has passed the House and Senate and is now awaiting the Connecticut Governor's approval for enactment. CL&P's ability to recover the majority of its deferred storm costs and utilize securitization would be credit supportive because it would improve the utility's balance sheet and financial profile while also mitigating some of the social risk around affordability particularly large increases in customer rates. Significant financial metric volatility which could continue Over the last several years, CL&P’s financial profile has exhibited significant volatility primarily due to swings in regulatory adjustment mechanisms as well as delayed recovery of storm costs. Although CL&P’s financial metrics have begun to recover this year, including a ratio of cash flow from operations before changes in working capital (CFO pre-W/C) to debt of 23.0% for the 12-months ended 31 March 2025, the company’s CFO pre-W/C to debt ratio was as low as 13.8% in 2023. Given the challenging Connecticut regulatory environment, it is uncertain whether CL&P will be able to consistently maintain strong financial metrics going forward. Many other states already have securitization provisions in place, which has supported the credit profiles of utilities in those jurisdictions. Lower investments in Connecticut in the future will reduce currently elevated capital expenditure levels CL&P's capital expenditure program remains somewhat elevated but lower than its peak spending level of $1.1 billion in 2023. During the period from 2018 - 2024, CL&P's average annual capital expenditures have been about $908 million, which is considerably higher than the annual average of about $550 million from 2013-2017. Over the next couple of years, we expect CL&P's annual 5 27 June 2025 Connecticut Light and Power Company (The): Update following downgrade to Baa1
  4. Page 18 of 73

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-142 Attachment 6 Page 18 of 73 Moody's Ratings Infrastructure and Project Finance capital expenditures to remain at levels consistent with recent years. A substantial portion of this spending will be at its FERC regulated transmission business. However, management has indicated that Eversource will reduce its investment levels in Connecticut prospectively, roughly $500 million over the next five years beginning in 2024, owing to the unpredictability of cost recovery in the state. In 2024, CL&P invested roughly $979 million in capital expenditures. Of this amount, about half was related to FERC regulated transmission investments which gets immediate recovery in rates. Of the remaining amount related to CL&P’s distribution business, which included upgrades of aging infrastructure, reliability investments as well as new business and capacity additions, a substantial amount was allowed immediate recovery in rates due to capital trackers. The majority, but not all, of CL&P’s planned investment receives timely recovery in rates either through distribution capital trackers or FERC’s forward-looking formulaic ratemaking. At times, CL&P will require new debt issuances and capital contributions from its parent to supplement internally generated cash flow to finance capital investments. We expect CL&P to finance its capital investments with a balanced mix of equity and debt in a manner that maintains the company's targeted capital structure authorized by regulators. As an example, Eversource made capital contributions of $200 million to CL&P in last twelve months ended 31 March 2025 to help the utility finance its investments, which also helped offset the $498 million of dividends distributed to the parent. CL&P continues to go through a lengthy regulatory process for its proposed Advanced Metering Infrastructure (AMI) investments in the state. In July 2020, CL&P filed a proposed $512 million AMI investment and implementation plan with PURA. In August 2021, PURA issued a notice of request for an amended AMI proposal and in response, CL&P submitted an amended proposal in November 2021 with an updated schedule for investments from 2022 through 2028. On 3 January 2024, PURA issued a decision on CL&P's AMI plan, which included an updated estimate of approximately $766 million. However, CL&P indicated that the final decision delayed implementation and did not provide a reasonable path for cost recovery. After CL&P's motion for reconsideration, PURA and the utility continue to engage in hearings to further update their views, however a final determination on the investment period and timing of recovery has yet to be determined. The utility is not expecting to pursue these investments without assured timely recovery from PURA. Substantial transmission rate base under the purview of highly credit supportive FERC regulatory framework A large portion of CL&P’s rate base ($4.4 billion as of 31 December 2024) relates to transmission assets under the purview of FERC, which we view as highly credit supportive given its rate construct and above average authorized returns. FERC regulated rates are set based on a formulaic forward-looking cost of service model with annual true-up mechanisms that adjust for changes in network load that impact demand. This ensures the utility's ability to earn its authorized ROE and enhances the stability and predictability of cash flow, a significant credit positive. Transmission projects generally enter rate base after they are placed into commercial operation, although certain FERC approved projects can recover construction work in progress (CWIP) costs in rates, another credit positive. In addition, FERC regulated returns are generally higher than returns in most states. CL&P is currently allowed a FERC regulated return of a base ROE of 10.57% plus incentive adders for a total of 11.74%. It is unclear whether the base ROE allowed by FERC for transmission owners in the Independent System Operator-New England (ISO-NE) region will be reduced further since the base ROE may be changed as FERC's ROE methodology continues to evolve. More discussion on this matter below. FERC Section 206 complaint remains an overhang, but any further downward reduction in ROE will likely be limited As a result of FERC's decisions to date, authorized ROEs for New England transmission owners, including CL&P, have been reduced compared to returns, pre-complaints. While the complaint proceedings are still pending final resolution from FERC, we expect any further changes in authorized ROEs to be limited. As a result, total ROEs, including incentive adders, should still remain above the average authorized ROEs allowed in most states. In addition, we do not expect any changes to the formulaic, forward-looking, credit supportive ratemaking framework allowed by the FERC. Four separate complaints were filed at FERC by groups of New England state attorneys general, state regulatory commissions, consumer advocates, consumer groups, municipal parties and other parties challenging the historical authorized base ROE of 11.14% that had been utilized by New England transmission owners since 2005. Each complaint covered a refund period of 15 months. FERC ruled on the first ISO-NE Section 206 complaint in June 2014 and cut the authorized ROE to 10.57% from 11.14%. FERC's order also limited the total authorized ROE, including incentive adders, to 11.74%, which is the high end of the zone of reasonableness. 6 27 June 2025 Connecticut Light and Power Company (The): Update following downgrade to Baa1
  5. Page 19 of 73Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-142 Attachment 6 Page 19 of 73 Infrastructure and Project Finance Moody's Ratings Over the last few years, FERC has developed multiple versions of a methodology to determine base ROEs for transmission owners in the Midcontinent Independent System Operator (MISO) Regional Transmission Organization as well as for New England transmission owners, including CL&P. Further changes to the methodology are possible as a result of the ongoing hearings in both the MISO and ISO-NE proceedings. CL&P has refunded $22.4 million associated with the first complaint, reflecting both the base ROE and the incentive cap, for the refund period from October 2011 to December 2012. Additionally, CL&P has reserved $21.4 million for the difference in rates during the refund period of December 2012 through March 2014 for the second complaint. No reserves were recorded for the third and fourth complaints because tariff rates are set based on the current 10.57% base authorized ROE established by FERC in response to the first complaint. While we continue to expect the final authorized ROEs to be set lower than the historical base rate of 11.14%, we do not expect the authorized ROE to be much lower than the 10.57% base ROE that FERC originally ruled on in the first complaint in June 2014. In April 2021, the FERC issued a Supplemental Notice of Proposed Rulemaking (SNOPR), which proposes to modify the NOPR's incentive for participation in an RTO by limiting the incentive for utilities participating in an RTO to 50 bps and only permitting them to earn the incentive for three years. If this proposal ends up being included in a final rule, CL&P would no longer be eligible for the 50 bps RTO incentive adder. However, a time frame has not been established for FERC to issue a final rule, and any impacts would be prospective. The elimination of the adder would be credit negative but it is not expected to materially impact the company's financial profile. ESG considerations Connecticut Light and Power Company (The)'s ESG credit impact score is CIS-3 Exhibit 4 ESG credit impact score Source: Moody's Ratings CL&P's CIS-3 indicates that ESG considerations have a limited impact on the current credit rating with potential for greater negative impact over time. Physical climate risks and increased exposure to demographic and social trends, such as a less supportive regulatory environment and customer affordability concerns, could weaken credit quality over the long-term Exhibit 5 ESG issuer profile scores Source: Moody's Ratings 7 27 June 2025 Connecticut Light and Power Company (The): Update following downgrade to Baa1
  6. Page 20 of 73Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-142 Attachment 6 Page 20 of 73 Moody's Ratings Infrastructure and Project Finance Environmental CL&P's E-4 issuer profile score reflects its elevated exposure to physical climate driven by its service territory in the Northeast US, which exposes the company to material and extreme weather events such as storms. This creates risks of physical damage to infrastructure assets and associated costs which is somewhat mitigated by a supportive regulatory framework, although there can be lag in cost recovery for these events. As an electric T&D, the company has low carbon transition risk. Social CL&P's S-4 issuer profile score reflects higher exposure to demographic and societal trends that could lead to adverse regulatory or political decisions. This reflects recent legislative initiatives and regulatory orders that have made the Connecticut regulatory environment more unpredictable and cost recovery for CL&P less timely. Social pressures or public concern over affordability, utility reputation or environmental issues could continue to lead to adverse regulatory or political intervention into utility operations or regulatory changes, which could have a prolonged negative financial impact on CL&P's electric distribution business. Governance CL&P's G-2 issuer profile score reflects the company's financial policy to maintain the capital structure authorized by regulators with any dividends distributed to its parent, Eversource, offset by sufficient equity injections to maintain the target capital structure. ESG Issuer Profile Scores and Credit Impact Scores for the rated entity/transaction are available on Moodys.com. In order to view the latest scores, please click here to go to the landing page for the entity/transaction on MDC and view the ESG Scores section. Additional ESG considerations As a regulated electric T&D utility, CL&P has low carbon transition risk within the sector, particularly compared to vertically integrated electric utilities, mainly due to its lack of generation asset ownership. All commodity costs, including carbon, associated with power procurement for customers are fully passed through to customers with effective cost recovery mechanisms. CL&P continues to invest in hardening, modernizing, and making its electric distribution network more resilient and reliable particularly as the company faces extreme weather events due to climate change. Social risks are primarily related to health and safety, demographic and societal trends, as well as customer relations as the company works to provide reliable and affordable service to customers and safe working conditions for employees. Regarding affordability, we see the potential for rising social risks associated with an inflationary environment, rising energy bills stemming from potential spikes in natural gas prices and the effect of high interest rates longer term. A high inflationary environment could make customers less able to absorb rate increases. Should this influence state regulators' decisions on rate increases or cost recovery, the company's financial profile and cash flow ratios could weaken. From a governance perspective, financial and risk management policies including a strong financial profile are important characteristics for managing environmental and social risks. 8 27 June 2025 Connecticut Light and Power Company (The): Update following downgrade to Baa1
  7. Page 21 of 73

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-142 Attachment 6 Page 21 of 73 Infrastructure and Project Finance Moody's Ratings Liquidity analysis CL&P's liquidity profile is sufficient based on its cash flow generation and access to its parent's joint revolving credit facility. At 31 March 2025, CL&P had a cash balance of $68 million. For the 12-months ended 31 March 2025, CL&P generated cash flow from operations of $1,133 million, which was lower than its capital expenditures of $916 million and dividend distributions of $504 million, resulting in negative free cash flow of $287 million. The shortfall in meeting its outflows using internally generated cash flow was largely funded through the issuance of $700 million of longterm debt, short-term borrowings and capital contributions from its parent. For the LTM period, Eversource made capital contributions of $200 million to CL&P to help the utility meet its financing needs. Going forward, we expect that CL&P will continue to fund its capital needs in a balanced manner and that its dividend policy, parent equity contributions and any long-term debt issuances will be managed in a manner that maintains the utility’s regulated capital structure, including an equity ratio of about 53%. CL&P, along with affiliated entities, PSNH, NSTAR Gas, Yankee Gas, EGMA and AWC-CT have access to Eversource's $2 billion revolving joint credit facility that expires on 11 October 2029. Under the revolving credit facility, CL&P has a borrowing sub limit of $600 million. Borrowings under this facility are not subject to a material adverse change clause, but there is one financial maintenance covenant that sets a limit of total debt to total capitalization of 70% for Eversource and 65% for the Eversource subsidiaries. Eversource and its subsidiaries were in compliance with the financial maintenance covenant as of 31 March 2025. Eversource uses the $2 billion facility to backstop its same-sized commercial paper program. Eversource has typically used its shortterm financings to help fund its subsidiaries' capex programs, pension contributions, working capital requirements (including any storm related costs) and debt repayments until longer term financing is arranged. At 31 March 2025, approximately $618.4 million was available on the credit facility with approximately $1.4 billion of commercial paper outstanding. At 31 December 2024, there were intercompany loans of $280 million from Eversource to CL&P. CL&P’s next debt maturity is $400 million of first mortgage bonds due December 2025. 9 27 June 2025 Connecticut Light and Power Company (The): Update following downgrade to Baa1
  8. Page 22 of 73

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-142 Attachment 6 Page 22 of 73 Infrastructure and Project Finance Moody's Ratings Methodology and scorecard We use our global Regulated Electric and Gas Utilities rating methodology as the primary methodology for analyzing Connecticut Light and Power Company (The). Exhibit 6 Methodology scorecard factors Connecticut Light and Power Company (The) Current LTM Mar-25 Regulated Electric and Gas Utilities Industry Scorecard Factor 1 : Regulatory Framework (25%) Moody's 12-18 month forward view Measure Score Measure a) Legislative and Judicial Underpinnings of the Regulatory Framework A A A Score A b) Consistency and Predictability of Regulation Baa Baa Baa Baa Factor 2 : Ability to Recover Costs and Earn Returns (25%) a) Timeliness of Recovery of Operating and Capital Costs A A A A b) Sufficiency of Rates and Returns Baa Baa Baa Baa a) Market Position Baa Baa Baa Baa b) Generation and Fuel Diversity N/A N/A N/A N/A A Factor 3 : Diversification (10%) Factor 4 : Financial Strength (40%) a) CFO pre-WC + Interest / Interest (3 Year Avg) 5.8x A 5.3x - 5.8x b) CFO pre-WC / Debt (3 Year Avg) 18.5% Baa 18% - 22% A c) CFO pre-WC – Dividends / Debt (3 Year Avg) 11.3% Baa 10% - 14% Baa d) Debt / Capitalization (3 Year Avg) 39.2% Aa 38% - 42% A Rating: Scorecard-Indicated Outcome Before Notching Adjustment HoldCo Structural Subordination Notching a) Scorecard-Indicated Outcome Baa1 A3 0 0 Baa1 A3 b) Actual Rating Assigned Baa1 All data based on adjusted financial data, which follow our Financial Statement Adjustments in the Analysis of Nonfinancial Corporations methodology. LTM = Last 12 months. Moody’s forecasts are Moody’s opinion and do not represent the views of the issuer. Sources: Moody’s Financial Metrics™ and Moody's Ratings forecasts 10 27 June 2025 Connecticut Light and Power Company (The): Update following downgrade to Baa1
  9. Page 23 of 73

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-142 Attachment 6 Page 23 of 73 Infrastructure and Project Finance Moody's Ratings Appendix Exhibit 7 Peer comparison Connecticut Light and Power Company (The) Connecticut Light and Power Company (The) United Illuminating Company (The) Yankee Gas Services Company Baa1 Stable Baa1 Stable Baa1 Stable Southern Connecticut Gas Company Baa1 Negative FY FY LTM FY FY FY FY FY LTM FY FY LTM (in $ millions) Dec-23 Dec-24 Mar-25 Dec-22 Dec-23 Dec-24 Dec-23 Dec-24 Mar-25 Dec-23 Dec-24 Mar-25 Revenue 4,579 4,615 5,035 1,156 1,356 1,341 706 609 634 426 416 478 711 898 1,287 292 48 160 220 143 122 74 54 80 5,143 5,474 5,591 1,115 1,250 1,308 1,112 1,168 1,196 436 523 484 CFO Pre-W/C Total Debt CFO Pre-W/C + Interest / Interest 4.6x 4.8x 6.6x 6.6x 1.9x 3.5x 7.0x 3.9x 3.5x 4.6x 3.0x 3.9x 13.8% 16.4% 23.0% 26.2% 3.8% 12.3% 19.8% 12.2% 10.2% 16.9% 10.3% 16.5% CFO Pre-W/C – Dividends / Debt 7.4% 10.3% 14.1% 21.7% -4.6% 12.3% 9.7% 8.6% 6.5% 12.3% 9.1% 16.5% Debt / Capitalization 39.1% 38.7% 39.5% 39.0% 39.8% 39.4% 39.8% 38.0% 38.0% 38.0% 41.0% 39.3% CFO Pre-W/C / Debt All data based on adjusted financial data, which follow our Financial Statement Adjustments in the Analysis of Nonfinancial Corporations methodology. LTM = Last 12 months. Source: Moody's Financial Metrics™ Exhibit 8 Moody’s–adjusted cash flow reconciliation Connecticut Light and Power Company (The) (in $ millions) 2020 2021 2022 2023 2024 LTM Mar-25 FFO 911.1 1,014.4 1,139.9 542.6 1,138.7 1,489.6 +/- Other (267.1) (139.3) (129.2) 168.9 (240.4) (202.3) 644.0 875.1 1,010.7 711.5 898.4 1,287.3 +/- ΔWC (190.4) (93.1) (72.1) (183.6) (155.0) (112.3) CFO 453.6 782.1 938.7 527.9 743.4 1,175.0 501.1 CFO Pre-WC - Div 72.3 344.2 295.2 333.2 336.6 - Capex 893.5 887.6 948.6 1,174.2 1,042.5 962.5 FCF (512.2) (449.7) (305.1) (979.5) (635.7) (288.5) (CFO Pre-W/C) / Debt 14.6% 20.4% 23.6% 13.8% 16.4% 23.0% (CFO Pre-W/C - Dividends) / Debt 13.0% 12.4% 16.7% 7.4% 10.3% 14.1% FFO / Debt 20.7% 23.7% 26.7% 10.6% 20.8% 26.6% RCF / Debt 19.0% 15.7% 19.8% 4.1% 14.7% 17.7% Revenue 3,547.5 3,637.4 4,817.7 4,578.8 4,615.0 5,034.9 Interest Expense 165.4 175.8 172.5 196.3 234.2 229.3 Net Income 446.3 383.2 485.4 483.4 485.2 502.7 Total Assets 13,456.0 13,949.7 14,758.8 15,849.6 16,839.8 16,874.0 Total Liabilities 8,353.1 8,592.1 8,916.3 9,700.9 10,217.9 10,344.2 Total Equity 5,102.9 5,357.6 5,842.5 6,148.8 6,622.0 6,529.8 All data based on adjusted financial data, which follow our Financial Statement Adjustments in the Analysis of Nonfinancial Corporations methodology. LTM = Last 12 months. Source: Moody's Financial Metrics™ 11 27 June 2025 Connecticut Light and Power Company (The): Update following downgrade to Baa1
  10. Page 24 of 73

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 24, 2026 ALLCO-142 Attachment 6 Page 24 of 73 Infrastructure and Project Finance Moody's Ratings Ratings Exhibit 9 Category CONNECTICUT LIGHT AND POWER COMPANY (THE) Outlook Issuer Rating First Mortgage Bonds Pref. Stock Moody's Rating Stable Baa1 A2 Baa3 PARENT: EVERSOURCE ENERGY Outlook Issuer Rating Senior Unsecured Pref. Shelf Commercial Paper Negative Baa2 Baa2 (P)Ba1 P-2 Source: Moody's Ratings 12 27 June 2025 Connecticut Light and Power Company (The): Update following downgrade to Baa1

Text of ALLCO-142 Attachment 7.pdf

Extracted from the file · 119 pages · 283,203 characters

As listed on the current system

Question(s) Answered 142 (The Connecticut Light and Power Company) Date Filed: 10/16/2026

This filing on the current system (opens in a new tab)