Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 27

Files12

Text of ALLCO-027 Attachment 3.pdf

Extracted from the file · 1 page · 576 characters

Text of ALLCO-027 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ALLCO-027 Attachment 6 REDACTED (CL&P RFP).pdf

Extracted from the file · 5 pages · 7,247 characters

Text of ALLCO-027 Attachment 8 REDACTED.pdf

Extracted from the file · 2 pages · 514 characters

Text of ALLCO-027 Attachment 9.pdf

Extracted from the file · 1 page · 741 characters

Text of ALLCO-027 Attachment 9.xlsx

Sheet names, column headings and text cells; numbers left out

Text of ALLCO-027 Attachment 4 REDACTED.pdf

Extracted from the file · 409 pages · 1,259,015 characters

  1. Page 9 of 238

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 2, 2026 ALLCO-027 Attachment 5 REDACTED Page 9 of 238 5.3. Workplan Sub-Tasks Tables 2-3 provide the list of the main sub-tasks involved in each of the studies. We will schedule conference calls for interviews/discussions with the Company as needed for clarification during the data collection process. Table 2. Project Task 1 – MCS Subtask 1.1 Kick of meeting 1.2 – Collect and Analyze Data 1.3 – Conduct MCS 1.5 – Draft MCS Model Description Prepare initial data requests Provide an overview of the MCS with technical foundation as well as use for rate design. Collect and review data received, prepare follow-up questions. Prepare model tailored for the Company. Conduct analysis of capacity-related distribution costs Conduct an analysis of gas distribution facilities costs. Estimate marginal customer costs. Draft MCS Model with summary of results Meeting to present draft results to the Company. Finalize MCS Report and MCS Model incorporating any feedback received by the company and any data refinement. Conduct final checks and prepare back-up documentation. Meeting via Teams to discuss results with the Company. Using the unit distribution costs, discuss and recommend specific application of the MCS to distribution rate designs. Use the results of the MCOS study as a starting point to propose changes in existing rate designs (e.g., guiding increases to monthly service charges, or the fixed cost component of a service classification’s rate, time of use or seasonal price differentials). Compute class revenues that would result if rates were set at marginal costs and to ensure that each customer class recovers no less than incremental costs. Explaining and defending the methods used and findings. Explain the Company’s position regarding the study results. Provide high-level recommendations on use of MCS for rate design decisions and how MCS results may be considered when deciding class revenue targets. 1.6 – Final MCS Summary Report and Model 1.7 –Preparation of results for use on rate design 1.8– Pre-filed Direct Testimony Table 3. Project Task 2 – ACOSS Subtask Description Prepare an overview for the Company of the ACOSS with theoretical foundation Prepare initial data requests for the ACOSS collect and review data received, prepare follow-up questions and review data available. Build an ACS model tailored for the Company. Classification of plant and operating expenses between demand and customer-related 2.1 – Kick off Meeting and Collection of Data for the Study 2.2 – Classification and Functionalization of Costs Cover Agreement – CL&P ACOS and MCS CRA International Inc. Page 9 Eversource Confidential
  2. Page 10 of 238

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 2, 2026 ALLCO-027 Attachment 5 REDACTED Page 10 of 238 Subtask 2.3 – Cost Allocation to Customer Classes and to Seasons and Time of Use as applicable Description Review inputs and output of the Company’s Minimum System Study and provide recommend enhancements as needed. Identify cost drivers and develop allocation factors for each cost component, plant and expenses, appropriately. Identify the potential allocation of costs on a time varying basis Determine class revenue target by class. Identify current earned return by customer class. Identify required rate increases that would equalize return on rate base by class. Calculation of Excess or Deficiency by Rate Class in existing rates relative to the revenue requirements calculated in ACOS Provide draft ACOSS model. Conference call to discuss class allocated cost results with the Company. Review results and data for accuracy; evaluate class allocations and classified components against past results. Finalize ACOSS Model incorporating any feedback received by the company and any data refinement. Conduct final checks and prepare back-up documentation. Explain and defend the methods used and findings. Explain the Company’s position regarding the results. Provide recommendations on the use of ACOSS results for class revenue requirement allocation decisions and comparison with MCS by class. Discuss how methods and recommendations comport with Commission precedent. 2.4. Class revenue target results 2.3– Draft ACOSS Model 2.4 – Final ACOSS Model 2.5 – Pre-filed direct testimony Table 3. Project Task 3 – Rate Design Subtask Description Support the Company in setting final class revenue requirements for Rate Year 1 based on the results of the ACOS study including PURA requirements. 3.2 – Review Existing Rates and Analyze Pros and Cons of Different Rate Design Alternatives Meeting with the Company to discuss need for improvement to move towards cost-based distribution rates Inform on use of MCS study to align rate components with efficient goals, Identify the appropriate level of customer charges and potential use of an optional multi-part rates to best ensure that a higher share of fixed costs is recovered in fixed charges or demand charges, as opposed to relying only on a fixed charge and on kWh charges, to most closely follow the marginal cost structure of distribution costs. 3.3 – Prepare Rate Design Enhancements including optional TOU rates and other structures 3.4 – Pre-filed Direct Testimony (potentially combined with MCS testimony) 3.1 – Guidance on Final Revenue Target by Class Working with the Company personnel, modeling of a suite of rate design options for consideration by the Company’s Rates team. Prepare presentation of draft rate design alternatives and finalize after receiving feedback from the Company. Review the foundation and rationale justifying Company’s proposed rate designs and how well they meet objectives of equity, efficiency and affordability. Discuss range of optional rates and how they can improve shifting of peak load and electrification based on industry experience Cover Agreement – CL&P ACOS and MCS CRA International Inc. Page 10 Eversource Confidential
  3. Page 11 of 238

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 2, 2026 ALLCO-027 Attachment 5 REDACTED Page 11 of 238 Post-filing Support Tasks Amparo Nieto, with support from her team, will perform the following expert witness role tasks: 5.4. • • • • • Support Direct Pre-filed Testimony (responses to information requests). Preparation of Rebuttal testimony, as needed. Assist in the Interrogation of Testimony as submitted by other parties. Attend Hearings for Cross Examination. Respond to In-Hearing Record Requests. • Assist in Drafting of Legal Brief submitted by the Commission. Project Timeline CRA is available to begin work as soon as early February. We anticipate that a complete draft ACOS and MCS studies will be ready by the fourth week of March, with final models of both studies completed during the week of April 20, subject to receiving all key required inputs. CRA will work with the Company to review available data expeditiously and ensure an efficient process. CRA’s team will meet and collaborate with the Company in the Rate Analysis task to guide final class revenue decisions, TOU period analysis and innovative rate options. This work can be expected to be completed by the week of April 27 well in advance of the rate case filing on June 2. Figure 2 illustrates the anticipated timeline for the pre-filing tasks. This timeline can be discussed at the kick of meeting, and CRA’s team can adapt to Company’s requirements as needed. The envisioned timeline for milestones includes potential need for updates to the draft studies, e.g., should the Company need to revise initial revenue requirement. Figure 1. Project Timeline for Pre-Filing Phase Cover Agreement – CL&P ACOS and MCS CRA International Inc. Page 11 Eversource Confidential
  4. Page 12 of 238

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 2, 2026 ALLCO-027 Attachment 5 REDACTED Page 12 of 238 6. TECHNICAL APPROACH OF THE MARGINAL COST OF SERVICE STUDY 6.1. The Role of a Marginal Cost Study The goal of a MCOS is to obtain a forward-looking view of the typical cost associated with a unit of incremental electricity usage over the study period, so that it is useful to set cost reflective charges in rates. We will discuss the details of the various alternatives at the onset of the project and will explain the rationale of our proposed approach. Progressing towards economically efficient rates ultimately is largely grounded on offering tariffs that allow the Company to more closely reflect the utility’s forward-looking cost of meeting incremental demand, i.e., marginal cost-based price signals. Such signals represent the economic impact of incremental customer loads, or cost savings from decremental peak load on the grid. Customers are ultimately encouraged to make efficient usage and investment decisions if the rate components are more aligned with appropriate relationships between fixed and variable cost of service, as well as by appropriate seasonality and cost-reflective time of use charges. The study will estimate timedifferentiated, system-wide average distribution value of load reductions, therefore will be helpful to inform the direction of reforms that would be suitable for Eversource’s distribution rate designs, in terms of rate structure, and rebalancing of revenue requirement by rate component, and improvements in Time of Use (TOU) rates. These rates are applicable to determine applicable rates to all retail customers, including those with customer-sited distributed generation (DG), and other distributed energy resources (DERs). It also provides information on the going forward marginal upstream distribution cost of meeting incremental peak load, which may be driven by addition of customers or incremental load by existing customers, such as those related to electric vehicles, or electric heat pump loads. Cover Agreement – CL&P ACOS and MCS CRA International Inc. Page 12 Eversource Confidential
  5. Page 13 of 238

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 2, 2026 ALLCO-027 Attachment 5 REDACTED Page 13 of 238 6.2. Use of engineering approach In the context of the utility distribution service, a forward-looking marginal cost analysis requires evaluating the utility’s response to an anticipated change in the use of the distribution system in a given hour, as well as incremental unit costs driven by changes in customer connections and customer service requirements. Thus, best practice marginal costing requires engineering-based methods that are consistent with system planning, i.e., the Company’s prevailing capital plan and design standards. We will review the expected peak load growth and meet with representatives of the planning group as well as potentially the load forecasting group to make sure that we are consistent in assumptions and inputs into the model. In the MCS study we will identify the three main elements of distribution service based on the respective cost drivers: Distribution costs that vary with expected growth in near-time peak load (substations and trunkline feeders) Distribution facility costs that vary with the long-term, maximum design demand of the customers expected to served (primary lines, secondary transformer, and secondary lines) Costs that are specific to the customer (meter and service drop, meter-reading and billing, customer accounting and customer services). 6.3. Approach to Estimate Costs 6.3.1. Marginal Distribution Substation and Primary Feeder Costs Ideally, the marginal study will capture the expected investment in distribution upstream station, distribution substation and trunkline primary feeder investment per kW of load growth over the study period. We will review the latest capital expansion plan, size and location of the distribution projects and identify the nature of the projects in consultation with the Company’s distribution planners to identify capital expansion that is mainly related to growth. We will compute the marginal cost of distribution stations, by dividing the identified peak-load related station investments by the station project’s added capacity. We will verify with the Company what the current reliability standards at each voltage level are. The distribution substation and primary feeder marginal costs, both determined as an average of capacityexpansion areas and as a system-wide average marginal cost estimate, will be annualized using an economic carrying charge (ECC) and will incorporate marginal O&M expenses and loading factors. All marginal cost calculations require developing economic carrying charges for annualizing investment. The study also requires estimating operating and maintenance expenses for each type of marginal plant, estimating marginal corporate overheads such as general plant and administrative and general expenses, estimating losses to convert to costs at the meters of customers, and identifying loaders for marginal working capital. Marginal costs will be summarized by pricing periods suitable for TOU tariffs. Cover Agreement – CL&P ACOS and MCS CRA International Inc. Page 13 Eversource Confidential
  6. Page 14 of 238

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 2, 2026 ALLCO-027 Attachment 5 REDACTED Page 14 of 238 6.3.2. Marginal Local Distribution Facilities Costs Another component of the distribution marginal cost study is the cost associated with connecting a new customer to the grid. The costs involved in distribution connections may involve a new line transformer, investment in primary lines, and/or secondary lines. These local facilities must be sized sufficiently large to meet the expected maximum demand of the customers that will be connected to them over their service life. The costs vary depending on type of area served, including customer density (urban, rural), and type of customer use (industrial versus primarily residential). Single versus three-phase connections also determine the specific design demand. We will rely on the Companies’ work order system to review the range of historical line extension jobs to obtain a range of connection scenarios (single vs poly-phase, residential subdivisions vs. commercial, etc.) and the costs associated with the connection. To the extent that some of the scenarios are not included in recent history, we would request calculations for specific applications or scenarios from distribution engineers, net of customer contributions. 6.3.3. Marginal Customer Costs We will review the current installed cost of a typical meter and service drop by rate class and add an estimate of marginal meter O&M costs, based on recent meter O&M expenses and assuming that the meter O&M is proportional to the cost of the meter in order to estimate meter O&M differentiated by rate class. Customer accounts expenses, composed mainly of meter-reading and billing expenses, and customer service and informational expenses, are function of the number of customers on the system and may reflect relative cost differences based on requirements by class. The MCOS study will apply weighting factors developed for customer accounts and customer service and informational expenses by class excluding any cost associated with energy efficiency programs and apply to recent per-customer expense to develop future marginal expense of these set of accounts. 6.3.4. Streetlighting The MCS study will incorporate marginal cost in today’s dollars, of system-related service consisting of customer and demand components that apply to any fixture connected to the Company’s distribution system, regardless of ownership. The customer component applies monthly to each fixture connected to the Company’s system, while the demand component is a uniform rate per watt that applies to the rated wattage of each fixture under either rate schedule. These two charges are combined to form the total charge per fixture each month for the system component of distribution service. The components of total installed cost of each type of equipment will be annualized using the appropriate economic carrying charge. 6.1. Other important elements of the MCS Study This section provides additional details of the proposed approach for the MCS study. 6.1.1. Timeframe Factors that affect the robustness and applicability of the results for rate design include the time frame considered for the study. To be useful for efficient price signals in rates, the chosen timeframe must reasonably capture the period the rates are going to be in effect. Our initial recommendation is to use a Cover Agreement – CL&P ACOS and MCS CRA International Inc. Page 14 Eversource Confidential
  7. Page 15 of 238

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 2, 2026 ALLCO-027 Attachment 5 REDACTED Page 15 of 238 timeframe that is consistent with the Company’s distribution capital expansion plan. Going beyond the expansion plan to evaluate marginal costs may limit the precision of the marginal cost estimates. 6.1.2. Locational granularity The study will look at marginal costs by distribution substation area in the capital plan and in additionally, we will offer to review particular feeders of other high growth areas. Marginal investment in a given substation and trunkline feeder divided by project capacity added, can be restated as dollar per peak load growth that is driving the need for the investment. 6.1.3. Sensitivity scenarios Time of Use rates consider peak-related marginal costs over several years, and might need to be revisited as solar DG and EV use increase over time. We propose to undertake a marginal cost study sensitivity that would review how the distribution peak load could be expected to increase from electrification goals in the upcoming five years and how it would affect the capacity of the system but for the existence of the improved and more granular seasonality in TOU distribution rates. 6.2. Calculation of Marginal Costs Revenues Our MCOSS model will allow computing marginal cost revenues by customer class. This step will be important in using marginal costs as a floor for rate design and special contract design. We will also work with the Company to discuss how these results can be used as an input for decisions on class revenue requirements along with ACOS study results. 6.4. Deliverables The deliverables of the MCS study will be: • • • • A draft and Final MCOS Model, which will provide a summary of marginal unit cost by cost component and TOD to compare with current rates A presentation with the main findings of the MCOS Study and application to rate design A presentation of the results of the hourly probability of peak that assigns annualized cost to different hourly periods by daytype and month, informing the decisions on appropriate TOU periods. Pre-filed direct testimony with an overview of the overall MCOS methods and results, cost of service principles and the advantages of the chosen approaches over other methods The MCOS studies will be flexible and able to fully support any service class re-alignment or rate restructuring that the Companies propose. We will review the results with the Company via a PowerPoint presentation to go over the main findings and clarify any questions. We will provide complete documentation of all inputs and sources to enable the Company’s staff to update the studies in the future. We note that the model should be considered proprietary and therefore the Company will be able to use it for rate case, but it may only be shared with rate case intervenors if they agreed to the appropriate protective Orders of the rate case. Cover Agreement – CL&P ACOS and MCS CRA International Inc. Page 15 Eversource Confidential
  8. Page 16 of 238

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 2, 2026 ALLCO-027 Attachment 5 REDACTED Page 16 of 238 7. TECHNICAL APPROACH FOR THE ALLOCATED COST OF SERVICE STUDY 7.1. PURA Requirements In PURA Docket No. 17-10-46, Eversource/CL&P did use the Minimum System methodology in its Cost of Service Study (COSS), and PURA explicitly accepted continued use of that approach to guide revenue allocation and class rate design targets. 7.2. Approach CRA will develop an overview of the ACOSS with methods supported by the Authority and aligned with best practice theoretical foundation, Work will involve classification and functionalization of costs in accordance with how they are incurred (demand- or customer related); development and assignment of cost allocators according to their function and classification; allocation of costs to each rate class; potential allocation of costs on a time varying basis; and calculation of the revenue “excess” or “deficiency” by rate class relative to the revenue requirement. ACOS studies are used as a guide in the Company’s revenue allocation, by allocating costs (test-year plant and expenses) to each customer class according to the appropriate functionalization, classification, and allocation methods. The ACOS study allows establishing appropriate class cost responsibility, and inform changes in overall rate revenues that are required to ensure that each class Rate of Return (“ROR”) gets closer to the average Company’s proposed ROR. This means that classes with below system average rates of return (as calculated within the COSS) may need to be allocated a greater than average percentage distribution increase, while those classes with above system average rates of return would receive a lower than average percentage increase. CRA will run a “proforma” ACOS study (based on the per books study, but adjusted for known and measurable changes, and other adjustments, including the revenue requirement. Earlier in the process, we will review how the proposed revenue requirement that the Company will prepare for the test year is factored into the proforma version of the ACOS study. The ACOS model will include the classification of distribution costs between directly assigned, demand, customer and revenue-related, and the allocation of embedded costs among its rate classes. At the initial stage we will include any preliminary information available on all inputs in accordance with total company cost of service for the test year. Final ACOS result sheets will show: • A summary of the current revenue, operating expense and earned ROR relative to the allocated Proforma rate base for each rate class; • A summary of the calculated revenue excess or deficiency of each rate class when applying the proposed ROR on a levelized basis across all rate classes. • A breakdown by rate class of the proposed Rate Year 1 revenue requirement into customer and demand related components; and a calculation of corresponding unit costs. • Back up worksheets will detail the calculation of costs by component represented in the summary pages of the ACOS model. Specific Summary pages are listed in “ACOS workpapers section”. Cover Agreement – CL&P ACOS and MCS CRA International Inc. Page 16 Eversource Confidential
  9. Page 17 of 238

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 2, 2026 ALLCO-027 Attachment 5 REDACTED Page 17 of 238 • A comparison of Current versus Proposed Rate of Return by class. 7.2.1. Steps in ACOS approach The elements of ACOS study approach that we expect to review and discuss with the Company in the early stage of modelling will include the following aspects: The classification of costs, previously functionalized in the Company’s revenue requirement model. CRA will conduct the breakdown between customer and demand-related component of the distribution primary and secondary system using the results of the Minimum System Approach for accounts. CRA will review any relevant worksheets or exhibits from the latest ACOS study in particular the classification step and the allocation factors for the test year and discuss any potential enhancements in the method for the Company’s consideration. The proposed allocation approach will include review of the availability of the data necessary and guidance as to the development of required allocation factors, with criteria indicated below: • how primary and secondary costs will be allocated to customers depending on their voltage level of service, the street lighting cost allocation method, and the underlying assumptions to develop allocators for each test year (actual and pro-forma). • The method to assign line transformer costs to customers may include a combination of weighted customer count, for the customer-related component, and the demand-related costs • The basis and method to produce weighted customer counts to allocate services and meter costs. 7.2.2. Minimum system study The MS has a long history of development and application across the country, and the Authority ordered the Company to continue using it in its decision at the last rate case. We have assumed that the Company will prepare the Minimum System Study, with our support and feedback. CRA will review the input data into the study, and in particular: • The choice of minimum size by relevant account • The separation between primary and secondary, overhead and underground as feasible • The application of Handy-Whitman index • The method to calculate population for each feeder and transformer type CRA will review the inputs and provide any feedback if needed to make the analysis more robust or objective. Once results are available, CRA will meet with the Company to review the results, alignment with prior rate case study and what drives the difference. 7.3. Deliverables The main deliverables for the ACOS study will include: 1. ACOS Model and external back-up files. Sensitivity will be incorporated into the ACOS model so that the Company can test different allocators (NCP, CP, INCP, Probability of Peak factors, others.) Cover Agreement – CL&P ACOS and MCS CRA International Inc. Page 17 Eversource Confidential
  10. Page 18 of 238

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 2, 2026 ALLCO-027 Attachment 5 REDACTED Page 18 of 238 2. Periodic calls and brief notes with progress report on the ACOS model and findings, discussions on classification and cost allocation approaches, and modifications as necessary for a more robust ACOS approach. 3. Exhibits with calculations of class revenue requirements supporting the Company’s proposals on revenue targets. 4. Exhibits with calculations supporting the Company’s proposed distribution rate designs. 5. Pre-filed direct testimony (draft and final) explaining ACOS methods and results, recommendations in revenue requirement allocation by class and distribution rate designs. We will produce a draft and a final ACOS study, and will be sure that the model is thoroughly checked and that all assumptions used are transparent and discussed with the Company. 7.1. Alignment between ACOS and MCOS Studies CRA will work with the Company’s Rates team to make sure that the assumptions used for the ACOS study are appropriate and consistent with assumptions used for the MCOS study. The ACOS study includes some information that is also used in the development of marginal cost estimates, including test-year installed cost of distribution equipment, such as transformers, meters, service drops; test year customer class allocations of customer service and information expenses, as well as customer account expenses (which were an input to the calculation of customer weighting factors in the MCOS); and peak load data by region. The typical local distribution configurations used in the MCOS study will be helpful to the development of factors employed in the minimum size methodology in the ACOS study. 8. RATE DESIGN APPROACH 8.1. Overview of Rate Design Considerations CRA will develop robust and defensible cost allocation and marginal cost studies that will jointly inform the Company on (a) appropriate class cost responsibility based on cost causation as per the ACOS and on (b) the needed revenue recovery from individual rate components, i.e., potentially applying differentiated increases to customer charges, vs. volumetric charges, as well as appropriate adjustments to demand charges for those classes that are demand-metered using largely the results of the MCOS analysis and ensuring the right provision of incentives. Innovative rate structures, which introduce more cost-reflective time-differentiation, as well as rates that reflect a more appropriate allocation of costs to the various components in alignment with cost causation, have a higher likelihood of providing customers with the right economic incentives, compared to legacy rates, that no longer reflect the underlying marginal cost of service across hours of the day, and/or seasons, or components. We will complete a review of existing rates and discuss modifications to each of the rate components as informed by the study results. Our review will include an evaluation of the appropriateness of the Company’s customer rate designs, including whether the rates reflect price signals consistent with marginal costs. CRA will review these and other areas and provide recommendations based on study results and rate design expertise. We will review including appropriate TOU periods and seasons, potential to streamline any Cover Agreement – CL&P ACOS and MCS CRA International Inc. Page 18 Eversource Confidential

Text of ALLCO-027 Attachment 7 REDACTED (1).pdf

Extracted from the file · 41 pages, 19 without text · 46,195 characters

As listed on the current system

Question(s) Answered 27 (CL&P dba Eversource Energy) Date Filed: 09/24/2026

This filing on the current system (opens in a new tab)