  1. Page 5 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 17, 2026 ALLCO-081-SP01 Attachment 2 Page 5 of 14 Backcasting: Estimating CL&P’s Standard Service rate during January – June 2023 Cost Components (¢/kWh) Wholesale Power Suppliers (existing method) Millstone PPA + Residual Needs from Spot Market Energy 4.93 Supplier Profit/Risk Premium Spot Market Procurements to Self-Supply 4.45 0 2 2 0.1 0.1 Mystic RMR 0.6 0.6 Renewable Portfolio Standard 1.2 1.2 Adjustments/Distribution line losses 0.19 0.18 Capacity Ancillary Services 23.912 Total (¢/kWh) 23.912 9.0 8.5 Cost to Customers ($) $1 billion $388 million $367 million Notes: Estimate that Millstone PPA covers 62% of Standard Service obligation. Distribution line losses = 2%. Market-based procurement costs rely on preliminary ISO-NE data for January through June 2023. 4 Safety First and Always
  2. Page 6 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 17, 2026 ALLCO-081-SP01 Attachment 2 Page 6 of 14 Backcasting: Estimating CL&P’s Standard Service rate during January – June 2022 Cost Components (¢/kWh) Wholesale Power Suppliers (existing method) Millstone PPA + Residual Needs from Spot Market Spot Market Procurements to Self-Supply 9.76 Energy 7.45 Supplier Profit/Risk Premium 0 2 2 0.1 0.1 Mystic RMR 0.1 0.1 Renewable Portfolio Standard 1.2 1.2 Adjustments/Distribution line losses 0.29 0.36 Capacity Ancillary Services 11.292 Total (¢/kWh) 11.292 11.14 13.52 Cost to Customers ($) $584 million $577 million $699 million Notes: Estimate that Millstone PPA covers 57% of Standard Service obligation. Distribution line losses = 2%. Energy component using on DA LMPs from ISO-NE for January through June 2022 and estimates for other components 5 Safety First and Always
  3. Page 7 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 17, 2026 ALLCO-081-SP01 Attachment 2 Page 7 of 14 Backcasting: Estimating CL&P’s Standard Service rate during January – June 2021 Cost Components (¢/kWh) Wholesale Power Suppliers (existing method) Millstone PPA + Residual Needs from Spot Market Spot Market Procurements to Self-Supply 4.3 Energy 5.23 Supplier Profit/Risk Premium 0 2.2 2.2 0.16 0.16 Mystic RMR n/a n/a Renewable Portfolio Standard 1.2 1.2 Adjustments/Distribution line losses 0.29 0.26 Capacity Ancillary Services 8.366 Total (¢/kWh) 8.366 8.88 7.92 Cost to Customers ($) $396 million $420 million $375 million Notes: Estimate that Millstone PPA covers 73% of Standard Service obligation. Distribution line losses = 2%. Energy component using on DA LMPs from ISO-NE for January through June 2021 and estimates for other components 6 Safety First and Always
  4. Page 8 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 17, 2026 ALLCO-081-SP01 Attachment 2 Page 8 of 14 Key Take-Aways ▪ Standard Service was designed to be an all-inclusive, premium service with wholesale suppliers whereby: – Suppliers take on the risk of market price and load volatility. ▪ New England power markets are becoming highly volatile and risky with the retirement of base load units and a shortage of natural gas supply ▪ High volatility and risk for suppliers increases the profit/premiums demanded by wholesale suppliers, translating into high prices for customers. ▪ Using Millstone and Seabrook fixed-price contracts to substitute for wholesale supply in a high supply-cost market will reduce costs for customers. – In a high-cost environment, the fixed-price contracts provide a lower cost supply, providing customers with substantial savings in periods where market dislocations, lack of market liquidity, global supply shortages, and/or extreme weather are causing volatility and risk to increase for wholesale suppliers. – Requires a limited change in law to allow the use of these contracts to supply Standard Service directly. – To the extent that Millstone and Seabrook are used for Standard Service, there will no corresponding credit or charge to the NBFMCC. ▪ Using the spot market to augment Millstone and Seabrook contracts will transfer some risk to customers. Safety First and Always 7
  5. Page 9 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 17, 2026 ALLCO-081-SP01 Attachment 2 Page 9 of 14 APPENDIX 8 Safety First and Always
  6. Page 10 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 17, 2026 ALLCO-081-SP01 Attachment 2 Page 10 of 14 CL&P’s Share of Millstone Net Generation, 1H 2023 800,000 700,000 600,000 500,000 MWh 400,000 300,000 200,000 100,000 0 2023-01 2023-02 2023-03 2023-04 2023-05 2023-06 Note: Millstone Unit 2 went offline starting on April 6, 2023 and was back online on June 30, 2023. Millstone Unit 3 went offline starting on May 30, 2023 and was back online on June 29, 2023 9 Safety First and Always
  7. Page 11 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 17, 2026 ALLCO-081-SP01 Attachment 2 Page 11 of 14 CL&P’s expected purchases under PPA’s, 2023-30 12,000,000 10,000,000 MWh 8,000,000 6,000,000 4,000,000 2,000,000 0 2023 2024 Millstone 2 & 3 2025 Seabrook 2026 2027 Revolution Wind 2028 2029 2030 Park City Wind 10 Safety First and Always
  8. Page 12 of 14Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 17, 2026 ALLCO-081-SP01 Attachment 2 Page 12 of 14 What Does This Mean? Events Wholesale Power Suppliers (existing method) Large Outage (higher LMPs) Winter Supply Constraints (higher LMPs) Warm Winter (lower LMPs and lower demand) Cold Winter (high LMPs and higher demand) Customers Leave Standard Service Customers pay higher costs Price Stability. No impact to ratepayers because customers are paying embedded risk premium in fixed price Customers Return to Standard Service Rate Reconciliation (True-Ups in subsequent rate periods) Using Millstone and/or Spot Market Customers pay higher costs Customers pay lower costs Customers pay higher costs Customers pay higher costs Increase reliance on spot market Minimal Could be substantial 11 Safety First and Always
  9. Page 13 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 17, 2026 ALLCO-081-SP01 Attachment 2 Page 13 of 14 2022 PPA Generation vs Standard Service & Total Load Note: Excludes Last Resort Service 12 Safety First and Always
  10. Page 14 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 17, 2026 ALLCO-081-SP01 Attachment 2 Page 14 of 14 Percent of Load Served (Migration): January 2022 – June 2023 13 Safety First and Always

As listed on the current system

Question(s) Answered 81 (Connecticut Light and Power Company dba Eversource) Date Filed: 11/19/2026