Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 1, 2, 3, 4, 5, 6, 7, 11, 12, 13

ResponseFiled by The Connecticut Light and Power Company dba Eversource Energy18 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files18

Text of CIEC-002 Attachment 1.xlsx

Extracted from the file

Text of CIEC-003_final.pdf

Extracted from the file · 1 page · 752 characters

Text of CIEC-003 Attachment 1.pdf

Extracted from the file · 7 pages · 36,165 characters

Text of CIEC-003 Attachment 1.xlsx

Extracted from the file

Text of CIEC-004_final.pdf

Extracted from the file · 1 page · 706 characters

  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-01 Date Issued August 04, 2026 CIEC-005 Page 1 of 1 Date Filed: August 18, 2026 Witness: Amparo Nieto Request from: Connecticut Industrial Energy Consumers Question: (Amparo Nieto (ACOSS)) Explain the rationale behind the decision to allocate meter plant as described on page 6, lines 21 through 25, of Nieto’s Direct Testimony. Include in your response workpapers in their native format with all cells and formulae unlocked (if applicable) that demonstrate how the meter plant allocators were determined. Response: The Company calculated the total loaded meter plant cost for each rate class, using as the basis for this calculation the meter types that are currently used to provide meter services for each class, the number of meters of each type, and the unit installed loaded cost per meter type. The loaded meter plant costs include loaded labor costs, and any use of vehicle and IT-related costs involved in installation. Once these costs are calculated for the range of meter types used in a class, the costs were summed for each customer class. The resulting class-based allocated costs form the basis for the ACOS allocation factors. The explanation at page 6, lines 21-25, in Ms. Nieto’s Direct Testimony is meant only to reflect that the meter plant allocation factors are not merely based on the number of meters by class, rather the factors also reflect the relative unit cost differentials among the meter types used for different customer classes. The class weighting factors were computed for informational purposes. The workpaper associated with the class allocation factor for meter plant is provided as CIEC-005, Attachment 1.

Text of CIEC-005 Attachment 1.pdf

Extracted from the file · 1 page · 3,469 characters

Text of CIEC-005 Attachment 1.xlsx

Extracted from the file

Text of CIEC-006_final.pdf

Extracted from the file · 1 page · 556 characters

Text of CIEC-007_final.pdf

Extracted from the file · 1 page · 554 characters

Text of CIEC-011_final.pdf

Extracted from the file · 1 page · 1,273 characters

Text of CIEC-011 Attachment 1.pdf

Extracted from the file

Text of CIEC-011 Attachment 1.xlsx

Extracted from the file

Text of CIEC-012_final.pdf

Extracted from the file · 2 pages · 2,797 characters

Text of CIEC-013_final.pdf

Extracted from the file · 1 page · 1,752 characters

As listed on the current system

Question(s) Answered 1, 2, 3, 4, 5, 6, 7, 11, 12, 13 (The Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/18/2026

This filing on the current system (opens in a new tab)